P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
TABLE OF CONTENTS
Sr. No. Description Page No.
1. Introduction 03
2. Objective 03
3. Scope 03
4. Reference Documents 03
5. Test Set-Up Deployed 03
6. Pile Details 04
7. Test Details 04
8. Load Test Arrangement 05
9. Pile Load Test Procedure 05-06
10. Reaction beam details 07
LIST OF TABLES
Sr. No. Description Page No.
1. Pile and supporting beam details 07
2. Load increment details 08
3. Interpretation of The Test Data 09
LIST OF ANNEXURES
1.0 INTRODUCTION
INITIAL PILE LOAD TEST WAS CONDUCTED ON BEHALF OF THE PROJECT “SETTING UP OF
NORTH EAST (ASHTLAXMI) HAAT & EXPERIENCE CENTRE FOR FACILITATING MARKET LINKAGE
FOR THE HANDICRAFTS & HANDLOOM ARTISANS AND WEAVERS FROM THE NORTH EASTERN
REGION AT NEHHDC'S CRAFT PROMOTION CENTRE (CPC), GARCHUK, GUWAHATI. (SH :
CONSTRUCTION OF G+2 STORIED HAAT AND EXPERIENCE CENTRE, PUBLIC UTILITY BLOCK, FOOD
COURT AREA, KITCHEN I/C EI AND FANS).”
OBJECTIVE
2.0 SCOPE
REFERENCE DOCUMENTS
IS 2911 (IV) 2013: Code of Practice for Design and Construction of Pile
Foundations –Load Tests on Piles.
The load was given by hydraulic jack and reaction was taken from dial gauges positioned
at equal distance around the pile and held by datum bars resting on immovable supports at
a distance of 2.00 m from the edge of the pile. Details of the hydraulic jack, pressure gauge
and dial gauges are given in table no 2.
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
Vertical Initial Pile load test ( Compression) was done as per IS: 2911 (Part-4)-2013 in
which compression load was applied to Pile top ( after preparation of pile top) by means of a
hydraulic jack against rolled steel Joist capable of providing reaction . Settlement was
recorded by four dial gauges of 0.01 mm sensitivity each positioned at equal distance
around the pile and held by datum bars resting on immovable supports at a minimum
distance of 3D or 2.00 m whichever is more from the edge of the pile. The reactions for the
jack was obtained from a kentledge placed on a platform supported clear of the test pile. The
center of gravity of the Kentledge was tried to be kept on the axis of the pile and the load
applied by the Jack was also made co-axial with this pile.
The pile head was chipped off to natural horizontal plane till sound concrete met. The
projecting reinforcement was cut-off or bent suitably and the top finished smooth and level
with cement plaster or similar synthetic material where required. A Distancepiece with a
mark at centre was placed on the head of test pile for the jack to rest.
Hydraulic jacks, Hydraulic Pump, datum bar, ISMB and horizontal channel were assembled
as shown in methodology.
The test was carried out by applying series of vertical downward incremental load by means
of hydraulic jacks. Each increment being of about 20 % of safe load on pile.
Settlements readings were recorded with 4 dial gauges of 0.01 mm sensitivity held by
magnetic base. The dial gauges were placed symmetrically and at equal distances from the
pile. The dial gauges were held by magnetic base supported by datum bar resting on
immovable support.
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
Settlement readings were noted on each dial gauge immediately after loading and
after every 30 minutes for each stage. Next loading increment was applied after satisfying
following criteria:
The safe vertical load on single pile for the initial test should be least of the following:
a) For piles up to and including 600 mm diameter:
1) Two-thirds of the final load at which the total displacement attains a value
of 12 mm unless otherwise required in a given case on the basis of nature and
type of structure in which case, the safe load should be corresponding to the
stated total displacement permissible; and
2) Fifty percent of the final load at which the total displacement equal to 10
percent of the pile diameter in case of uniform diameter piles and 7.5 percent
of bulb diameter in case of under-reamed piles.
b) For piles more than 600 mm diameter:
1) Two-thirds of the final load at which the total displacement attains a value
of 18 mm or maximum of 2 percent pile diameter whichever is less
unless otherwise required in a given case on the basis of nature and type of
structure in which case, the safe load should be corresponding to the
stated total displacement permissible; and
2)50 percent of the final load at which the total displacement equal to 10
percent of the pile diameter in case of uniform diameter piles and 7.5 percent
of bulb diameter in case of under-reamed piles.
