Professional Documents
Culture Documents
Iaf MD5 2019
Iaf MD5 2019
Note 1: Audit time is shown for audits at high, medium and low complexity category of OH&SM
risk.
Note 2: The numbers of personnel in Table OH&SMS 1 should be seen as a continuum rather
than a stepped change. If drawn as a graph, the line should start with the values in the lower
band. The starting point of the graph should be personnel of one attracting 2,5 days. See clause
2.2 for dealing with parts of a day.
Issued: 07 May 2019 Application Date: 07 May 2020 IAF MD 5:2019 Issue 4
© International Accreditation Forum, Inc. 2019