CASE STUDIES
WITH
RBI GRADE-81 IN
INDIA
Page 1 of 38
RBI GRADE-81
CASE STUDY 1
A. Project: Construction of the Diversion (160m x 11m) with RBI Grade-81. The
site is located at NH-9 Ch. 91+700 RHS near Chityala village , Hyderabad
B. Design: GMR, themselves designed the road, and RBI Grade-81 provided the
technical support to construct the road
BC : 50mm
(Soil + 4% RBI Grade-81) : 225mm
GSB : 100 mm
Compacted Subgrade
Page 2 of 38
RBI GRADE-81
C. Field Evaluation
To evaluate the performance of constructed Diversion the strength parameters are
evaluated with the help of the following Equipment:-
Geo Gauge
Digital Static cone Penetrometer (DSCP)
Geo Gauge Testing
Geo Gauge Results
YOUNG'S Average
STIFFNESS (MN/m) CBR (%)
MODULUS (MPa) CBR (%)
35.04 454.90 356.3
33.94 335.19 341.8 357.63
35.92 506.50 374.8
Note: The above tests are performed over asphalt layer of 50mm
Digital Static Cone Penetrometer (DSCP)
DSCP Results
DSCP Reading
Sr. No. Force (kg/cm²) Penetration (mm)
1 38 5
2 42 5
3 42 2
4 41 5
5 40 5
Conclusion:
1. The stabilization of road successfully completed with RBI Grade-81 in two
layers.
2. The work completed within 4 days.
3. The Road is in good condition till date.
4. The average CBR value of the stabilized layer with RBI Grade-81 as per Geo
Gauge Test is 357.63.
5. The CBR results obtained on the soil + RBI grade-81 layer and the
performance (structural & functional) suggest that the layer has successfully
withstood the traffic and the same design can be used at other places also.
6. The DSCP results shows the bearing capacity of Diversion, at the average
penetration of 4.4mm is 40.60kg/cm2
The bond between soil stabilized layer and bituminous layer is strong and intact.
Page 3 of 38
RBI GRADE-81
CASE STUDY 2
A. Project: - Subgrade Stabilization of an ALG at Nyoma(13,500 ft altitude),
Ladakh
Page 4 of 38
RBI GRADE-81
C. Soil Laboratory Results :- the Local soils from site were tested with RBI-81
in Laboratory, the values obtained are given in table 1 below
The majority of soils above fall in the category of silty-sand and sandy-silt. There is
only one soil ‘DD’ which has very high percentage of clay.
D. Field Evaluation
E. Conclusion
Page 5 of 38
RBI GRADE-81
CASE STUDY 3
A. The Project: Construction of RBI Grade-81 Road (110m X 9m) on NH-22, Near
Fagu Village Kufri, Shimla, Himachal Pradesh.
BC 40mm
Stabilized Base (50% SD+50% 150mm
Aggregate+5% RBI -81)
Page 6 of 38
RBI GRADE-81
C. Field Evaluation
i. Dynamic Cone Penetrometer (DCP)
CBR (%)
Test No. Locations As per DCP
1 50 m 140
2 75 m 180
3 100m 190
D. Conclusion:
1. The work completed within 2 days.
2. The performance of road till date is satisfactory.
3. The average CBR value of the stabilized layer with RBI Grade-81 as per DCP
Test is 167.50.
4. The CBR results obtained on the Aggregate layer + RBI grade-81, and the
performance (structural & functional) suggests that the layer has successfully
withstood the traffic and low temperatures, and the same design can be used
at other places also.
5. The average compactable factor (s/v) values obtained from Light Weight
Deflectometer test are less than 3.
6. The dynamic deflection values obtained from Light Weight Deflectometer test
are above 50MN/m2 which satisfies the design requirement.
7. The average value of the UCS cores is 17.40 kg/cm2
8. Successfully performed 2 seasons of snow bearing all freeze & thaw
conditions & heavy traffic.
Page 7 of 38
RBI GRADE-81
CASE STUDY 4
SDBC = 25mm
Compacted Subgrade
Page 8 of 38
RBI GRADE-81
The field evaluation study is conducted on RBI-81 Section and controlled section
(Conventional Adjoining Crust). The conventional section has 150mm WBM layer as
base course. The evaluations and Result obtained are given below
i. Visual Observation :-
D. Conclusion:-
1. RBI Grade-81improves the engineering properties of soil, especially CBR.
2. The RBI-81 section is performing excellent , even under overloaded mine
trucks
3. The stabilized layer performance shows that RBI-81 technology can replace
the aggregate usage in pavement.
4. The adhesion between stabilized layer and bituminous layer is intact and
strong.
