Professional Documents
Culture Documents
SEN-01 - Complete
SEN-01 - Complete
Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 54 0 0 88 0 5 147
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Load
Load
Load
Total Number of Buses: 125 83.333 32.037 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000
Project: SWCC PUMP STATION ETAP Page: 8
Line/Cable/Busway Length
Line/Cable/Busway Length
Line/Cable/Busway Length
Capacitor Rating
Max. # of
ID Phase kV kV Mvar/Bank Banks microfarad Grounding % Loading
Control Parameters
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
T603-PSA2 3-Phase 50.000 132.000 13.800 23.00 45.00 0 0 7.5 0 0 24.7250 Dyn 0.000
T603-PSA3. 3-Phase 50.000 132.000 13.800 23.00 45.00 0 0 7.5 0 0 24.7250 Dyn 0.000
T603-PSA4. 3-Phase 55.000 132.000 13.800 26.00 45.00 0 0 7.5 0 0 27.9500 Dyn 0.000
T604-PSA2 3-Phase 50.000 132.000 13.800 23.00 45.00 0 0 7.5 0 0 24.7250 Dyn 0.000
T604-PSA3 3-Phase 50.000 132.000 13.800 23.00 45.00 0 0 7.5 0 0 24.7250 Dyn 0.000
T604-PSA4 3-Phase 55.000 132.000 13.800 26.00 45.00 0 0 7.5 0 0 27.9500 Dyn 0.000
T603-PSA2 * Bus27 Bus33 -12.00 8.00 1.250 PSA2 PH-3 13.8KV BUS-1 100.00 13.800
T603-PSA3. * Bus29 Bus37 -12.00 8.00 1.250 PSA3 PH-3 13.8KV BUS-1 100.00 13.800
T603-PSA4. * Bus32 Bus39 -12.00 8.00 1.250 PSA4 PH-3 13.8KV BUS-1 100.00 13.800
T604-PSA2 * Bus28 Bus35 -12.00 8.00 1.250 PSA2 PH-3 13.8KV BUS-2 100.00 13.800
T604-PSA3 * Bus30 Bus38 -12.00 8.00 1.250 PSA3 PH-3 13.8KV BUS-2 100.00 13.800
T604-PSA4 * Bus31 Bus40 -12.00 8.00 1.250 PSA4 PH-3 13.8KV BUS-2 100.00 13.800
Project: SWCC PUMP STATION ETAP Page: 14
Branch Connections
Cable1 Cable PSA2 PH-3 13.8KV BUS-1 Bus4 0.51 0.92 1.05
Cable2 Cable PSA2 PH-3 13.8KV BUS-2 Bus6 0.47 0.84 0.97
Cable3 Cable PSA2 PH-3 13.8KV BUS-2 Bus8 0.43 0.77 0.88
Cable4 Cable PSA2 PH-3 13.8KV BUS-1 Bus2 0.55 0.99 1.13
Cable12 Cable PSA3 PH-3 13.8KV BUS-1 Bus10 0.41 0.73 0.84
Cable13 Cable Bus33 PSA2 PH-3 13.8KV BUS-1 0.12 0.20 0.24
Cable14 Cable PSA4 PH-3 13.8KV BUS-1 Bus12 0.54 0.41 0.68
Cable18 Cable PSA3 PH-3 13.8KV BUS-1 Bus14 0.41 0.73 0.84
Cable19 Cable PSA3 PH-3 13.8KV BUS-2 Bus16 0.41 0.73 0.84
Cable20 Cable PSA3 PH-3 13.8KV BUS-2 Bus18 0.41 0.73 0.84
Cable21 Cable PSA4 PH-3 13.8KV BUS-1 Bus22 0.46 0.35 0.58
Project: SWCC PUMP STATION ETAP Page: 16
Cable22 Cable PSA4 PH-3 13.8KV BUS-2 Bus24 0.50 0.38 0.63
Cable23 Cable PSA4 PH-3 13.8KV BUS-2 Bus26 0.42 0.32 0.53
Cable24 Cable Bus35 PSA2 PH-3 13.8KV BUS-2 0.12 0.20 0.24
Cable25 Cable PSA2 PH-3 13.8KV BUS-1 Bus34 0.71 0.65 0.96
Cable26 Cable Bus37 PSA3 PH-3 13.8KV BUS-1 0.16 0.27 0.31
Cable27 Cable Bus38 PSA3 PH-3 13.8KV BUS-2 0.16 0.27 0.31
Cable28 Cable Bus39 PSA4 PH-3 13.8KV BUS-1 0.12 0.20 0.23
Cable29 Cable Bus40 PSA4 PH-3 13.8KV BUS-2 0.12 0.20 0.23
Cable31 Cable PSA2 PH-3 13.8KV BUS-2 Bus36 0.71 0.65 0.96
Cable33 Cable PSA3 PH-3 13.8KV BUS-1 Bus41 0.20 0.37 0.42
Cable35 Cable PSA3 PH-3 13.8KV BUS-2 Bus42 0.20 0.37 0.42
Cable37 Cable PSA4 PH-3 13.8KV BUS-1 Bus43 0.44 0.33 0.55
Cable38 Cable PSA4 PH-3 13.8KV BUS-2 Bus44 0.40 0.30 0.50
LINE-1(E09)-1 Line T-OFF TWR#203-1 132KV SHUQAIQ SS BUS-1 2.82 18.44 18.65 4.2603770
LINE-1(E09)-2. Line T-OFF TWR#274-1 T-OFF TWR#203-1 1.25 6.56 6.68 1.5379890
