MGMT 627 Grand Quiz File
MGMT 627 Grand Quiz File
2. Which of the following phases can also be referred as the design phase?
(Doubtful)
a. Concept phase
b. Development phase
c. Implementation phase
d. Acquisition phase
a. Benefit-cost analysis
b. Breakeven analysis
c. Tangible and intangible aspects
d. All of the given options (Lesson no 8 Page no 70 Handouts)
a. Contractor
b. Line Manager
c. Functional Manager
d. Project Office (Lesson no 21 Page no 147 Handouts)
6. A Gantt chart is useful in determining _____________. (Doubtful)
7. Which of the following is the ability to work with people, making cooperative
effort, teamwork, make them feeling secure and free to express their opinions?
a. Technical Skill
b. Human skill (Lesson no 3 Page no 19 Handouts)
c. Conceptual skill
d. Design skill
a. Management skills
b. Technical skills
c. Leadership skills
d. All of the given options
Note: Focus on the underline word individual.
a. Project Plan
b. Scope statement
c. Feasibility Study (Lesson no 9 Page no 73 Handouts)
d. Work Breakdown Structure
11. In which of the following phases, the project’s scope and objectives are
determined?
a. Conceptual
b. Development
c. Implementation
d. Close-out
12. Which of the following is a process to determine the viability of a project, and
provides a framework and direction for its development and delivery?
(Doubtful)
a. Project Plan
b. Scope statement
c. Feasibility Study
d. Work Breakdown Structure
14. Which of the following is what system does and includes system design,
reliability, quality, maintainability, and reparability?
15. After Initial feasibility analysis, the next step is to prepare: (Doubtful)
a. Traditional Management
b. Communication
c. Human Resource Management (Lesson no 3 Page no 18 Handouts)
d. Networking
17. Which of the following should not be conducted as a forum merely to support
a desire that the project will be successful?
a. Project Plan
b. Scope statement
c. Feasibility Study (Lesson no 9 Page no 75 Handouts)
d. Work Breakdown Structure
18. Fredrick Taylor’s major concerns were all of the following, EXCEPT:
20. All of the following are internal operating variables for strategic planning in
the tire industry EXCEPT:
a. Product Changes
b. Research & Development
c. Volume (Economies of Scale)
d. Capacity of Plants (Lesson no 20 Page no 143 Handouts)
21. All of the following are life cycle phases used in engineering EXCEPT:
a. Start-up
b. Definition
c. Formation (Lesson no 20 Page no 144 Handouts)
d. Termination
23. The best way to control creeping scope is with a good definition of which of
the following?
a. Specifications
b. Requirements (Lesson no 21 Page no 148 Handouts)
c. Milestones
d. Statement of Work (SOW)
24. The Kala Bagh Dam project could not be started because it was not feasible
______. (Doubtful)
a. Politicaly
b. Legally
c. Economically
d. Socially
25. Which of the following life cycle phases is also called “defining the
requirements”?
a. Conceptualization
b. Feasibility
c. Preliminary planning (Lesson no 20 Page no 145 Handouts)
d. Detail planning
26.Which of the following activities is performed by Project Administration
Manager? (Doubtful)
a. Office Services
b. Contract Plan
c. Expediting
d. Inspection
a. Policy
b. *Procedure (Lecture no 18 Page no 139 Handouts)
c. Standard
d. Decision
28. Which of the following statements is TRUE for Work breakdown Structure
(WBS)? (Doubtful)
a. Project Manager must structure work into small elements that are manageable
b. Project Manager must structure work into small elements that are
independent
c. Project Manager must structure work into small elements that are measurable
d. All of the given options
29. All of the following are life cycle phases used in construction EXCEPT:
a. Data gathering and procedures
b. Construction
c. Testing
d. Implementation (Lesson no 20 Page no 144 Handouts)