Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CURRICULUM VITAE

Mr.Vedat ÇOBAN

Occupation : Geologoigal Engineer


Place/Date of Birth : Malatya 1970
Permanent Adres : Gümüşpala Mah. Arif Çalış Cad. 51/14
Elmadağ-ANKARA
Telephone : 00 90 536 9239063
Email :vedat_coban@hotmail.com / v.coban2014@gmail.com
Education : Dokuz Eylül Üniversity İzmir /Turkey
WORK EXPERIENCE
• 1994 - 1997 ; Kralkızı dam hydro elektric power plant.Responsible for drıllıng and grouting –
water lost grouting work; Temson Drilling and Grouting CO (Site Engineer, Site Manager).
• 1997 - 1998 ; Şanlı Urfa irrigantion tunnel.Prosention aktif dywidag anchar; Temson Drilling
and Grouting CO (Site Manager).
• 1998 - 1999 ; Umurbey dam responsible for drıllıng and grouting work; Temson Drilling and
Grouting CO (Site Manager).
• 1999 - 2000 ; Papuçdere dam responsible for drıllıng and grouting work – water lost grouting
work; Temson Drilling and Grouting CO (Site Manager).
• 2000 ; Orta Tokoi dam (Kırgızistan) water lost grouting work; Temson Drilling and Grouting
CO (Site Manager).
• 2001 ; Kığı dam hydro elektric power plant responsible for.Slope support and colleps grouting
work; Temson Drilling and Grouting CO (Site Manager).
• 2002 ; Dağcı dam (Irrigation dam) responsible for drıllıng and grouting work; Tural Drilling
and Grouting CO (Site Manager).
• 2002 ; Hacılar hydro elektric power plant for responsible for drıllıng and grouting work;
Tural Drilling and Grouting CO (Site Manager).
• 2003 ; Beşkarış dam responsible for drıllıng and grouting work; Asason CO (Site Manager).
• 2004 ; Double hıgh way tunnel responsible for ascauation and supporting work; Yavuz Yiğit
CO (Tunnel Responsible).
• 2005 - 2006 ; Mujip dam (Irrigation dam) (Jordan) water lost grouting work; Temson Drilling
and Grouting CO (Site Manager).
• 2006 - 2008 ; Al Wehdah dam (Jordan) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).
• 2008 - 2009 ; Beydağ dam prensiple responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).
• 2009 ; Borcka dam water lost grouting work; Temson Drilling and Grouting CO (Site
Manager).
• 2009 ; Erikli – Akocak hydro elektric power plant and tunnel for drıllıng and grouting work;
Temson Drilling and Grouting CO (Site Manager). ; Temson Drilling and Grouting CO (Site
Manager).
• 2009 - 2012 ; Gotvand dam (Iran) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).
• 2012 ; Izmir Metro - Poligon and Göztepe Stations; responsible for drıllıng and grouting
work; Temson Drilling and Grouting CO (Site Manager).
• 2012 ; Saracbendi hydro elektric power plant for responsible for drıllıng and grouting work;
Temson Drilling and Grouting CO (Site Manager). ; Temson Drilling and Grouting CO (Site
Manager).
• 2013 - 2014 ; Seymareh dam (Iran) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).
• 2014 - 2015 ; Kufranja dam (Jordan) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager) ; Temson Drilling and Grouting CO (Site Manager).
• 2015 - 2016 ; Banja dam (Albania) responsible for drıllıng and grouting work; Maber Drilling
and Grouting CO (Project Manager).
• 2016 ; Ura E Fanit dam (Albania) responsible for drıllıng and grouting work; Maber Drilling
and Grouting CO (Project Manager).
• 2017 ; Alparslan 1 dam water lost grouting work . (Project Manager).
• 2018 ; Ura E Fanit dam (Albania) responsible for drıllıng and grouting work; Kale Group CO
(Project Manager).
• 2019 ; Temson Drilling & Grouting CO. (Ankara) – Project Coordinator
• 2020 ; Ankara - Sivas High Speed Train Project; Jet Grout, all drıllıng and grouting
work; Çelikler Holding CO (Section Manager).
• 2021 ; OMS Drilling & Grouting CO. (Ankara) – Soda non-metallic mineral drilling work
(Project Manager).
• 2022 - 2023 ; First Mining Madencilik CO. (Sivas, Kahraman Maraş, Bingöl and Albania) –
Iron and Cupper metallic mineral drilling work (Section Manager).
• 2024 ; Rogun HPP dam (Tajikistan) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).

Foreign Languages

- English – B1
- Arabbic – A2 (Intermediate Level)
- Persian – A2 (Intermediate Level)

Computer Skills

- MS Office
- AutoCad

You might also like