Woodlands SD PROPOSED DEVELOPMENT OF 6 BLOCKS OF 7-STOREY HEALTH CAMPUS COMPRISING ACUTE HOSPITAL, SPECIALIST OUTPATIENT CLINICS, COMMUNITY HOSPITAL, NURSING HOME AND 4 BASEMENT LEVELS WITH 2 LEVELS FOR CARPARKING ‘ON LOTS OGD6sN(PT)& 0958¢T(PT) Mc AT WOODLANDS ORIVE 17/ WOODLANDS AVENUE 12 (WOODLANDS 2 PLANNING AREA) PROJECT REF :A1966-15003-2015 REQUEST FOR APPROVAL (RFA) PART | Details of RFA (Pam rss 0K WHC. 04a. POP 2.08) 76: O vom =O saa 0 Kcer ao Date 02/05/19 Gwe oOmn Go a Ret. No: Oa &sMa Oras Se ag a WHC_SDK_RFA-ME-MS-0126_01 O mow =O sa 0 keer Ore Pages :( including this page oe om xs O_rss. Required Reply Date: 16/05/19 Subject: METHOD STATEMENT FOR INSTALLATION OF SPRINKLER PUMPSET AND ASSOCIATED PIPEWORKS & WIRINGS Area / Building: B1 PUMP ROOM Reference (Drawings / Specs): WHC-SDK-ME-MS-BMECH-FIRE-01 - Rev 1 Description and Details: REFER TO ATTACHED METHOD STATEMENT, ‘Submitted by: 14 Mase he Name J Designation’ Signature Date PART ll- Consultant's Reply \We reviewed the statement ofthe Contracior regarding this submittal. The shop drawings submited is hereby transite with action as indicates, [1 NOEXCEPTION TAKEN a MAKE CORRECTIONS NOTED (PROCEED WITH COMMENTS) 1 revecreo (Revise & RESUEMIT [For Recoro PURPOSE Consultant's Reply and Comments: Enclose Eng | incipal | Engler 9 a & Electrical ging "ar Jurong Consultants te i, ale WA SoMa Name Signature Date Name of Fim WHC_SOK_RFA.ME-MS-0126_01,00¢ ceult grat OA nig 12 "pengnd ayinosign tsana6l3 & vsainetool® Hoenad enor onsets bys at ain Woodlands =a] Ith Campus ee PROPOSED DEVELOPMENT OF 6 BLOCKS OF 7-STOREY HEALTH CAMPUS COMPRISING ACUTE HOSPITAL, SPECIALIST OUTPATIENT CLINICS, COMMUNITY HOSPITAL, NURSING HOME AND 4 BASEMENT LEVELS WITH 2 LEVELS FOR CARPARKING ON LOTS 06065N (PT) & 05681T (PT) MK 13 AT WOODLANDS DRIVE 17 / WOODLANDS AVENUE 12 (WOODLANDS 2 PLANNING AREA) METHOD STATEMENT FOR INSTALLATION OF SPRINKLER PUMPSET AND ASSOCIATED PIPEWORKS & WIRINGS Name of Subcontractor: B-MECH ENGINEERING PTE LTD Document Ref No: WHC_SDK_RFA-ME-MS-0126_01 Date Submitted: 02/05/19 Rev] Date | Description Prepared | Checked | Approved af (SDK) ___| (Consultant) o1 | cas | IssuED FOR APPROVAL cron | ALS | n Sv SDK CONSORTIUM | METHOD STATEMENT | FOR INSTALLATION & TESTING | OF SPRINKLER PUMPSET AND ah 0 ASSOCIATED PIPEWORKS & WIRINGS Date: 02 May 2019 Rev no: 1 Doc no: WHC-SDK-ME- MS-BMECH-FIRE-O1 Table of Contents 1, Scope Of Work La. 12. 13. 14. 2. Installation Works. 21 2.2. 2.3, 2.4, 3. Safety Matters. APPENDIX A: Sprinkler Main Pumpset Drawing. Work Location... Location of Installation Works. Shop Drawings... Material/Equipment.... Work Preparation / Delivery Equipment / Tools / Specifications... Installation Procedures ~ Sprinkler Main Pumpset Installation Procedures ~ Sprinkler Jockey Pump & Control Panel .. WHC-SDK-ME-MS-BMECH-FIRE-O1 Page 2 of 7 SOK CONSORTIUM METHOD STATEMENT FOR INSTALLATION & TESTING OF SPRINKLER PUMPSET AND ASSOCIATED PIPEWORKS & WIRINGS | Date: 02 May 2019 Rev no: 1 Doc no: WHC-SDK-ME- MS-BMECH-FIRE-01 1. Scope Of Work To supply, delivery and installation of Sprinkler pumpset and associated pipeworks & wirings accordingly to the approved material, equipment and drawings 1.1. Work Location © Project Name: Woodlands Health Campus ‘© Woodlands Avenue 12/Drive 