Page 9 of 38
RBI GRADE-81
CASE STUDY 5
A. The Project: Construction of CNN to KOLO Road, 600m length, with RBI Grade-
81 at Hardoi (UP), under Construction Division-2 (PP) PWD Hardoi.
B. Design:
Page 10 of 38
RBI GRADE-81
C. Field Evaluation
To evaluate the performance of the RBI grade-81 pavement, the strength
parameters are evaluated with the help of following Equipment:
i. Geo Gauge
D. Discussions:
1. The stabilization of road successfully completed with RBI Grade-81.
2. The work completed within 15 days.
3. The performance of road till date is satisfactory.
4. The average CBR value as per Geo Gauge readings is 234.69 of the
Pavement.
5. The average CBR value of Aggregate (with 4% RBI-81) layer is (CBR>200)
and Soil (with 3% RBI-81) layer is 135 as per DCP values.
6. The value of UCS cores is 3.36 MPa & 3.35 MPa.
7. The stabilized layer with RBI Grade-81 result shows that, the layer can be
used as a replacement of WBM and crushed aggregate layer in flexible
pavement, depth may be vary as per the pavement design requirement.
Page 11 of 38
RBI GRADE-81
CASE STUDY 6
A. Project: - Durbal –Hanjik Road , PWD(R&B), Srinagar J&K
B. Design: - The design adopted for the above project is give in table1 below
Page 12 of 38
RBI GRADE-81
The field evaluation study is conducted on RBI-81 Section with two different designs
as give above in table 1
i. Visual Observation :-
Maximum Average
Sr. No Section
Observation Points Observation Points
1 1 56.6
70
2 2 60.25
Field CBR, %
Sr. No Section
Soil +3% Soil +2%
Subgrade
RBI-81 RBI-81
1 1 5 84 68
2 2 6 - -
Roughness Value ,
Sr. No Section
mm/Km
1 With RBI Grade-81 1936
2 Conventional 1874
D. Conclusion:-
1. RBI Grade-81improves the engineering properties of soil, especially CBR.
2. The RBI-81 section is performing to satisfaction even under freeze and thaw
condition
3. The stabilized layer performance shows that RBI-81 technology can replace
the aggregate usage in pavement.
4. The adhesion between stabilized layer and bituminous layer is intact and
strong.
5. The overall performance of both the RBI-81 section after 2 years (now 5
years) is satisfactory, although section 2 is performing slightly better than
section 1.
Page 13 of 38
RBI GRADE-81
CASE STUDY 7
A. Project: - PWD Road, Thenzwal Mizoram.
Page 14 of 38
RBI GRADE-81
C. Field Evaluation
D. Conclusion:
Page 15 of 38
RBI GRADE-81
CASE STUDY 8
A. The Project: Un-Paved road in DRDO complex , Narhar Pilani , Rajasthan
B. Design:
Page 16 of 38
RBI GRADE-81
C. Field Evaluation
To evaluate the performance of the RBI grade-81 pavement, the strength
parameters are evaluated with the help of following Equipment:
i. Geo Gauge
Average Young's
Average Stiffness (Mn/m) Average CBR (%)
Modulus (Mpa)
CENTE
LHS CENTER RHS LHS RHS LHS CENTER RHS
R
16.71 15.51 17.40 144.82 134.61 150.95 85.21 74.60 92.29
D. Discussions:
1. The work completed within 10 days.
2. The performance of road till date is satisfactory, even when majority of
construction material is routed through this section.
3. The average CBR value as per Geo Gauge readings is above 84.
4. The average elastic modulus of pavement obtained through LWD is above 50
Mn/M2, it satisfies the design requirement
5. No repair has taken place in 3 years.
Page 17 of 38
RBI GRADE-81
CASE STUDY 9
A. Project: - Recycling Of Bangalore University, Internal Road, With RBI-81.
Page 18 of 38
RBI GRADE-81
C. Field Evaluation
i. Geo Gauge Test Results
Unevenness
Surface
Mm/km
SDBC 2320
D. Conclusion:
Page 19 of 38
RBI GRADE-81
CASE STUDY 10
A. Name of Project: - Widening and Strengthening Of Existing Carriageway of NH-58
from KM. 131 to KM. 211 in the State of UP-Uttarakhand.
C. Discussion :-
1. It is first project in India where Automatic Stabilizing Equipment , for in situ
application (STEHR) is used
2. The performance of stretch so far is satisfactory.
Page 20 of 38
RBI GRADE-81
CASE STUDY 11
A. Project: NICE Expressway (Bangalore – Mysore)
B. Design: - The design adopted for the above project is
Existing Surface
Page 21 of 38
RBI GRADE-81
CASE STUDY 12
A. Project Name: - Widening, Reconstruction and Strengthening of Kashipur -
Thakurdwara 6.06 km Motor Road SH-45, District Udham Singh Nagar, Uttarakhand.
