INDUSTRIES SDN BHO
BB ™ THE PREFERRED BRAND ® BINA PLAST!
FOR PIPING Sumsaer
HOT
50
Ball indentation Hardness 180 2039 T1 (132N) Nemim? 48
Flexural Stress at 3.5% DIN 53452 N/mm? 20
‘Outer Fiber Strain, i
Modulus or Elasticity, Tensile Test Iso 827 N/mm? 700
Shear Modulus “10°C 1S0 537 Method A N/mm? 1100
orc N/mm? 770
10°C imme 500
20°C mm 370
30'c Némm? 300
4orc N/mm? 240
sore N/mm? 180
sore N/mm? 140
Mechanical Strength Properties DIN8078 no failure
Determined by Impact Strength at 0°C
Impact Strength RT 1so.179/1eU igme no failure
(Charpy) oc Kime no failure
“10°C im no failure
Noiched impact Strength RT 180 179/1eA ium? 20
(Charpy) oc kgm? 4
20°C kis 3
Coefficient of Linear Thermal Expansion VDE 0304 Part 124 ke 1.sx104
‘Thermal Conductivity at 20°C DIN 52612 wimk 024
Specific Heat at 20°C Adiabatic Calorimeter Kika k 20
‘The ent species were made andthe tot methods edlected in accordance wth DIN 16774, Pat 2
Bina lasticCatalogue BE5-2017.3, 05Jointing Methods ® BINA: Pees
Step 1 Step 2 Step 3
Cut the pipe to required length using Push the pipe and fitting into the When the welding heating time is
cutter, mark the welding depth onthe welding adaptors, applying even _reached. remove both pipe and fittings
Pipe, ensure that the indicator light on _strength et both ends. Do not twist or together, again without twisting or
the welding tool signals thatthe toolis tur the pipe and fiting while pushing. turning while pulling cut of the welding
hot enough (260°C) for welding. Wait until heating time is reached. adaptor. Almost immediately, push both
pipe and fitting together until the death
is reached. tis possible to adjust the
joints for more than 5 degrees during
this tine. Jointisnow completed.
=
iT)
Welding Machine Welding Machine
20mm to 63mm 75mm to 110mm
Welding Depth, Heating, Welding and Cooling Time
The table below provides the necessary information for a good welding joint for various 8BB pipe and fitting size.
Sees Were Pets Ceri Cooling Time
(mm) (mm) (sec.) (sec.) (min)
20 140 5 4 2
25 150 7 4 2
32. 165 8 6 4
40 18.0 2 6 4
50 20.0 18 6 4
68 24.0 24 8 6
8 26.0 30 8 8
90 290 40 8 8
no 32.5 50, 10 8
Note: Heating time starts when both pipe and fitting are pushed into correct depth. Welding time begins when joints
are connected, Cooling time is the time taken for the joint to be completely cured. Never reduce cooling time by
pouting water or other means.
Bina PasticCatalogve 688-2017-8 06= i @
Cee Sue
Headquarters
Lot 4844, Jalan KPB 1A, Balckong New Village Industrial Estate,
43300 Seri Kembangan, Selangor Darul Ehsan, Malaysia
Tet 4003-8901 2211 Fay: #6038961 2313
Factory 2
Lot 2079, Jalan KPB 12, Balakong New Village Industral Estate,
43300 Seri Kembangan, Selangor Darul Ehsan, Malaysia
Tet +003:8961 2107 Fay: #603896) 2544
Nilai Factory
Lot 158, Jalan Permata 1, Arab Malaysian Industral Park,
711800 Nilai, Negeri Sembilan Darul Khusus, Malaysie
Tet 4606-799 9909 Fax: +606-799 9920
Website
wonubingplast.com
Email
info@binaplast.com