Download as pdf or txt
Download as pdf or txt
You are on page 1of 43

Project: SWCC PUMP STATION ETAP Page: 1

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (2): Normal

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 14 0 111 125

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 54 0 0 88 0 5 147

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 9999

Precision of Solution: 0.0010000

System Frequency: 60.00 Hz

Unit System: Metric

Project Filename: 380_RTCC

Output Filename: E:\Ram\RTCC\380_RTCC Recommendation\Untitled.lfr


Project: SWCC PUMP STATION ETAP Page: 2

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: SWCC PUMP STATION ETAP Page: 3

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

132KV PSA2 BUS-1 132.000 2 100.0 0.0

132KV PSA2 BUS-2 132.000 2 100.0 0.0

132KV PSA3 BUS-1 132.000 2 100.0 0.0

132KV PSA3 BUS-2 132.000 2 100.0 0.0

132KV PSA4 BUS-1 132.000 2 100.0 0.0

132KV PSA4 BUS-2 132.000 2 100.0 0.0

132KV SHUQAIQ SS BUS-1 132.000 2 100.0 0.0

132KV SHUQAIQ SS BUS-2 132.000 2 100.0 0.0

Bus1 1.800 2 100.0 0.0

Bus2 13.800 2 100.0 0.0

Bus3 3.300 14 100.0 0.0 6.006 2.309

Bus4 13.800 2 100.0 0.0

Bus6 13.800 2 100.0 0.0

Bus7 1.800 2 100.0 0.0

Bus8 13.800 2 100.0 0.0

Bus9 1.800 2 100.0 0.0

Bus10 13.800 2 100.0 0.0

Bus11 3.300 12 100.0 0.0 6.006 2.309

Bus12 13.800 2 100.0 0.0

Bus13 1.800 2 100.0 0.0

Bus14 13.800 2 100.0 0.0

Bus15 1.800 2 100.0 0.0

Bus16 13.800 2 100.0 0.0

Bus17 1.800 2 100.0 0.0

Bus18 13.800 2 100.0 0.0

Bus19 132.000 1 100.0 0.0

Bus20 1.800 2 100.0 0.0

Bus21 132.000 2 100.0 0.0

Bus22 13.800 2 100.0 0.0

Bus24 13.800 2 100.0 0.0

Bus25 3.300 8 100.0 0.0 8.051 3.095

Bus26 13.800 2 100.0 0.0

Bus27 132.000 2 100.0 0.0


Project: SWCC PUMP STATION ETAP Page: 4

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus28 132.000 2 100.0 0.0

Bus29 132.000 2 100.0 0.0

Bus30 132.000 2 100.0 0.0

Bus31 132.000 2 100.0 0.0

Bus32 132.000 2 100.0 0.0

Bus33 13.800 2 100.0 0.0

Bus34 13.800 2 100.0 0.0

Bus35 13.800 2 100.0 0.0

Bus36 13.800 2 100.0 0.0

Bus37 13.800 2 100.0 0.0

Bus38 13.800 2 100.0 0.0

Bus39 13.800 2 100.0 0.0

Bus40 13.800 2 100.0 0.0

Bus41 13.800 2 100.0 0.0

Bus42 13.800 2 100.0 0.0

Bus43 13.800 2 100.0 0.0

Bus44 13.800 2 100.0 0.0

Bus45 1.800 2 100.0 0.0

Bus46 1.800 2 100.0 0.0

Bus47 1.800 2 100.0 0.0

Bus48 1.800 2 100.0 0.0

Bus49 1.800 2 100.0 0.0

Bus50 1.800 2 100.0 0.0

Bus51 1.800 2 100.0 0.0

Bus52 1.800 2 100.0 0.0

Bus53 1.800 2 100.0 0.0

Bus54 1.800 2 100.0 0.0

Bus55 1.800 2 100.0 0.0

Bus56 1.800 2 100.0 0.0

Bus57 1.800 2 100.0 0.0

Bus58 1.800 2 100.0 0.0

Bus59 132.000 2 100.0 0.0

Bus60 1.800 2 100.0 0.0

Bus61 1.800 2 100.0 0.0

Bus62 1.800 2 100.0 0.0


Project: SWCC PUMP STATION ETAP Page: 5

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus63 3.300 4 100.0 0.0 8.051 3.095

Bus64 1.800 2 100.0 0.0

Bus67 1.800 2 100.0 0.0

Bus69 3.300 6 100.0 0.0 8.051 3.095

Bus70 1.800 2 100.0 0.0

Bus72 3.300 7 100.0 0.0 8.051 3.095

Bus73 3.300 5 100.0 0.0 6.776 2.605

Bus74 1.800 2 100.0 0.0

Bus76 3.300 11 100.0 0.0 6.776 2.605

Bus77 1.800 2 100.0 0.0

Bus79 3.300 9 100.0 0.0 6.776 2.605

Bus80 1.800 2 100.0 0.0

Bus82 3.300 10 100.0 0.0 6.776 2.605

Bus83 1.800 2 100.0 0.0

Bus84 1.800 2 100.0 0.0

Bus85 1.800 2 100.0 0.0

Bus86 1.800 2 100.0 0.0

Bus87 1.800 2 100.0 0.0

Bus88 1.800 2 100.0 0.0

Bus89 1.800 2 100.0 0.0

Bus90 1.800 2 100.0 0.0

Bus91 1.800 2 100.0 0.0

Bus92 1.800 2 100.0 0.0

Bus93 1.800 2 100.0 0.0

Bus94 1.800 2 100.0 0.0

Bus95 1.800 2 100.0 0.0

Bus96 3.300 3 100.0 0.0 6.006 2.309

Bus99 1.800 2 100.0 0.0

Bus100 3.300 13 100.0 0.0 6.006 2.309

Bus102 1.800 2 100.0 0.0

Bus103 1.800 2 100.0 0.0

Bus104 1.800 2 100.0 0.0

Bus105 1.800 2 100.0 0.0

Bus106 1.800 2 100.0 0.0

Bus107 1.800 2 100.0 0.0


Project: SWCC PUMP STATION ETAP Page: 6

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus108 1.800 2 100.0 0.0

Bus109 1.800 2 100.0 0.0

Bus110 1.800 2 100.0 0.0

Bus111 1.800 2 100.0 0.0

Bus112 1.800 2 100.0 0.0

Bus113 1.800 2 100.0 0.0

Bus114 1.800 2 100.0 0.0

Bus115 1.800 2 100.0 0.0

Bus116 1.800 2 100.0 0.0

Bus117 1.800 2 100.0 0.0

PSA2 PH-3 13.8KV BUS-1 13.800 2 100.0 0.0

PSA2 PH-3 13.8KV BUS-2 13.800 2 100.0 0.0

PSA3 PH-3 13.8KV BUS-1 13.800 2 100.0 0.0

PSA3 PH-3 13.8KV BUS-2 13.800 2 100.0 0.0

PSA4 PH-3 13.8KV BUS-1 13.800 2 100.0 0.0

PSA4 PH-3 13.8KV BUS-2 13.800 2 100.0 0.0

T-OFF PSA4-1 132.000 2 100.0 0.0

T-OFF PSA4-2 132.000 2 100.0 0.0

T-OFF TWR#203-1 132.000 2 100.0 0.0

T-OFF TWR#203-2 132.000 2 100.0 0.0

T-OFF TWR#274-1 132.000 2 100.0 0.0

T-OFF TWR#274-2 132.000 2 100.0 0.0

Total Number of Buses: 125 83.333 32.037 0.000 0.000 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus3 3.300 Swing 14 100.0 0.0

Bus11 3.300 Swing 12 100.0 0.0

Bus19 132.000 Swing 1 100.0 0.0

Bus21 132.000 Swing 2 100.0 0.0

Bus25 3.300 Swing 8 100.0 0.0

Bus63 3.300 Swing 4 100.0 0.0

Bus69 3.300 Swing 6 100.0 0.0

Bus72 3.300 Swing 7 100.0 0.0

Bus73 3.300 Swing 5 100.0 0.0


Project: SWCC PUMP STATION ETAP Page: 7

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus76 3.300 Swing 11 100.0 0.0

Bus79 3.300 Swing 9 100.0 0.0

Bus82 3.300 Swing 10 100.0 0.0

Bus96 3.300 Swing 3 100.0 0.0

Bus100 3.300 Swing 13 100.0 0.0

0.000 0.000
Project: SWCC PUMP STATION ETAP Page: 8

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Line/Cable/Busway Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable1 15NCUS1 300 125.0 0.0 1 75 0.077447 0.139860

Cable2 15NCUS1 300 115.0 0.0 1 75 0.077447 0.139860

Cable3 15NCUS1 300 105.0 0.0 1 75 0.077447 0.139860

Cable4 15NCUS1 300 135.0 0.0 1 75 0.077447 0.139860

Cable5 138NCUS1 630 350.0 0.0 1 75 0.034431 0.078000

Cable6 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable7 138NCUS1 630 350.0 0.0 1 75 0.034431 0.078000

Cable8 138NCUS1 630 250.0 0.0 1 75 0.034431 0.078000

Cable9 138NCUS1 630 250.0 0.0 1 75 0.034431 0.078000

Cable10 138NCUS1 630 290.0 0.0 1 75 0.034431 0.078000

Cable11 138NCUS1 630 290.0 0.0 1 75 0.034431 0.078000

Cable12 15NCUS1 300 100.0 0.0 1 75 0.077447 0.139860

Cable13 15NCUS1 400 150.0 0.0 4 75 0.062091 0.102000

Cable14 15NCUS1 150 135.0 0.0 2 75 0.152604 0.115000

Cable15 6.0NCUN1 400 65.0 0.0 2 75 0.062663 0.103500

Cable16 6.0NCUN1 400 65.0 0.0 2 75 0.062663 0.103500

Cable17 6.0NCUN1 400 65.0 0.0 2 75 0.062663 0.103500

Cable18 15NCUS1 300 100.0 0.0 1 75 0.077447 0.139860

Cable19 15NCUS1 300 100.0 0.0 1 75 0.077447 0.139860

Cable20 15NCUS1 300 100.0 0.0 1 75 0.077447 0.139860

Cable21 15NCUS1 150 115.0 0.0 2 75 0.152604 0.115000

Cable22 15NCUS1 150 125.0 0.0 2 75 0.152604 0.115000

Cable23 15NCUS1 150 105.0 0.0 2 75 0.152604 0.115000

Cable24 15NCUS1 400 150.0 0.0 4 75 0.062091 0.102000

Cable25 15NCUS1 185 110.0 0.0 1 75 0.123037 0.112000

Cable26 15NCUS1 400 200.0 0.0 4 75 0.062091 0.102000

Cable27 15NCUS1 400 200.0 0.0 4 75 0.062091 0.102000

Cable28 15NCUS1 400 150.0 0.0 4 75 0.061518 0.102000

Cable29 15NCUS1 400 150.0 0.0 4 75 0.061518 0.102000

Cable31 15NCUS1 185 110.0 0.0 1 75 0.123037 0.112000

Cable32 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable33 15NCUS1 300 50.0 0.0 1 75 0.077447 0.139860

Cable34 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable35 15NCUS1 300 50.0 0.0 1 75 0.077447 0.139860


Project: SWCC PUMP STATION ETAP Page: 9

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable36 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable37 15NCUS1 150 110.0 0.0 2 75 0.152604 0.115000

Cable38 15NCUS1 150 100.0 0.0 2 75 0.152604 0.115000

Cable39 6.0NCUN1 400 75.0 0.0 2 75 0.062663 0.103500

Cable40 6.0NCUN1 400 70.0 0.0 2 75 0.062663 0.103500

Cable41 6.0NCUN1 400 75.0 0.0 2 75 0.062663 0.103500

Cable42 6.0NCUN1 400 75.0 0.0 2 75 0.062663 0.103500

Cable43 6.0NCUN1 400 75.0 0.0 2 75 0.062663 0.103500

Cable44 6.0NCUN1 400 70.0 0.0 2 75 0.062663 0.103500

Cable45 6.0NCUN1 400 70.0 0.0 2 75 0.062663 0.103500

Cable46 6.0NCUN1 400 70.0 0.0 2 75 0.062663 0.103500

Cable48 6.0NCUN1 400 68.0 0.0 2 75 0.062663 0.103500

Cable49 6.0NCUN1 400 68.0 0.0 2 75 0.062663 0.103500

Cable50 6.0NCUN1 400 68.0 0.0 2 75 0.062663 0.103500

Cable51 6.0NCUN1 400 68.0 0.0 2 75 0.062663 0.103500

Cable52 6.0NCUN1 400 65.0 0.0 2 75 0.062663 0.103500

Cable67 6.0NCUN1 400 70.0 0.0 4 75 0.076970 0.106800

Cable68 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable69 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable70 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable77 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable78 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable79 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable80 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable84 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable85 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable86 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable87 6.0NCUN1 400 70.0 0.0 4 75 0.062663 0.103500

