DESIGN MANUAL
PEB DIVISION 8. Cranes systems design
Table 8.1. – Built-Up Crane Beam with parallel flange cap channel
MORRIS
Crane Capacities(T)
Cranes Crane
Beam Single Girder Cranes
Crane
Span
Bridge
(m)
Span(m) 1 2 3.2 5 6.3 8
NOTE:
1. Fatigue Criteria (Loading Condition 2) is considered.
2. Based on Pendent Operated Crane.
3. Section Details: ( # = With No-Bearing Stiffener. ## = With Bearing Stiffener. ### = No Stiffener)
Data Sequence:
Cap Channel Continued.....
Top Flange Size (mm)
Web Size (mm)
Bottom Flange Size (mm)
Weight (kN/m)
DM 03.10.00 8-9
ZAMIL STEEL BUILDINGS
DESIGN MANUAL
PEB DIVISION 8. Cranes systems design
Table 8.1.(cont’d) – Built-Up Crane Beam with parallel flange cap channel
NOTE:
1. Fatigue Criteria (Loading Condition 2) is considered.
2. Based on Pendent Operated Crane.
3. Section Details: ( # = With No-Bearing Stiffener. ## = With Bearing Stiffener. ### = No Stiffener)
Data Sequence:
Cap Channel
Top Flange Size (mm)
Web Size (mm)
Bottom Flange Size (mm)
Weight (kN/m)
DM 03.10.00 8-10
ZAMIL STEEL BUILDINGS
DESIGN MANUAL
PEB DIVISION 8. Cranes systems design
Table 8.2. – Top Running Crane Reactions at Runway Beam supports (Kn)
DM 03.10.00 8-11