Process Line Sizing
Process Line Sizing
ρ(kg/m3)
576
Liquid density
Stage 2,
Go to HYSYS program and the internal pipe diameter(ID) beween D1 and D2 given in bellow un
∆P (bar/km or bar/100m) criteria in stage 1 is met.input calculated ID in bellow.
D1(in)= ID(in)= ?
2.6698952959 (Calculated ID)
D2(in)= 3
Stage 3,
Go to pipe schedule page and select nominal ppe size regarding the thickness.
DN(mm)
(pipe nominal size)
Q(m3/hr) =
(Volumetric Flow rate) 56.65694444
Dmin 2.6698952959
Dmax 4.6243943034
Comment
om Criteria-Liquid page .
corresponding to your
e fromCriteria-Liquid page .
ickness.
Stage 1,
Input following data:
Item Value Comment
∆P (bar/km or bar/100m) Min Max.
Find range of rated ∆P from Criteria-Liquid page .if th
Pressure Drop cells empty.
ρV² max or Vmax as criteria?
1 please enter 1 if you want to use ρV²m
ρV² max (kg/ms²)
1.5 find ρV² max from 'Criteria gas'
IGNORE THIS ROW
2
Mg (kg/hr)
Flow rate 100000
ρg(kg/m3)
599
Liquid density
Stage 2,
Go to HYSYS program and the try internal pipe diameter(ID) bellow Dmax given in bellow untill
∆P (bar/km or bar/100m) criteria in stage 1 is met.input the selected ID in bellow.
Dmax(mm)= 1086.51168384121
ID(mm)=
(Selected ID)
Stage 3,
Go to pipe schedule page and select nominal ppe size regarding the thickness.
DN(mm) =
(pipe nominal size)
Q(m3/hr) = 166.94490818
(Volumetric
d(mm)= 1086.5116838412
d(mm)= 171.86423616443
Comment
P from Criteria-Liquid page .if there is not any leave the
hickness.
Input
Item Value Comment
ID (mm) 4.1
(Internal diameter)
P(barg) 15
(Pipe Design Pressure)
C(mm) 1.6 Normally equals 1.6mm,if other please input
Corrosion Allowance
Output
Item Value Comment
e(mm) 4.65357142857143
(Thikhness)
ut
Use "Piping Material Specification" file to determine the material and piping
The file is available in Line siszing file
material and piping class of line .
NIEOC
Total
NIOEC
Total
88.9 60.3 114.3 73
5.49 3.91 6.02 5.16
77.92 52.48 102.26 62.68