Cable91 6.0NCUN1 300 65.0 0.0 2 75 0.062663 0.103500

Cable92 6.0NCUN1 300 65.0 0.0 2 75 0.062663 0.103500

Cable93 6.0NCUN1 300 65.0 0.0 2 75 0.062663 0.103500

Cable94 6.0NCUN1 300 65.0 0.0 2 75 0.076970 0.106800

Cable95 6.0NCUN1 300 68.0 0.0 2 75 0.076970 0.106800

Cable96 6.0NCUN1 300 68.0 0.0 2 75 0.062663 0.103500

Cable97 6.0NCUN1 300 68.0 0.0 2 75 0.062663 0.103500

Cable101 6.0NCUN1 300 68.0 0.0 2 75 0.062663 0.103500


Project: SWCC PUMP STATION ETAP Page: 10

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable105 6.0NCUN1 300 75.0 0.0 2 75 0.076970 0.106800

Cable106 6.0NCUN1 300 75.0 0.0 2 75 0.062663 0.103500

Cable107 6.0NCUN1 300 75.0 0.0 2 75 0.062663 0.103500

Cable108 6.0NCUN1 300 75.0 0.0 2 75 0.062663 0.103500

Cable112 6.0NCUN1 300 70.0 0.0 2 75 0.076970 0.106800

Cable113 6.0NCUN1 300 70.0 0.0 2 75 0.062663 0.103500

Cable114 6.0NCUN1 300 70.0 0.0 2 75 0.062663 0.103500

Cable115 6.0NCUN1 300 70.0 0.0 2 75 0.062663 0.103500

LINE-1(E09)-1 67920.0 0.0 1 90 0.072460 0.473000 0.0000036

LINE-1(E09)-2. 24519.0 0.0 1 90 0.088700 0.466000 0.0000036

LINE-1(E09)-PSA2 364.0 0.0 1 90 0.072460 0.473000 0.0000036

LINE-1(E09)-PSA3 96.0 0.0 1 90 0.088700 0.466000 0.0000036

LINE-1(E09)-PSA4 6055.0 0.0 1 95 0.089700 0.482000 0.0000036

LINE-2(E13)-1 67920.0 0.0 1 90 0.080630 0.487000 0.0000036

LINE-2(E13)-2. 24519.0 0.0 1 90 0.072400 0.489000 0.0000036

LINE-2(E13)-PSA2 364.0 0.0 1 90 0.080630 0.487000 0.0000036

LINE-2(E13)-PSA3 96.0 0.0 1 90 0.072460 0.489000 0.0000036

LINE-2(E13)-PSA4 6055.0 0.0 1 90 0.075500 0.466000 0.0000036

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: SWCC PUMP STATION ETAP Page: 11

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Switched Capacitor Input Data

Capacitor Rating

Max. # of
ID Phase kV kV Mvar/Bank Banks microfarad Grounding % Loading

C22CP01 3-Phase 13.800 17.500 0.412 7 40.170 Y-Solid 100.00


C22CP02 3-Phase 13.800 17.500 0.412 7 40.170 Y-Solid 100.00
C23CP01 3-Phase 13.800 13.800 0.600 6 50.143 Y-Solid 100.00
C23CP02 3-Phase 13.800 13.800 0.600 6 50.143 Y-Solid 100.00
C24CP01 3-Phase 13.800 13.800 0.669 7 65.228 Y-Solid 100.00
C24CP02 3-Phase 13.800 13.800 0.669 7 65.228 Y-Solid 100.00

Control Parameters

Capacitor Control Mode

Switch Switch Upper Lower


ID Type In Out Band Band Unit

C22CP01 Power Factor 90.00 100.00 5.00 5.00 %


C22CP02 Power Factor 90.00 100.00 5.00 5.00 %
C23CP01 Power Factor 90.00 100.00 5.00 5.00 %
C23CP02 Power Factor 90.00 100.00 5.00 5.00 %
C24CP01 Power Factor 90.00 100.00 5.00 5.00 %
C24CP02 Power Factor 90.00 100.00 5.00 5.00 %
Project: SWCC PUMP STATION ETAP Page: 12

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

C22XR11N002-1 3-Phase 2.500 13.800 1.800 5.27 6.00 0 0 0 0 0 5.2700 Yd 0.000


C22XR11N002-2 3-Phase 2.500 13.800 1.800 5.29 6.00 0 0 0 0 0 5.2900 Yd 0.000

C22XR11N002-3 3-Phase 2.500 13.800 1.800 5.23 6.00 0 0 0 0 0 5.2300 Yd 0.000

C22XR11N002-4 3-Phase 2.500 13.800 1.800 5.27 6.00 0 0 0 0 0 5.2700 Yd 0.000

C22XR12N002-1 3-Phase 2.500 13.800 1.800 5.27 6.00 0 0 0 0 0 5.2700 Yd 0.000

C22XR12N002-2 3-Phase 2.500 13.800 1.800 5.29 6.00 0 0 0 0 0 5.2900 Yd 0.000


C22XR12N002-3 3-Phase 2.500 13.800 1.800 5.23 6.00 0 0 0 0 0 5.2300 Yd 0.000

C22XR12N002-4 3-Phase 2.500 13.800 1.800 5.27 6.00 0 0 0 0 0 5.2700 Yd 0.000

C22XR13N002-1 3-Phase 2.500 13.800 1.800 5.27 6.00 0 0 0 0 0 5.2700 Yd 0.000


C22XR13N002-2 3-Phase 2.500 13.800 1.800 5.29 6.00 0 0 0 0 0 5.2900 Yd 0.000

C22XR13N002-3 3-Phase 2.500 13.800 1.800 5.23 6.00 0 0 0 0 0 5.2300 Yd 0.000


C22XR13N002-4 3-Phase 2.500 13.800 1.800 5.27 6.00 0 0 0 0 0 5.2700 Yd 0.000

C22XR14N002-1 3-Phase 2.500 13.800 1.800 5.27 6.00 0 0 0 0 0 5.2700 Yd 0.000


C22XR14N002-2 3-Phase 2.500 13.800 1.800 5.29 6.00 0 0 0 0 0 5.2900 Yd 0.000

C22XR14N002-3 3-Phase 2.500 13.800 1.800 5.23 6.00 0 0 0 0 0 5.2300 Yd 0.000


C22XR14N002-4 3-Phase 2.500 13.800 1.800 5.27 6.00 0 0 0 0 0 5.2700 Yd 0.000

C23XR11N002-1 3-Phase 2.750 13.800 1.800 5.45 6.00 0 0 0 0 0 5.4500 Yd 0.000


C23XR11N002-2 3-Phase 2.750 13.800 1.800 5.71 6.00 0 0 0 0 0 5.7100 Yd 0.000

C23XR11N002-3 3-Phase 2.750 13.800 1.800 5.63 6.00 0 0 0 0 0 5.6300 Yd 0.000


C23XR11N002-4 3-Phase 2.750 13.800 1.800 5.34 6.00 0 0 0 0 0 5.3400 Yd 0.000

C23XR12N002-1 3-Phase 2.750 13.800 1.800 5.45 6.00 0 0 0 0 0 5.4500 Yd 0.000


C23XR12N002-2 3-Phase 2.750 13.800 1.800 5.71 6.00 0 0 0 0 0 5.7100 Yd 0.000
C23XR12N002-3 3-Phase 2.750 13.800 1.800 5.63 6.00 0 0 0 0 0 5.6300 Yd 0.000

C23XR12N002-4 3-Phase 2.750 13.800 1.800 5.34 6.00 0 0 0 0 0 5.3400 Yd 0.000

C23XR13N002-1 3-Phase 2.750 13.800 1.800 5.45 6.00 0 0 0 0 0 5.4500 Yd 0.000


C23XR13N002-2 3-Phase 2.750 13.800 1.800 5.71 6.00 0 0 0 0 0 5.7100 Yd 0.000
C23XR13N002-3 3-Phase 2.750 13.800 1.800 5.63 6.00 0 0 0 0 0 5.6300 Yd 0.000

C23XR13N002-4 3-Phase 2.750 13.800 1.800 5.34 6.00 0 0 0 0 0 5.3400 Yd 0.000

C23XR14N002-1 3-Phase 2.750 13.800 1.800 5.45 6.00 0 0 0 0 0 5.4500 Yd 0.000


C23XR14N002-2 3-Phase 2.750 13.800 1.800 5.71 6.00 0 0 0 0 0 5.7100 Yd 0.000
C23XR14N002-3 3-Phase 2.750 13.800 1.800 5.63 6.00 0 0 0 0 0 5.6300 Yd 0.000

C23XR14N002-4 3-Phase 2.750 13.800 1.800 5.34 6.00 0 0 0 0 0 5.3400 Yd 0.000

C24XR11N002-1 3-Phase 3.375 13.800 1.800 5.41 8.50 0 0 0 0 0 5.4100 Yd 0.000


C24XR11N002-2 3-Phase 3.375 13.800 1.800 5.37 8.50 0 0 0 0 0 5.3700 Yd 0.000
C24XR11N002-3 3-Phase 3.375 13.800 1.800 5.29 8.50 0 0 0 0 0 5.2900 Yd 0.000

C24XR11N002-4 3-Phase 3.375 13.800 1.800 5.72 8.50 0 0 0 0 0 5.7200 Yd 0.000

C24XR12N002-1 3-Phase 3.375 13.800 1.800 5.41 8.50 0 0 0 0 0 5.4100 Yd 0.000


C24XR12N002-2 3-Phase 3.375 13.800 1.800 5.37 8.50 0 0 0 0 0 5.3700 Yd 0.000
Project: SWCC PUMP STATION ETAP Page: 13

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

C24XR12N002-3 3-Phase 3.375 13.800 1.800 5.29 8.50 0 0 0 0 0 5.2900 Yd 0.000


C24XR12N002-4 3-Phase 3.375 13.800 1.800 5.72 8.50 0 0 0 0 0 5.7200 Yd 0.000

C24XR13N002-1 3-Phase 3.375 13.800 1.800 5.41 8.50 0 0 0 0 0 5.4100 Yd 0.000

C24XR13N002-2 3-Phase 3.375 13.800 1.800 5.37 8.50 0 0 0 0 0 5.3700 Yd 0.000

C24XR13N002-3 3-Phase 3.375 13.800 1.800 5.29 8.50 0 0 0 0 0 5.2900 Yd 0.000

C24XR13N002-4 3-Phase 3.375 13.800 1.800 5.72 8.50 0 0 0 0 0 5.7200 Yd 0.000


C24XR14N002-1 3-Phase 3.375 13.800 1.800 5.41 8.50 0 0 0 0 0 5.4100 Yd 0.000

C24XR14N002-2 3-Phase 3.375 13.800 1.800 5.37 8.50 0 0 0 0 0 5.3700 Yd 0.000

C24XR14N002-3 3-Phase 3.375 13.800 1.800 5.29 8.50 0 0 0 0 0 5.2900 Yd 0.000


C24XR14N002-4 3-Phase 3.375 13.800 1.800 5.72 8.50 0 0 0 0 0 5.7200 Yd 0.000

T603-PSA2 3-Phase 50.000 132.000 13.800 23.00 45.00 0 0 7.5 0 0 24.7250 Dyn 0.000
T603-PSA3. 3-Phase 50.000 132.000 13.800 23.00 45.00 0 0 7.5 0 0 24.7250 Dyn 0.000

T603-PSA4. 3-Phase 55.000 132.000 13.800 26.00 45.00 0 0 7.5 0 0 27.9500 Dyn 0.000
T604-PSA2 3-Phase 50.000 132.000 13.800 23.00 45.00 0 0 7.5 0 0 24.7250 Dyn 0.000

T604-PSA3 3-Phase 50.000 132.000 13.800 23.00 45.00 0 0 7.5 0 0 24.7250 Dyn 0.000
T604-PSA4 3-Phase 55.000 132.000 13.800 26.00 45.00 0 0 7.5 0 0 27.9500 Dyn 0.000

2-Winding Transformer Load Tap Changer (LTC) Settings

Transformer Load Tap Changer Setting


Transformer Connected Buses ("*" LTC Side)
% Min. % Max.
ID Primary Bus ID Secondary Bus ID Tap Tap % Step Regulated Bus ID %V kV

T603-PSA2 * Bus27 Bus33 -12.00 8.00 1.250 PSA2 PH-3 13.8KV BUS-1 100.00 13.800

T603-PSA3. * Bus29 Bus37 -12.00 8.00 1.250 PSA3 PH-3 13.8KV BUS-1 100.00 13.800

T603-PSA4. * Bus32 Bus39 -12.00 8.00 1.250 PSA4 PH-3 13.8KV BUS-1 100.00 13.800

T604-PSA2 * Bus28 Bus35 -12.00 8.00 1.250 PSA2 PH-3 13.8KV BUS-2 100.00 13.800

T604-PSA3 * Bus30 Bus38 -12.00 8.00 1.250 PSA3 PH-3 13.8KV BUS-2 100.00 13.800

T604-PSA4 * Bus31 Bus40 -12.00 8.00 1.250 PSA4 PH-3 13.8KV BUS-2 100.00 13.800
Project: SWCC PUMP STATION ETAP Page: 14

