Sequence
Item Inspection or Test Batch principle or sampling Sampling method and quantity Information to be
entry acceptance basis content frequency provided when sending
samples
1, grain
1. Place of origin;
GB/T14684-2011 grading When sampling on the material pile, the
2, specifications;
"Sand for 2, fineness Each 600t or 400m³ of the same sampling parts should be evenly distributed.
Construction" modulus Before sampling, remove the surface of the 3, the type of sand or
2 sand classification, the same specification and the grade of concrete to
JGJ52-2006 Standard of 3. Mud content the same application grade shall be a sampling part, and then extract roughly equal
sand from each part to form a group of be used;
quality and inspection 4. Clay content batch, and each batch shall be sampled not
method of sand and less than once. samples, the total amount of at least 30kg: 4, the represented
5. Apparent
stone for ordinary batch; 5, the use of
density
concrete parts.
6. Packing
Standard density
7. Void ratio
1, grain 1. Origin;
grading 2, specifications;
GB/T14685-2011 "Stone When sampling on the material pile, the
2. Mud content 3, the type of sand or
and gravel for Each 600t or 400m³ of the same sampling parts should be evenly distributed.
3. Mud content the grade of concrete to
construction" classification, specification and application Before sampling, remove the surface of the
3 stone 4. Apparent be used;
JGJ52-2006 Standard of
density grade shall be one batch, and each batch sampling part first, and then extract roughly
4, the section of the
quality and inspection shall be sampled not less than once. equal 16 pieces of stone from each part to
method of sand and stone 5. Packing member is the smallest
density form a group of samples, the total amount of
for ordinary concrete inch, the smallest
at least 80kg
6. Void ratio spacing of the steel bar
Standard
7, needle 5, represents the
sheet batch; 6, the use of
content 8, parts.
crushing
index value
The first part commonly used building materials sampling basis and method
Sequence
entry Inspection or acceptance basis Test content Batch principle or sampling Sampling method and quantity Information to be
frequency provided when sending
samples
Item Inspection or Test Batch principle or sampling frequency Sampling method and Information to be
entry acceptance basis content quantity provided when
sending samples
Flash butt welding: In the same shift, 300 welded joints of
Flash butt welding:
the same grade and diameter steel bars completed by the
same welder are taken as a batch. Randomly cut 6 joints from
each batch of joints, 3 of them
When the number of welded joints in the same class is less, it
for tensile test, 3
can be accumulated within a week, and the cumulative number is
Do the bending test;
still less than 300 joints, which should be calculated according to
a batch. Stirrup flash butt welding:
Stirrup flash butt welding: 600 stirrup flash butt welding Each inspection batch should be
joints of the same brand and diameter completed by the randomly cut 3 welding joints
for tensile test.
same welder in the same shift shall be used as an
inspection batch; If there are more than 600 joints, The length of the tensile test 1. Manufacturer;
The excess part can be combined with the next shift to specimen is generally: 2, steel varieties:
complete the joint cumulative calculation. 450-500mm 3, brand:
Steel JGJ18-2012 "Steel Bar 1. Tensile
5 The length of the curved specimen 4, welding type;
Welding welding and inspection test
Procedures" is generally: 5, welder's name and
2. Bending certificate number;
test 300-350mm:
6, represents the
Arc welding joint: In the cast-in-place concrete structure, quantity
300 of the same grade and type should be used 3 joints are randomly cut from
each batch of joints for tensile 7. Where to use.
Joint as a batch; In the building structure should not test;
exceed two floors in 300 of the same brand number, the
The length of the tensile sample is
same type of joint as a batch.
generally:
500-550mm.
Electroslag pressure welding: In the cast-in-place concrete
structure, 300 joints of the same grade should be taken as a
batch; In the building structure, 300 joints of the same Randomly cut 3 joints from each
grade should be taken as a batch in not exceeding the batch for tensile test; The length
second floor; When there are less than 300 joints, of the tensile sample is generally:
Still as a batch. 450-500mm.
The first part commonly used building materials sampling basis and method
Sequence
Item entry Inspection or Test Batch principle or sampling Sampling method and quantity Information to be
acceptance basis content frequency provided when
sending samples
1, steel bar
manufacturers;
Joints of the same grade, type and 2, steel varieties;
Rebar In each acceptance lot, 3 joint specimens were
JGJ107-2010 specification with the same batch of 3, brand;
6 Machinery Tensile materials under the same construction randomly intercepted for tensile strength test.
"Reinforced strength 4, the type of
Connections machinery connecting conditions, The length of the specimen is generally: 450-
500mm; joint;
technical regulations" 500 are used as an acceptance batch, 5, design joint
and less than 500 are also used as an grade;
acceptance batch.
