8 Hrs

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

DATE MPC CODE NUMBER

ENGINEERING
DEPARTMENT, MAINTENANCE PROCEDURE Page 1 of 2
CARD (MPC) 29th July 2022 A 521 - (8 hrs)
SRI LANKA NAVY
[1].

Ship/ Base : A 521 Class : OPV Frequency : Every 8 hours


System : Starting air system Subsystem : Main engine Number of components : 02
Component : Air compressor Component code : Work hours : 10 minutes

Personnel : 01 No

PROCEDURE /DESCRIPTION:
Every 8 hours

[2]. SAFETY PRECAUTIONS

Wear hand gloves and googles

[3]. REFERENCES

Air compressor G40 BSI ELD technical file

[4]. TOOLS

[5]. CONSUMABLES

[6]. SPARE PARTS

[7]. HAZMAT

-
DATE MPC CODE NUMBER
ENGINEERING
DEPARTMENT, MAINTENANCE PROCEDURE Page 2 of 2
CARD (MPC) 29th July 2022 A 521 - (8 hrs)
SRI LANKA NAVY
[8]. RELATED MAINTENANCE

[9]. LOCATION

Engine room

[10]. PROCEDURE

a. Checking oil level.


b. Release pressure from cock valve.

Prepared by: ERA - A 521 Recommended by: EO - A 521 Approved by: SEO - A 521

You might also like