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

C22XR11N002-1 2W XFMR Bus4 Bus106 34.66 207.93 210.80

C22XR11N002-2 2W XFMR Bus4 Bus107 34.79 208.72 211.60

C22XR11N002-3 2W XFMR Bus4 Bus108 34.39 206.35 209.20

C22XR11N002-4 2W XFMR Bus4 Bus109 34.66 207.93 210.80

C22XR12N002-1 2W XFMR Bus6 Bus110 34.66 207.93 210.80

C22XR12N002-2 2W XFMR Bus6 Bus111 34.79 208.72 211.60

C22XR12N002-3 2W XFMR Bus6 Bus112 34.39 206.35 209.20

C22XR12N002-4 2W XFMR Bus6 Bus113 34.66 207.93 210.80

C22XR13N002-1 2W XFMR Bus2 Bus102 34.66 207.93 210.80

C22XR13N002-2 2W XFMR Bus2 Bus103 34.79 208.72 211.60

C22XR13N002-3 2W XFMR Bus2 Bus104 34.39 206.35 209.20

C22XR13N002-4 2W XFMR Bus2 Bus105 34.66 207.93 210.80

C22XR14N002-1 2W XFMR Bus8 Bus114 34.66 207.93 210.80

C22XR14N002-2 2W XFMR Bus8 Bus115 34.79 208.72 211.60

C22XR14N002-3 2W XFMR Bus8 Bus116 34.39 206.35 209.20

C22XR14N002-4 2W XFMR Bus8 Bus117 34.66 207.93 210.80

C23XR11N002-1 2W XFMR Bus10 Bus87 32.58 195.49 198.18

C23XR11N002-2 2W XFMR Bus10 Bus88 34.14 204.81 207.64

C23XR11N002-3 2W XFMR Bus10 Bus89 33.66 201.94 204.73

C23XR11N002-4 2W XFMR Bus10 Bus90 31.92 191.54 194.18

C23XR12N002-1 2W XFMR Bus16 Bus91 32.58 195.49 198.18

C23XR12N002-2 2W XFMR Bus16 Bus92 34.14 204.81 207.64

C23XR12N002-3 2W XFMR Bus16 Bus93 33.66 201.94 204.73

C23XR12N002-4 2W XFMR Bus16 Bus94 31.92 191.54 194.18

C23XR13N002-1 2W XFMR Bus14 Bus83 32.58 195.49 198.18

C23XR13N002-2 2W XFMR Bus14 Bus84 34.14 204.81 207.64

C23XR13N002-3 2W XFMR Bus14 Bus85 33.66 201.94 204.73

C23XR13N002-4 2W XFMR Bus14 Bus86 31.92 191.54 194.18

C23XR14N002-1 2W XFMR Bus18 Bus13 32.58 195.49 198.18

C23XR14N002-2 2W XFMR Bus18 Bus15 34.14 204.81 207.64

C23XR14N002-3 2W XFMR Bus18 Bus17 33.66 201.94 204.73

C23XR14N002-4 2W XFMR Bus18 Bus64 31.92 191.54 194.18

C24XR11N002-1 2W XFMR Bus22 Bus49 18.73 159.20 160.30

C24XR11N002-2 2W XFMR Bus22 Bus50 18.59 158.02 159.11

C24XR11N002-3 2W XFMR Bus22 Bus52 18.31 155.67 156.74

C24XR11N002-4 2W XFMR Bus22 Bus51 19.80 168.32 169.48


Project: SWCC PUMP STATION ETAP Page: 15

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

C24XR12N002-1 2W XFMR Bus24 Bus53 18.73 159.20 160.30

C24XR12N002-2 2W XFMR Bus24 Bus54 18.59 158.02 159.11

C24XR12N002-3 2W XFMR Bus24 Bus55 18.31 155.67 156.74

C24XR12N002-4 2W XFMR Bus24 Bus56 19.80 168.32 169.48

C24XR13N002-1 2W XFMR Bus12 Bus45 18.73 159.20 160.30

C24XR13N002-2 2W XFMR Bus12 Bus46 18.59 158.02 159.11

C24XR13N002-3 2W XFMR Bus12 Bus47 18.31 155.67 156.74

C24XR13N002-4 2W XFMR Bus12 Bus48 19.80 168.32 169.48

C24XR14N002-1 2W XFMR Bus26 Bus57 18.73 159.20 160.30

C24XR14N002-2 2W XFMR Bus26 Bus58 18.59 158.02 159.11

C24XR14N002-3 2W XFMR Bus26 Bus60 18.31 155.67 156.74

C24XR14N002-4 2W XFMR Bus26 Bus61 19.80 168.32 169.48

T603-PSA2 2W XFMR Bus27 Bus33 1.06 47.58 47.60

T603-PSA3. 2W XFMR Bus29 Bus37 1.04 46.97 46.98

T603-PSA4. 2W XFMR Bus32 Bus39 1.07 48.27 48.28

T604-PSA2 2W XFMR Bus28 Bus35 1.06 47.58 47.60

T604-PSA3 2W XFMR Bus30 Bus38 1.04 46.97 46.98

T604-PSA4 2W XFMR Bus31 Bus40 1.07 48.27 48.28

Cable1 Cable PSA2 PH-3 13.8KV BUS-1 Bus4 0.51 0.92 1.05

Cable2 Cable PSA2 PH-3 13.8KV BUS-2 Bus6 0.47 0.84 0.97

Cable3 Cable PSA2 PH-3 13.8KV BUS-2 Bus8 0.43 0.77 0.88

Cable4 Cable PSA2 PH-3 13.8KV BUS-1 Bus2 0.55 0.99 1.13

Cable5 Cable 132KV PSA2 BUS-1 Bus27 0.01 0.02 0.02

Cable6 Cable Bus15 Bus9 3.38 5.59 6.54

Cable7 Cable 132KV PSA2 BUS-2 Bus28 0.01 0.02 0.02

Cable8 Cable 132KV PSA3 BUS-1 Bus29 0.00 0.01 0.01

Cable9 Cable 132KV PSA3 BUS-2 Bus30 0.00 0.01 0.01

Cable10 Cable 132KV PSA4 BUS-2 Bus31 0.01 0.01 0.01

Cable11 Cable 132KV PSA4 BUS-1 Bus32 0.01 0.01 0.01

Cable12 Cable PSA3 PH-3 13.8KV BUS-1 Bus10 0.41 0.73 0.84

Cable13 Cable Bus33 PSA2 PH-3 13.8KV BUS-1 0.12 0.20 0.24

Cable14 Cable PSA4 PH-3 13.8KV BUS-1 Bus12 0.54 0.41 0.68

Cable15 Cable Bus57 Bus20 6.29 10.38 12.14

Cable16 Cable Bus61 Bus20 6.29 10.38 12.14

Cable17 Cable Bus58 Bus20 6.29 10.38 12.14

Cable18 Cable PSA3 PH-3 13.8KV BUS-1 Bus14 0.41 0.73 0.84

Cable19 Cable PSA3 PH-3 13.8KV BUS-2 Bus16 0.41 0.73 0.84

Cable20 Cable PSA3 PH-3 13.8KV BUS-2 Bus18 0.41 0.73 0.84

Cable21 Cable PSA4 PH-3 13.8KV BUS-1 Bus22 0.46 0.35 0.58
Project: SWCC PUMP STATION ETAP Page: 16

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Cable22 Cable PSA4 PH-3 13.8KV BUS-2 Bus24 0.50 0.38 0.63

Cable23 Cable PSA4 PH-3 13.8KV BUS-2 Bus26 0.42 0.32 0.53

Cable24 Cable Bus35 PSA2 PH-3 13.8KV BUS-2 0.12 0.20 0.24

Cable25 Cable PSA2 PH-3 13.8KV BUS-1 Bus34 0.71 0.65 0.96

Cable26 Cable Bus37 PSA3 PH-3 13.8KV BUS-1 0.16 0.27 0.31

Cable27 Cable Bus38 PSA3 PH-3 13.8KV BUS-2 0.16 0.27 0.31

Cable28 Cable Bus39 PSA4 PH-3 13.8KV BUS-1 0.12 0.20 0.23

Cable29 Cable Bus40 PSA4 PH-3 13.8KV BUS-2 0.12 0.20 0.23

Cable31 Cable PSA2 PH-3 13.8KV BUS-2 Bus36 0.71 0.65 0.96

Cable32 Cable Bus17 Bus9 3.38 5.59 6.54

Cable33 Cable PSA3 PH-3 13.8KV BUS-1 Bus41 0.20 0.37 0.42

Cable34 Cable Bus64 Bus9 3.38 5.59 6.54

Cable35 Cable PSA3 PH-3 13.8KV BUS-2 Bus42 0.20 0.37 0.42

Cable36 Cable Bus13 Bus9 3.38 5.59 6.54

Cable37 Cable PSA4 PH-3 13.8KV BUS-1 Bus43 0.44 0.33 0.55

Cable38 Cable PSA4 PH-3 13.8KV BUS-2 Bus44 0.40 0.30 0.50

Cable39 Cable Bus45 Bus62 7.25 11.98 14.00

Cable40 Cable Bus50 Bus67 6.77 11.18 13.07

Cable41 Cable Bus46 Bus62 7.25 11.98 14.00

Cable42 Cable Bus47 Bus62 7.25 11.98 14.00

Cable43 Cable Bus48 Bus62 7.25 11.98 14.00

Cable44 Cable Bus49 Bus67 6.77 11.18 13.07

Cable45 Cable Bus51 Bus67 6.77 11.18 13.07

Cable46 Cable Bus52 Bus67 6.77 11.18 13.07

Cable48 Cable Bus53 Bus70 6.58 10.86 12.70

Cable49 Cable Bus56 Bus70 6.58 10.86 12.70

Cable50 Cable Bus54 Bus70 6.58 10.86 12.70

Cable51 Cable Bus55 Bus70 6.58 10.86 12.70

Cable52 Cable Bus60 Bus20 6.29 10.38 12.14

Cable67 Cable Bus83 Bus74 4.16 5.77 7.11

Cable68 Cable Bus84 Bus74 3.38 5.59 6.54

Cable69 Cable Bus85 Bus74 3.38 5.59 6.54

Cable70 Cable Bus86 Bus74 3.38 5.59 6.54

Cable77 Cable Bus91 Bus77 3.38 5.59 6.54

Cable78 Cable Bus92 Bus77 3.38 5.59 6.54

Cable79 Cable Bus93 Bus77 3.38 5.59 6.54

Cable80 Cable Bus94 Bus77 3.38 5.59 6.54

Cable84 Cable Bus87 Bus80 3.38 5.59 6.54

Cable85 Cable Bus88 Bus80 3.38 5.59 6.54


Project: SWCC PUMP STATION ETAP Page: 17

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Cable86 Cable Bus89 Bus80 3.38 5.59 6.54

Cable87 Cable Bus90 Bus80 3.38 5.59 6.54

Cable91 Cable Bus115 Bus95 6.29 10.38 12.14

Cable92 Cable Bus116 Bus95 6.29 10.38 12.14

Cable93 Cable Bus117 Bus95 6.29 10.38 12.14

Cable94 Cable Bus114 Bus95 7.72 10.71 13.21

Cable95 Cable Bus110 Bus1 8.08 11.21 13.81

Cable96 Cable Bus111 Bus1 6.58 10.86 12.70

Cable97 Cable Bus112 Bus1 6.58 10.86 12.70

Cable101 Cable Bus113 Bus1 6.58 10.86 12.70

Cable105 Cable Bus102 Bus7 8.91 12.36 15.24

Cable106 Cable Bus103 Bus7 7.25 11.98 14.00

Cable107 Cable Bus104 Bus7 7.25 11.98 14.00

Cable108 Cable Bus105 Bus7 7.25 11.98 14.00

Cable112 Cable Bus106 Bus99 8.31 11.54 14.22

Cable113 Cable Bus107 Bus99 6.77 11.18 13.07

Cable114 Cable Bus108 Bus99 6.77 11.18 13.07

Cable115 Cable Bus109 Bus99 6.77 11.18 13.07

LINE-1(E09)-1 Line T-OFF TWR#203-1 132KV SHUQAIQ SS BUS-1 2.82 18.44 18.65 4.2603770

LINE-1(E09)-2. Line T-OFF TWR#274-1 T-OFF TWR#203-1 1.25 6.56 6.68 1.5379890

LINE-1(E09)-PSA2 Line 132KV PSA2 BUS-1 T-OFF TWR#203-1 0.02 0.10 0.10 0.0228324

LINE-1(E09)-PSA3 Line 132KV PSA3 BUS-1 T-OFF TWR#274-1 0.00 0.03 0.03 0.0060217

LINE-1(E09)-PSA4 Line T-OFF PSA4-1 T-OFF TWR#274-1 0.31 1.67 1.70 0.3798083

LINE-2(E13)-1 Line T-OFF TWR#203-2 132KV SHUQAIQ SS BUS-2 3.14 18.98 19.24 4.2603770

LINE-2(E13)-2. Line T-OFF TWR#274-2 T-OFF TWR#203-2 1.02 6.88 6.96 1.5379890

LINE-2(E13)-PSA2 Line 132KV PSA2 BUS-2 T-OFF TWR#203-2 0.02 0.10 0.10 0.0228324

LINE-2(E13)-PSA3 Line 132KV PSA3 BUS-2 T-OFF TWR#274-2 0.00 0.03 0.03 0.0060217

LINE-2(E13)-PSA4 Line T-OFF PSA4-2 T-OFF TWR#274-2 0.26 1.62 1.64 0.3798083

24SA6X02 Tie Breakr 132KV PSA4 BUS-2 T-OFF PSA4-2

24SA6X05 Tie Breakr 132KV PSA4 BUS-1 T-OFF PSA4-1

CB4 Tie Breakr 132KV SHUQAIQ SS BUS-1 Bus59

CB6 Tie Breakr 132KV SHUQAIQ SS BUS-2 Bus59

2SW1 Tie Switch Bus59 Bus21


Project: SWCC PUMP STATION ETAP Page: 18

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

VFD Input Data

AC Rating
MVA kV FLA Input Operating Output
Bypass
ID Output Input Output Input Output % EFF % PF V/Hz % Frequency Hz % Imax Switch