6, represent the
number
7. Where to use.
The first part commonly used building materials sampling basis and method
Serial
Items Inspection or Test content Batch principle or sampling Sampling method and quantity Information to be provided when
acceptance frequency sending samples
basis
1, each mix 100 plates and not more than
100m
The concrete of the same mix ratio shall 1. Strength grade (C) or
be sampled not less than once; impermeability grade (P);
2. The same mix ratio of each working Specimens used to check the strength 2, maintenance conditions
shift of concrete of structural members (standard age of 28d, starting
When the concrete is less than 100 from stirring and adding water)
GB/T50081-2002 should be randomly selected at the
disks, the sample shall not be less than 3, the purpose of the compressive
"Standard test concrete pouring site, and each specimen, such as strength
once;
method for 3, when a continuous pouring more than group of specimens should be assessment (standard maintenance,
mechanical 1000m³, the same mix of concrete every sampled from the same plate of opening identification), mold
1.Compressive 200m³ sampling shall not be less than concrete. removal (the same piece of mold
7 Concrete properties of removal), or for the strength of the
ordinary concrete" strength once Cube compressive strength test block:
4, each floor, the same mix of concrete structural entity (the same
GB50204-2002(2011 2,impermeability Soil, sampling shall not be less than Standard test block size: conditions). If used for structural
edition) once; entity strength
150mm×150mm×150mm
Code for 5, each sampling should be at least one 3 piec es/ set ; The equivalent age period should
Acceptance of set of standard specimens, the same Impermeable specimen size: be counted, and the sample
Construction conditions of the retention of the should be sent when the
quality of specimen Generally, the top surface diameter statistical daily average
Concrete Structure The number should be determined is 175mm, the bottom surface temperature accumulates to
Engineering according to actual needs. diameter is 185mm, and the height 600℃·d. The equivalent age
6, for the concrete structure with is 150mm. 6 pieces/group are used period should not be less than 14
GB50208-2011 impermeability requirements, the same days, also
"Underground project, the same concrete grade, the Should not be greater than 60
Waterproofing same impermeability grade of concrete, days.
process quality each class does not exceed 500m³, at
acceptance Code" least 1 group of test blocks, and each unit
of engineering shall not be less than two
groups. The impermeability test specimen
of premixed concrete is used, and the
number of indwelling groups can be
determined according to actual needs.
Making of concrete test specimen
Curing conditions:
The production of specimens by manual tamping shall be carried out in the following ways:
1, the concrete mix should be divided into two layers into the mold, each layer of loading 1, the test block used for the evaluation of concrete strength should adopt
thickness is roughly equal; standard maintenance. It should be put into the standard curing room with
a temperature of 20±2℃ and relative humidity of 95% or more
2, ramming should be evenly carried out from the edge to the center according to the spiral
direction. When inserting and ramming the bottom concrete, the ramming rod should reach the The specimens in the standard curing room should be placed on the support
and separated from each other
bottom of the test mold. When inserting and ramming the upper layer, the ramming rod should be
10-20mm, the surface of the specimen should be kept wet, and should not
inserted into the lower layer 20-30mm after running through the upper layer; When inserting and be directly washed by water
ramming, the rammer should be kept vertical and not inclined. Then apply the spatula to insert
2. The test block used for mold removal or evaluation of the strength of
and pull several times along the inner wall of the test mold.
the structural entity should be maintained under the same conditions.
3. The number of insertion and ramming of each layer shall not be less than 12 times within
10000mm² cross-section area, and the test mold of 150mm×150mm×150mm shall not be less than
27 times. 4. After insertion and ramming, the rubber hammer shall be used to gently knock around
the test mold until the hole left by the insertion and ramming rod disappears.
The first part commonly used building materials sampling basis and method
Sequence
Item Inspection or Test content Batch principle or sampling frequency Sampling method and quantity Information to be
entry acceptance basis provided when
sending samples
1, each test batch and not more than 250m masonry
of all types, strength grades of ordinary masonry sand In the mortar mixer outlet or wet mix
slurry, each mixer should be sampling inspection at mortar
least once. The discharge port of the storage container
2. For the ready-mixed mortar and autoclaved aerated is made by random sampling
concrete block special mortar of the acceptance batch, the Mortar test block (mortar mixed on site,
JGJ/T70-2009 sampling inspection can be 3 groups. 3. Mortar admixtures same
1, mortar
"Building mortar such as plasticizer, early strength agent, retarding agent, Disk mortar should only do 1 group of test varieties;
based performance antifreeze agent and waterproofing agent added into the blocks) test block label
1.Compressive 2, mortar
8 Mortar test method strength mortar shall be tested and determined by qualified testing Do strength test after raising for 28d. The
units. The plasticizer with a content greater than 5%, consistency of wet-mixed mortar in ready strength grade;
Standard" 2, admixture
every 200t is a batch number; Plasticizer with 3, the use of
GB50203-2011 test -mixed mortar should be tested by taking
content less than 5% and greater than 1%, every parts;
"Masonry samples at the time of entry.
