NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
MEASUREMENT SUMMARY SHEET

Bill No : 05 IPA No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.5.1.5

Provision, laying, including trenching, and jointing subsurface 160 mm


diameter PVC lead away pipes forming connection between drainage pipes
Description :
and outlet structures, including Class C12/15 concrete pad, as shown on the
Drawings at locations as directed by the Engineer

pay unit : m

Previous This Cum


DESCRIPTION JMS No
Qty Qty Qty
47.00 47.00 Up to IPA-42
160 mm diameter PVC lead away
pipes 5.00 5.00 CSCEC/IPA-54/CW/5.5.1.5/01

Total Quantity 47.00 5.00 52.00

Engineers Representative
Contractor's Representative
Checked By
Prepared by

Name : M.S.M.A slam A siri Jayawikrama

Designation : QS QS

Signature :

Date :
… … ./......../2024 … … ./......../2024
NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.5.1.5

Provision, laying, including trenching, and jointing subsurface


160 mm diameter PVC lead away pipes forming connection
Description : between drainage pipes and outlet structures, including Class Sheet No : CSCEC/IPA-54/CW/5.5.1.5/01
C12/15 concrete pad, as shown on the Drawings at locations
as directed by the Engineer

pay unit :m

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

160 mm diameter PVC lead away pipes


Ch: 10+790.000 5.000 5.00
Trapezoidal
10+795.000

Sketch

(Refer Drawing NW-102-C-GEN-065 /CSDR586)


Total Quantity 5.00

Contractor Engineer

Prepared By Reviewed By Checked By Certified By


`

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
MEASUREMENT SUMMARY SHEET

Bill No : 05 IPA No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.5.1.6

Provision, laying, including trenching, and jointing subsurface 225 mm


diameter PVC lead away pipes forming connection between drainage pipes
Description :
and outlet structures, including Class C12/15 concrete pad, as shown on the
Drawings at locations as directed by the Engineer

pay unit : m

Previous This Cum


DESCRIPTION JMS No
Qty Qty Qty
47.00 47.00 Up to IPA-42
160 mm diameter PVC lead away
pipes 80.00 80.00 CSCEC/IPA-54/CW/5.5.1.5/01
57.00 57.00 CSCEC/IPA-54/CW/5.5.1.5/02
47.00 47.00 CSCEC/IPA-54/CW/5.5.1.5/03

Total Quantity 47.00 184.00 231.00

Engineers Representative
Contractor's Representative
Checked By
Prepared by

Name : M.S.M.A slam A siri Jayawikrama

Designation : QS QS

Signature :

Date :
… … ./......../2024 … … ./......../2024
NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.5.1.6

Provision, laying, including trenching, and jointing subsurface


225 mm diameter PVC lead away pipes forming connection
Description : between drainage pipes and outlet structures, including Class Sheet No : CSCEC/IPA-54/CW/5.5.1.5/01
C12/15 concrete pad, as shown on the Drawings at locations
as directed by the Engineer

pay unit :m

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

225 mm diameter PVC lead away pipes


Ch: 10+625.000 35.000 35.00
LCW
10+660.000

Ch: 10+660.000 20.000 20.00


Siphon 4
10+680.000

Ch: 10+655.000 25.000 25.00


Siphon 4
10+680.000

Sketch

(Refer Drawing NW-102-C-GEN-136 /CSDR0975)


Total Quantity 80.00

Contractor Engineer

Prepared By Reviewed By Checked By Certified By


`

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.5.1.6

Provision, laying, including trenching, and jointing subsurface


225 mm diameter PVC lead away pipes forming connection
Description : between drainage pipes and outlet structures, including Class Sheet No : CSCEC/IPA-54/CW/5.5.1.5/02
C12/15 concrete pad, as shown on the Drawings at locations
as directed by the Engineer

pay unit :m

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

225 mm diameter PVC lead away pipes


Ch: 10+750.000 15.000 15.00
Trapezoidal
10+765.000

Ch: 10+723.000 27.000 27.00


Trapezoidal
10+750.000

Ch: 10+708.000 15.000 15.00


Siphon 4
10+723.000

Sketch

(Refer Drawing NW-102-C-GEN-136 /CSDR0975)


Total Quantity 57.00

Contractor Engineer

Prepared By Reviewed By Checked By Certified By


`

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.5.1.6

Provision, laying, including trenching, and jointing subsurface


225 mm diameter PVC lead away pipes forming connection
Description : between drainage pipes and outlet structures, including Class Sheet No : CSCEC/IPA-54/CW/5.5.1.5/03
C12/15 concrete pad, as shown on the Drawings at locations
as directed by the Engineer

pay unit :m

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

225 mm diameter PVC lead away pipes


Ch: 10+680.000 15.000 15.00
Siphon 4
10+695.000

Ch: 10+695.000 13.000 13.00


Siphon 4
10+708.000

Ch: 10+770.000 19.000 19.00


Trapezoidal
10+789.000

Sketch

(Refer Drawing NW-102-C-GEN-136 /CSDR0975)


