Professional Documents
Culture Documents
RFQ 60 Close Date MD 120
RFQ 60 Close Date MD 120
RFQ 60 Close Date MD 120
Approvals:
<Approver 1>
<Approver 2>
1|P a g e
PUBLIC
Document Control
Change Record
1
Reviewers
Name Position
2|P a g e
PUBLIC
Contents
Document Control....................................................................................................................2
Technical Overview.................................................................................................................4
Approach:...........................................................................................................................4
Implementation Steps..............................................................................................................5
Setups Summary..............................................................................................................5
Coding Summary..............................................................................................................5
Open and Closed Issues for this Deliverable.......................................................................6
Open Issues........................................................................................................................6
Closed Issues......................................................................................................................6
3|P a g e
PUBLIC
Technical Overview
Approach:
Changes in the existing standard Online Message for Negotiation report. Requirement was to display the Latest
closed date and time of the negation in the Online message notification sent to the Buyer which was previously
showing the old “Days after open” in the respective notification.
Implementation Steps
The required changes were done in the data model and the layout needs to be updated in the data model to reflect the
changes made.
We have done the testing for a negotiation with closed date given as “Open after days” and extended the closed date.
After the changes are made, the notification is now reflecting the date for the closed date field and reflects the latest
extended date.
Testing is done for negotiation with fixed closed date, this notification also displays the closed date and time as
required.
4|P a g e
PUBLIC
Installation Steps
N/A
Deployment steps
3. Link the Data Model to the above Report(Online Messages Notification Report).
4. Change the BIP Refresh Time to 1 Minute to make the above changes effective instantly as given below.
Setup and Maintenance > Manage Administrator Profile Values and set the following profile options as
below:
Rollback Plan
5|P a g e
PUBLIC
Deployment Cycles
ID Object Executed By Instance Execution Overall Issue Listed
Date Result
Verification Checklist
N/A
6|P a g e
PUBLIC
Open Issues
Closed Issues
7|P a g e