LINE-1(E09)-PSA2 Line 132KV PSA2 BUS-1 T-OFF TWR#203-1 0.02 0.10 0.10 0.0228324
LINE-1(E09)-PSA3 Line 132KV PSA3 BUS-1 T-OFF TWR#274-1 0.00 0.03 0.03 0.0060217
LINE-1(E09)-PSA4 Line T-OFF PSA4-1 T-OFF TWR#274-1 0.31 1.67 1.70 0.3798083
LINE-2(E13)-1 Line T-OFF TWR#203-2 132KV SHUQAIQ SS BUS-2 3.14 18.98 19.24 4.2603770
LINE-2(E13)-2. Line T-OFF TWR#274-2 T-OFF TWR#203-2 1.02 6.88 6.96 1.5379890
LINE-2(E13)-PSA2 Line 132KV PSA2 BUS-2 T-OFF TWR#203-2 0.02 0.10 0.10 0.0228324
LINE-2(E13)-PSA3 Line 132KV PSA3 BUS-2 T-OFF TWR#274-2 0.00 0.03 0.03 0.0060217
LINE-2(E13)-PSA4 Line T-OFF PSA4-2 T-OFF TWR#274-2 0.26 1.62 1.64 0.3798083
AC Rating
MVA kV FLA Input Operating Output
Bypass
ID Output Input Output Input Output % EFF % PF V/Hz % Frequency Hz % Imax Switch
C22XR11N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C22XR12N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C22XR13N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C22XR14N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C23XR11N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C23XR12N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C23XR13N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C23XR14N001 11.500 1.800 3.300 3464.10 2011.98 98.50 95.00 100.00 100.0 60.0 150.0 No
C24XR11N001 15.200 1.800 3.300 4618.80 2659.31 98.50 100.00 100.0 60.0 150.0 No
C24XR12N001 15.200 1.800 3.300 4618.80 2659.31 98.50 100.00 100.0 60.0 150.0 No
C24XR13N001 15.200 1.800 3.300 4618.80 2659.31 98.50 100.00 100.0 60.0 150.0 No
C24XR14N001 15.200 1.800 3.300 4618.80 2659.31 98.50 100.00 100.0 60.0 150.0 No
Project: SWCC PUMP STATION ETAP Page: 19
132KV PSA2 BUS-1 132.000 97.452 -4.6 0.000 0.000 0.000 0.000 Bus27 12.309 2.356 56.2 98.2
132KV PSA2 BUS-2 132.000 97.240 -4.7 0.000 0.000 0.000 0.000 Bus28 12.308 2.372 56.4 98.2
132KV PSA3 BUS-1 132.000 96.706 -5.7 0.000 0.000 0.000 0.000 Bus29 13.886 2.384 63.7 98.6
132KV PSA3 BUS-2 132.000 96.543 -5.9 0.000 0.000 0.000 0.000 Bus30 13.886 2.403 63.8 98.5
132KV PSA4 BUS-1 132.000 96.594 -5.9 0.000 0.000 0.000 0.000 Bus32 16.493 3.607 76.4 97.7
132KV PSA4 BUS-2 132.000 96.441 -6.1 0.000 0.000 0.000 0.000 Bus31 16.490 3.626 76.6 97.7
132KV SHUQAIQ SS 132.000 100.000 0.0 0.000 0.000 0.000 0.000 T-OFF TWR#203-1 43.378 6.693 192.0 98.8
BUS-1
Bus59 -43.378 -6.693 192.0 98.8
132KV SHUQAIQ SS 132.000 100.000 0.0 0.000 0.000 0.000 0.000 T-OFF TWR#203-2 43.415 6.917 192.3 98.8
BUS-2
Bus59 -43.415 -6.917 192.3 98.8
Bus1 1.800 98.031 -10.0 0.000 0.000 6.098 2.004 Bus110 -1.522 -0.492 523.5 95.1
Bus2 13.800 100.069 -8.0 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-1 -6.143 -2.239 273.4 94.0
Bus4 13.800 100.073 -8.0 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-1 -6.142 -2.238 273.3 94.0
Bus6 13.800 99.847 -8.2 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-2 -6.142 -2.239 273.9 94.0
Bus7 1.800 98.240 -9.9 0.000 0.000 6.098 2.004 Bus102 -1.522 -0.492 522.2 95.2
Bus8 13.800 99.851 -8.2 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-2 -6.142 -2.238 273.9 94.0
Bus9 1.800 98.596 -11.7 0.000 0.000 6.880 2.261 Bus15 -1.667 -0.549 570.8 95.0
Bus10 13.800 100.639 -9.6 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-1 -6.929 -2.535 306.7 93.9
