ATB-Daily Activity Report-3WL Ahead - 20240506
ATB-Daily Activity Report-3WL Ahead - 20240506
ATB-Daily Activity Report-3WL Ahead - 20240506
TODAY ACTIVITY
Progress % Completion Manpower Productivity
1 ATB-CP-001 Substation 2 Gravel Filling 80 m 30 30 38% 38% 15 8 120 120 0.1 320.0 0.4
2
3
TOMORROW PLANNING
Date : 5/8/2024
1 ATB-CP-001 Substation 2 Gravel Filling 80 m 30 30 38% 76% 15 8 240 120 0.1 320.0 0.8
2 ATB-CP-001 Substation 2 Copper tape rectification (Lightning Protection System) 6 point 3 4 50% 67% 5 8 20 40 0.2 80.0 0.3
16
Gravel filling on cable trench infront of existing building Substation 2 Gravel filling on cable trench beside genset room existing building Substation 2
Gravel filling on cable trench infront of existing building Substation 2 Gravel filling on cable trench beside genset room existing building Substation 2
Reported by :
AMIRUL ADLY
ENGINEER (E&I)
ATB-ALL JOB SUMMARY
ManhourLoading
Remarks
5/5 5/6 5/7 5/8 5/9 5/10 5/11 5/12 5/13 5/14 5/15 5/16 5/17 5/18 5/19 5/20 5/21 5/22 5/23 5/24 5/25
Total
S.no Quotation/ Job No. P.O. Number Work Location No Work Description Work load UOM Current Pending Material Required by Harvest In- Progres Planned Accu. Productivity Area of Concern
Progress Charge s % Manhours Manhours
Client PIC
M T W Th F S S M T W Th F S S M T W Th F S S
Work Direct ATB
New Tx Substation 2-Project
Substation 2 1 Gravel backfilling 80 m 38% Gravel insufficient LPK 38% 320 120 2.67
1 ATB-CP-001 770-609026 Substation 2 2 Copper tape rectification (Lightning Protection System) 6 point 1 Pending quotation Skylift rental Rano 17% 5 5 5 80 32 2.50 Halim/ Datuk
Substation 2 3 Fill device name plate installation 43 nos 0 Pending name plate Rano 0% 5 5 80 0
Substation 2 4 LPK 0% 0 0
Cable way cover job
Pending Scaffholding, Pending ATB
Jetty 1 Install new cover T-junction - berth 6 90 m 0 - Rano 0% 12 12 12 12 12 12 115 0 confirmation
Pending Scaffholding, Pending ATB
Jetty 2 Install new cover T-junction until BD 5 162 m 0 - Rano 0% 12 12 12 12 12 12 207 0 confirmation
Pending Scaffholding, Pending ATB
2 ATB-QT-010 770-609293 Jetty 3 Install new cover BD5 - BD2 45 m 0 - Rano 0% 58 0 confirmation Munawar
Pending Scaffholding, Pending ATB
Jetty 4 Install new cover BD2 - BD4 162 m 0 - Rano 0% 207 0 confirmation
Pending Scaffholding, Pending ATB
Jetty 5 Install new cover BD4 - BD1 216 m 0 - Rano 0% 276 0 confirmation
Pending Scaffholding, Pending ATB
Jetty 6 Install new cover BD1 - BD3 63 m 0 - Rano 0% 81 0 confirmation
SS 1 33kV Cable Rectification
3 ATB-QT-023 Pending P.O. Jetty 1 Install cable ladder TBA TBA TBA - Rano 0% TBA 0 Pending P.O. Halim
Jetty 2 Install Cable cleat TBA TBA TBA - Rano 0% TBA 0 Pending P.O.
Preventive Maintenance DB
Tank Farm 1 DB Rectification TBA TBA TBA - Rano 0% TBA 0 Pending P.O.
4 ATB-QT-024 Pending P.O. Jetty 2 DB Rectification TBA TBA TBA - Rano 0% TBA 0 Pending P.O. Halim
TLB 3 DB Rectification TBA TBA TBA - Rano 0% TBA 0 Pending P.O.
Admin Building 4 DB Rectification TBA TBA TBA - Rano 0% TBA 0 Pending P.O.
Work sub from Contractor
TRMS Punchlist
5 TRMS-QT-003 TRMS PO 23-121 Datuk/ Halim
Substation 3 1 Additional to install TB 40 nos 0 Rano 80% 640 361 1.77 Pending terminal block
DATARAN ELEKTRA-CABLE LAYING FOR GAS DETECTOR (JETTY)
6 DTRN-QT-001(R3) Pending PO Jetty 1 Cable Laying TBA TBA TBA TBA 0% TBA 0 Quotation for discount Munawar
Jetty 2 Gas detector installation TBA TBA TBA - TBA 0% TBA 0 To install next year
POWER-CAM-CABLE LAYING FOR POWER PACT
7 PC-QT-001 Pending PO Klagester 1 Cable trenching (manual excavation) TBA TBA TBA TBA 0% TBA 0 Quotation for discount Munawar
2 Cable Laying TBA TBA TBA - TBA 0% TBA 0 To install next year
1
2
3