B. Design:-
BC = 50mm
DBM = 50mm
24% 20mm+24%10mm+48% Stone Dust+4%RBI Grade-81 = 150 mm
24.5% 20mm+24.5%10mm+49% Stone Dust+4%RBI Grade-81 = 150 mm
RBM Layer (As profile Correction) = 100 mm
Page 22 of 38
RBI GRADE-81
C. Laboratory Test :-
Table3: Cube test for Quality Control at G.B. Pant University, Pant Nagar
Compressive
Sr. Average Load
Composition Curing in Days Strength
No. (KN)
(MPa)
1 24% 10mm+24% 7 Days Saw Dust Curing 66.08 2.94
2 20mm+48% Stone Dust+4% 14 Days Saw Dust Curing 88.16 3.92
RBI Grade-81
3 28 Days Saw Dust Curing 121.16 5.12
4 24.5% 10mm+24.5% 7 Days Saw Dust Curing 26.57 1.20
5 20mm+49% Stone Dust+2% 14 Days Saw Dust Curing 42.05 1.88
6 RBI Grade-81 28 Days Saw Dust Curing 41.35 1.83
E. Conclusion:
1. The Road is in good condition even after one monsoon has passed.
2. There is a strong bond found between the RBI Grade-81 stabilized layer and
the bituminous layer.
3. The cube samples have shown desired strength, before and during
construction
Page 23 of 38
RBI GRADE-81
CASE STUDY 13
A. Project Name: - Construction of PMGSY Road from Kodoli to Bhabul Gaon,
Jalna, Maharashtra.
B. Design:-
PMC with Seal Coat = 20mm
25% 20mm + 75% Soil + 3%RBI Grade-81 = 100 mm
GSB = 100 mm
Modified Subgrade = 150 mm
Page 24 of 38
RBI GRADE-81
CASE STUDY 14
A. Project Name: - Construction of Rural Road of Udumalaipeth, Tamil Nadu.
B. Design:-
PMC with Seal Coat = 20mm
25% 20mm + 75% Soil + 2.75% RBI Grade-81 = 150 mm
Page 25 of 38
RBI GRADE-81
CASE STUDY 15
A. Project Name: - Construction of PMGSY Road Sonegaon Gunthala, Nagpur,
Maharashtra.
B. Design:-
PMC with Seal Coat = 20mm
25% 20mm + 75% Soil + 3%RBI Grade-81 = 100 mm
Page 26 of 38
RBI GRADE-81
CASE STUDY 16
A. Project Name: - Construction of PMGSY Road from Lasurgaon to Amanatpur,
Aurangabad, Maharashtra.
B. Design:-
PMC with Seal Coat = 20mm
25% 20mm + 75% Soil + 3%RBI Grade-81 = 100 mm
Page 27 of 38
RBI GRADE-81
CASE STUDY 17
A. Project Name: - Construction of Internal Road of Aqasia, Bhiwadi, Rajasthan.
B. Design:-
CC (M-25) = 100mm
25% 20mm + 75% Soil + 3% RBI Grade-81 = 170 mm
Page 28 of 38
RBI GRADE-81
CASE STUDY 18
A. Project Name: - Construction of PMGSY Road from Satrina to
Kawacherwan(Stage-II), Pkg-JK 13-68, Srinagar, J&K.
B. Design:-
SDBC with seal Coat = 25mm
25% 20mm + 75% Soil + 4%RBI Grade-81 = 125 mm
GSB = 150 mm
Subgrade = 300 mm
Page 29 of 38
RBI GRADE-81
CASE STUDY 19
A. Project Name: - Construction of the approach road of ROB near Mirzapur
Railway Station, Mirzapur Uttar Pradesh
B. Design:-
BC = 40mm
25% 20mm+25% 10mm+50% Stone Dust+4% RBI Grade-81 = 150 mm
GSB = 100 mm
Soil + 2% RBI Grade-81 = 150 mm
Page 30 of 38
RBI GRADE-81
C. Field Evaluation
To evaluate the performance of the approach road constructed with RBI Grade-
81. The strength parameters are evaluated with the help of following equipments:
Geo Gauge
Dynamic Cone Penetrometer ( DCP)
Light Weight Deflectometer (LWD)
Nuclear Density Gauge (NDG)
YOUNG'S Average
STIFFNESS (MN/m) CBR (%)
MODULUS (MPa) CBR (%)
28.64 248.61 241
31.38 272.38 289 266
30.46 264.36 270
Note: The above tests are performed over asphalt layer of 40mm
Dynamic Cone Penetrometer (DCP)
CBR (%)
Test No. Locations As per DCP
1 50 m 155
Page 31 of 38
RBI GRADE-81
D. Discussion
The average CBR value as per Geo Gauge readings 266. The CBR of sub
base is 155% as per DCP.