C22XR11N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C22XR12N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C22XR13N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C22XR14N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C23XR11N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C23XR12N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C23XR13N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C23XR14N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C24XR11N001 15.200 1.800 3.300 4618.80 2659.31 98.50 100.00 100.0 60.0 150.0 No
C24XR12N001 15.200 1.800 3.300 4618.80 2659.31 98.50 100.00 100.0 60.0 150.0 No
C24XR13N001 15.200 1.800 3.300 4618.80 2659.31 98.50 100.00 100.0 60.0 150.0 No
C24XR14N001 15.200 1.800 3.300 4618.80 2659.31 98.50 100.00 100.0 60.0 150.0 No
Project: SWCC PUMP STATION ETAP Page: 19

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

132KV PSA2 BUS-1 132.000 97.452 -4.6 0.000 0.000 0.000 0.000 Bus27 12.309 2.356 56.2 98.2

T-OFF TWR#203-1 -12.309 -2.356 56.2 98.2

132KV PSA2 BUS-2 132.000 97.240 -4.7 0.000 0.000 0.000 0.000 Bus28 12.308 2.372 56.4 98.2

T-OFF TWR#203-2 -12.308 -2.372 56.4 98.2

132KV PSA3 BUS-1 132.000 96.706 -5.7 0.000 0.000 0.000 0.000 Bus29 13.886 2.384 63.7 98.6

T-OFF TWR#274-1 -13.886 -2.384 63.7 98.6

132KV PSA3 BUS-2 132.000 96.543 -5.9 0.000 0.000 0.000 0.000 Bus30 13.886 2.403 63.8 98.5

T-OFF TWR#274-2 -13.886 -2.403 63.8 98.5

132KV PSA4 BUS-1 132.000 96.594 -5.9 0.000 0.000 0.000 0.000 Bus32 16.493 3.607 76.4 97.7

T-OFF PSA4-1 -16.493 -3.607 76.4 97.7

132KV PSA4 BUS-2 132.000 96.441 -6.1 0.000 0.000 0.000 0.000 Bus31 16.490 3.626 76.6 97.7

T-OFF PSA4-2 -16.490 -3.626 76.6 97.7

132KV SHUQAIQ SS 132.000 100.000 0.0 0.000 0.000 0.000 0.000 T-OFF TWR#203-1 43.378 6.693 192.0 98.8
BUS-1
Bus59 -43.378 -6.693 192.0 98.8

132KV SHUQAIQ SS 132.000 100.000 0.0 0.000 0.000 0.000 0.000 T-OFF TWR#203-2 43.415 6.917 192.3 98.8
BUS-2
Bus59 -43.415 -6.917 192.3 98.8

Bus1 1.800 98.031 -10.0 0.000 0.000 6.098 2.004 Bus110 -1.522 -0.492 523.5 95.1

Bus111 -1.518 -0.502 523.1 94.9

Bus112 -1.534 -0.507 528.7 95.0

Bus113 -1.523 -0.503 524.9 94.9

C22XR12N001 6.098 2.004 2100.2 95.0

Bus2 13.800 100.069 -8.0 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-1 -6.143 -2.239 273.4 94.0

Bus102 1.534 0.550 68.1 94.1

Bus103 1.529 0.560 68.1 93.9

Bus104 1.546 0.566 68.8 93.9

Bus105 1.535 0.562 68.3 93.9

Bus4 13.800 100.073 -8.0 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-1 -6.142 -2.238 273.3 94.0

Bus106 1.534 0.550 68.1 94.1

Bus107 1.529 0.560 68.1 93.9

Bus108 1.546 0.566 68.8 93.9

Bus109 1.534 0.562 68.3 93.9


Project: SWCC PUMP STATION ETAP Page: 20

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus6 13.800 99.847 -8.2 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-2 -6.142 -2.239 273.9 94.0

Bus110 1.534 0.551 68.3 94.1

Bus111 1.529 0.560 68.2 93.9

Bus112 1.546 0.566 69.0 93.9

Bus113 1.534 0.562 68.5 93.9

Bus7 1.800 98.240 -9.9 0.000 0.000 6.098 2.004 Bus102 -1.522 -0.492 522.2 95.2

Bus103 -1.518 -0.502 522.0 94.9

Bus104 -1.534 -0.507 527.6 94.9

Bus105 -1.523 -0.504 523.9 94.9

C22XR13N001 6.098 2.004 2095.7 95.0

Bus8 13.800 99.851 -8.2 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-2 -6.142 -2.238 273.9 94.0

Bus114 1.534 0.551 68.3 94.1

Bus115 1.529 0.560 68.2 93.9

Bus116 1.545 0.566 69.0 93.9

Bus117 1.534 0.562 68.5 93.9

Bus9 1.800 98.596 -11.7 0.000 0.000 6.880 2.261 Bus15 -1.667 -0.549 570.8 95.0

Bus17 -1.690 -0.556 578.7 95.0

Bus64 -1.779 -0.584 609.2 95.0

Bus13 -1.744 -0.573 597.2 95.0

C23XR14N001 6.880 2.261 2355.9 95.0

Bus10 13.800 100.639 -9.6 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-1 -6.929 -2.535 306.7 93.9

Bus87 1.757 0.642 77.8 93.9

Bus88 1.678 0.615 74.3 93.9

Bus89 1.702 0.623 75.3 93.9

Bus90 1.792 0.655 79.3 93.9

Bus12 13.800 99.945 -10.6 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-1 -8.225 -3.437 373.2 92.3

Bus45 2.068 0.864 93.8 92.3

Bus46 2.083 0.869 94.5 92.3

Bus47 2.112 0.880 95.8 92.3

Bus48 1.963 0.824 89.1 92.2

Bus13 1.800 98.688 -11.7 0.000 0.000 0.000 0.000 Bus9 1.745 0.575 597.2 95.0

Bus18 -1.745 -0.575 597.2 95.0

Bus14 13.800 100.639 -9.6 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-1 -6.929 -2.535 306.7 93.9
Project: SWCC PUMP STATION ETAP Page: 21

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus83 1.756 0.637 77.7 94.0

Bus84 1.679 0.617 74.3 93.9

Bus85 1.702 0.625 75.4 93.9

Bus86 1.792 0.657 79.3 93.9

Bus15 1.800 98.684 -11.7 0.000 0.000 0.000 0.000 Bus9 1.668 0.550 570.8 95.0

Bus18 -1.668 -0.550 570.8 95.0

Bus16 13.800 100.456 -9.8 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-2 -6.929 -2.536 307.3 93.9

Bus91 1.757 0.643 77.9 93.9

Bus92 1.679 0.615 74.5 93.9

Bus93 1.702 0.623 75.5 93.9

Bus94 1.792 0.655 79.5 93.9

Bus17 1.800 98.685 -11.7 0.000 0.000 0.000 0.000 Bus9 1.691 0.558 578.7 95.0

Bus18 -1.691 -0.558 578.7 95.0

Bus18 13.800 100.456 -9.8 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-2 -6.929 -2.536 307.3 93.9

Bus13 1.757 0.643 77.9 93.9

Bus15 1.679 0.615 74.5 93.9

Bus17 1.702 0.623 75.5 93.9

Bus64 1.792 0.655 79.5 93.9

Bus20 1.800 97.856 -12.8 0.000 0.000 8.173 3.095 Bus57 -2.055 -0.778 720.3 93.5

Bus61 -1.950 -0.741 683.6 93.5

Bus58 -2.070 -0.783 725.3 93.5

Bus60 -2.099 -0.793 735.5 93.5

C24XR14N001 8.173 3.095 2864.7 93.5

* Bus21 132.000 100.000 0.0 86.793 13.610 0.000 0.000 Bus59 86.793 13.610 384.3 98.8

Bus22 13.800 99.954 -10.6 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-1 -8.224 -3.436 373.1 92.3

Bus49 2.068 0.863 93.8 92.3

Bus50 2.082 0.869 94.4 92.3

Bus52 2.112 0.880 95.8 92.3

Bus51 1.962 0.823 89.0 92.2

Bus24 13.800 99.777 -10.8 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-2 -8.224 -3.436 373.7 92.3

Bus53 2.068 0.864 94.0 92.3

Bus54 2.082 0.869 94.6 92.3

Bus55 2.112 0.880 95.9 92.3


Project: SWCC PUMP STATION ETAP Page: 22

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus56 1.962 0.823 89.2 92.2

Bus26 13.800 99.786 -10.8 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-2 -8.223 -3.435 373.7 92.3

Bus57 2.068 0.863 93.9 92.3

Bus58 2.082 0.869 94.6 92.3

Bus60 2.112 0.880 95.9 92.3

Bus61 1.961 0.822 89.2 92.2

Bus27 132.000 97.451 -4.6 0.000 0.000 0.000 0.000 132KV PSA2 BUS-1 -12.309 -2.356 56.2 98.2

Bus33 12.309 2.356 56.2 98.2 -3.750

Bus28 132.000 97.238 -4.7 0.000 0.000 0.000 0.000 132KV PSA2 BUS-2 -12.308 -2.372 56.4 98.2

Bus35 12.308 2.372 56.4 98.2 -3.750

Bus29 132.000 96.705 -5.7 0.000 0.000 0.000 0.000 132KV PSA3 BUS-1 -13.886 -2.384 63.7 98.6

Bus37 13.886 2.384 63.7 98.6 -5.000

Bus30 132.000 96.542 -5.9 0.000 0.000 0.000 0.000 132KV PSA3 BUS-2 -13.886 -2.403 63.8 98.5

Bus38 13.886 2.403 63.8 98.5 -5.000

Bus31 132.000 96.439 -6.1 0.000 0.000 0.000 0.000 132KV PSA4 BUS-2 -16.490 -3.625 76.6 97.7

Bus40 16.490 3.625 76.6 97.7 -5.000

Bus32 132.000 96.593 -5.9 0.000 0.000 0.000 0.000 132KV PSA4 BUS-1 -16.493 -3.606 76.4 97.7

Bus39 16.493 3.606 76.4 97.7 -5.000

Bus33 13.800 100.143 -8.0 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-1 12.292 1.598 517.9 99.2

Bus27 -12.292 -1.598 517.9 99.2

Bus34 13.800 100.143 -8.0 0.000 0.000 0.000 -2.890 PSA2 PH-3 13.8KV BUS-1 0.000 2.890 120.8 0.0

Bus35 13.800 99.913 -8.1 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-2 12.291 1.611 519.1 99.2

Bus28 -12.291 -1.611 519.1 99.2

Bus36 13.800 99.913 -8.2 0.000 0.000 0.000 -2.877 PSA2 PH-3 13.8KV BUS-2 0.000 2.877 120.5 0.0

Bus37 13.800 100.711 -9.6 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-1 13.865 1.437 579.1 99.5

Bus29 -13.865 -1.437 579.1 99.5

Bus38 13.800 100.529 -9.8 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-2 13.865 1.453 580.2 99.5

Bus30 -13.865 -1.453 580.2 99.5

Bus39 13.800 100.028 -10.6 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-1 16.462 2.206 694.7 99.1

Bus32 -16.462 -2.206 694.7 99.1

Bus40 13.800 99.856 -10.8 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-2 16.459 2.220 695.8 99.1

Bus31 -16.459 -2.220 695.8 99.1

Bus41 13.800 100.698 -9.6 0.000 0.000 0.000 -3.647 PSA3 PH-3 13.8KV BUS-1 0.000 3.647 151.5 0.0
Project: SWCC PUMP STATION ETAP Page: 23

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus42 13.800 100.516 -9.8 0.000 0.000 0.000 -3.634 PSA3 PH-3 13.8KV BUS-2 0.000 3.634 151.3 0.0