Bus12 13.800 99.945 -10.6 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-1 -8.225 -3.437 373.2 92.3
Bus13 1.800 98.688 -11.7 0.000 0.000 0.000 0.000 Bus9 1.745 0.575 597.2 95.0
Bus14 13.800 100.639 -9.6 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-1 -6.929 -2.535 306.7 93.9
Project: SWCC PUMP STATION ETAP Page: 21
Bus15 1.800 98.684 -11.7 0.000 0.000 0.000 0.000 Bus9 1.668 0.550 570.8 95.0
Bus16 13.800 100.456 -9.8 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-2 -6.929 -2.536 307.3 93.9
Bus17 1.800 98.685 -11.7 0.000 0.000 0.000 0.000 Bus9 1.691 0.558 578.7 95.0
Bus18 13.800 100.456 -9.8 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-2 -6.929 -2.536 307.3 93.9
Bus20 1.800 97.856 -12.8 0.000 0.000 8.173 3.095 Bus57 -2.055 -0.778 720.3 93.5
* Bus21 132.000 100.000 0.0 86.793 13.610 0.000 0.000 Bus59 86.793 13.610 384.3 98.8
Bus22 13.800 99.954 -10.6 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-1 -8.224 -3.436 373.1 92.3
Bus24 13.800 99.777 -10.8 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-2 -8.224 -3.436 373.7 92.3
Bus26 13.800 99.786 -10.8 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-2 -8.223 -3.435 373.7 92.3
Bus27 132.000 97.451 -4.6 0.000 0.000 0.000 0.000 132KV PSA2 BUS-1 -12.309 -2.356 56.2 98.2
Bus28 132.000 97.238 -4.7 0.000 0.000 0.000 0.000 132KV PSA2 BUS-2 -12.308 -2.372 56.4 98.2
Bus29 132.000 96.705 -5.7 0.000 0.000 0.000 0.000 132KV PSA3 BUS-1 -13.886 -2.384 63.7 98.6
Bus30 132.000 96.542 -5.9 0.000 0.000 0.000 0.000 132KV PSA3 BUS-2 -13.886 -2.403 63.8 98.5
Bus31 132.000 96.439 -6.1 0.000 0.000 0.000 0.000 132KV PSA4 BUS-2 -16.490 -3.625 76.6 97.7
Bus32 132.000 96.593 -5.9 0.000 0.000 0.000 0.000 132KV PSA4 BUS-1 -16.493 -3.606 76.4 97.7
Bus33 13.800 100.143 -8.0 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-1 12.292 1.598 517.9 99.2
Bus34 13.800 100.143 -8.0 0.000 0.000 0.000 -2.890 PSA2 PH-3 13.8KV BUS-1 0.000 2.890 120.8 0.0
Bus35 13.800 99.913 -8.1 0.000 0.000 0.000 0.000 PSA2 PH-3 13.8KV BUS-2 12.291 1.611 519.1 99.2
Bus36 13.800 99.913 -8.2 0.000 0.000 0.000 -2.877 PSA2 PH-3 13.8KV BUS-2 0.000 2.877 120.5 0.0
Bus37 13.800 100.711 -9.6 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-1 13.865 1.437 579.1 99.5
Bus38 13.800 100.529 -9.8 0.000 0.000 0.000 0.000 PSA3 PH-3 13.8KV BUS-2 13.865 1.453 580.2 99.5
Bus39 13.800 100.028 -10.6 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-1 16.462 2.206 694.7 99.1
Bus40 13.800 99.856 -10.8 0.000 0.000 0.000 0.000 PSA4 PH-3 13.8KV BUS-2 16.459 2.220 695.8 99.1
Bus41 13.800 100.698 -9.6 0.000 0.000 0.000 -3.647 PSA3 PH-3 13.8KV BUS-1 0.000 3.647 151.5 0.0
Project: SWCC PUMP STATION ETAP Page: 23
Bus42 13.800 100.516 -9.8 0.000 0.000 0.000 -3.634 PSA3 PH-3 13.8KV BUS-2 0.000 3.634 151.3 0.0
Bus43 13.800 100.020 -10.6 0.000 0.000 0.000 -4.680 PSA4 PH-3 13.8KV BUS-1 0.000 4.680 195.7 0.0
Bus44 13.800 99.845 -10.8 0.000 0.000 0.000 -4.663 PSA4 PH-3 13.8KV BUS-2 0.000 4.663 195.4 0.0
Bus45 1.800 98.232 -12.5 0.000 0.000 0.000 0.000 Bus62 2.059 0.784 719.3 93.5
Bus46 1.800 98.233 -12.5 0.000 0.000 0.000 0.000 Bus62 2.073 0.789 724.2 93.5
Bus47 1.800 98.237 -12.5 0.000 0.000 0.000 0.000 Bus62 2.102 0.799 734.3 93.5