14.0 Maintained load [Cl. 7.2 of IS 2911 (IV) 2013] :
In this method, each stage of loading shall be maintained till the rate of movement of the
pile top is not more than 0.2 mm/h or until 2 h have elapsed, whichever is earlier subject
to a minimum of 1 h. The maximum test load shall be maintained for 24 h.
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
The test was carried out by applying a series of vertical downward incremental load of 6.00
Tone. The final load applied was 80.00 Tone.
After completion of the test, the load Vs settlement curve was plotted.
From the initial Pile Load test conducted at site, the following settlements were observed.
From the Load Vs Settlement curve it is observed that for an applied load of
80.00 MT, settlement reached is 7.00 mm
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
18. CONCLUSION :
The safe vertical load on single pile for the initial test should be least of the
following:
2) Fifty percent of the final load at which the total displacement equal to
10 percent of the pile diameter in case of uniform diameter piles and
7.5 percent of bulb diameter in case of under-reamed piles.
d) For piles more than 600 mm diameter:
OBSERVATION
DATA
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
140.00
LOAD vs SETTLEMENT CURVE
136.00
132.00
128.00
124.00
120.00
116.00
112.00
108.00
104.00
100.00
96.00
92.00
88.00
84.00
LOAD IN MT
80.00
76.00
72.00
68.00
64.00
60.00
56.00
52.00
48.00
44.00
40.00
36.00
32.00
28.00
24.00
20.00
16.00
12.00
8.00
4.00
0.00
0
10
11
12
13
14
SETTLEMENT IN MM
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
1.) The selected pile by Engineer in Charge for Initial Vertical pile and hence sets load was two and
half time as per clause 29, IS 2911 (Part-4) for Kentledge for availability of reaction as per IS 2911.
(Part IV) 2013.
2.) The Pile head was chipped off to natural horizontal plane approximately at cut-off level.
Projecting reinforcement were cut or bent suitable to the level. The ground level around pile was
lowered by approx. 0.60m. Covering working area required for test activities Top of pile was finished
smooth with plaster of paris or any other suitable material. Bearing plate was 25 mm thick and
placed on pile head for jack no CSL.
3) Load were applied by 100 Ton capacity Hydraulic Screw jack with pressure gauges against
kantiledge of 100 MT including supporting beam decking etc. The Platform was provide loading area
of size 6 m x 6 m. The main beam ISMB 300 @ 6m x 2nos , secondary beam ISMB 300@6m x5 nos
and channel 100MMx50@6M x 30nos were supported on sand bags.
88847.40Kg /1700kg/m3
88847.40Kg
= = 49.36 m3
1800kg/m3
1.00m
1.00m
1.00m
1.00m 1.00m
ISMB 300MM
5 Nos.
ISMB 500MM 2 Nos.
test
pile
6.00m
1.00m
1.00m
1.00m
6.00M
5.00m
6.00m
MS PLATE
HYDROLIC
SUPPORTED SAND BAGS
JACK
150MT
MS PLATE
PILE LEVEL
CALIBRATION CERTIFICATES
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
P&D ENGINEERING INITIAL PILE LOAD TEST
FOR CONSTRUCTION OF G+2
STORIED HAAT AND
EXPERIENCE CENTRE,
PUBLIC UTILITY BLOCK,
AN ISO 9001:2015 CERTIFIED
REPORT FOR INITIAL PILE LOAD TEST FOOD COURT AREA,
ORGANIZATION KITCHEN I/C EI AND FANS.
TESTING WORK PHOTOGRAPH