Total Quantity 47.00

Contractor Engineer

Prepared By Reviewed By Checked By Certified By


`

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB - 02)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
MEASUREMENT SUMMARY SHEET

Bill No : 05 IPA No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.5.1.10
Concrete Class C12/15 where required and directed by the Engineer to
Description :
provide suitable foundation surface for lining

pay unit : m3

Previous This Cum


DESCRIPTION JMS No
Qty Qty Qty
4.54 4.54 Up to IPA 47
Screed Concrete
0.87 0.87 CSCEC/IPA-54/CW/5.5.1.10/01
0.91 CSCEC/IPA-54/CW/5.5.1.10/02

Total Quantity 4.54 1.78 5.41

Engineers Representative
Contractor's Representative
Checked By
Prepared by

M.S.M.A slam A siri Jayawikrama


Name :
QS QS
Designation :

Signature :

Date : … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB - 02)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.5.1.10
Concrete Class C12/15 where required and directed by the
Description : Sheet No : CSCEC/IPA-54/CW/5.5.1.10/01
Engineer to provide suitable foundation surface for lining

pay unit : m3

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

Concrete Class C12/15


Trapezoidal Line
Ch: 10+636.000 0.850 13.50 0.075 0.87 (Refer Lab Sample No
Canal Base ICB -02 / CON/(25/30
(1m) L/S) -1633)
10+637.000

Sketch

Drawing NO. NW-102-C-STR-027E Rev C/CSDR-0876


Total Quantity 0.87

Contractor Engineer

Prepared By Reviewed By Checked By Certified By

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB - 02)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.5.1.10
Concrete Class C12/15 where required and directed by the
Description : Sheet No : CSCEC/IPA-54/CW/5.5.1.10/02
Engineer to provide suitable foundation surface for lining

pay unit : m3

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

Concrete Class C12/15


Trapezoidal Line
Ch: 16+220.204 0.850 14.15 0.075 0.91 (Refer Lab Sample No
Canal Base ICB -02 / CON/(25/30
(1m) L/S) -1616)
16+221.204

Sketch

Refer Drawing No.NW.I02-C-STR-059.5B Rev.B -CSDR-0951


Total Quantity 0.91

Contractor Engineer

Prepared By Reviewed By Checked By Certified By

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
MEASUREMENT SUMMARY SHEET

Bill No : 05 IPA No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.7.4.1

Description : Blinding concrete Class C12/15

pay unit : m3

`
Previous This Cum
DESCRIPTION JMS No
Qty Qty Qty
Screed Concrete 694.11 694.11 Up to IPA-47
1.24 1.24 CSCEC/IPA-54/CW/5.7.4.1/01
0.25 0.25 CSCEC/IPA-54/CW/5.7.4.1/02
0.48 0.48 CSCEC/IPA-54/CW/5.7.4.1/03
1.05 1.05 CSCEC/IPA-54/CW/5.7.4.1/04
1.05 1.05 CSCEC/IPA-54/CW/5.7.4.1/05
16.39 16.39 CSCEC/IPA-54/CW/5.7.4.1/06
8.87 8.87 CSCEC/IPA-54/CW/5.7.4.1/07

Total Quantity 694.11 29.33 723.44

Engineers Representative
Contractor's Representative
Checked By
Prepared by

M.S.M.A slam A siri Jayawikrama


Name :
QS QS
Designation :

Signature :

… … ./......../2024 … … ./......../2024
Date :
NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.7.4.1

Description : Blinding concrete Class C12/15 Sheet No : CSCEC/IPA-54/CW/5.7.4.1/01

pay unit : m3

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

Blinding Concrete
Ch: 17+600.000 1 1 0.019 5.868 0.11 Hunch
Turn Out

Ch: 17+600.000 1 1 1.893 0.075 0.14 Cutoff wall


Turn Out

(Refer Lab Sample No


ICB -02 / CON/(12/15)-
1497/1625,1626,1628)

Ch: 17+600.000 1 1 10.058 0.075 0.75 Ganging Pool


Turn Out

Turn Out Ch: 17+600.000 1 1 0.192 1.200 0.23 Hump


(2.5m)

Sketch

Refer Drawing NO. NW-102-C-STR-034E Rev 0/CSDR-1018


Total Quantity 1.24

Contractor Engineer

Prepared By Reviewed By Checked By Certified By

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.7.4.1

Description : Blinding concrete Class C12/15 Sheet No : CSCEC/IPA-54/CW/5.7.4.1/02

pay unit : m3

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

Blinding Concrete

Turn Out Ch: 17+600.000 1 1 0.193 1.200 0.23 Stilling Pool


(2.5m)

Turn Out Ch: 17+600.000 1 1 0.019 1.200 0.02 Cutoff wall


(0.250m)

(Refer Lab Sample No


ICB -02 / CON/(12/15)-
1497/1625,1626,1628)