17, Singapore 1.2. Location of Installation Works * Basement | Pump Room 1.3. Shop Drawings © The relevant shop drawings for B1 Pump Room shall be approved & used as the base in the installation, 1.4, Material/Equipment ‘© Sprinkler Pump © Sprinkler Pump Control Panel © Sprinkler Jockey Pump ‘© Sprinkler Jockey Pump Control Panel + Pipes & fittings © Valves * Cable Support and wirings WHC-SDK-ME-MS-BMECH-FIRE-O1 Page 3 of 7 ° | METHOD STATEMENT | SD [azz] | FOR INSTALLATION & TESTING LJ |suit| | OF SPRINKLER PUMPSET AND SDK CONSORTIUM ASSOCIATED PIPEWORKS & WIRINGS Date: 02 May 2019 Rev no: 1 Doc no: WHC-SDK-ME- MS-BMECH-FIRE-01 2. Installation Works 2.1. Work Preparation / Delivery a) The main pump and control panel completed with intemal wirings are assembled on a modular skid in the factory. (Refer to Appendix A) b) The pumpsets will be wrapped up with protective sheet and will be resting on the pallet. Canvas sheet will be used to cover over the pump after delivery to site. ©) Lorry will be used to transport the pumpsets through the ramps on site to the designated location of Basement 1 Sprinkler Pump Room (GL: 38-39, B-C]. 4) Unloading the pumpsets will be by lorry crane / forklift. ¢) The pumpsets will be transported by pallet jacks/forklift to the installation location (Access route shall be free from obstruction during the movement at Basement 1.) 2.2. Equipment / Tools / Specifications a) Chain blocks b) Jacks / Trolley ©) Tool box 4) Scissors Lift / Ladder / Scaffolding ©) Insulation tester f) Size & Weight of the equipment are as follows: No. Description Qy Size Weight LxBxH(mm) | (Kg) 1 | Sprinkler Main Pump 2 | 1362x477x565 | 633kg 2 | Sprinkler Jockey Pump 1 | 250x210x856 | 35kg 3. | Sprinkler Main Pump Control] 2 | 965x365x1219 | 188kg Panel 4 | Sprinkler Jockey Pump Control | 1 | 345 x 196 x 381 7kg Panel WHC-SDK-ME-MS-8MECH-FIRE-DL Page 4 of 7 METHOD STATEMENT Date: 02 May 2019 SON preg] | FOR INSTALLATION & TESTING | Revo: 1 $ Sp OF SPRINKLER PUMPSET AND SDK CONSORTIUM ASSOCIATED PIPEWORKS & _| Doc no: WHC-SDK-ME- MS-BMECH-FIRE-01 WIRINGS 2.3. Installation Procedures — Sprinkler Main Pumpset 1. 10, MW 12, 13. 14, 15. 16. 17. 18. Ensure structural & architectural clearance are obtained in the Pumproom before installation work. (Example - Masonry works completed & staging are all cleared) Check pump foundation plinth, location, level and size are as per approved crawing. Check that the inertia block is constructed as per approved drawing Proceed with preparation of the pumpset installation. Set the dimensions of the inertia block onto the pump foundation plinth as per approved drawing, ‘Mark the location of the support brackets of the inertia block and install the anchor bolts for spring isolators. (Refer to Appendix A). Use jack/chain block to position the inertia block in accordance to the mark location. Jack up the inertia block and install the spring isolator on the marked location and secure by tightening the bolt & nut of the anchor. Lower the inertia block and secure its brackets onto the spring isolator. Proceed with initial level adjustment of the inertia block by adjusting the spring isolators, Mark the location of the pumpset’s anchorage points on the inertia block as per approved drawing and install the anchor bolts. ‘Use chain