Bus48 1.800 98.220 -12.5 0.000 0.000 0.000 0.000 Bus62 1.954 0.747 683.1 93.4
Bus49 1.800 98.241 -12.5 0.000 0.000 0.000 0.000 Bus67 2.058 0.783 719.1 93.5
Bus50 1.800 98.243 -12.5 0.000 0.000 0.000 0.000 Bus67 2.073 0.788 724.1 93.5
Bus51 1.800 98.230 -12.5 0.000 0.000 0.000 0.000 Bus67 1.953 0.747 682.7 93.4
Bus52 1.800 98.246 -12.5 0.000 0.000 0.000 0.000 Bus67 2.102 0.799 734.2 93.5
Bus53 1.800 98.061 -12.7 0.000 0.000 0.000 0.000 Bus70 2.058 0.783 720.4 93.5
Bus54 1.800 98.063 -12.7 0.000 0.000 0.000 0.000 Bus70 2.073 0.788 725.4 93.5
Bus55 1.800 98.066 -12.7 0.000 0.000 0.000 0.000 Bus70 2.102 0.799 735.6 93.5
Bus56 1.800 98.050 -12.7 0.000 0.000 0.000 0.000 Bus70 1.953 0.746 683.9 93.4
Bus57 1.800 98.070 -12.7 0.000 0.000 0.000 0.000 Bus20 2.058 0.783 720.3 93.5
Bus58 1.800 98.072 -12.7 0.000 0.000 0.000 0.000 Bus20 2.073 0.788 725.3 93.5
Bus59 132.000 100.000 0.0 0.000 0.000 0.000 0.000 Bus21 -86.793 -13.610 384.3 98.8
Bus60 1.800 98.075 -12.7 0.000 0.000 0.000 0.000 Bus20 2.102 0.798 735.5 93.5
Bus61 1.800 98.060 -12.7 0.000 0.000 0.000 0.000 Bus20 1.952 0.746 683.6 93.4
Bus62 1.800 97.984 -12.6 0.000 0.000 8.173 3.095 Bus45 -2.055 -0.778 719.3 93.5
Bus64 1.800 98.690 -11.7 0.000 0.000 0.000 0.000 Bus9 1.780 0.586 609.2 95.0
Bus67 1.800 98.010 -12.6 0.000 0.000 8.173 3.095 Bus50 -2.069 -0.783 724.1 93.5
Bus70 1.800 97.836 -12.8 0.000 0.000 8.173 3.095 Bus53 -2.055 -0.778 720.4 93.5
Bus74 1.800 98.778 -11.5 0.000 0.000 6.880 2.261 Bus83 -1.744 -0.568 595.4 95.1
Bus77 1.800 98.596 -11.7 0.000 0.000 6.880 2.261 Bus91 -1.744 -0.573 597.2 95.0
Bus80 1.800 98.782 -11.5 0.000 0.000 6.880 2.261 Bus87 -1.744 -0.573 596.1 95.0
Project: SWCC PUMP STATION ETAP Page: 25
Bus83 1.800 98.884 -11.5 0.000 0.000 0.000 0.000 Bus74 1.745 0.570 595.4 95.1
Bus84 1.800 98.866 -11.5 0.000 0.000 0.000 0.000 Bus74 1.668 0.552 570.0 94.9
Bus85 1.800 98.867 -11.5 0.000 0.000 0.000 0.000 Bus74 1.691 0.559 577.8 94.9
Bus86 1.800 98.872 -11.5 0.000 0.000 0.000 0.000 Bus74 1.780 0.588 608.3 95.0
Bus87 1.800 98.874 -11.5 0.000 0.000 0.000 0.000 Bus80 1.745 0.575 596.1 95.0
Bus88 1.800 98.870 -11.5 0.000 0.000 0.000 0.000 Bus80 1.668 0.550 569.7 95.0
Bus89 1.800 98.871 -11.5 0.000 0.000 0.000 0.000 Bus80 1.691 0.558 577.6 95.0
Bus90 1.800 98.876 -11.5 0.000 0.000 0.000 0.000 Bus80 1.780 0.586 608.0 95.0
Bus91 1.800 98.688 -11.7 0.000 0.000 0.000 0.000 Bus77 1.745 0.575 597.2 95.0
Bus92 1.800 98.684 -11.7 0.000 0.000 0.000 0.000 Bus77 1.668 0.550 570.8 95.0
Bus93 1.800 98.685 -11.7 0.000 0.000 0.000 0.000 Bus77 1.691 0.558 578.7 95.0
Bus94 1.800 98.690 -11.7 0.000 0.000 0.000 0.000 Bus77 1.780 0.586 609.2 95.0
Bus95 1.800 98.043 -10.0 0.000 0.000 6.098 2.004 Bus115 -1.518 -0.502 523.0 94.9
Bus99 1.800 98.257 -9.9 0.000 0.000 6.098 2.004 Bus106 -1.522 -0.492 522.2 95.1
Bus102 1.800 98.440 -9.8 0.000 0.000 0.000 0.000 Bus7 1.524 0.495 522.2 95.1
Bus103 1.800 98.414 -9.8 0.000 0.000 0.000 0.000 Bus7 1.520 0.505 522.0 94.9
Bus104 1.800 98.415 -9.8 0.000 0.000 0.000 0.000 Bus7 1.536 0.510 527.6 94.9
Bus105 1.800 98.414 -9.8 0.000 0.000 0.000 0.000 Bus7 1.525 0.507 523.9 94.9
Bus106 1.800 98.444 -9.8 0.000 0.000 0.000 0.000 Bus99 1.524 0.495 522.2 95.1
