MATERIAL AND WORKMANSHIP SPECIFICATION FOR PERFORMANCE

ALUMINUM ARCHITECTURAL SYSTEM, GLAZING WORKS & FACADE CLADDING

I. Compliance with Regulation


1. Conform to performance of BS 5368 on the following test and all the
performance test reports shall be submitted with professional engineer
(P.E) endorsement :-
a. Part 1 - Air leakage test to MS 832 requirement (positive test pressure
of 200 pascals)
b. Part 2 - Water tightness test MS 1017 requirement (positive test pressure
of 300 pascals)
c. Part 3 - Structural load test
2. Horizontal lateral loading of no less than
1.5kN/m2 for spandrel glazing/ railing to P.E endorsement.
3. Where full height glass wall is provided to an area which overlooks any
sunken area, void, air-well, courtyard or external open space with a
drop of more than 1000mm, such full height glass wall shall be
protected with a railing or other barrier of not less than 900mm height.
in
The horizontal and lateral load on such railing or barrier shall be
designed with no less than 1.5kN/M.
4. All aluminium louvre below 1100mm to withstand lateral load 1.5kN/M
with P.E endorsement.

II. Specification
1. Gasket to glass - Santoprene gasket for internal glazing
2. Weather Silicone - "DOW CORNING" 791 neutral cure sealant (Matt
Black Colour or Grey and paintable) along external
perimeter.
3. Structural Silicone - "SIKA" SIKASIL SG-18 & SIKASIL SG-500 CN (Matt Black
Colour or Grey and paintable) along external
perimeter.
4. Sub-Frame - 25mm X 25mm X 12mm X 1.2mm thk aluminium
sub-frame c/w galvanized iron strap (1.0mm thk)
and concrete nail
5.Setting Block for Glass - EFCM or Santoprene (Black or Grey Colour)
6. Handle multi point - "Giesse" 2-points or more locking handle
7. Friction-stay & Support - "Imperial" stainless steel grade #304 friction
stay
- "Imperial" stainless steel grade #304 support
arm for top hung window
8. Roller - "Constyle" sliding door roller with stainless steel
wheel

III. Material Requirement for Aluminum Work REF DATE AMENDMENT NOTE
1. All windows, doors and screens shall be designed using approved
sections structurally sound and fit for the intended purposes. PROJECT TITLE:
2. Unless otherwise specified, all aluminium extrusion sections and sheets
shall be constructed of minimum sizes and gauge to approved samples CADANGAN PEMBANGUNAN 2 MENARA PANGSAPURI
submitted. SUITE (MENARA A - 58 TINGKAT DAN MENARA B - 61
TINGKAT) YANG MENGANDUNGI:
3. Frames shall be square and flat and fabricated of sections cut to
length,corners mitred and welded then cleaned to obtain a smooth
FASA 1
surface.
a. 1 BLOK PANGSAPURI SUITE, MENARA A - 45
4. All joints and mitres shall be accurately assembled to provide closed TINGKAT (941 UNIT) DI TINGKAT 12 - TINGKAT
smooth connection. Screw and bolt heads shall be concealed wherever 56
possible and counter sunk finished flush. b. RUANG PERNIAGAAN DI TINGKAT BAWAH
5. Drainage holes and gutter system shall be provided to discharge any MENARA B
water seeping into cavity of frames, and drainage hole position c. KEMUDAHAN PENDUDUK DI TINGKAT BAWAH &
approved by the Architect. TINGKAT 11 (MENARA A & B) DAN TINGKAT 57
6. All external extrusion and pressed section surfaces shall be electrolytically (MENARA A)
anodize to a natural satin matt finish in compliance with BS 1615 with the d. 11 TINGKAT PODIUM TEMPAT LETAK KERETA DI
anodic film thickness of not less than 25 microns. TINGKAT BAWAH - TINGKAT 10
7. When powder coating is specified, the coating shall comply to the test e. 1 BUAH PONDOK PENGAWAL
requirement of BS 6494:1984 with the coating thickness of not less than 60
microns.
1 DESIGN INTENT OF PORTE COCHERE 2 DESIGN INTENT OF PORTE COCHERE 8. All glass used shall be free of bubbles, waviness, smoke wanes, scratches
and other defects.
FASA 2
a. 1 BLOK PANGSAPURI SUITE,
306.3 - AXONOMETRIC 306.3 - AXONOMETRIC (BOTTOM VIEW UP) 9. All glazing to be internally glazed with EDPM setting blocks and edging
with neoprene gaskets. All window and door panels shall be complete
MENARA B - 48 TINGKAT (897 UNIT) DI
TINGKAT 12 - TINGKAT 59
SCALE SCALE with double seal gasket. b. KEMUDAHAN PENDUDUK DI
10. All hardware shall be of material resistant to atmospheric corrosion, TINGKAT 60 (MENARA B)
where casement opening windows are specified, friction stay and barrel
hinges shall be used together with Geese on SEA double locking lever DI ATAS LOT 481549 (LOT ASAL 18781), LOT 481550 (LOT
handset. In sliding doors, sections shall include parting separators c/w felt ASAL 18782), LOT 53684, LOT 54920, LOT 481277 (LOT
in-lay. ASAL PT 9445) DAN LOT 481278 (LOT ASAL PT 9446) DI
11. Hardware to sliding doors to include self-latching top and bottom double MUKIM KUALA LUMPUR DAN LOT 103693 (LOT ASAL
9616), LOT 38764 DAN LOT 101940 DI MUKIM PETALING,
locking lever handset. Catalogues or samples of hardware to be
JALAN KUCHAI LAMA, DAERAH KUALA LUMPUR
submitted for approval.
WILAYAH PERSEKUTUAN
12. The assembly intended shall be complete with fixing sub frame.
13. Fixing frames, straps, built-in lugs, brackets etc shall be of galvanised UNTUK TETUAN L&T REALTY SDN. BHD.
mild steel and of appropriate gauge and sizes capable of withstanding
the design wind load and other design loads to which the system is KEY PLAN :
subjected.
14. Airtight seals are required at all junctions and joints. Windows sections,
if operable, shall be rebated types with provision for installation of
double neoprene tubular compression seals.
15. All glazing thickness and specification indicated are minimum
requirements and Contractor/ Sub-contractor is responsible for
confirming for compliance with required performance specifications.