block to lift the pumpset and position it on the inertia block. Final adjustment to the pumpset position and secure onto the inertia block. Re-adjust the level of the inertia block by adjusting the spring isolators. Install pipeworks, valves, flexible connector, pressure gauges, flow meter & strainers by means of threaded/coupling/flange joints as per approved drawing. Install conduit/trunking and follow up with installation of cabling works (power & control cablings) Check proper termination of all cabling points. (¢.g. to Pump Panel, Pressure Switches & Level Electrodes) Conduct insulation resistance test for fire pump power cablings as per approved test form. Page 5 of 7 WHC-SDK-ME-MS-BMECH-PIRE-O1 METHOD STATEMENT Date: 02 May 2019 y FOR INSTALLATION & TESTING | ev n0: | OF SPRINKLER PUMPSET AND c RTIUM Doc no: WHC-SDK-ME- BRS. Baten A oes ea & MS-BMECH-FIRE-01 19. Check that all electrical interlocks are in accordance with pump’s wiring schematic. 20. Touch-up paint & labelling works to pumpsets, panels, pipeworks and conduit/trunking. 21. Conduct inspection on the installation works as per approved checklist. 2.4, Installation Procedures — Sprinkler Jockey Pump & Control Panel 1, Ensure structural & architectural clearance are obtain in the Pumproom before installation work. (Example - Masonry works completed & staging are all cleared) 2. Check pump foundation plinth, location, level and size are as per approved drawing. 3. Proceed with preparation of the pump installation by marking the location of the pump’s anchorage points as per approved drawing and install the anchor bolts. 4, Install the jockey pump with neoprene pad support onto the plinth and secure by tightening the bolts & nuts. 5. Install pipeworks, valves, flexible connector, pressure gauges & strainers by means of threaded joints as per approved drawing. 6. Mark the location of pump control panel on the wall and install — pl a wh, ee the supports as per approved drawing. ba 7. Install the mp oo control panel and secure it property by tightening te bolts sand ‘5 4" {sto the wall} ee ae a - 8. Install conduivtrunking and follow up with installation of cabling works (power & control cables). 9. Check proper termination of all cabling points. (¢.g., to Pump Panel, Pressure Switches & Level Electrodes.) 10. Conduct insulation resistance test for fire pump power cablings as per approved test form, 11. Check all electrical interlocks are in accordance with pump’s wiring schematic. 12, Touch-up paint & labelling works to pumpset, panels, pipeworks and conduit/trunking 13, Conduet inspection on the installation works as per approved checklist Page 6 of 7 WHC-SDK-ME-MS-BMECH-FIRE-O! METHOD STATEMENT Date: 02 May 2019 [ez] FOR INSTALLATION & TESTING | Rev 70:1 1 S OF SPRINKLER PUMPSET AND See eos an ASSOCIATED PIPEWORKS & | Dec 10: WHC-SDK-ME- WIRINGS MS-BMECH-FIRE-01 3. Safety Matters All works performed in accordance with this document will be carried out safely based on the approved risk assessments. (Refer to relevant risk assessment document) APPENDIX A: Sprinkler Main Pumpset Drawing ARE Puve ear patcce NO. OF SPRING ISOLATOR SHOWN IS FOR ILLUSTRATION PURPOSES. ACTUAL SPRING ISOLATOR QTY é& SIZING IS BASED ON LOAD CALCULATION Page 7 of 7 \WHC-SDK-ME-MS-BMECH-FIRE-O1

You might also like