Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SWIMMING POOL SERVICES DESIGN

SWIMMING POOL CONTROL ROOM

Pipe 63 mm Pipe 63 mm Pipe 63 mm Pipe 63 mm Pipe 63 mm

Pipe 63 mm Pipe 63 mm Pipe 63 mm Pipe 63 mm

Pipe 63 mm
Pipe 63 mm

Pipe 63 mm
Pipe 63 mm

Pipe 63 mm
RETURN INLET 5
RETURN INLET 4
SKIMMER 3

SKIMMER 1
MAIN MAIN
DRAIN 4 DRAIN 2
Pipe 63 mm

Pipe 63 mm

PUMP 2
PUMP 1
RETURN INLET 3

PUMPS
Pipe 63 mm

Pipe 63 mm
Pipe 63 mm

RETURN INLET 2
RETURN INLET 1

36'' Sand filter

36'' Sand filter


FILTER 1

FILTER 2
80 - 100 m3/ hr
SKIMMER 4

SKIMMER 2

RECIRCULATE

RECIRCULATE
CIRCULATION

CIRCULATION
RINCAGE

RINCAGE
RINSE

RINSE
MAIN

FILTRATION

FILTRATION
BACKWASH

BACKWASH
LAVAGE

LAVAGE
FILTER

FILTER
MAIN Filter Works

WASTE
EGOUT

WASTE
EGOUT
CLOSED

CLOSED
FERME

FERME
WINTER

WINTER
HIVER

HIVER
DRAIN 3 DRAIN 1

To Drain

To Drain
FILTERS

Pipe 90 mm

Pipe 63 mm Pipe 63 mm Pipe 63 mm Pipe 63 mm

SWIMMING POOL CHEMICAL PUMP


(CHLORINE)

PROJECT: REV. No. REVISION NOTES REV. BY DATE


BEEOGK INTEGRATED SERVICES MECHANICAL DRAWING SHEET No. DRAWN: ONYENUFORO STEPHEN PROJECT NO.:
PROPOSED RESIDENTIAL DEVELOPMENT LIMITED.
FOR CONSTAIN W.A PLC. DRAWING TITLE: DESIGNED: ADEYEMI AKINPELUMI SCALE: N/A
AT GWARIMPA DISTRICT,
Project Managers and M&E Engineers. MD/64
Plot 985, Algamji Estate, Phase 4, Wuye, Abuja SWIMMING POOL SERVICES DESIGN
CADASTRAL ZONE 2 LIFE CAMP, FCT ABUJA Tel: 07031946788 CHECKED: ENGR. KAREEM, A. G. DATE: JANUARY 2024

You might also like