Bus43 13.800 100.020 -10.6 0.000 0.000 0.000 -4.680 PSA4 PH-3 13.8KV BUS-1 0.000 4.680 195.7 0.0

Bus44 13.800 99.845 -10.8 0.000 0.000 0.000 -4.663 PSA4 PH-3 13.8KV BUS-2 0.000 4.663 195.4 0.0

Bus45 1.800 98.232 -12.5 0.000 0.000 0.000 0.000 Bus62 2.059 0.784 719.3 93.5

Bus12 -2.059 -0.784 719.3 93.5

Bus46 1.800 98.233 -12.5 0.000 0.000 0.000 0.000 Bus62 2.073 0.789 724.2 93.5

Bus12 -2.073 -0.789 724.2 93.5

Bus47 1.800 98.237 -12.5 0.000 0.000 0.000 0.000 Bus62 2.102 0.799 734.3 93.5

Bus12 -2.102 -0.799 734.3 93.5

Bus48 1.800 98.220 -12.5 0.000 0.000 0.000 0.000 Bus62 1.954 0.747 683.1 93.4

Bus12 -1.954 -0.747 683.1 93.4

Bus49 1.800 98.241 -12.5 0.000 0.000 0.000 0.000 Bus67 2.058 0.783 719.1 93.5

Bus22 -2.058 -0.783 719.1 93.5

Bus50 1.800 98.243 -12.5 0.000 0.000 0.000 0.000 Bus67 2.073 0.788 724.1 93.5

Bus22 -2.073 -0.788 724.1 93.5

Bus51 1.800 98.230 -12.5 0.000 0.000 0.000 0.000 Bus67 1.953 0.747 682.7 93.4

Bus22 -1.953 -0.747 682.7 93.4

Bus52 1.800 98.246 -12.5 0.000 0.000 0.000 0.000 Bus67 2.102 0.799 734.2 93.5

Bus22 -2.102 -0.799 734.2 93.5

Bus53 1.800 98.061 -12.7 0.000 0.000 0.000 0.000 Bus70 2.058 0.783 720.4 93.5

Bus24 -2.058 -0.783 720.4 93.5

Bus54 1.800 98.063 -12.7 0.000 0.000 0.000 0.000 Bus70 2.073 0.788 725.4 93.5

Bus24 -2.073 -0.788 725.4 93.5

Bus55 1.800 98.066 -12.7 0.000 0.000 0.000 0.000 Bus70 2.102 0.799 735.6 93.5

Bus24 -2.102 -0.799 735.6 93.5

Bus56 1.800 98.050 -12.7 0.000 0.000 0.000 0.000 Bus70 1.953 0.746 683.9 93.4

Bus24 -1.953 -0.746 683.9 93.4

Bus57 1.800 98.070 -12.7 0.000 0.000 0.000 0.000 Bus20 2.058 0.783 720.3 93.5

Bus26 -2.058 -0.783 720.3 93.5

Bus58 1.800 98.072 -12.7 0.000 0.000 0.000 0.000 Bus20 2.073 0.788 725.3 93.5

Bus26 -2.073 -0.788 725.3 93.5

Bus59 132.000 100.000 0.0 0.000 0.000 0.000 0.000 Bus21 -86.793 -13.610 384.3 98.8

132KV SHUQAIQ SS BUS-1 43.378 6.693 192.0 98.8


Project: SWCC PUMP STATION ETAP Page: 24

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

132KV SHUQAIQ SS BUS-2 43.415 6.917 192.3 98.8

Bus60 1.800 98.075 -12.7 0.000 0.000 0.000 0.000 Bus20 2.102 0.798 735.5 93.5

Bus26 -2.102 -0.798 735.5 93.5

Bus61 1.800 98.060 -12.7 0.000 0.000 0.000 0.000 Bus20 1.952 0.746 683.6 93.4

Bus26 -1.952 -0.746 683.6 93.4

Bus62 1.800 97.984 -12.6 0.000 0.000 8.173 3.095 Bus45 -2.055 -0.778 719.3 93.5

Bus46 -2.069 -0.783 724.2 93.5

Bus47 -2.099 -0.793 734.3 93.6

Bus48 -1.950 -0.742 683.1 93.5

C24XR13N001 8.173 3.095 2860.9 93.5

Bus64 1.800 98.690 -11.7 0.000 0.000 0.000 0.000 Bus9 1.780 0.586 609.2 95.0

Bus18 -1.780 -0.586 609.2 95.0

Bus67 1.800 98.010 -12.6 0.000 0.000 8.173 3.095 Bus50 -2.069 -0.783 724.1 93.5

Bus49 -2.055 -0.778 719.1 93.5

Bus51 -1.950 -0.742 682.7 93.5

Bus52 -2.099 -0.793 734.2 93.5

C24XR11N001 8.173 3.095 2860.1 93.5

Bus70 1.800 97.836 -12.8 0.000 0.000 8.173 3.095 Bus53 -2.055 -0.778 720.4 93.5

Bus56 -1.950 -0.741 683.9 93.5

Bus54 -2.069 -0.783 725.4 93.5

Bus55 -2.099 -0.793 735.6 93.5

C24XR12N001 8.173 3.095 2865.2 93.5

Bus74 1.800 98.778 -11.5 0.000 0.000 6.880 2.261 Bus83 -1.744 -0.568 595.4 95.1

Bus84 -1.667 -0.550 570.0 95.0

Bus85 -1.690 -0.558 577.8 95.0

Bus86 -1.779 -0.586 608.3 95.0

C23XR13N001 6.880 2.261 2351.5 95.0

Bus77 1.800 98.596 -11.7 0.000 0.000 6.880 2.261 Bus91 -1.744 -0.573 597.2 95.0

Bus92 -1.667 -0.549 570.8 95.0

Bus93 -1.690 -0.556 578.7 95.0

Bus94 -1.779 -0.584 609.2 95.0

C23XR12N001 6.880 2.261 2355.9 95.0

Bus80 1.800 98.782 -11.5 0.000 0.000 6.880 2.261 Bus87 -1.744 -0.573 596.1 95.0
Project: SWCC PUMP STATION ETAP Page: 25

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus88 -1.667 -0.549 569.7 95.0

Bus89 -1.690 -0.556 577.6 95.0

Bus90 -1.779 -0.584 608.0 95.0

C23XR11N001 6.880 2.261 2351.4 95.0

Bus83 1.800 98.884 -11.5 0.000 0.000 0.000 0.000 Bus74 1.745 0.570 595.4 95.1

Bus14 -1.745 -0.570 595.4 95.1

Bus84 1.800 98.866 -11.5 0.000 0.000 0.000 0.000 Bus74 1.668 0.552 570.0 94.9

Bus14 -1.668 -0.552 570.0 94.9

Bus85 1.800 98.867 -11.5 0.000 0.000 0.000 0.000 Bus74 1.691 0.559 577.8 94.9

Bus14 -1.691 -0.559 577.8 94.9

Bus86 1.800 98.872 -11.5 0.000 0.000 0.000 0.000 Bus74 1.780 0.588 608.3 95.0

Bus14 -1.780 -0.588 608.3 95.0

Bus87 1.800 98.874 -11.5 0.000 0.000 0.000 0.000 Bus80 1.745 0.575 596.1 95.0

Bus10 -1.745 -0.575 596.1 95.0

Bus88 1.800 98.870 -11.5 0.000 0.000 0.000 0.000 Bus80 1.668 0.550 569.7 95.0

Bus10 -1.668 -0.550 569.7 95.0

Bus89 1.800 98.871 -11.5 0.000 0.000 0.000 0.000 Bus80 1.691 0.558 577.6 95.0

Bus10 -1.691 -0.558 577.6 95.0

Bus90 1.800 98.876 -11.5 0.000 0.000 0.000 0.000 Bus80 1.780 0.586 608.0 95.0

Bus10 -1.780 -0.586 608.0 95.0

Bus91 1.800 98.688 -11.7 0.000 0.000 0.000 0.000 Bus77 1.745 0.575 597.2 95.0

Bus16 -1.745 -0.575 597.2 95.0

Bus92 1.800 98.684 -11.7 0.000 0.000 0.000 0.000 Bus77 1.668 0.550 570.8 95.0

Bus16 -1.668 -0.550 570.8 95.0

Bus93 1.800 98.685 -11.7 0.000 0.000 0.000 0.000 Bus77 1.691 0.558 578.7 95.0

Bus16 -1.691 -0.558 578.7 95.0

Bus94 1.800 98.690 -11.7 0.000 0.000 0.000 0.000 Bus77 1.780 0.586 609.2 95.0

Bus16 -1.780 -0.586 609.2 95.0

Bus95 1.800 98.043 -10.0 0.000 0.000 6.098 2.004 Bus115 -1.518 -0.502 523.0 94.9

Bus116 -1.534 -0.507 528.7 95.0

Bus117 -1.523 -0.503 524.9 95.0

Bus114 -1.522 -0.493 523.5 95.1

C22XR14N001 6.098 2.004 2099.9 95.0


Project: SWCC PUMP STATION ETAP Page: 26

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus99 1.800 98.257 -9.9 0.000 0.000 6.098 2.004 Bus106 -1.522 -0.492 522.2 95.1

Bus107 -1.518 -0.502 521.9 94.9

Bus108 -1.534 -0.507 527.5 95.0

Bus109 -1.523 -0.504 523.7 94.9

C22XR11N001 6.098 2.004 2095.4 95.0

Bus102 1.800 98.440 -9.8 0.000 0.000 0.000 0.000 Bus7 1.524 0.495 522.2 95.1

Bus2 -1.524 -0.495 522.2 95.1

Bus103 1.800 98.414 -9.8 0.000 0.000 0.000 0.000 Bus7 1.520 0.505 522.0 94.9

Bus2 -1.520 -0.505 522.0 94.9

Bus104 1.800 98.415 -9.8 0.000 0.000 0.000 0.000 Bus7 1.536 0.510 527.6 94.9

Bus2 -1.536 -0.510 527.6 94.9

Bus105 1.800 98.414 -9.8 0.000 0.000 0.000 0.000 Bus7 1.525 0.507 523.9 94.9

Bus2 -1.525 -0.507 523.9 94.9

Bus106 1.800 98.444 -9.8 0.000 0.000 0.000 0.000 Bus99 1.524 0.495 522.2 95.1

Bus4 -1.524 -0.495 522.2 95.1

Bus107 1.800 98.419 -9.8 0.000 0.000 0.000 0.000 Bus99 1.520 0.505 521.9 94.9

Bus4 -1.520 -0.505 521.9 94.9

Bus108 1.800 98.421 -9.8 0.000 0.000 0.000 0.000 Bus99 1.536 0.510 527.5 94.9

Bus4 -1.536 -0.510 527.5 94.9

Bus109 1.800 98.419 -9.8 0.000 0.000 0.000 0.000 Bus99 1.525 0.506 523.7 94.9

Bus4 -1.525 -0.506 523.7 94.9

Bus110 1.800 98.213 -9.9 0.000 0.000 0.000 0.000 Bus1 1.524 0.495 523.5 95.1

Bus6 -1.524 -0.495 523.5 95.1

Bus111 1.800 98.189 -9.9 0.000 0.000 0.000 0.000 Bus1 1.520 0.505 523.1 94.9

Bus6 -1.520 -0.505 523.1 94.9

Bus112 1.800 98.191 -9.9 0.000 0.000 0.000 0.000 Bus1 1.536 0.510 528.7 94.9

Bus6 -1.536 -0.510 528.7 94.9

Bus113 1.800 98.189 -9.9 0.000 0.000 0.000 0.000 Bus1 1.525 0.506 524.9 94.9

Bus6 -1.525 -0.506 524.9 94.9

Bus114 1.800 98.217 -9.9 0.000 0.000 0.000 0.000 Bus95 1.524 0.496 523.5 95.1

Bus8 -1.524 -0.496 523.5 95.1

Bus115 1.800 98.194 -9.9 0.000 0.000 0.000 0.000 Bus95 1.519 0.504 523.0 94.9

Bus8 -1.519 -0.504 523.0 94.9


Project: SWCC PUMP STATION ETAP Page: 27

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus116 1.800 98.195 -9.9 0.000 0.000 0.000 0.000 Bus95 1.536 0.510 528.7 94.9

Bus8 -1.536 -0.510 528.7 94.9

Bus117 1.800 98.194 -9.9 0.000 0.000 0.000 0.000 Bus95 1.525 0.506 524.9 94.9

Bus8 -1.525 -0.506 524.9 94.9

PSA2 PH-3 13.8KV BUS-1 13.800 100.125 -8.0 0.000 0.000 0.000 0.000 Bus4 6.145 2.242 273.3 93.9

Bus2 6.145 2.243 273.4 93.9

Bus33 -12.290 -1.595 517.9 99.2

Bus34 0.001 -2.890 120.8 0.0

PSA2 PH-3 13.8KV BUS-2 13.800 99.894 -8.2 0.000 0.000 0.000 0.000 Bus6 6.144 2.242 273.9 93.9

Bus8 6.144 2.242 273.9 93.9

Bus35 -12.289 -1.607 519.1 99.2

Bus36 0.001 -2.877 120.5 0.0

PSA3 PH-3 13.8KV BUS-1 13.800 100.685 -9.6 0.000 0.000 0.000 0.000 Bus10 6.931 2.539 306.7 93.9

Bus14 6.931 2.539 306.7 93.9

Bus37 -13.862 -1.432 579.1 99.5

Bus41 0.000 -3.647 151.5 0.0

PSA3 PH-3 13.8KV BUS-2 13.800 100.503 -9.8 0.000 0.000 0.000 0.000 Bus16 6.931 2.540 307.3 93.9

Bus18 6.931 2.540 307.3 93.9

Bus38 -13.862 -1.447 580.2 99.5

Bus42 0.000 -3.633 151.3 0.0

PSA4 PH-3 13.8KV BUS-1 13.800 100.004 -10.6 0.000 0.000 0.000 0.000 Bus12 8.229 3.441 373.2 92.3

Bus22 8.228 3.438 373.1 92.3

Bus39 -16.458 -2.200 694.7 99.1

Bus43 0.001 -4.679 195.7 0.0

PSA4 PH-3 13.8KV BUS-2 13.800 99.831 -10.8 0.000 0.000 0.000 0.000 Bus24 8.228 3.439 373.7 92.3

Bus26 8.227 3.438 373.7 92.3

Bus40 -16.456 -2.214 695.8 99.1

Bus44 0.001 -4.663 195.4 0.0

T-OFF PSA4-1 132.000 96.594 -5.9 0.000 0.000 0.000 0.000 T-OFF TWR#274-1 -16.493 -3.607 76.4 97.7

132KV PSA4 BUS-1 16.493 3.607 76.4 97.7

T-OFF PSA4-2 132.000 96.441 -6.1 0.000 0.000 0.000 0.000 T-OFF TWR#274-2 -16.490 -3.626 76.6 97.7

132KV PSA4 BUS-2 16.490 3.626 76.6 97.7

T-OFF TWR#203-1 132.000 97.457 -4.6 0.000 0.000 0.000 0.000 132KV SHUQAIQ SS BUS-1 -42.825 -7.233 194.9 98.6
Project: SWCC PUMP STATION ETAP Page: 28

