Plant Head are responsible for start and stop of Initial production &
supply control.
3.0 SCOPE:
Applicable to all products which are under initial supply in following
condition:
1) New Product Development -3 Months / 10,000 nos
2) Engineering /Design Change - 3 Months / 5000 nos
3) Mold Duplication – 3 Months / 10,000 nos
4) Location Change – 3 Months / 5000 nos
5) Material Change – 2 Months / 5000 nos
6) Process Sequence Change – 1 Months / 2500 nos
7) Machine Change – 1 Months / 2500 nos
5.0 Criterion For Defining Target / Extension Period for IPSC Sign of Sheet –
Extension Period if
IPSC Criterion Target Target not achieved
Customer Complaint 0 3-Month / 10,000 nos
Inprocess Rejection Less Than 5% 3-Month / 10,000 nos
(Moulding)
Process Capability >1.33 3-Month / 5000 nos
Delivery Adherence 100 % 1-Month / 2500 nos
Result of 1-Month / 2500 nos
Countermeasure taken 100 %
against the problem
during IPSC
Process Audit NC 100 % 1-Month/2500 nos
Closure
PARAMOUNT POLYMERS PVT LTD
Doc. No.: PPPL/NPD/QSP/03
Quality System Procedure Page 3 of 4 Rev No :00 Date (Rev.): 04.04.19
Plant Head
Define criteria for IPSC with
CFT
specification/Target on IPSC Sign off
in Project Handover check list
No
Extend the Initial
Are the criteria Production and supply
defined for the control period / quantity
initial supply as per define period /
control meeting quantity.
the requirements? CFT
Yes
Plant Head
Hand Over the project to
Production department
Close
PARAMOUNT POLYMERS PVT LTD
Doc. No.: PPPL/NPD/QSP/03