Gala Precision Engineering Limited

ERF - Part 1 - ENQUIRY REVIEW: INPUTS FOR NEW PRODUCT ENQUIRY


Process Owner : MKT Customer Project 1465484 - Project TE 10 -
Brugge Stamping
ERF No ERF_EA_030(3 of 3)_2024-25 Date 13-05-2024
Customer name Dana Italia s.r.l. Region Europe
Enquiry Ref No 1465484 - Project TE 10 - Enquiry Date 09-05-2024
Brugge Stamping
Quotation Deadline : NPD No :
Enclosed : ☑ Drawing Specifications ☐ Other Documents ☐ Item Description
Wire Diameter (mm) :
Customer Drg. No. 004213881000
Wire Size (mm) :
Item Description :
Assembly Disc Spring Project Life: 1
Quantity/Year (pcs) 1000
SOP:
Raw Material : As per drawing

INPUTS FOR NPD BY MARKETING :


Clutch No
Spring Application Varriator No
Other Off highway
"The standard by which spring to be Manufactured? ( IS / DIN / Cust specific)" As per drawing & specifications
mentioned.
"Surface treatment ? Phosphating / Oiling / Painting / Plating (with specifications)" As per drawing
Customer Specific Information / Comment (If any) NA
Prepared By Approved By (Marketing In-charge)

Manoj Sawale Dinesh Kadam


Notes:
1) Part-I to be filled by Marketing capturing all the maximum possible parameters
2) In case of more than 1 size attach annexures mentioning size specific requirement
GPEPL/MKT/F/01, REV.01 REV DATE : 26.02.2019
Gala Precision Engineering Limited

ERF-Part 2 - New Product Feasibility Review


Process Owner : NPD Approach : CFT MKT/OPRNS/TR/STR/PUR/QA
ERF Number : ERF_EA_030(3 of 3)_2024-25
NPD Number : Date :
Review by NPD
FeasibIlity to manufacturing the part in our set up?
Design Validation
Raw material sourcing
To prepare and review the CP for capability, capacity and constraints for each of the process (Attach separate sheet if required)
This will be reviewed in detail in NPD review by the management.

CFT REVIEW
Review by Tool Room : Feasible : YES/NO

Sign :
Review by Purchase :
Checkpoint Comment
RM Availability -

RM Cost -

Forging Cost - Feasible : YES/NO

Plating Cost -

Machining Cost -

Oher outsource operation cost (If


any) -
Sign :
Review by Operations: Feasible : YES/NO
Checkpoint Comment
Capacity Confirmation - Sign :
Review by Quality Assurance: Feasible : YES/NO
Sign :
Comments by Stores : Feasible : YES/NO
Sign :
Comments by Marketing : Feasible : YES/NO
Checkpoint Comment
Sign :
CSR

Prepared By NPD Approved By - COO

GPEPL/MKT/F/02 Rev: 00
Gala Precision Engineering Limited

ERF - Part 1 - ENQUIRY REVIEW: INPUTS FOR NEW PRODUCT ENQUIRY


Process Owner : MKT Customer Project 1465484 - Project TE 10 -
Brugge Stamping
ERF No ERF_EA_028(1 of 3)_2024-25 Date 13-05-2024
Customer name Dana Italia s.r.l. Region Europe
Enquiry Ref No 1465484 - Project TE 10 - Enquiry Date 09-05-2024
Brugge Stamping
Quotation Deadline : NPD No :
Enclosed : ☑ Drawing Specifications ☐ Other Documents ☐ Item Description
Wire Diameter (mm) :
Customer Drg. No. 004213878000
Wire Size (mm) :
Item Description :
Assembly Disc Spring Project Life: 1
Quantity/Year (pcs) 4000
SOP:
Raw Material : As per drawing

INPUTS FOR NPD BY MARKETING :


Clutch No
Spring Application Varriator No
Other Off highway
"The standard by which spring to be Manufactured? ( IS / DIN / Cust specific)" As per drawing & specifications
mentioned.
"Surface treatment ? Phosphating / Oiling / Painting / Plating (with specifications)" As per drawing
Customer Specific Information / Comment (If any) NA
Prepared By Approved By (Marketing In-charge)

