Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Date : 06 May 2024

A - B Road Crossing Inspection

Serial
Observation Corrective Action Closure Date
No.
Inadequate/ Misplaced hump Additional hump (Rumble strip) @ all three
1
(Rumble Strip) approaches.
Additional 3 construction signages @ all
2 Inadeqaute signages approaches (Signage proposal attached with
email)

3 Inadequate flagman Additional 6 flagman to ensure job rotation

Red flag to be provided for each signage (as


4 Signage attention visibility
per MOT's Guidelines)
Flagman signage not visible @ exit of Relocate the flagman signage for better
5
plot A visibility.
Provide New Jersey barriers filled with
6 Damaged platic jersey barriers. water / sand at all locations (exit of plot A,
Exit of Plot B)

7 No umbrella for flagman Provide umbrella for flagman at all 6 stations

Cold water container / igloo missing


8 Provide igloos @ each station (6 stations)
for flagman

9 Small signage at B1 exit Replace with bigger size signs

Provide flower blinking lights for each


10 Warning lights not fit for purpose
signage.

11 No lighting plan for Night Shift Provide lighting plan for night shift.

You might also like