S.NO PROJECTS PROJECT STAGE DISCIPLINE LESSAN LEARNED RISK SUGGESTED ACTIONS

01 RA4080 Execution MEP High Risk During the installation of the floor drain, please ensure that it coordinates
The floor drain location does not match the tile layout.
with the tile layout to prevent any damages to the structural concrete slab (SOG).

02 RA4080 Execution MEP High Pressure shower requirements Medium Risk The pipe sizes for high-pressure showers should be designed according to the
shower flow rate or recommended by the manufacturer for optimal performance.

A drain outlet should be provided for plumbing fixtures in accordance with the
03 RA4080 Execution MEP Plumbing Fixtures Drain Outlet Medium Risk approved sanitary wares, such as washbasins and WC, to avoid a reverse slope and
prevent any chipping work during the final stages of construction.

Proper access panels were not provided for easy access to Access panels for MEP services should be accessible and located in the proper
04 RA4080 Execution MEP Medium Risk
MEP (Mechanical, Electrical, and Plumbing) services. positions to facilitate easy maintenance work.

MEP equipment on the roof is visible from the surrounding The height of MEP equipment on roof should be coordinated with the parapet height
05 RA4080 Execution MEP High Risk
villa. to prevent any service visibility from the surrounding villa.

The consideration of the floor trap invert level in wet areas is essential to ensure easy access
6 RA4080 Execution MEP The floor trap is not accessible for maintenance. Medium Risk
and facilitate effective cleaning procedures.