Bus107 1.800 98.419 -9.8 0.000 0.000 0.000 0.000 Bus99 1.520 0.505 521.9 94.9
Bus108 1.800 98.421 -9.8 0.000 0.000 0.000 0.000 Bus99 1.536 0.510 527.5 94.9
Bus109 1.800 98.419 -9.8 0.000 0.000 0.000 0.000 Bus99 1.525 0.506 523.7 94.9
Bus110 1.800 98.213 -9.9 0.000 0.000 0.000 0.000 Bus1 1.524 0.495 523.5 95.1
Bus111 1.800 98.189 -9.9 0.000 0.000 0.000 0.000 Bus1 1.520 0.505 523.1 94.9
Bus112 1.800 98.191 -9.9 0.000 0.000 0.000 0.000 Bus1 1.536 0.510 528.7 94.9
Bus113 1.800 98.189 -9.9 0.000 0.000 0.000 0.000 Bus1 1.525 0.506 524.9 94.9
Bus114 1.800 98.217 -9.9 0.000 0.000 0.000 0.000 Bus95 1.524 0.496 523.5 95.1
Bus115 1.800 98.194 -9.9 0.000 0.000 0.000 0.000 Bus95 1.519 0.504 523.0 94.9
Bus116 1.800 98.195 -9.9 0.000 0.000 0.000 0.000 Bus95 1.536 0.510 528.7 94.9
Bus117 1.800 98.194 -9.9 0.000 0.000 0.000 0.000 Bus95 1.525 0.506 524.9 94.9
PSA2 PH-3 13.8KV BUS-1 13.800 100.125 -8.0 0.000 0.000 0.000 0.000 Bus4 6.145 2.242 273.3 93.9
PSA2 PH-3 13.8KV BUS-2 13.800 99.894 -8.2 0.000 0.000 0.000 0.000 Bus6 6.144 2.242 273.9 93.9
PSA3 PH-3 13.8KV BUS-1 13.800 100.685 -9.6 0.000 0.000 0.000 0.000 Bus10 6.931 2.539 306.7 93.9
PSA3 PH-3 13.8KV BUS-2 13.800 100.503 -9.8 0.000 0.000 0.000 0.000 Bus16 6.931 2.540 307.3 93.9
PSA4 PH-3 13.8KV BUS-1 13.800 100.004 -10.6 0.000 0.000 0.000 0.000 Bus12 8.229 3.441 373.2 92.3
PSA4 PH-3 13.8KV BUS-2 13.800 99.831 -10.8 0.000 0.000 0.000 0.000 Bus24 8.228 3.439 373.7 92.3
T-OFF PSA4-1 132.000 96.594 -5.9 0.000 0.000 0.000 0.000 T-OFF TWR#274-1 -16.493 -3.607 76.4 97.7
T-OFF PSA4-2 132.000 96.441 -6.1 0.000 0.000 0.000 0.000 T-OFF TWR#274-2 -16.490 -3.626 76.6 97.7
T-OFF TWR#203-1 132.000 97.457 -4.6 0.000 0.000 0.000 0.000 132KV SHUQAIQ SS BUS-1 -42.825 -7.233 194.9 98.6
Project: SWCC PUMP STATION ETAP Page: 28
T-OFF TWR#203-2 132.000 97.244 -4.7 0.000 0.000 0.000 0.000 132KV SHUQAIQ SS BUS-2 -42.796 -7.328 195.3 98.6
T-OFF TWR#274-1 132.000 96.707 -5.7 0.000 0.000 0.000 0.000 T-OFF TWR#203-1 -30.389 -5.682 139.8 98.3
T-OFF TWR#274-2 132.000 96.544 -5.9 0.000 0.000 0.000 0.000 T-OFF TWR#203-2 -30.385 -5.720 140.1 98.3
C22XR11N001 3.300 100.000 0.0 6.006 2.309 0.000 0.000 Bus100 6.006 2.309 1125.8 93.3
C22XR12N001 3.300 100.000 0.0 6.006 2.309 0.000 0.000 Bus3 6.006 2.309 1125.8 93.3
C22XR13N001 3.300 100.000 0.0 6.006 2.309 0.000 0.000 Bus11 6.006 2.309 1125.8 93.3
C22XR14N001 3.300 100.000 0.0 6.006 2.309 0.000 0.000 Bus96 6.006 2.309 1125.8 93.3
C23XR11N001 3.300 100.000 0.0 6.776 2.605 0.000 0.000 Bus82 6.776 2.605 1270.2 93.3
C23XR12N001 3.300 100.000 0.0 6.776 2.605 0.000 0.000 Bus79 6.776 2.605 1270.2 93.3
C23XR13N001 3.300 100.000 0.0 6.776 2.605 0.000 0.000 Bus76 6.776 2.605 1270.2 93.3
C23XR14N001 3.300 100.000 0.0 6.776 2.605 0.000 0.000 Bus73 6.776 2.605 1270.2 93.3
C24XR11N001 3.300 100.000 0.0 8.051 3.095 0.000 0.000 Bus69 8.051 3.095 1509.0 93.3
C24XR12N001 3.300 100.000 0.0 8.051 3.095 0.000 0.000 Bus72 8.051 3.095 1509.0 93.3
C24XR13N001 3.300 100.000 0.0 8.051 3.095 0.000 0.000 Bus63 8.051 3.095 1509.0 93.3
C24XR14N001 3.300 100.000 0.0 8.051 3.095 0.000 0.000 Bus25 8.051 3.095 1509.0 93.3
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: SWCC PUMP STATION ETAP Page: 29
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: SWCC PUMP STATION ETAP Page: 33
