+7.98 +7.98
+6.11
+5.71
+5.46 +5.45
+4.66
+3.50 +3.50
+ 3.35 + 3.35
+2.70 +2.70
+2.40
+1.11
+0.83
+0.67
+0.52
16.38
Ground floor line: ± 0.00 = mBf Family house Building permit plan date: 12.01.2015
Comment : Bonyhád, Wernau street hrs.: 381 Western facade scale Mon 1:50
• The construction of the supporting structures can only be carried out on the Builder Dr. Barbara Hartmann-Szabó and Dr. Máté Hartmann Builder's signature
basis of the relevant static specialist plans.
OR K
7150, Bonyhád, Katona József utca 23.
INTER-W
• Breakthroughs and engravings on the support structure may only be made
according to static plans or with the written consent of the static designer.
• Professional and architectural plans must be handled together. Responsible designer
• It is possible to deviate from the published plans only with the designer's approval. Designers Dr. Ágnes Borsos Architect designer
design sheet
N-11
Architect mt.
• The execution plan must be handled together with the technical description and budget. Patyi Szabolcs architectural associate
Daniel the Virgin architectural associate Architect mt. number
• During the installation of prefabricated elements, the instructions in the respective
Architect mt.
manufacturer's "Application Technical Guide" must be followed, if the plan does not stipulate
The design documentation is the intellectual creation of the Author. LXXVI of 1999. according to law, the design is protected by intellectual property rights. Use only PTK 409/3. may be based on paragraph
GSPublisherEngine 0.13.100.100
otherwise. NOTES: All sizes and levels must be checked on site! Size cannot be measured from the drawing. The architect's plan sheet must be handled together with the related professional plans! In case of contradiction, consultation with the designer is required.