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

T-OFF TWR#274-1 30.515 4.897 138.7 98.7

132KV PSA2 BUS-1 12.309 2.336 56.2 98.2

T-OFF TWR#203-2 132.000 97.244 -4.7 0.000 0.000 0.000 0.000 132KV SHUQAIQ SS BUS-2 -42.796 -7.328 195.3 98.6

T-OFF TWR#274-2 30.488 4.976 138.9 98.7

132KV PSA2 BUS-2 12.308 2.352 56.4 98.2

T-OFF TWR#274-1 132.000 96.707 -5.7 0.000 0.000 0.000 0.000 T-OFF TWR#203-1 -30.389 -5.682 139.8 98.3

132KV PSA3 BUS-1 13.886 2.379 63.7 98.6

T-OFF PSA4-1 16.502 3.303 76.1 98.1

T-OFF TWR#274-2 132.000 96.544 -5.9 0.000 0.000 0.000 0.000 T-OFF TWR#203-2 -30.385 -5.720 140.1 98.3

132KV PSA3 BUS-2 13.887 2.398 63.8 98.5

T-OFF PSA4-2 16.498 3.321 76.2 98.0

C22XR11N001 3.300 100.000 0.0 6.006 2.309 0.000 0.000 Bus100 6.006 2.309 1125.8 93.3

C22XR12N001 3.300 100.000 0.0 6.006 2.309 0.000 0.000 Bus3 6.006 2.309 1125.8 93.3

C22XR13N001 3.300 100.000 0.0 6.006 2.309 0.000 0.000 Bus11 6.006 2.309 1125.8 93.3

C22XR14N001 3.300 100.000 0.0 6.006 2.309 0.000 0.000 Bus96 6.006 2.309 1125.8 93.3

C23XR11N001 3.300 100.000 0.0 6.776 2.605 0.000 0.000 Bus82 6.776 2.605 1270.2 93.3

C23XR12N001 3.300 100.000 0.0 6.776 2.605 0.000 0.000 Bus79 6.776 2.605 1270.2 93.3

C23XR13N001 3.300 100.000 0.0 6.776 2.605 0.000 0.000 Bus76 6.776 2.605 1270.2 93.3

C23XR14N001 3.300 100.000 0.0 6.776 2.605 0.000 0.000 Bus73 6.776 2.605 1270.2 93.3

C24XR11N001 3.300 100.000 0.0 8.051 3.095 0.000 0.000 Bus69 8.051 3.095 1509.0 93.3

C24XR12N001 3.300 100.000 0.0 8.051 3.095 0.000 0.000 Bus72 8.051 3.095 1509.0 93.3

C24XR13N001 3.300 100.000 0.0 8.051 3.095 0.000 0.000 Bus63 8.051 3.095 1509.0 93.3

C24XR14N001 3.300 100.000 0.0 8.051 3.095 0.000 0.000 Bus25 8.051 3.095 1509.0 93.3
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: SWCC PUMP STATION ETAP Page: 29

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus3 3.300 6.435 93.3 1125.8


Bus11 3.300 6.435 93.3 1125.8
Bus19 132.000
Bus25 3.300 8.625 93.3 1509.0
Bus63 3.300 8.625 93.3 1509.0
Bus69 3.300 8.625 93.3 1509.0
Bus72 3.300 8.625 93.3 1509.0
Bus73 3.300 7.260 93.3 1270.2
Bus76 3.300 7.260 93.3 1270.2
Bus79 3.300 7.260 93.3 1270.2
Bus82 3.300 7.260 93.3 1270.2
Bus96 3.300 6.435 93.3 1125.8
Bus100 3.300 6.435 93.3 1125.8
132KV PSA2 BUS-1 132.000 1600.0 12.533 98.2 56.2 3.5
132KV PSA2 BUS-2 132.000 1600.0 12.534 98.2 56.4 3.5
132KV PSA3 BUS-1 132.000 14.089 98.6 63.7
132KV PSA3 BUS-2 132.000 1600.0 14.093 98.5 63.8 4.0
132KV PSA4 BUS-1 132.000 16.883 97.7 76.4
132KV PSA4 BUS-2 132.000 1600.0 16.884 97.7 76.6 4.8
132KV SHUQAIQ SS BUS-1 132.000 43.891 98.8 192.0
132KV SHUQAIQ SS BUS-2 132.000 43.962 98.8 192.3
Bus1 1.800 6.098 2.004 6.419 95.0 2100.2
Bus2 13.800 6.538 94.0 273.4
Bus4 13.800 6.537 94.0 273.3
Bus6 13.800 6.538 94.0 273.9
Bus7 1.800 6.098 2.004 6.419 95.0 2095.7
Bus8 13.800 6.537 94.0 273.9
Bus9 1.800 6.880 2.261 7.242 95.0 2355.9
Bus10 13.800 7.378 93.9 306.7
Bus12 13.800 8.915 92.3 373.2
Bus13 1.800 1.838 95.0 597.2
Bus14 13.800 7.378 93.9 306.7
Bus15 1.800 1.756 95.0 570.8
Bus16 13.800 7.378 93.9 307.3
Bus17 1.800 1.780 95.0 578.7
Bus18 13.800 7.378 93.9 307.3
Bus20 1.800 8.173 3.095 8.740 93.5 2864.7
Bus21 132.000 87.853 98.8 384.3
Bus22 13.800 8.913 92.3 373.1
Project: SWCC PUMP STATION ETAP Page: 30

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus24 13.800 8.913 92.3 373.7


Bus26 13.800 8.912 92.3 373.7
Bus27 132.000 12.533 98.2 56.2
Bus28 132.000 12.534 98.2 56.4
Bus29 132.000 14.089 98.6 63.7
Bus30 132.000 14.093 98.5 63.8
Bus31 132.000 0.000 16.884 97.7 76.6
Bus32 132.000 0.000 16.882 97.7 76.4
Bus33 13.800 12.396 99.2 517.9
Bus34 13.800 0.002 -2.892 2.892 - 120.8
Bus35 13.800 12.396 99.2 519.1
Bus36 13.800 0.002 -2.879 2.879 - 120.6
Bus37 13.800 0.000 13.939 99.5 579.1
Bus38 13.800 0.000 13.941 99.5 580.2
Bus39 13.800 0.000 16.609 99.1 694.7
Bus40 13.800 0.000 16.608 99.1 695.8
Bus41 13.800 0.003 -3.650 3.650 - 151.7
Bus42 13.800 0.003 -3.637 3.637 - 151.4
Bus43 13.800 0.005 -4.685 4.685 - 196.0
Bus44 13.800 0.000 0.005 -4.669 4.669 - 195.6
Bus45 1.800 2.203 93.5 719.3
Bus46 1.800 2.218 93.5 724.2
Bus47 1.800 2.249 93.5 734.3
Bus48 1.800 2.092 93.4 683.1
Bus49 1.800 2.202 93.5 719.1
Bus50 1.800 2.218 93.5 724.1
Bus51 1.800 2.091 93.4 682.7
Bus52 1.800 2.249 93.5 734.2
Bus53 1.800 2.202 93.5 720.4
Bus54 1.800 2.218 93.5 725.4
Bus55 1.800 2.249 93.5 735.6
Bus56 1.800 2.091 93.4 683.9
Bus57 1.800 2.202 93.5 720.3
Bus58 1.800 2.218 93.5 725.3
Bus59 132.000 87.853 98.8 384.3
Bus60 1.800 2.249 93.5 735.5
Bus61 1.800 2.090 93.4 683.6
Bus62 1.800 8.173 3.095 8.740 93.5 2860.9
Bus64 1.800 1.874 95.0 609.2
Bus67 1.800 8.173 3.095 8.740 93.5 2860.1
Bus70 1.800 8.173 3.095 8.740 93.5 2865.2
Bus74 1.800 6.880 2.261 7.242 95.0 2351.5
Project: SWCC PUMP STATION ETAP Page: 31

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus77 1.800 6.880 2.261 7.242 95.0 2355.9


Bus80 1.800 6.880 2.261 7.242 95.0 2351.4
Bus83 1.800 1.836 95.1 595.4
Bus84 1.800 1.757 94.9 570.0
Bus85 1.800 1.781 94.9 577.8
Bus86 1.800 1.875 95.0 608.3
Bus87 1.800 1.838 95.0 596.1
Bus88 1.800 1.756 95.0 569.7
Bus89 1.800 1.780 95.0 577.6
Bus90 1.800 1.874 95.0 608.0
Bus91 1.800 1.838 95.0 597.2
Bus92 1.800 1.756 95.0 570.8
Bus93 1.800 1.780 95.0 578.7
Bus94 1.800 1.874 95.0 609.2
Bus95 1.800 6.098 2.004 6.419 95.0 2099.9
Bus99 1.800 6.098 2.004 6.419 95.0 2095.4
Bus102 1.800 1.603 95.1 522.2
Bus103 1.800 1.602 94.9 522.0
Bus104 1.800 1.619 94.9 527.6
Bus105 1.800 1.607 94.9 523.9
Bus106 1.800 1.603 95.1 522.2
Bus107 1.800 1.601 94.9 521.9
Bus108 1.800 1.619 94.9 527.5
Bus109 1.800 1.607 94.9 523.7
Bus110 1.800 1.603 95.1 523.5
Bus111 1.800 1.601 94.9 523.1
Bus112 1.800 1.619 94.9 528.7
Bus113 1.800 1.607 94.9 524.9
Bus114 1.800 1.603 95.1 523.5
Bus115 1.800 1.601 94.9 523.0
Bus116 1.800 1.618 94.9 528.7
Bus117 1.800 1.607 94.9 524.9
PSA2 PH-3 13.8KV BUS-1 13.800 2500.0 0.000 13.083 93.9 546.7 21.9
PSA2 PH-3 13.8KV BUS-2 13.800 2500.0 0.000 13.081 93.9 547.9 21.9
PSA3 PH-3 13.8KV BUS-1 13.800 2500.0 14.763 93.9 613.4 24.5
PSA3 PH-3 13.8KV BUS-2 13.800 2500.0 14.764 93.9 614.6 24.6
PSA4 PH-3 13.8KV BUS-1 13.800 2500.0 0.000 17.838 92.3 746.3 29.9
PSA4 PH-3 13.8KV BUS-2 13.800 2500.0 0.000 17.835 92.3 747.4 29.9
T-OFF PSA4-1 132.000 16.883 97.7 76.4
T-OFF PSA4-2 132.000 16.884 97.7 76.6
T-OFF TWR#203-1 132.000 43.431 98.6 194.9
T-OFF TWR#203-2 132.000 43.419 98.6 195.3
Project: SWCC PUMP STATION ETAP Page: 32

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

T-OFF TWR#274-1 132.000 30.915 98.3 139.8


T-OFF TWR#274-2 132.000 30.918 98.3 140.1

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: SWCC PUMP STATION ETAP Page: 33

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Branch Loading Summary Report

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable1 Cable 791.98 273.31 34.51

Cable2 Cable 791.98 273.94 34.59

Cable3 Cable 791.98 273.90 34.58

Cable4 Cable 791.98 273.35 34.52

Cable5 Cable 850.36 56.25 6.61

Cable6 Cable 2675.08 570.81 21.34

Cable7 Cable 850.36 56.38 6.63

Cable8 Cable 850.36 63.72 7.49

Cable9 Cable 850.36 63.85 7.51

Cable10 Cable 850.36 76.57 9.00

Cable11 Cable 850.36 76.45 8.99

Cable12 Cable 791.98 306.71 38.73

Cable13 Cable 3612.06 517.86 14.34

Cable14 Cable 1072.68 373.16 34.79

Cable15 Cable 1337.54 720.25 53.85

Cable16 Cable 1337.54 683.64 51.11

Cable17 Cable 1337.54 725.27 54.22

Cable18 Cable 791.98 306.72 38.73

Cable19 Cable 791.98 307.29 38.80

Cable20 Cable 791.98 307.29 38.80

Cable21 Cable 1072.68 373.06 34.78

Cable22 Cable 1072.68 373.72 34.84

Cable23 Cable 1072.68 373.65 34.83

Cable24 Cable 3612.06 519.05 14.37

Cable25 Cable 605.76 120.75 19.93

Cable26 Cable 3612.06 579.06 16.03

Cable27 Cable 3612.06 580.18 16.06

Cable28 Cable 3628.82 694.66 19.14

Cable29 Cable 3628.82 695.83 19.18

Cable31 Cable 605.76 120.47 19.89

Cable32 Cable 2675.08 578.68 21.63

Cable33 Cable 791.98 151.53 19.13

Cable34 Cable 2675.08 609.15 22.77


Project: SWCC PUMP STATION ETAP Page: 34

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable35 Cable 791.98 151.25 19.10