100t is a batch number; The plasticizer of less than 4, the production unit,
construction quality Cube compressive strength test block size:
1% and greater than 0.05%, every 50t for a batch variety, dosage of
acceptance Code" 70.7 mm x 70.7 mm x 70.7 mm
number; doped mortar admixture, etc.
JGJ/T164-2004 The amount of plasticizer is less than 0.05%, every 3 pieces/group
"Plasticizer for 10t is a batch number. Less than one lot number Mortar test blocks of the same type and
Masonry Mortar" should be counted by one lot number. Products strength grade
with the same number must There should be no less than 3 groups.
The number of samples of mortar
admixtures should be taken not less than
2.5 times the test amount according to the
dosage
The production of mortar specimen
1, the test mold should be 70.7mm×70.7mm×70.7mm with the bottom test mold. Sealing materials such as
butter should be used to spread the outer joints of the test mold, and a thin layer of oil or spacer should be
Curing of mortar specimen
brushed inside the test mold. The mixed mortar should be filled with mortar test mold at one time, and the
After mold removal, the specimen should be immediately put
molding method should be determined according to the consistency. When the consistency is greater than 50mm,
into the standard curing room with a temperature of 20±2℃ and
it is appropriate to use manual ramming molding, when the consistency is not greater than 50mm, it is
relative humidity of more than 90%. During the maintenance
appropriate to use shaking table vibration molding; Manual insertion and ramming: the ramming rod should be
period, the interval between the specimens shall not be less
uniformly inserted and rammed 25 times from the edge to the center in a spiral way. When the mortar falls
than 10mm. The mixed mortar and wet mixed mortar
lower than the test die, the mortar should be added at any time during the insertion and ramming process. The
specimens shall be covered to prevent water droplets from
putty knife can be inserted and rammed several times, and the test die side is raised by 5-10mm for 5 times
falling on the specimens. Starting from mixing and adding
each vibration, and the mortar should be higher water, the standard curing age should be 28d.
The top surface of the test mold is 6-8mm
2, should be slightly dry surface moisture, and then higher than the test mold part of the mortar along the
test mold top surface to scrape and smooth;
3, after the production of the specimen should be in the temperature of 20±5℃ environment 24±2h, the
specimen number, remove the mold. When the temperature is low or the setting time of the mortar is
greater than 24h, the time can be extended appropriately, but it should not exceed 2d.
The first part commonly used building materials sampling basis and method
Sequen
Item Inspection or Test Batch principle or sampling Sampling method and quantity Information to be provided
entry acceptance basis content frequency when sending samples
Sintered porous brick:
15 bricks, 10 for compression, 5 for spare
Item Inspection or Test Batch principle or sampling Sampling method and quantity Information to
entry acceptance basis content frequency be provided
when sending
samples
1, polyvinyl chloride waterproof coil, 1, PVC waterproof coil chlorinated polyethylene
1. chlorinated polyethylene waterproof coil waterproof coil: randomly selected 3 volumes in the
batch for appearance quality, size, area inspection, after
Impermeabilit To 10000m² of the same type of coil passing the inspection, take a volume, about 3m from
for a batch, less than this number is also the outer end of 500mm intercepted for physical and 1.
y chemical properties test;
GB12952-2003 "PVC counted according to a batch; Manufacturer
2, tensile 2, SBS, APP in each batch randomly selected 5
waterproofing coil" 2, elastomer modified asphalt waterproof volumes for unit area quality, area, thickness and :
performance
GB12953-2003 coil appearance inspection, after passing the inspection, 2, product
3. Heat take a volume, cut away from the outer roll head
"Chlorinated polyethylene (SBS), plastic body modified asphalt name:
resistance waterproof roll 2500mm, take 1m long coil; Asphalt composite tire
waterproof roll" 4, low 3,
Wood (APP), asphalt composite tire flexibility
GB18242-2008 "Elastomer specifications
tenderness flexible waterproof Waterproof coil: 5 rolls are randomly selected in each
modified asphalt waterproof batch for unit area mass, area and thickness and models
5. Elongation Coil, modified asphalt polyethylene tire And appearance inspection, after passing the (see coil
roll"
6. Tear waterproof roll inspection, take a roll, remove 1000mm from the outer Mark on it)
GB18243-2008 "Plastic roll head, take 1m long roll; Modified bitumen such as:
Material, aluminum foil surface petroleum
Waterproof material
Item Inspection or Test content Batch principle or sampling frequency Sampling method and Information to be
entry acceptance basis quantity provided when
sending samples
1. Water Concrete admixtures: including high performance water Concrete admixtures: The
reduction rate reducing agent (early strength type, standard type, retarding same number of the additive
2. Ratio of type), high efficiency water reducing agent (standard type, must be mixed evenly, each
bleeding rate retarding type), ordinary water reducing agent (early strength number sampling
3, setting time type, standard type, retarding type), air reducing agent, The quantity shall not be
(difference) pumping agent, early strength agent, retarding agent and air less than the additional
4, compressive entraining agent, dosage required for 0.2t
strength (ratio) Dosage ≥1% of the same variety of admixtures, each cement.
