CONSTRUCTION METHOD STATEMENT PROCEDURE
Doc. Code: E6RV-ACC-QA-PLN-ALZN-0001
Rev: 02
Date: 12/04/2023
INDEX
-1-
CONSTRUCTION METHOD STATEMENT PROCEDURE
Doc. Code: E6RV-ACC-QA-PLN-ALZN-0001
Rev: 02
Date: 12/04/2023
-2-
CONSTRUCTION METHOD STATEMENT PROCEDURE
Doc. Code: E6RV-ACC-QA-PLN-ALZN-0001
Rev: 02
Date: 12/04/2023
1. PROJECT OVERVIEW.
2.1 PURPOSE
2.2 SCOPE
All construction activities linked to permanent works in the project and the temporary
ones under a detailed design.
-3-
CONSTRUCTION METHOD STATEMENT PROCEDURE
Doc. Code: E6RV-ACC-QA-PLN-ALZN-0001
Rev: 02
Date: 12/04/2023
3. DOCUMENTS RELATED
- This role is performed by the responsible of the construction area that releases
this document even though the CMS is drawn up by Acciona representatives
or the sub contractor .
- Supports the owner of the method statement in any concerns that may arise
in their area.
- Review and approve the OH&S-related topics of the document as Risk
Assessment (RA), Safety Job Analysis (SJA), and interaction with other jobs,
among others.
- Support the owner of the method statement in any concerns that may arise
in their area.
- Review and approve the Environmental-related topics of the document as
environmental aspects/impacts related to the tasks, and environmental
mitigation measures, among others.
- Support the owner of the method statement in any concerns that may arise
in their area.
- Review and approve the Technical Office-related topics of the document as
the adequacy of the CMS with the design.
- Develop the control plans for the activities involved in the CMS.
-4-
CONSTRUCTION METHOD STATEMENT PROCEDURE
Doc. Code: E6RV-ACC-QA-PLN-ALZN-0001
Rev: 02
Date: 12/04/2023
- Support the owner of the method statement in any concerns that may arise
in their area.
- Review and approve the Quality-related topics of the document as Control
Plans, Material Reception Programs, among others.
- Support the owner of the method statement in any concerns that may arise
in their area.
- Activate the workflow for the revision of the CMS.
- Upload the CMS in PIMS.
All the CMS released by the project will show a minimum content as follows:
Page number.
Roles and responsibilities for people signing the CMS. The signature and date of
signing will be displayed. Roles must be described according to E6RV-ACC-PM-REG-
ALZN-0007 - Organization Chart E6.
There will be a relationship of people indicating who prepares the CMS, who checks
the CMS, who approves the CMS, and other people responsible as Health and Safety
Manager, Environmental Manager, Technical Office Manager, Quality Manager,
subcontractors, and whoever else it is considered must be involved in the process of
drawing up a Construction Method Statement.
The number of revisions, as well as the date of revision, must show their history of
changes.
-5-
CONSTRUCTION METHOD STATEMENT PROCEDURE
Doc. Code: E6RV-ACC-QA-PLN-ALZN-0001
Rev: 02
Date: 12/04/2023
- The main construction activity, the location, and the scope (from beginning to
end).
• Constraints:
- List all the conditions that might impact the construction activities described
in the CMS.
• Document references:
• Technical data:
- List all relevant design reports, datasheets, and any other technical data
related to the tasks.
• Applicable drawings:
• Precursors to construction:
- Permits, approvals, activities, safety measures, and any other activities that
have to be completed prior to the commencement of the construction.
- Name and telephone number of one person who must be contactable 24 hours
a day in connection with any matter arising during the performance of the
contract works.
-6-
CONSTRUCTION METHOD STATEMENT PROCEDURE
Doc. Code: E6RV-ACC-QA-PLN-ALZN-0001
Rev: 02
Date: 12/04/2023
- List all the equipment, consumables and tools for testing required in the
described tasks.
- Proposals for the dates and times of delivery to the site of materials and
equipment intended to be in the performance of the Contract works, if
applicable.
- Proposals for the storage and preservation at site of the materials and
equipment intended for use in the performance of the contract works.
- Proposals for the method by which (on a regular basis) separate materials,
wastes and rubbish of the subcontractor and its assistants are to be removed
from the site. These shall also include their safety data sheet and/or material
data sheet.
• Construction sequence:
- Describe the sequence of the tasks, including temporary works or, in case
these temporary works are subject to specific CMS, the reference to this CMS.
- Perform RA and SJA of the related tasks according to the document: E6RV-
ACC-HS-PLN-ALZN-0002 - Performing Risk Analysis. List it as a reference in
this section and the proper measures to address these risks.
- Reference the Contigency Response Plan related to the safety risks.
o Environmental:
- Identify and list all the environmental aspects/impacts related to the tasks
and define the related measures according to the E6RV-ACC-RK-REG-ALZN-
0001 General Environmental Risk Assessment.
- Perform an assessment if the task is not listed in the General Environmental
Risk Assessment.
- Reference all the mitigation measures (proposals for minimizing dust, grit and
noise at the site during the performance of the contract works) and
environmental emergency procedures.
-7-
CONSTRUCTION METHOD STATEMENT PROCEDURE
Doc. Code: E6RV-ACC-QA-PLN-ALZN-0001
Rev: 02
Date: 12/04/2023
o Quality:
- Identify and list all the quality risks related to the tasks.
- List the Control Plans to be implemented during the execution of the
construction activities.
• Appendices:
- Describe any relevant documentation that the CMS owner considers to include
as an appendix.
A template for the Method Statement will be located in the teams folder of the project
at this link.
The responsibility to collect the information from all the involved parties and to
release the CMS is the construction responsible. In case that the subcontractor
delivers the CMS, the construction responsible will review the information contained
therein and the development of the approval process.
ACCIONA understands that the CMS does have the subcontractor’s approval, even
though they do not sign the document, once this process ends without receiving
comments from them. ACCIONA must give evidence about these emails.
Once the CMS is in status “reviewed” or “reviewed with comments”, the document
must be published in Aconex (according to E6RV-ACC-DM-PLN-ALZN-0001 -
Document Management and Coding Procedure) and the Document Controller will
upload the document into PIMS register following the “NV-ADM-VLD-0001 Veileder
for teknisk og administrativ dokumentasjon Rev 02 – 23.09.2020” for the
communication and knowledge of the Client. If the document is rejected, the owner
of the CMS must revise and resubmit the document, reinitiating the process.
-8-
CONSTRUCTION METHOD STATEMENT PROCEDURE
Doc. Code: E6RV-ACC-QA-PLN-ALZN-0001
Rev: 02
Date: 12/04/2023
The CMS must be communicated to whom will be involved in the activities in order
to ensure that all personnel associated with the task are aware of the planned
process, potential hazards, and controls involved.
- If circumstances arise that require the update of the document like a change
of the tasks, the sequence of the tasks, or any other condition, the new
version will be delivered to the Document Controller for reinitiating this
sequence.