IV. Warranty
1. Successful sub-contractor shall produce in writing, upon completion of
work, a warranty against defects in a format outlined by the Architect

TOWER B
on the followings, whichever are applicable:-
a. Anodizing process for a period of 10 years (the quantity of aluminium
used is to be mentioned in this letter).
TO
b. Powder coating for period of 10 years. W
c. Structural design for a period of 10 years. ER
A
d. Workmanship for a period of 10 years.
e. Sealant or gasket for a period of 10 years against leakages.
2. The warranty letter shall be accompanied by individual letter from
individual manufacturer or supplier.
3. The warranty letter shall be addressed to the owners/ developers,
the Architects and the quantity surveyors.
4. As-Built drawings shall be submitted with Professional Engineer
endorsement. ARCHITECT:

V. Special Specification
architects 61 sdn. bhd. (291677P)
1. All windows complete with heavy duty Friction-stay to Architect's
suite c-12-03, block c, plaza mont kiara,
approval. no.2, jalan kiara, mont kiara,
2. Colour of glass to be grey tint to Architect's approval 50480 kuala lumpur, malaysia.
3. Colour of powder coating shall be RAL 7043 to Architect's approval
4. Performance test : Allow performance test to one (1) mock up unit of t : +603 6203 1820 f : +603 6203 2820 e : a61kl@a61.com.my
window and one (1) mock up unit of sliding door at testing laboratory;
including all preparation, setting up and demolition of the necessary
OWNER:
components and equipments; all in accordance with Architect's
specification and to Architect's satisfaction. L & T REALTY SDN. BHD.
5. Field test : Field test to mock up unit of window and sliding door TSLAW (MENARA TSLAW)
(10 nos.)at site; including all preparation, setting up and demolition LEVEL 45, NO. 39, JALAN KAMUNING, PINGGIRAN TRX,
55100 KUALA LUMPUR, MALAYSIA
of the necessary components and equipments; all in accordance with Tel: +603-2282 9668
Architect's specification and to Architect's satisfaction.

NOTES :
1. GLASS THICKNESS STATED IN TENDER DRAWING ARE THE MININUM
REQUIREMENT & INDICATIVE ONLY, ACTUAL THICKNESS TO BE ADVISED
BY SPECIALIST BASED ON FACADE CLADDING PRESSURE STUDY REPORT.
2. ALL ALUMINIUM WINDOW FRAME ARE TO BE CONSISTENT IN SIZING
REGARDLESS THE GLASS THICKNESS SPECIFIED LATER ON BY SPECIALIST.
WORKING DRAWINGS
3. THE DIMENSION PROVIDED IS INDICATIVE ONLY AND MAIN
CONTRACTOR TO SUBMIT SHOP DRAWINGS WITH ACTUAL DIMENSION
AUG 2023
& P.E CALCULATION, SUBJECT TO THE APPROVAL OF ARCHITECT.
4. ALL GLASS OF THE WINDOWS LOCATED WITHIN THE TOILETS &
BATHROOM TO HAVE TRANSLUCENT FINISH. DRAWING TITLE:

PORTE COCHERE B DETAIL


- DESIGN INTENT (AXONOMETRIC)

DATE : AUG 2023 DRAWN BY: CHECK BY:


SCALE: 1:1 Author IBRAHIM / ALIA

DRAWING NO : REVISION :

M165/306.3
THIS DRAWING IS COPYRIGHT.Contractors shall work from figured dimensions only.
Contractors must check all dimensions on site. Discrepancies must be reported
immediately to the architect before proceeding on relevant work.

You might also like