Manoj Sawale Dinesh Kadam


Notes:
1) Part-I to be filled by Marketing capturing all the maximum possible parameters
2) In case of more than 1 size attach annexures mentioning size specific requirement
GPEPL/MKT/F/01, REV.01 REV DATE : 26.02.2019
Gala Precision Engineering Limited

ERF-Part 2 - New Product Feasibility Review


Process Owner : NPD Approach : CFT MKT/OPRNS/TR/STR/PUR/QA
ERF Number : ERF_EA_028(1 of 3)_2024-25
NPD Number : Date :
Review by NPD
FeasibIlity to manufacturing the part in our set up?
Design Validation
Raw material sourcing
To prepare and review the CP for capability, capacity and constraints for each of the process (Attach separate sheet if required)
This will be reviewed in detail in NPD review by the management.

CFT REVIEW
Review by Tool Room : Feasible : YES/NO

Sign :
Review by Purchase :
Checkpoint Comment
RM Availability -

RM Cost -

Forging Cost - Feasible : YES/NO

Plating Cost -

Machining Cost -

Oher outsource operation cost (If


any) -
Sign :
Review by Operations: Feasible : YES/NO
Checkpoint Comment
Capacity Confirmation - Sign :
Review by Quality Assurance: Feasible : YES/NO
Sign :
Comments by Stores : Feasible : YES/NO
Sign :
Comments by Marketing : Feasible : YES/NO
Checkpoint Comment
Sign :
CSR

Prepared By NPD Approved By - COO

GPEPL/MKT/F/02 Rev: 00
Gala Precision Engineering Limited

ERF - Part 1 - ENQUIRY REVIEW: INPUTS FOR NEW PRODUCT ENQUIRY


Process Owner : MKT Customer Project 1465484 - Project TE 10 -
Brugge Stamping
ERF No ERF_EA_029(2 of 3)_2024-25 Date 13-05-2024
Customer name Dana Italia s.r.l. Region Europe
Enquiry Ref No 1465484 - Project TE 10 - Enquiry Date 09-05-2024
Brugge Stamping
Quotation Deadline : NPD No :
Enclosed : ☑ Drawing Specifications ☐ Other Documents ☐ Item Description
Wire Diameter (mm) :
Customer Drg. No. 004213880000
Wire Size (mm) :
Item Description :
Assembly Disc Spring Project Life: 1
Quantity/Year (pcs) 4000
SOP:
Raw Material : As per drawing

INPUTS FOR NPD BY MARKETING :


Clutch No
Spring Application Varriator No
Other Off highway
"The standard by which spring to be Manufactured? ( IS / DIN / Cust specific)" As per drawing & specifications
mentioned.
"Surface treatment ? Phosphating / Oiling / Painting / Plating (with specifications)" As per drawing
Customer Specific Information / Comment (If any) NA
Prepared By Approved By (Marketing In-charge)

Manoj Sawale Dinesh Kadam


Notes:
1) Part-I to be filled by Marketing capturing all the maximum possible parameters
2) In case of more than 1 size attach annexures mentioning size specific requirement
GPEPL/MKT/F/01, REV.01 REV DATE : 26.02.2019
Gala Precision Engineering Limited

ERF-Part 2 - New Product Feasibility Review


Process Owner : NPD Approach : CFT MKT/OPRNS/TR/STR/PUR/QA
ERF Number : ERF_EA_029(2 of 3)_2024-25
NPD Number : Date :
Review by NPD
FeasibIlity to manufacturing the part in our set up?
Design Validation
Raw material sourcing
To prepare and review the CP for capability, capacity and constraints for each of the process (Attach separate sheet if required)
This will be reviewed in detail in NPD review by the management.

CFT REVIEW
Review by Tool Room : Feasible : YES/NO

Sign :
Review by Purchase :
Checkpoint Comment
RM Availability -

RM Cost -

Forging Cost - Feasible : YES/NO

Plating Cost -

Machining Cost -

Oher outsource operation cost (If


any) -
Sign :
Review by Operations: Feasible : YES/NO
Checkpoint Comment
Capacity Confirmation - Sign :
Review by Quality Assurance: Feasible : YES/NO
Sign :
Comments by Stores : Feasible : YES/NO
Sign :
Comments by Marketing : Feasible : YES/NO
Checkpoint Comment
Sign :
CSR

Prepared By NPD Approved By - COO