Cable36 Cable 2675.08 597.23 22.33

Cable37 Cable 1072.68 195.75 18.25

Cable38 Cable 1072.68 195.40 18.22

Cable39 Cable 1337.54 719.27 53.78

Cable40 Cable 1337.54 724.08 54.14

Cable41 Cable 1337.54 724.23 54.15

Cable42 Cable 1337.54 734.34 54.90

Cable43 Cable 1337.54 683.05 51.07

Cable44 Cable 1337.54 719.10 53.76

Cable45 Cable 1337.54 682.72 51.04

Cable46 Cable 1337.54 734.24 54.90

Cable48 Cable 1337.54 720.38 53.86

Cable49 Cable 1337.54 683.87 51.13

Cable50 Cable 1337.54 725.38 54.23

Cable51 Cable 1337.54 735.59 55.00

Cable52 Cable 1337.54 735.50 54.99

Cable67 Cable 2675.08 595.44 22.26

Cable68 Cable 2675.08 569.98 21.31

Cable69 Cable 2675.08 577.84 21.60

Cable70 Cable 2675.08 608.27 22.74

Cable77 Cable 2675.08 597.23 22.33

Cable78 Cable 2675.08 570.81 21.34

Cable79 Cable 2675.08 578.68 21.63

Cable80 Cable 2675.08 609.15 22.77

Cable84 Cable 2675.08 596.10 22.28

Cable85 Cable 2675.08 569.73 21.30

Cable86 Cable 2675.08 577.59 21.59

Cable87 Cable 2675.08 608.01 22.73

Cable91 Cable 1170.33 522.97 44.69

Cable92 Cable 1170.33 528.66 45.17

Cable93 Cable 1170.33 524.85 44.85

Cable94 Cable 1170.33 523.45 44.73

Cable95 Cable 1170.33 523.47 44.73

Cable96 Cable 1170.33 523.05 44.69


Project: SWCC PUMP STATION ETAP Page: 35

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable97 Cable 1170.33 528.73 45.18

Cable101 Cable 1170.33 524.93 44.85

Cable105 Cable 1170.33 522.25 44.62

Cable106 Cable 1170.33 521.99 44.60

Cable107 Cable 1170.33 527.63 45.08

Cable108 Cable 1170.33 523.86 44.76

Cable112 Cable 1170.33 522.23 44.62

Cable113 Cable 1170.33 521.87 44.59

Cable114 Cable 1170.33 527.52 45.07

Cable115 Cable 1170.33 523.74 44.75

C22XR11N002-1 Transformer 2.500 1.629 65.2 1.603 64.1

C22XR11N002-2 Transformer 2.500 1.628 65.1 1.601 64.1

C22XR11N002-3 Transformer 2.500 1.646 65.8 1.619 64.7

C22XR11N002-4 Transformer 2.500 1.634 65.4 1.607 64.3

C22XR12N002-1 Transformer 2.500 1.630 65.2 1.603 64.1

C22XR12N002-2 Transformer 2.500 1.628 65.1 1.601 64.0

C22XR12N002-3 Transformer 2.500 1.646 65.8 1.619 64.7

C22XR12N002-4 Transformer 2.500 1.634 65.4 1.607 64.3

C22XR13N002-1 Transformer 2.500 1.629 65.2 1.603 64.1

C22XR13N002-2 Transformer 2.500 1.629 65.1 1.602 64.1

C22XR13N002-3 Transformer 2.500 1.646 65.8 1.619 64.8

C22XR13N002-4 Transformer 2.500 1.634 65.4 1.607 64.3

C22XR14N002-1 Transformer 2.500 1.630 65.2 1.603 64.1

C22XR14N002-2 Transformer 2.500 1.628 65.1 1.601 64.0

C22XR14N002-3 Transformer 2.500 1.646 65.8 1.618 64.7

C22XR14N002-4 Transformer 2.500 1.634 65.4 1.607 64.3

C23XR11N002-1 Transformer 2.750 1.870 68.0 1.838 66.8

C23XR11N002-2 Transformer 2.750 1.788 65.0 1.756 63.9

C23XR11N002-3 Transformer 2.750 1.812 65.9 1.780 64.7

C23XR11N002-4 Transformer 2.750 1.908 69.4 1.874 68.2

C23XR12N002-1 Transformer 2.750 1.870 68.0 1.838 66.8

C23XR12N002-2 Transformer 2.750 1.788 65.0 1.756 63.9

C23XR12N002-3 Transformer 2.750 1.812 65.9 1.780 64.7

C23XR12N002-4 Transformer 2.750 1.908 69.4 1.874 68.2

C23XR13N002-1 Transformer 2.750 1.868 67.9 1.836 66.8


Project: SWCC PUMP STATION ETAP Page: 36

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

C23XR13N002-2 Transformer 2.750 1.788 65.0 1.757 63.9

C23XR13N002-3 Transformer 2.750 1.813 65.9 1.781 64.8

C23XR13N002-4 Transformer 2.750 1.908 69.4 1.875 68.2

C23XR14N002-1 Transformer 2.750 1.870 68.0 1.838 66.8

C23XR14N002-2 Transformer 2.750 1.788 65.0 1.756 63.9

C23XR14N002-3 Transformer 2.750 1.812 65.9 1.780 64.7

C23XR14N002-4 Transformer 2.750 1.908 69.4 1.874 68.2

C24XR11N002-1 Transformer 3.375 2.241 66.4 2.202 65.3

C24XR11N002-2 Transformer 3.375 2.256 66.9 2.218 65.7

C24XR11N002-3 Transformer 3.375 2.288 67.8 2.249 66.6

C24XR11N002-4 Transformer 3.375 2.128 63.0 2.091 62.0

C24XR12N002-1 Transformer 3.375 2.241 66.4 2.202 65.3

C24XR12N002-2 Transformer 3.375 2.256 66.9 2.218 65.7

C24XR12N002-3 Transformer 3.375 2.288 67.8 2.249 66.6

C24XR12N002-4 Transformer 3.375 2.127 63.0 2.091 61.9

C24XR13N002-1 Transformer 3.375 2.241 66.4 2.203 65.3

C24XR13N002-2 Transformer 3.375 2.257 66.9 2.218 65.7

C24XR13N002-3 Transformer 3.375 2.288 67.8 2.249 66.6

C24XR13N002-4 Transformer 3.375 2.128 63.1 2.092 62.0

C24XR14N002-1 Transformer 3.375 2.241 66.4 2.202 65.3

C24XR14N002-2 Transformer 3.375 2.256 66.9 2.218 65.7

C24XR14N002-3 Transformer 3.375 2.288 67.8 2.249 66.6

C24XR14N002-4 Transformer 3.375 2.127 63.0 2.090 61.9

T603-PSA2 Transformer 50.000 12.533 25.1 12.396 24.8

T603-PSA3. Transformer 50.000 14.089 28.2 13.939 27.9

T603-PSA4. Transformer 55.000 16.882 30.7 16.609 30.2

T604-PSA2 Transformer 50.000 12.534 25.1 12.396 24.8

T604-PSA3 Transformer 50.000 14.093 28.2 13.941 27.9

T604-PSA4 Transformer 55.000 16.884 30.7 16.608 30.2

* Indicates a branch with operating load exceeding the branch capability.


Project: SWCC PUMP STATION ETAP Page: 37

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

C22XR11N002-1 1.534 0.550 -1.524 -0.495 9.2 55.1 100.1 98.4 1.63

C22XR11N002-2 1.529 0.560 -1.520 -0.505 9.2 55.3 100.1 98.4 1.65

C22XR11N002-3 1.546 0.566 -1.536 -0.510 9.3 55.8 100.1 98.4 1.65

C22XR11N002-4 1.534 0.562 -1.525 -0.506 9.2 55.4 100.1 98.4 1.65

C22XR12N002-1 1.534 0.551 -1.524 -0.495 9.2 55.4 99.8 98.2 1.63

C22XR12N002-2 1.529 0.560 -1.520 -0.505 9.3 55.5 99.8 98.2 1.66

C22XR12N002-3 1.546 0.566 -1.536 -0.510 9.3 56.1 99.8 98.2 1.66

C22XR12N002-4 1.534 0.562 -1.525 -0.506 9.3 55.7 99.8 98.2 1.66

C22XR13N002-1 1.534 0.550 -1.524 -0.495 9.2 55.1 100.1 98.4 1.63

C22XR13N002-2 1.529 0.560 -1.520 -0.505 9.2 55.3 100.1 98.4 1.66

C22XR13N002-3 1.546 0.566 -1.536 -0.510 9.3 55.8 100.1 98.4 1.65

C22XR13N002-4 1.535 0.562 -1.525 -0.507 9.2 55.5 100.1 98.4 1.65

C22XR14N002-1 1.534 0.551 -1.524 -0.496 9.2 55.4 99.9 98.2 1.63

C22XR14N002-2 1.529 0.560 -1.519 -0.504 9.2 55.5 99.9 98.2 1.66

C22XR14N002-3 1.545 0.566 -1.536 -0.510 9.3 56.1 99.9 98.2 1.66

C22XR14N002-4 1.534 0.562 -1.525 -0.506 9.3 55.7 99.9 98.2 1.66

C23XR11N002-1 1.757 0.642 -1.745 -0.575 11.3 67.5 100.6 98.9 1.76

C23XR11N002-2 1.678 0.615 -1.668 -0.550 10.8 64.6 100.6 98.9 1.77

C23XR11N002-3 1.702 0.623 -1.691 -0.558 10.9 65.5 100.6 98.9 1.77

C23XR11N002-4 1.792 0.655 -1.780 -0.586 11.5 68.8 100.6 98.9 1.76

C23XR12N002-1 1.757 0.643 -1.745 -0.575 11.3 67.8 100.5 98.7 1.77

C23XR12N002-2 1.679 0.615 -1.668 -0.550 10.8 64.9 100.5 98.7 1.77

C23XR12N002-3 1.702 0.623 -1.691 -0.558 11.0 65.7 100.5 98.7 1.77

C23XR12N002-4 1.792 0.655 -1.780 -0.586 11.5 69.1 100.5 98.7 1.77

C23XR13N002-1 1.756 0.637 -1.745 -0.570 11.2 67.4 100.6 98.9 1.75

C23XR13N002-2 1.679 0.617 -1.668 -0.552 10.8 64.7 100.6 98.9 1.77

C23XR13N002-3 1.702 0.625 -1.691 -0.559 10.9 65.5 100.6 98.9 1.77

C23XR13N002-4 1.792 0.657 -1.780 -0.588 11.5 68.9 100.6 98.9 1.77

C23XR14N002-1 -1.745 -0.575 1.757 0.643 11.3 67.8 98.7 100.5 1.77

C23XR14N002-2 -1.668 -0.550 1.679 0.615 10.8 64.9 98.7 100.5 1.77

C23XR14N002-3 -1.691 -0.558 1.702 0.623 11.0 65.7 98.7 100.5 1.77

C23XR14N002-4 1.792 0.655 -1.780 -0.586 11.5 69.1 100.5 98.7 1.77

C24XR11N002-1 2.068 0.863 -2.058 -0.783 9.4 80.0 100.0 98.2 1.71

C24XR11N002-2 2.082 0.869 -2.073 -0.788 9.5 80.5 100.0 98.2 1.71
Project: SWCC PUMP STATION ETAP Page: 38