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
C22XR11N002-1 1.534 0.550 -1.524 -0.495 9.2 55.1 100.1 98.4 1.63
C22XR11N002-2 1.529 0.560 -1.520 -0.505 9.2 55.3 100.1 98.4 1.65
C22XR11N002-3 1.546 0.566 -1.536 -0.510 9.3 55.8 100.1 98.4 1.65
C22XR11N002-4 1.534 0.562 -1.525 -0.506 9.2 55.4 100.1 98.4 1.65
C22XR12N002-1 1.534 0.551 -1.524 -0.495 9.2 55.4 99.8 98.2 1.63
C22XR12N002-2 1.529 0.560 -1.520 -0.505 9.3 55.5 99.8 98.2 1.66
C22XR12N002-3 1.546 0.566 -1.536 -0.510 9.3 56.1 99.8 98.2 1.66
C22XR12N002-4 1.534 0.562 -1.525 -0.506 9.3 55.7 99.8 98.2 1.66
C22XR13N002-1 1.534 0.550 -1.524 -0.495 9.2 55.1 100.1 98.4 1.63
C22XR13N002-2 1.529 0.560 -1.520 -0.505 9.2 55.3 100.1 98.4 1.66
C22XR13N002-3 1.546 0.566 -1.536 -0.510 9.3 55.8 100.1 98.4 1.65
C22XR13N002-4 1.535 0.562 -1.525 -0.507 9.2 55.5 100.1 98.4 1.65
C22XR14N002-1 1.534 0.551 -1.524 -0.496 9.2 55.4 99.9 98.2 1.63
C22XR14N002-2 1.529 0.560 -1.519 -0.504 9.2 55.5 99.9 98.2 1.66
C22XR14N002-3 1.545 0.566 -1.536 -0.510 9.3 56.1 99.9 98.2 1.66
C22XR14N002-4 1.534 0.562 -1.525 -0.506 9.3 55.7 99.9 98.2 1.66
C23XR11N002-1 1.757 0.642 -1.745 -0.575 11.3 67.5 100.6 98.9 1.76
C23XR11N002-2 1.678 0.615 -1.668 -0.550 10.8 64.6 100.6 98.9 1.77
C23XR11N002-3 1.702 0.623 -1.691 -0.558 10.9 65.5 100.6 98.9 1.77
C23XR11N002-4 1.792 0.655 -1.780 -0.586 11.5 68.8 100.6 98.9 1.76
C23XR12N002-1 1.757 0.643 -1.745 -0.575 11.3 67.8 100.5 98.7 1.77
C23XR12N002-2 1.679 0.615 -1.668 -0.550 10.8 64.9 100.5 98.7 1.77
C23XR12N002-3 1.702 0.623 -1.691 -0.558 11.0 65.7 100.5 98.7 1.77
C23XR12N002-4 1.792 0.655 -1.780 -0.586 11.5 69.1 100.5 98.7 1.77
C23XR13N002-1 1.756 0.637 -1.745 -0.570 11.2 67.4 100.6 98.9 1.75
C23XR13N002-2 1.679 0.617 -1.668 -0.552 10.8 64.7 100.6 98.9 1.77
C23XR13N002-3 1.702 0.625 -1.691 -0.559 10.9 65.5 100.6 98.9 1.77
C23XR13N002-4 1.792 0.657 -1.780 -0.588 11.5 68.9 100.6 98.9 1.77
C23XR14N002-1 -1.745 -0.575 1.757 0.643 11.3 67.8 98.7 100.5 1.77
C23XR14N002-2 -1.668 -0.550 1.679 0.615 10.8 64.9 98.7 100.5 1.77
C23XR14N002-3 -1.691 -0.558 1.702 0.623 11.0 65.7 98.7 100.5 1.77
C23XR14N002-4 1.792 0.655 -1.780 -0.586 11.5 69.1 100.5 98.7 1.77
C24XR11N002-1 2.068 0.863 -2.058 -0.783 9.4 80.0 100.0 98.2 1.71
C24XR11N002-2 2.082 0.869 -2.073 -0.788 9.5 80.5 100.0 98.2 1.71
Project: SWCC PUMP STATION ETAP Page: 38
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
C24XR11N002-3 2.112 0.880 -2.102 -0.799 9.6 81.6 100.0 98.2 1.71
C24XR11N002-4 1.962 0.823 -1.953 -0.747 9.0 76.3 100.0 98.2 1.72
C24XR12N002-1 2.068 0.864 -2.058 -0.783 9.4 80.3 99.8 98.1 1.72
C24XR12N002-2 2.082 0.869 -2.073 -0.788 9.5 80.8 99.8 98.1 1.71
C24XR12N002-3 2.112 0.880 -2.102 -0.799 9.6 81.9 99.8 98.1 1.71
C24XR12N002-4 1.962 0.823 -1.953 -0.746 9.0 76.5 99.8 98.0 1.73
C24XR13N002-1 2.068 0.864 -2.059 -0.784 9.4 80.1 99.9 98.2 1.71
C24XR13N002-2 2.083 0.869 -2.073 -0.789 9.5 80.6 99.9 98.2 1.71
C24XR13N002-3 2.112 0.880 -2.102 -0.799 9.6 81.6 99.9 98.2 1.71
C24XR13N002-4 1.963 0.824 -1.954 -0.747 9.0 76.3 99.9 98.2 1.73
C24XR14N002-1 2.068 0.863 -2.058 -0.783 9.4 80.3 99.8 98.1 1.72
C24XR14N002-2 2.082 0.869 -2.073 -0.788 9.5 80.8 99.8 98.1 1.71
C24XR14N002-3 2.112 0.880 -2.102 -0.798 9.6 81.9 99.8 98.1 1.71