GB8076-2008 5, shrinkage ratio number is 100t, the same dosage <1% Concrete pumping agent:
"Concrete Additive" 6, gas content Each number of the additive of the variety is 50t, and less Sampling quantity of not less
Extra dosage
than 100t or 50t is also counted according to a batch. than 0.2t per lot number 1. Manufacturer;
GB23439-2009 7, slump increase
"Concrete expansion Concrete pumping agent: Additional dosage required for 2, variety;
value
11 Agent" cement. 3, model;
8, slump retention Sampling at least once for each batch number (50t batch).
JC474-2008 "Mortar, Concrete expansion agent: Concrete expansion agent: 4, admixture
value
concrete waterproof Sampling should be amount; 5, the
agent" 9, limit expansion The same variety of 200t concrete expansion agent for a representative, can be taken use of parts.
rate number, less than 200t, should also be a number.
GB50119-2003 continuously, also
10, permeable Mortar, concrete waterproofing agent: The same amount of
"Technical
Specification for pressure ratio Each 50t with an annual output of not less than 500t is a samples can be taken from
Application of concrete 11, water batch; Annual output less than 500t, every 30t for a more than 20 different
Additives" absorption ratio batch; Less than 50t or 30t is also counted according to a parts, the total amount is
12, fineness batch. not less than 10kg.
13. Stability Mortar, concrete
waterproofing agent: sample
14. Strength
each batch
Quantity not less than 0.2t
cement required for
additional dosage.
The first part commonly used building materials sampling basis and method
Sequence
Item Inspection or acceptance basis Test Batch principle or sampling Sampling method Information to be
content frequency and quantity provided when sending
samples
Item Inspectio Test content Batch principle or sampling frequency Sampling method and Information to be provided
entry n or quantity when sending samples
acceptan
ce basis
1 wall is 1 group, and the
GB50411- specifications of the test wall
2007 are generally:
"Building
Heat transfer coefficient 1.2 m * 1.2 m
energy saving
of wall Each unit of the same manufacturer, the same 1.5 m * 1.5 m
process
product, when the construction area of the unit Send 1 piece of material needed
construction
quality project is below 20,000 m², each test not less for the wall to the testing
acceptance than 3 groups; When the construction area of institution, and build the test
Code" the unit project is above 20,000 m², each test wall in the test frame of the
is not less than 6 groups. testing institution in the 1. It is best to provide
JC/T841-2007
simulation of the engineering drawings on energy-saving
"Alkali
Resistant site. construction. If not, you
Architec glass fiber Bond strength of should understand the area,
ture Fabric" bonding material type, external wall structure
13 and design parameters of the
Energy JG158-2004
saving "Rubber Enhance the mechanical construction
(wall) powder properties of the net, 2. The manufacturer, product
Polystyrene corrosion resistance name, grade, model or code
particle of the material to be
external wall Each unit project of the same manufacturer, inspected.
insulation the same product, when the unit construction
System" area of 20,000 m² below the detection of not Each group of thermal
JGJ144-2004 less than 3 groups; When the construction area insulation paste 5kg
"External of the unit project is above 20,000 m², each
Thermal conductivity,
Wall test is not less than 6 groups.
density, compressive
insulation
strength or compressive Use thermal insulation paste for the outside of the
engineering
strength of the insulation insulation layer
Technical
material For the wall, no less than 3 groups per inspection Each group of samples contains:
Regulations"
lot. Shall be made of the same materials, 3 pieces 300mm x 300mm x
techniques and construction practices 30mm
The wall, every 500m ²~1000 m² area is 5 pieces 100mm x 100mm x
divided into an inspection batch, less than 100mm.
500m² is also an inspection batch.
The first part commonly used building materials sampling basis and method
Sequence
Item entry Inspection or Detection content Batch principle Sampling method and Information to be provided when
acceptance basis or sampling quantity sending samples
frequency
Item entry Inspection or acceptance Test content Batch principle or Sampling method Information to be provided
basis sampling frequency and quantity when sending samples