MATCHLINE SEE DWG. NO.

CI-ET-01-04-007

1.C.T2/15
2.C.T2/16
3.C.T2/28.6
AL MARYAH ISLAND

RT4-P38
RT4-C3

RT4-P39
001 002 003 004 005 006

RT4-C32

RT4-C33
ELEVATOR

RT4-C51
RT4-P40
ELEVATOR

RT4-P42
RT4-C10a_10b

RT4-C11a

RT4-C11b

RT4-P60

RT4-P28
RT4-P37

RT4-C12

RT4-P41
RT4-P61

RT4-C52
RT4-P65

RT4-P43
RT4-C6_C7_C8_C9

RT4-C28

RT4-C31

RT4-C53
RT4-C54

RT4-C55

RT4-C58
RT4-C29

RT4-C30

RT4-C59

RT4-P30
UP

UP

UP
RT4-P16
RT4-P6

RT4-P53

RT4-C62
UP

RT4-P3

RT4-P29
RT4-P1

RT4-P2

RT4-C64
RT4-P4

RT4-C24

RT4-C25

RT4-C27
RT4-C26

RT4-C56

RT4-C60

RT4-C61
RT4-P5

RT4-C57

RT4-C63
RT4-SS1

RT4-SS4

RT4-P18
RT4-SS5

RT4-P66

RT4-P48
RT4-P34

RT4-P35

RT4-P44
RT4-SS3
007 008 009 010 011 012

RT4-P19

RT4-C70
RT4-C13

RT4-C80
RT4-C36
RT4-C34

RT4-C37

RT4-C69
RT4-C5

RT4-C66
RT4-C35

RT4-C65

RT4-C85
RT4-P51

RT4-P70
RT4-P54

RT4-C71
RT4-P7

RT4-C82
RT4-P62
RT4-P13

RT4-P14

RT4-P17

RT4-P20

RT4-P21

RT4-P31

RT4-C81
RT4-C4

RT4-C48

RT4-P73

RT4-C86
RT4-P22

RT4-C68
RT4-P23

RT4-P67
RT4-C14

RT4-C39
RT4-C38

RT4-C67

RT4-C77

RT4-C84
RT4-P9

RT4-SS2

RT4-C76

RT4-C83

RT4-C96
RT4-C74
RT4-P24

RT4-C79
RT4-P56
RT4-C73

RT4-P55
RT4-P72

RT4-C78

RT4-P36
RT4-SS7

RT4-P57
RT4-P74

RT4-P76

RT4-C95
L.O.C

RT4-C75

RT4-P45
RT4-C15

RT4-C17

RT4-C16

RT4-P10

RT4-C18
RT4-P58

RT4-C19
RT4-P11

RT4-C41

RT4-C42
RT4-C40

RT4-C43
RT4-C3

RT4-P25

RT4-C72
RT4-C49
RT4-P63
RT4-P71

RT4-SS6

RT4-C94
RT4-P75

RT4-C97
RT4-P69
RT4-C93
013 014 015 016 017 018

RT4-C91
RT4-C88

RT4-P33
RT4-C87

RT4-C92

RT4-P49
RT4-P46
RT4-C47

RT4-P32
RT4-P26
RT4-C22_C23

RT4-P68
RT4-C46
RT4-P15

RT4-C50
RT4--C20_C21

RT4-C90
RT4-C44

RT4-C45

RT4-P64
RT4-P12

RT4-P59
RT4-P8
RT4-C1_C2

RT4-C89
RT4-P27
RT4-P47

RT4-P78
RT4-P50
UP

UP

UP

RT4-P52
UP

UP

UP

UP
UP

AL REEM ISLAND
1.C.T2/15

19
18
17

16
20
15

14
21
13

12
22
11

10

2.C.T2/16
9

23

8
7
24
6

25 4

3
2
1

D87

RT4-P75
3.C.T2/28.6

1.C.T2/26
32.06 2.C.T2/28.6
KEY PLAN

L.O.C
TYPE 'F'
NOTES
L.O.C 1. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE STATED.
2. ALL COORDINATES ARE IN WGS 84 UTM ZONE IN 40N.
1.C.T2/15
2.C.T2/16 ALL ELEVATIONS ARE REFERED TO NEW ABUDHABI
3.C.T2/26 DATUM (NADD).
LEGEND
EXITING WATER NETWORK (TRANSCO)
400kV EXISTING CABLE
132kV EXISTING CABLE

TYPE 'F'
35.61
JN-13 132kV (UNDER CONSTRUCTION)