Sketch

Refer Drawing NO. NW-102-C-STR-034E Rev 0/CSDR-1018


Total Quantity 0.25

Contractor Engineer

Prepared By Reviewed By Checked By Certified By

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.7.4.1

Description : Blinding concrete Class C12/15 Sheet No : CSCEC/IPA-54/CW/5.7.4.1/03

pay unit : m3

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

Blinding Concrete

Turn Out Ch: 15+800.000 1 1 0.311 1.350 0.42 Inlet Box


(4.170m)

Turn Out Ch: 15+800.000 1 1 0.300 1.350 0.075 0.03 Cutoff wall 1

(Refer Lab Sample No


ICB -02 / CON/(12/15)-
1627)

Turn Out Ch: 15+800.000 1 1 0.250 1.350 0.075 0.03 Cutoff wall 2

Sketch

Refer Drawing NO. NW-102-C-STR-033G Rev A/CSDR-0351


Total Quantity 0.48

Contractor Engineer

Prepared By Reviewed By Checked By Certified By

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.7.4.1

Description : Blinding concrete Class C12/15 Sheet No : CSCEC/IPA-54/CW/5.7.4.1/04

pay unit : m3

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

Blinding Concrete

DOC Ch: 8+329.000 2 1 1.750 2.00 0.075 0.53 pire seg 01 & 02 (Refer Lab Sample No
ICB -02 / CON/(12/15)-
(Rec.Flume)
1624,1632,1643,1645)

Drawing NO. NW-102-C-STR-062D Rev A/CSDR-1040

DOC Ch: 8+395.000 2 1 1.750 2.00 0.075 0.53 pire seg 01 & 02 (Refer Lab Sample No
ICB -02 / CON/(12/15)-
(Rec.Flume)
1624,1632,1643,1645)

Sketch

Total Quantity 1.05

Contractor Engineer

Prepared By Reviewed By Checked By Certified By

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.7.4.1

Description : Blinding concrete Class C12/15 Sheet No : CSCEC/IPA-54/CW/5.7.4.1/05

pay unit : m3

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

Blinding Concrete

DOC Ch: 8+200.000 2 1 1.750 2.00 0.075 0.53 pire seg 01 & 02 (Refer Lab Sample No
ICB -02 / CON/(12/15)-
(Rec.Flume)
1630,1635)

Drawing NO. NW-102-C-STR-062B Rev A/CSDR-1038

DOC Ch: 8+468.000 2 1 1.750 2.00 0.075 0.53 pire seg 01 & 02 (Refer Lab Sample No
ICB -02 / CON/(12/15)-
(Rec.Flume)
1630,1635)

Drawing NO. NW-102-C-STR-062H Rev A/CSDR-1073

Sketch

Total Quantity 1.05

Contractor Engineer

Prepared By Reviewed By Checked By Certified By

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.7.4.1

Description : Blinding concrete Class C12/15 Sheet No : CSCEC/IPA-54/CW/5.7.4.1/06

pay unit : m3

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

Blinding Concrete

Transition Ch: 16+221.000 1 1 0.939 6.913 6.49 Section - C Base


Inlet
16+234.000

Transition
Ch: 16+221.000 1 2 65.15 0.075 9.77 Section - C
Inlet
16+234.000 Slant LHS & RHS
(Refer Lab Sample No
ICB -02 / CON/(12/15)-
1612,1616,1609)

Transition
Ch: 16+221.000 1 1 0.300 15.50 0.075 0.13 Cutoff Wall-1
Inlet
16+234.000 inlet

Sketch

Refer Drawing No.NW.I02-C-STR-059.5B Rev.B -CSDR-0951


Total Quantity 16.39

Contractor Engineer

Prepared By Reviewed By Checked By Certified By

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024


NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP - ICB -2)

CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR INLET


TUNNEL (FROM STN. 5+250KM TO STN 22+330KM)
AGREED MEASUREMENT SHEET

Bill No : 05 Bill No: : 54


Period Ending : 1st April 2024 to 30th April 2024
Pay Item : 5.7.4.1

Description : Blinding concrete Class C12/15 Sheet No : CSCEC/IPA-54/CW/5.7.4.1/07

pay unit : m3

TOTAL
DESCRIPTION SIDE NO LENGTH WIDTH DEPTH QUANTITY REMARKS
QUANTITY

Blinding Concrete

DUC Ch: 12+777.000 1 1 92.687 0.075 6.95 Outlet


(2m & 4m)
(Refer Lab Sample No
ICB -02 / CON/(12/15)-
1620,1622,1634,1637,16
39,1641,1644)
Ch: 12+777.000 1 1 19.765 0.075 1.48
DUC Bridge Footing

Ch: 12+777.000 1 1 0.300 19.57 0.075 0.44 Cutoff Wall-1


DUC
Outlet

Sketch

Refer Drawing No.NW.I02-C-STR-041K Rev.0 -CSDR-0976


Total Quantity 8.87

Contractor Engineer

Prepared By Reviewed By Checked By Certified By

Signature :
Site Engineer / Construction
Designation : QS / TO Manager EA QS/A RE

Name : Chamuditha sajith

Date : … … ./......../2024 … … ./......../2024 … … ./......../2024 … … ./......../2024