The Nuclear density gauge has provided average density of 2.15 g/cc. at 200
and 250 mm depth at both the Location of ROB Approach Road.
The dynamic deflection values obtained from Light Weight Deflectometer test
are above minimum requirement of 50MN/m2. which satisfies the design
requirement.
E. Conclusion
All the test results obtained satisfy the pavement requirement.
The stabilized layer with RBI Grade-81 result shows that, the layer can be use
as a replacement of WMM and crushed aggregate layer in flexible pavement,
depth may be vary as per the pavement design requirement.
The bond between soil stabilized layer and bituminous layer is strong and intact.
Page 32 of 38
RBI GRADE-81
CASE STUDY 20
A. Project Name: - Construction of the approach road of ROB at Purania, Aliganj,
Lucknow, Uttar Pradesh
B. Design:-
BC = 40mm
DBM = 60mm
WMM = 250mm
25% 20mm+25% 10mm+50% Stone Dust+3% RBI Grade-81 = 100 mm
Page 33 of 38
RBI GRADE-81
C. Field Evaluation
To evaluate the performance of the approach road constructed with RBI Grade-
81. The strength parameters are evaluated with the help of following equipments:
Geo Gauge
Dynamic Cone Penetrometer ( DCP)
Light Weight Deflectometer (LWD)
Nuclear Density Gauge (NDG)
YOUNG'S Average
STIFFNESS (MN/m) CBR (%)
MODULUS (MPa) CBR (%)
20.30 176.07 116.40
21.46 186.15 130.00
23.11 201.36 129.45
151.10
20.12 174.57 120.30
CBR (%)
Test No. Locations As per DCP
1 Stabilized layer Puraniya side LHS CBR>200
2 Stabilized layer Puraniya side Centre CBR>200
3 Stabilized layer Sitapur side LHS 150
LWD Reading
Sr. No. s/v (ms) Evd (MN/m2)
1 2.94 54.5
2 3.11 97.0
3 2.72 70.5
4 2.93 63.7
5 3.02 73.9
Page 34 of 38
RBI GRADE-81
D. Discussion
The average CBR value as per Geo Gauge readings is 129 of the Pavement.
The dynamic deflection values obtained from Light Weight Deflectometer test
are above minimum requirement of 50MN/m2
E. Conclusion
All the results after one month of construction satisfy the pavement
requirement.
The RBI Grade-81 layer can be used to replace aggregate in sub base.
Page 35 of 38
RBI GRADE-81
CASE STUDY 21
A. Project Name: - Construction of the approach road of ROB at Khurja, Uttar
Pradesh
B. Design:-
BC = 50mm
DBM = 80mm
25% 20mm+25% 10mm+50% Stone Dust+4% RBI Grade-81 = 160 mm
GSB + 2% RBI Grade-81 = 150mm
Page 36 of 38
RBI GRADE-81
C. Field Evaluation
To evaluate the performance of the approach road constructed with RBI Grade-
81. The strength parameters are evaluated with the help of following equipments:
Geo Gauge
Dynamic Cone Penetrometer ( DCP)
Nuclear Density Gauge (NDG)
YOUNG'S Average
STIFFNESS (MN/m) CBR (%)
MODULUS (MPa) CBR (%)
42.66 370.10 531.87
39.50 342.68 459.93
38.68 335.61 461.40 463.62
39.25 340.47 466.50
36.85 319.73 398.40
CBR (%)
Test No. Locations As per DCP
1 0+060 CBR>200
Page 37 of 38
RBI GRADE-81
D. Discussion
The average CBR value as per Geo Gauge readings 463.62. The tests were
performed over bituminous layer.
The average CBR value of the RBI-81 Base layer is more than 200 as per
DCP test.
The Density Gauge has provided average density of 2.11 g/cc. at both the
Location of ROB Approach Road.
E. Conclusion
The field CBR values are achieved more than the required for any base layer
of pavement i.e. 70-130 CBR.
The Density Gauge shows the density of 2.11g/cc with 99% compaction. The
required density is 98% compaction.
The stabilized layer with RBI Grade-81 result shows that, the layer can be
used as a replacement of WBM and crushed aggregate layer in flexible
pavement, depth may be vary as per the pavement design requirement.
Page 38 of 38