D86
22kV EXISTING CABLE
22kV EXISTING CABLE TO BE RELOCATE
RELOCATED 22kV CABLE
PROPOSED 22kV CABLE
PROPOSED 22kV, 3Cx300mm² Cu XLPE CABLE
DCP
EXISTING PRIMARY SUBSTATION
( REMGPRY4 -T2 )
1.C.T2/15
EXISTING SUBSTATION
2.C.T2/16 PROPOSED SUBSTATION
3.C.T2/26
L.O.C PROPOSED BUILDING SUBSTATION
EXISTING BUILDING SUBSTATION

D85
POWER DISTRIBUTION CORRIDOR

MATCHLINE SEE DWG. NO. CI-ET-01-04-014


POWER DISTRIBUTION CORRIDOR
L.O.C RESERVED FOR EXISTING
C.T2/26 POWER TRANSMISSION CORRIDOR
RESERVED FOR EXISTING
29.25
POWER DISTRIBUTION CORRIDOR
TYPE 'F' UNDER LOCAL ROADS
1x2WAY PROPOSED DUCT
ROAD AA-1 1x4WAY PROPOSED DUCT
2x3WAY PROPOSED DUCT
2x4WAY PROPOSED DUCT
1x5WAY PROPOSED 132kV DUCT
PROPOSED SPLIT 132kV DUCT
2x6WAY PROPOSED SPLIT 22kV DUCT
2x4WAY PROPOSED SPLIT 22kV DUCT
PROTECTION SLAB FOR 22kV CABLES
PROPOSED 132kV CABLE JOINT PIT
EXISTING DUCT TO BE EXTENDED
EXISTING CABLE JOINT PIT
EXISTING 400kV ELECTRICAL DUCT
NOTES PROTECTION SLAB FOR
3. BUILDING SUBSTATIONS SHOWN IN THE DRAWINGS EXISTING 400kV CABLES
ARE INDICATIVE. EXACT LOCATION WILL BE AS PER PROTECTION SLAB FOR
BUILDING DESIGN. EXISTING 132kV CABLES
EXISTING 22kV ELECTRICAL DUCT
4. POWER FOR PLOT NUMBER RT4 C6/7/8/9, RT4 C10a_10b, EXISTING 132kV ELECTRICAL DUCT
RT4 C11a, RT4 C11b & RT4 C12 ARE ALREADY PROPOSED 132kV ELECTRICAL DUCT
CONSIDERED IN EXISTING LOOP AND EXCLUDED FROM
MUSHTARAK
THE PROPOSED DESIGN.
INTERLOCKING TILES
5. CONTRACTOR HAS TO CHECK EXISTING 132kV PIT GRADE LEVEL
SCOPE UNDER REGIONAL ROADS
AND SHALL BE MATCHED WITH PROPOSED GRADE LEVEL. PROJECT BOUNDARY

RT4-C1_
6. CONTRACTOR HAS TO CHECK EXISTING DUCT GRADE LEVEL
AND SHALL BE MATCHED WITH PROPOSED GRADE LEVEL. CONSTRUCTION DOCUMENT
7. ALL WORKS SHALL BE AS PER LATEST ADDC STANDARD &
SPECIFICATION.

C2
8. APPROACH CABLES SHOWN FOR EACH BUILDING SUBSTATION IS
INDICATIVE AND NOT IN INFRASTRUCTURE SCOPE OF WORKS. PLOT
DEVELOPER CONTRACTOR WILL LAY THE APPROACH CABLE FROM
THE BUILDING SUBSTATION AND CONNECT TO THE INFRASTRUCTURE
MAIN RING BY SPLICING. IF ANY CROSSING DUCTS ARE REQUIRED FOR
THE APPROACH CABLE, THE SAME WILL BE CONSTRUCTED BY THE
PLOT DEVELOPER CONTRACTOR IN FUTURE. REV. DATE DESCRIPTION APPR'D
Client

Consultant

Project / Contract
CONSTRUCTION OF ESSENTIAL INFRASTRUCTURE
WORKS FOR PACKAGE II (A) (REGIONAL
INFRASTRUCTURE) AND PACKAGE II (B)
(SEA BRIDGE) REEM ISLAND, ABU DHABI
Drawing Title

ELECTRICAL 22kV NETWORK LAYOUT


SHEET 13 OF 18
CONTRACT No: JOB No:

DRAWN DESIGNED CHECKED APPROVED

ST MSD MSA IS
DATE APRIL 2021 ACTUAL SIZE A1
Drawing Scale.
1:500 @ T0, 1:1000 @ A3

Drawing No.
CI-ET-01-04-013 C0
S:\PROJECTS\000000 Reem Island Pkg-IIA\04 Users\CADD\PDF\IFC DRAWINGS REGIONAL_(12-DEC-2021)\CAD\PART-6 UTILITIES\11-ELECTRICAL 22kV NETWORK LAYOUT\CI-ET-01-04-001 TO 018.dwg