C24XR14N002-4 1.961 0.822 -1.952 -0.746 9.0 76.5 99.8 98.1 1.73
Cable1 -6.142 -2.238 6.145 2.242 2.2 3.9 100.1 100.1 0.05
Cable10 16.490 3.626 -16.490 -3.625 0.2 0.4 96.4 96.4 0.00
Cable101 -1.523 -0.503 1.525 0.506 1.8 2.9 98.0 98.2 0.16
Cable105 -1.522 -0.492 1.524 0.495 2.4 3.3 98.2 98.4 0.20
Cable106 -1.518 -0.502 1.520 0.505 1.9 3.2 98.2 98.4 0.17
Cable107 -1.534 -0.507 1.536 0.510 2.0 3.2 98.2 98.4 0.18
Cable108 -1.523 -0.504 1.525 0.507 1.9 3.2 98.2 98.4 0.17
Cable11 16.493 3.607 -16.493 -3.606 0.2 0.4 96.6 96.6 0.00
Cable112 -1.522 -0.492 1.524 0.495 2.2 3.1 98.3 98.4 0.19
Cable113 -1.518 -0.502 1.520 0.505 1.8 3.0 98.3 98.4 0.16
Cable114 -1.534 -0.507 1.536 0.510 1.8 3.0 98.3 98.4 0.16
Cable115 -1.523 -0.504 1.525 0.506 1.8 3.0 98.3 98.4 0.16
Cable12 -6.929 -2.535 6.931 2.539 2.2 3.9 100.6 100.7 0.05
Cable13 12.292 1.598 -12.290 -1.595 1.9 3.1 100.1 100.1 0.02
Cable14 -8.225 -3.437 8.229 3.441 4.3 3.2 99.9 100.0 0.06
Cable15 -2.055 -0.778 2.058 0.783 3.2 5.2 97.9 98.1 0.21
Cable16 -1.950 -0.741 1.952 0.746 2.9 4.7 97.9 98.1 0.20
Cable17 -2.070 -0.783 2.073 0.788 3.2 5.3 97.9 98.1 0.22
Cable18 -6.929 -2.535 6.931 2.539 2.2 3.9 100.6 100.7 0.05
Cable19 -6.929 -2.536 6.931 2.540 2.2 4.0 100.5 100.5 0.05
Cable2 -6.142 -2.239 6.144 2.242 2.0 3.6 99.8 99.9 0.05
Cable20 -6.929 -2.536 6.931 2.540 2.2 4.0 100.5 100.5 0.05
Cable21 -8.224 -3.436 8.228 3.438 3.7 2.8 100.0 100.0 0.05
Project: SWCC PUMP STATION ETAP Page: 39
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Cable22 -8.224 -3.436 8.228 3.439 4.0 3.0 99.8 99.8 0.05
Cable23 -8.223 -3.435 8.227 3.438 3.4 2.5 99.8 99.8 0.05
Cable24 12.291 1.611 -12.289 -1.607 1.9 3.1 99.9 99.9 0.02
Cable25 0.000 2.890 0.001 -2.890 0.6 0.5 100.1 100.1 0.02
Cable26 13.865 1.437 -13.862 -1.432 3.1 5.1 100.7 100.7 0.03
Cable27 13.865 1.453 -13.862 -1.447 3.1 5.2 100.5 100.5 0.03
Cable28 16.462 2.206 -16.458 -2.200 3.3 5.5 100.0 100.0 0.02
Cable29 16.459 2.220 -16.456 -2.214 3.4 5.6 99.9 99.8 0.02
Cable3 -6.142 -2.238 6.144 2.242 1.8 3.3 99.9 99.9 0.04
Cable31 0.000 2.877 0.001 -2.877 0.6 0.5 99.9 99.9 0.02
Cable32 -1.690 -0.556 1.691 0.558 1.1 1.8 98.6 98.7 0.09
Cable33 0.000 3.647 0.000 -3.647 0.3 0.5 100.7 100.7 0.01
Cable34 -1.779 -0.584 1.780 0.586 1.2 2.0 98.6 98.7 0.09
Cable35 0.000 3.634 0.000 -3.633 0.3 0.5 100.5 100.5 0.01
Cable36 -1.744 -0.573 1.745 0.575 1.2 1.9 98.6 98.7 0.09
Cable37 0.000 4.680 0.001 -4.679 1.0 0.7 100.0 100.0 0.02
Cable38 0.000 4.663 0.001 -4.663 0.9 0.7 99.8 99.8 0.01
Cable39 2.059 0.784 -2.055 -0.778 3.6 6.0 98.2 98.0 0.25
Cable4 -6.143 -2.239 6.145 2.243 2.3 4.2 100.1 100.1 0.06
Cable40 2.073 0.788 -2.069 -0.783 3.4 5.7 98.2 98.0 0.23
Cable41 2.073 0.789 -2.069 -0.783 3.7 6.1 98.2 98.0 0.25
Cable42 2.102 0.799 -2.099 -0.793 3.8 6.3 98.2 98.0 0.25
Cable43 1.954 0.747 -1.950 -0.742 3.3 5.4 98.2 98.0 0.24
Cable44 2.058 0.783 -2.055 -0.778 3.4 5.6 98.2 98.0 0.23
Cable45 1.953 0.747 -1.950 -0.742 3.1 5.1 98.2 98.0 0.22
Cable46 2.102 0.799 -2.099 -0.793 3.5 5.9 98.2 98.0 0.24
Cable48 2.058 0.783 -2.055 -0.778 3.3 5.5 98.1 97.8 0.22
Cable49 1.953 0.746 -1.950 -0.741 3.0 4.9 98.0 97.8 0.21
Cable5 12.309 2.356 -12.309 -2.356 0.1 0.3 97.5 97.5 0.00
