A1624 - Shuttering Drawing For Second Floor Lvl.
A1624 - Shuttering Drawing For Second Floor Lvl.
A1624 - Shuttering Drawing For Second Floor Lvl.
GENERAL NOTES:-
1) ALL DIMENSIONS ARE IN MM AND LEVELS ARE
IN METERS.
2) ALL C/C DIMENSIONS OF COLUMNS BEAM
ETC. SHALL BE CROSS CHECKED WITH
CB7
CB8
B17 B17 B17 B17 B17 B17 B17 B17 B17 B17 ARCHITECT AND RCC CONSULTANT'S. DRG.
ANY DISCREPANCIES SHALL BE BROUGHT TO
B15 B16 B16 B18 CS1 B18
CB9
NOTICE IN ADVANCE.
CB6
CB9
CB5 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2
CB
NC49 B19 B21 B21 B21 B21 B21 WB1 B21 B21 B21 B21 B21 NC65 B21 FOLLOWED.
B20 NC58b
WB4
WB3
PART-2 PART-2 1) DESHUTTERING OF PT AREA SHALL DONE
B3
B29
PT BEAM -1(450x750)
PT BEAM -2(450x750)
PT BEAM -3(450x750)
PT BEAM -4(450x750)
PT BEAM -5(450x750)
PT BEAM -1(600x750)
PT BEAM -2(600x750)
PT BEAM -3(600x750)
PT BEAM -4(600x750)
B29
PT SLAB - PT SLAB -
1
HIDDEN BEAM
SCON PROJECT ENGINEER.
PART-1 PART-1 PART-1 PART-1 PART-1 PART-1 S2 PART-2 PART-2 PART-2 2) BACK PROPPING IS REQUIRED FOR THIS
PT SLAB - PT SLAB - PT SLAB - PT SLAB - PT SLAB - PT SLAB - B35 B36 B36 PT SLAB - PT SLAB - PT SLAB - 3000
NC66 150 MM THK. 150 MM THK. 150 MM THK. 150 MM THK. 150 MM THK. 150 MM THK. 150 MM THK. 150 MM THK. 150 MM THK. NC65a FLOOR WHILE CONCRETING THE ABOVE
NC54 S2 FLOOR.
B33
B34
B33
3) 1M WIDE SHUTTERING PLATFORM IS
B32 B32
REQUIRED AROUND SLAB FOR STRESSING
5840
B29
B29
B25
B32 LIFT - 09
B2
PURPOSE.
MLB3
ST1
2
PT SLAB
DESCRIPTION SIZE LIVE LOAD DEAD LOAD SCAFFOLDING 450 150MM THK.
GRADE OF SLAB
150 MM THICKNESS CONCRETE
1. PT SLAB STRESSING &
FOR PT SLAB
GROUTING
600
5.0 KN / M2 1.5 KN / M2 & PT BEAM-M45
COLUMN COLUMN
AS PER SHUTTERING PTB-3
3. PT BEAM DRAWING (450X750)
STAGE - 1 STAGE - 3
2. PT SLAB 150 MM THICKNESS SECTION-1-1
GRADE OF CONCRETING SCALE-1:25
8.0 KN / M2 1.0 KN / M2 STEEL
AS PER SHUTTERING FE-500
3. PT BEAM DRAWING
COLUMN
4. CONSIDERED SIPOREX WALL LOAD STAGE - 4
8.3 KN/M
ON PERIPHERY OF SLAB. STAGE - 2 REMOVE THE SHUTTERING AFTER
PERMIT IS ISSUED BY SCON
5.PROVIDE 15 MM CAMBER AT GIVEN LOCATION.
UPPER SLAB READY FOR
1000
CONCRETING
6. GRID LINE DIMENSION INDICATION.
1000
BACKPROPPING 100%
REVISIONS
HIDDEN BEAM-300X150MM PT SLAB
S.NO DESCRIPTION DATE REV, BY.
BACKPROPPING 50% (SHOULD R1 ADD EXTENTION FUTURE SLAB 15-05-2024 K.D.
BE PLACED BEFOR CONRETING
THE UPPER SLAB & SHOULD BE
REMOVED ONLY AFTER THE
STRESSING OF UPPER SLAB)
BACKPROPPING 25%
STAGE - 5
DEPENDING ON THE AMOUNT OF CONSTRUCTION LOAD.
THE PROPS SHALL BE PLACED AT REQUIRED INTERVALS
AS ADVICED BY STRUCTURAL CONSULTANT DRAWING ISSUED FOR
SEQUENCE OF POST - TENSIONING ADVANCE COPY APPROVAL
CONSTRUCTION
TENDER COMMENTS
SCALE-N.T.S.
EXECUTION RECORD
PROJECT
PROPOSED 8 GRID @
Swarnbhoomi, Raipur. RAMA
AVENUE (BUILDING-5)
TITLE
SHUTTERING DRAWING FOR
SECOND FLOOR LVL.
ARCHITECT
STRUCTURAL CONSULTANT
PT CONSULTANT