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

C24XR11N002-3 2.112 0.880 -2.102 -0.799 9.6 81.6 100.0 98.2 1.71

C24XR11N002-4 1.962 0.823 -1.953 -0.747 9.0 76.3 100.0 98.2 1.72

C24XR12N002-1 2.068 0.864 -2.058 -0.783 9.4 80.3 99.8 98.1 1.72

C24XR12N002-2 2.082 0.869 -2.073 -0.788 9.5 80.8 99.8 98.1 1.71

C24XR12N002-3 2.112 0.880 -2.102 -0.799 9.6 81.9 99.8 98.1 1.71

C24XR12N002-4 1.962 0.823 -1.953 -0.746 9.0 76.5 99.8 98.0 1.73

C24XR13N002-1 2.068 0.864 -2.059 -0.784 9.4 80.1 99.9 98.2 1.71

C24XR13N002-2 2.083 0.869 -2.073 -0.789 9.5 80.6 99.9 98.2 1.71

C24XR13N002-3 2.112 0.880 -2.102 -0.799 9.6 81.6 99.9 98.2 1.71

C24XR13N002-4 1.963 0.824 -1.954 -0.747 9.0 76.3 99.9 98.2 1.73

C24XR14N002-1 2.068 0.863 -2.058 -0.783 9.4 80.3 99.8 98.1 1.72

C24XR14N002-2 2.082 0.869 -2.073 -0.788 9.5 80.8 99.8 98.1 1.71

C24XR14N002-3 2.112 0.880 -2.102 -0.798 9.6 81.9 99.8 98.1 1.71

C24XR14N002-4 1.961 0.822 -1.952 -0.746 9.0 76.5 99.8 98.1 1.73

Cable1 -6.142 -2.238 6.145 2.242 2.2 3.9 100.1 100.1 0.05

Cable10 16.490 3.626 -16.490 -3.625 0.2 0.4 96.4 96.4 0.00

Cable101 -1.523 -0.503 1.525 0.506 1.8 2.9 98.0 98.2 0.16

Cable105 -1.522 -0.492 1.524 0.495 2.4 3.3 98.2 98.4 0.20

Cable106 -1.518 -0.502 1.520 0.505 1.9 3.2 98.2 98.4 0.17

Cable107 -1.534 -0.507 1.536 0.510 2.0 3.2 98.2 98.4 0.18

Cable108 -1.523 -0.504 1.525 0.507 1.9 3.2 98.2 98.4 0.17

Cable11 16.493 3.607 -16.493 -3.606 0.2 0.4 96.6 96.6 0.00

Cable112 -1.522 -0.492 1.524 0.495 2.2 3.1 98.3 98.4 0.19

Cable113 -1.518 -0.502 1.520 0.505 1.8 3.0 98.3 98.4 0.16

Cable114 -1.534 -0.507 1.536 0.510 1.8 3.0 98.3 98.4 0.16

Cable115 -1.523 -0.504 1.525 0.506 1.8 3.0 98.3 98.4 0.16

Cable12 -6.929 -2.535 6.931 2.539 2.2 3.9 100.6 100.7 0.05

Cable13 12.292 1.598 -12.290 -1.595 1.9 3.1 100.1 100.1 0.02

Cable14 -8.225 -3.437 8.229 3.441 4.3 3.2 99.9 100.0 0.06

Cable15 -2.055 -0.778 2.058 0.783 3.2 5.2 97.9 98.1 0.21

Cable16 -1.950 -0.741 1.952 0.746 2.9 4.7 97.9 98.1 0.20

Cable17 -2.070 -0.783 2.073 0.788 3.2 5.3 97.9 98.1 0.22

Cable18 -6.929 -2.535 6.931 2.539 2.2 3.9 100.6 100.7 0.05

Cable19 -6.929 -2.536 6.931 2.540 2.2 4.0 100.5 100.5 0.05

Cable2 -6.142 -2.239 6.144 2.242 2.0 3.6 99.8 99.9 0.05

Cable20 -6.929 -2.536 6.931 2.540 2.2 4.0 100.5 100.5 0.05

Cable21 -8.224 -3.436 8.228 3.438 3.7 2.8 100.0 100.0 0.05
Project: SWCC PUMP STATION ETAP Page: 39

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable22 -8.224 -3.436 8.228 3.439 4.0 3.0 99.8 99.8 0.05

Cable23 -8.223 -3.435 8.227 3.438 3.4 2.5 99.8 99.8 0.05

Cable24 12.291 1.611 -12.289 -1.607 1.9 3.1 99.9 99.9 0.02

Cable25 0.000 2.890 0.001 -2.890 0.6 0.5 100.1 100.1 0.02

Cable26 13.865 1.437 -13.862 -1.432 3.1 5.1 100.7 100.7 0.03

Cable27 13.865 1.453 -13.862 -1.447 3.1 5.2 100.5 100.5 0.03

Cable28 16.462 2.206 -16.458 -2.200 3.3 5.5 100.0 100.0 0.02

Cable29 16.459 2.220 -16.456 -2.214 3.4 5.6 99.9 99.8 0.02

Cable3 -6.142 -2.238 6.144 2.242 1.8 3.3 99.9 99.9 0.04

Cable31 0.000 2.877 0.001 -2.877 0.6 0.5 99.9 99.9 0.02

Cable32 -1.690 -0.556 1.691 0.558 1.1 1.8 98.6 98.7 0.09

Cable33 0.000 3.647 0.000 -3.647 0.3 0.5 100.7 100.7 0.01

Cable34 -1.779 -0.584 1.780 0.586 1.2 2.0 98.6 98.7 0.09

Cable35 0.000 3.634 0.000 -3.633 0.3 0.5 100.5 100.5 0.01

Cable36 -1.744 -0.573 1.745 0.575 1.2 1.9 98.6 98.7 0.09

Cable37 0.000 4.680 0.001 -4.679 1.0 0.7 100.0 100.0 0.02

Cable38 0.000 4.663 0.001 -4.663 0.9 0.7 99.8 99.8 0.01

Cable39 2.059 0.784 -2.055 -0.778 3.6 6.0 98.2 98.0 0.25

Cable4 -6.143 -2.239 6.145 2.243 2.3 4.2 100.1 100.1 0.06

Cable40 2.073 0.788 -2.069 -0.783 3.4 5.7 98.2 98.0 0.23

Cable41 2.073 0.789 -2.069 -0.783 3.7 6.1 98.2 98.0 0.25

Cable42 2.102 0.799 -2.099 -0.793 3.8 6.3 98.2 98.0 0.25

Cable43 1.954 0.747 -1.950 -0.742 3.3 5.4 98.2 98.0 0.24

Cable44 2.058 0.783 -2.055 -0.778 3.4 5.6 98.2 98.0 0.23

Cable45 1.953 0.747 -1.950 -0.742 3.1 5.1 98.2 98.0 0.22

Cable46 2.102 0.799 -2.099 -0.793 3.5 5.9 98.2 98.0 0.24

Cable48 2.058 0.783 -2.055 -0.778 3.3 5.5 98.1 97.8 0.22

Cable49 1.953 0.746 -1.950 -0.741 3.0 4.9 98.0 97.8 0.21

Cable5 12.309 2.356 -12.309 -2.356 0.1 0.3 97.5 97.5 0.00

Cable50 2.073 0.788 -2.069 -0.783 3.4 5.6 98.1 97.8 0.23

Cable51 2.102 0.799 -2.099 -0.793 3.5 5.7 98.1 97.8 0.23

Cable52 -2.099 -0.793 2.102 0.798 3.3 5.5 97.9 98.1 0.22

Cable6 -1.667 -0.549 1.668 0.550 1.1 1.8 98.6 98.7 0.09

Cable67 -1.744 -0.568 1.745 0.570 1.4 2.0 98.8 98.9 0.11

Cable68 -1.667 -0.550 1.668 0.552 1.1 1.8 98.8 98.9 0.09

Cable69 -1.690 -0.558 1.691 0.559 1.1 1.8 98.8 98.9 0.09

Cable7 12.308 2.372 -12.308 -2.372 0.1 0.3 97.2 97.2 0.00
Project: SWCC PUMP STATION ETAP Page: 40

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable70 -1.779 -0.586 1.780 0.588 1.2 2.0 98.8 98.9 0.09

Cable77 -1.744 -0.573 1.745 0.575 1.2 1.9 98.6 98.7 0.09

Cable78 -1.667 -0.549 1.668 0.550 1.1 1.8 98.6 98.7 0.09

Cable79 -1.690 -0.556 1.691 0.558 1.1 1.8 98.6 98.7 0.09

Cable8 13.886 2.384 -13.886 -2.384 0.1 0.2 96.7 96.7 0.00

Cable80 -1.779 -0.584 1.780 0.586 1.2 2.0 98.6 98.7 0.09

Cable84 -1.744 -0.573 1.745 0.575 1.2 1.9 98.8 98.9 0.09

Cable85 -1.667 -0.549 1.668 0.550 1.1 1.8 98.8 98.9 0.09

Cable86 -1.690 -0.556 1.691 0.558 1.1 1.8 98.8 98.9 0.09

Cable87 -1.779 -0.584 1.780 0.586 1.2 2.0 98.8 98.9 0.09

Cable9 13.886 2.403 -13.886 -2.403 0.1 0.2 96.5 96.5 0.00

Cable91 -1.518 -0.502 1.519 0.504 1.7 2.8 98.0 98.2 0.15

Cable92 -1.534 -0.507 1.536 0.510 1.7 2.8 98.0 98.2 0.15

Cable93 -1.523 -0.503 1.525 0.506 1.7 2.8 98.0 98.2 0.15

Cable94 -1.522 -0.493 1.524 0.496 2.1 2.9 98.0 98.2 0.17

Cable95 -1.522 -0.492 1.524 0.495 2.2 3.0 98.0 98.2 0.18

Cable96 -1.518 -0.502 1.520 0.505 1.7 2.9 98.0 98.2 0.16

Cable97 -1.534 -0.507 1.536 0.510 1.8 3.0 98.0 98.2 0.16

LINE-1(E09)-1 43.378 6.693 -42.825 -7.233 553.5 -540.5 100.0 97.5 2.54

LINE-1(E09)-2. 30.515 4.897 -30.389 -5.682 126.5 -784.8 97.5 96.7 0.75

LINE-1(E09)-PSA2 -12.309 -2.356 12.309 2.336 0.3 -20.1 97.5 97.5 0.00

LINE-1(E09)-PSA3 -13.886 -2.384 13.886 2.379 0.1 -5.1 96.7 96.7 0.00

LINE-1(E09)-PSA4 -16.493 -3.607 16.502 3.303 9.5 -303.8 96.6 96.7 0.11

LINE-2(E13)-1 43.415 6.917 -42.796 -7.328 618.1 -411.1 100.0 97.2 2.76

LINE-2(E13)-2. 30.488 4.976 -30.385 -5.720 103.7 -743.9 97.2 96.5 0.70

LINE-2(E13)-PSA2 -12.308 -2.372 12.308 2.352 0.3 -19.9 97.2 97.2 0.00

LINE-2(E13)-PSA3 -13.886 -2.403 13.887 2.398 0.1 -5.0 96.5 96.5 0.00

LINE-2(E13)-PSA4 -16.490 -3.626 16.498 3.321 8.0 -304.2 96.4 96.5 0.10

T603-PSA2 12.309 2.356 -12.292 -1.598 16.8 757.5 97.5 100.1 2.69

T603-PSA3. 13.886 2.384 -13.865 -1.437 21.0 947.1 96.7 100.7 4.01

T603-PSA4. 16.493 3.606 -16.462 -2.206 31.1 1400.7 96.6 100.0 3.44

T604-PSA2 12.308 2.372 -12.291 -1.611 16.9 761.0 97.2 99.9 2.67

T604-PSA3 13.886 2.403 -13.865 -1.453 21.1 950.8 96.5 100.5 3.99

T604-PSA4 16.490 3.625 -16.459 -2.220 31.2 1405.4 96.4 99.9 3.42

2190.4 6557.8

* This Transmission Line includes Series Capacitor.


Project: SWCC PUMP STATION ETAP Page: 41

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Switched Capacitor Switching Summary Report

Initial Final

Capacitor ID Mvar Steps Mvar Steps

C22CP01 -2.884 7 -2.892 7


C22CP02 -2.884 7 -2.879 7
C23CP01 -3.600 6 -3.650 6
C23CP02 -3.600 6 -3.637 6
C24CP01 -4.683 7 -4.685 7
C24CP02 -4.683 7 -4.669 7
Project: SWCC PUMP STATION ETAP Page: 42

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable / Busway 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 100.0

Panel 100.0 100.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

132KV PSA2 BUS-1 Bus Under Voltage 132.000 kV 128.637 97.5 3-Phase

132KV PSA2 BUS-2 Bus Under Voltage 132.000 kV 128.356 97.2 3-Phase

132KV PSA3 BUS-1 Bus Under Voltage 132.000 kV 127.652 96.7 3-Phase

132KV PSA3 BUS-2 Bus Under Voltage 132.000 kV 127.436 96.5 3-Phase

132KV PSA4 BUS-1 Bus Under Voltage 132.000 kV 127.504 96.6 3-Phase

132KV PSA4 BUS-2 Bus Under Voltage 132.000 kV 127.302 96.4 3-Phase

Bus20 Bus Under Voltage 1.800 kV 1.761 97.9 3-Phase

Bus27 Bus Under Voltage 132.000 kV 128.635 97.5 3-Phase

Bus28 Bus Under Voltage 132.000 kV 128.355 97.2 3-Phase

Bus29 Bus Under Voltage 132.000 kV 127.651 96.7 3-Phase

Bus30 Bus Under Voltage 132.000 kV 127.435 96.5 3-Phase

Bus31 Bus Under Voltage 132.000 kV 127.300 96.4 3-Phase

Bus32 Bus Under Voltage 132.000 kV 127.502 96.6 3-Phase

Bus62 Bus Under Voltage 1.800 kV 1.764 98.0 3-Phase

Bus70 Bus Under Voltage 1.800 kV 1.761 97.8 3-Phase


Project: SWCC PUMP STATION ETAP Page: 43

Location: Shuqaiq, Saudi Arabia 21.0.2C Date: 05-29-2024

Contract: SN: PWRPROJECT

Engineer: Revision: Base


Study Case: LF
Filename: 380_RTCC Config.: Scenario-01

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

T-OFF PSA4-1 Bus Under Voltage 132.000 kV 127.504 96.6 3-Phase

T-OFF PSA4-2 Bus Under Voltage 132.000 kV 127.302 96.4 3-Phase

T-OFF TWR#203-1 Bus Under Voltage 132.000 kV 128.643 97.5 3-Phase

T-OFF TWR#203-2 Bus Under Voltage 132.000 kV 128.362 97.2 3-Phase

T-OFF TWR#274-1 Bus Under Voltage 132.000 kV 127.654 96.7 3-Phase

T-OFF TWR#274-2 Bus Under Voltage 132.000 kV 127.438 96.5 3-Phase

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 86.793 13.610 87.853 98.79 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 86.793 13.610 87.853 98.79 Lagging

Total Motor Load: 83.333 32.057 89.287 93.33 Lagging

Total Static Load: 0.000 -22.412 22.412 0.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 3.459 3.965

System Mismatch: 0.000 0.021

Number of Iterations: 4