Cable50 2.073 0.788 -2.069 -0.783 3.4 5.6 98.1 97.8 0.23
Cable51 2.102 0.799 -2.099 -0.793 3.5 5.7 98.1 97.8 0.23
Cable52 -2.099 -0.793 2.102 0.798 3.3 5.5 97.9 98.1 0.22
Cable6 -1.667 -0.549 1.668 0.550 1.1 1.8 98.6 98.7 0.09
Cable67 -1.744 -0.568 1.745 0.570 1.4 2.0 98.8 98.9 0.11
Cable68 -1.667 -0.550 1.668 0.552 1.1 1.8 98.8 98.9 0.09
Cable69 -1.690 -0.558 1.691 0.559 1.1 1.8 98.8 98.9 0.09
Cable7 12.308 2.372 -12.308 -2.372 0.1 0.3 97.2 97.2 0.00
Project: SWCC PUMP STATION ETAP Page: 40
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Cable70 -1.779 -0.586 1.780 0.588 1.2 2.0 98.8 98.9 0.09
Cable77 -1.744 -0.573 1.745 0.575 1.2 1.9 98.6 98.7 0.09
Cable78 -1.667 -0.549 1.668 0.550 1.1 1.8 98.6 98.7 0.09
Cable79 -1.690 -0.556 1.691 0.558 1.1 1.8 98.6 98.7 0.09
Cable8 13.886 2.384 -13.886 -2.384 0.1 0.2 96.7 96.7 0.00
Cable80 -1.779 -0.584 1.780 0.586 1.2 2.0 98.6 98.7 0.09
Cable84 -1.744 -0.573 1.745 0.575 1.2 1.9 98.8 98.9 0.09
Cable85 -1.667 -0.549 1.668 0.550 1.1 1.8 98.8 98.9 0.09
Cable86 -1.690 -0.556 1.691 0.558 1.1 1.8 98.8 98.9 0.09
Cable87 -1.779 -0.584 1.780 0.586 1.2 2.0 98.8 98.9 0.09
Cable9 13.886 2.403 -13.886 -2.403 0.1 0.2 96.5 96.5 0.00
Cable91 -1.518 -0.502 1.519 0.504 1.7 2.8 98.0 98.2 0.15
Cable92 -1.534 -0.507 1.536 0.510 1.7 2.8 98.0 98.2 0.15
Cable93 -1.523 -0.503 1.525 0.506 1.7 2.8 98.0 98.2 0.15
Cable94 -1.522 -0.493 1.524 0.496 2.1 2.9 98.0 98.2 0.17
Cable95 -1.522 -0.492 1.524 0.495 2.2 3.0 98.0 98.2 0.18
Cable96 -1.518 -0.502 1.520 0.505 1.7 2.9 98.0 98.2 0.16
Cable97 -1.534 -0.507 1.536 0.510 1.8 3.0 98.0 98.2 0.16
LINE-1(E09)-1 43.378 6.693 -42.825 -7.233 553.5 -540.5 100.0 97.5 2.54
LINE-1(E09)-2. 30.515 4.897 -30.389 -5.682 126.5 -784.8 97.5 96.7 0.75
LINE-1(E09)-PSA2 -12.309 -2.356 12.309 2.336 0.3 -20.1 97.5 97.5 0.00
LINE-1(E09)-PSA3 -13.886 -2.384 13.886 2.379 0.1 -5.1 96.7 96.7 0.00
LINE-1(E09)-PSA4 -16.493 -3.607 16.502 3.303 9.5 -303.8 96.6 96.7 0.11
LINE-2(E13)-1 43.415 6.917 -42.796 -7.328 618.1 -411.1 100.0 97.2 2.76
LINE-2(E13)-2. 30.488 4.976 -30.385 -5.720 103.7 -743.9 97.2 96.5 0.70
LINE-2(E13)-PSA2 -12.308 -2.372 12.308 2.352 0.3 -19.9 97.2 97.2 0.00
LINE-2(E13)-PSA3 -13.886 -2.403 13.887 2.398 0.1 -5.0 96.5 96.5 0.00
LINE-2(E13)-PSA4 -16.490 -3.626 16.498 3.321 8.0 -304.2 96.4 96.5 0.10
T603-PSA2 12.309 2.356 -12.292 -1.598 16.8 757.5 97.5 100.1 2.69
T603-PSA3. 13.886 2.384 -13.865 -1.437 21.0 947.1 96.7 100.7 4.01
T603-PSA4. 16.493 3.606 -16.462 -2.206 31.1 1400.7 96.6 100.0 3.44
T604-PSA2 12.308 2.372 -12.291 -1.611 16.9 761.0 97.2 99.9 2.67
T604-PSA3 13.886 2.403 -13.865 -1.453 21.1 950.8 96.5 100.5 3.99
T604-PSA4 16.490 3.625 -16.459 -2.220 31.2 1405.4 96.4 99.9 3.42
2190.4 6557.8
Initial Final
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Marginal Report
132KV PSA2 BUS-1 Bus Under Voltage 132.000 kV 128.637 97.5 3-Phase
132KV PSA2 BUS-2 Bus Under Voltage 132.000 kV 128.356 97.2 3-Phase
132KV PSA3 BUS-1 Bus Under Voltage 132.000 kV 127.652 96.7 3-Phase
132KV PSA3 BUS-2 Bus Under Voltage 132.000 kV 127.436 96.5 3-Phase
132KV PSA4 BUS-1 Bus Under Voltage 132.000 kV 127.504 96.6 3-Phase
132KV PSA4 BUS-2 Bus Under Voltage 132.000 kV 127.302 96.4 3-Phase
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 4