Format 59 - Heat Rate Data of Combined Cycle Gas Turbine Power Stations For Month - 20

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

187 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.

4]

FORMAT - 59
Periodicity- Monthly
Submission-by 20th day
HEAT RATE DATA OF COMBINED CYCLE GAS TURBINE POWER STATIONS FOR MONTH ………….YEAR…………20…………..20

1.0 General:
i) Station Name: -------------------------------------------------------------
ii) Station Capacity: (No. of units with size)

2.0 Design parameters for the Station:

No. of Modules Module Date of Make Module Heat Weighted


Capacity commissioning Gas Turbine Steam Turbine Rate (kcal/kWh) Design Station.
(MW) (if any) Heat Rate
w.r.t.Capacity
(kcal/kWh)

1 2 3 4 5 6 7
Module# 1
:
:
:
:
Module# n

3.0 Operational Performance Data For The Station For The Year : ---------------------------

Month Liquid fuel Liquid fuel Liquid fuel Total Liquid fuel Generation Average GCV Specific Liquid Gas Consumption Specific Gas Average GCV Actual Station
stock in the stock at the end received consumption (MkWh) of Liquid Fuel fuel (at S.T.P.) Consumption of Gas (at Heat Rate
beginning of of the month during the during the month (kcal/l) Consumption (million Cu.m) (Cu.m/kWh) S.T.P.) Col.(7x8+10x11)
the month (kl) month Col.(2+4-3) (l/Kwh)) (9)/(6) (kcal/Cu. m) kcal/kWh)
(kl) (kl) (kl) (5)/(6)*1000)

1 2 3 4 5 6 7 8 9 10 11 12
April
May
:
:
:
:
March
Weighted/AV.
Total (March
to March)