Egypt Scrubber Execution Plan
Egypt Scrubber Execution Plan
incomplete
Pending (because of scaffolding)
Pending
Pending
Completion date 10 April
Sr. no. Ref. Drawing No. 04-04-24 Planning
1. Supporting lugs will be prepared - 10 nos.
1 E-P2310-511-918-03
2. Supporting ring (200*16mm) cutting will be done.
1. Supporting lugs will be prepared - 10 nos.
2 E-P2310-511-917-03
2. Supporting ring (200*16mm) moulding will be done.
1. T-supporr ring moulding will be done.
3 E-P2310-511-923-03
2. Gusset plate (200*200*16mm) cutting will be done.
1. Supporting ring (200*16mm) cutting will be done.
4 E-P2310-511-919-03 2. Gusset plate (200*200*16mm) cutting will be done.
3. Air sparger all branches fitting will be done.
1. Nozzle N-15,N-13,N-10 fitting will be done
5 E-P2310-511-919-03 2. Nozzle N-08,N-07,N-3A,H-01,N-05,N-09B,N-09A,
both side lining will be done.
6 E-P2310-511-916-03 1. Grip plate parts cutting , grinding will be done .