Panel Kontrol Motorized: Keyplan
Panel Kontrol Motorized: Keyplan
LOKASI UB-4
IRRIGATION 04B
IRRIGATION 04
PERIMETER
DRAINAGE 01A
PERIMETER
DRAINAGE 02A
KEYPLAN
IRRIGATION 04A
+103.40 MSL
+98.50 MSL
UNIT
UNIT
A/C OUTDOOR A/C OUTDOOR
+103.40 MSL
+98.50 MSL
+95.70 MSL
+95.70 MSL
+95.00 MSL
+94.50 MSL
)0W
0R
1( :E
m
1Tm
LTL0UA
0G
F3
LLAF
PERIMETER
DRAINAGE 10B
BM PTB 1 BM PTB 5 BM PTB 6 BM PTB 2 +100.00 MSL
+97.90 MSL
+100.00 MSL
LLAF
N 9141758,9506 N 9141826,5919 N 9141900,3154 9141924,3917 N
RD
RD
E 604644,5414 604581,2931 E
LLAF
E 604697,1372 E 604696,1635 PERIMETER
FDFD
+95.00 MSL
DRAINAGE 03A
RD
RD
BM PTB 1 BM PTB 2
+100.00 MSL
+97.90 MSL +94.50 MSL
LLAF
LLAF
FDFD
+100.00 MSL
RD
RD
RD
4 5 6 7 8 9 10
)0W
0R
00R
)W( mm003
1( :E
m
1:E
1Tm
1TLTLUAG
LTL0UA
LLAF
LLAF
0GF
3
F
H
H
PHO PTB 1 PHO PTB 2 +94.50 MSL
BM PTB 5 BM PTB 6
G
+96.00 MSL
KANOPI #1
FFL+4.000
+94.00 MSL
F
FFL+13.150
KANOPI #2
FFL+7.400
FFL+4.000
ATAP
ATAP
E
+96.50 MSL
+94.00 MSL
BOX CULVERT HARDISINGAT-
+95.00 MSL +95.00 MSL
D
"BRAVO"(TO BE DESIGNED BY
OTHERS)
UNIT
UNIT
A/C
UNITOUTDOOR A/C
UNITOUTDOOR A/C OUTDOOR A/C OUTDOOR
BM PTB 7 BM PTB 8
PHO PTB 4
B
A
A
4 5 6 7 8 9 10
3
BM PTB 3 BM PTB 4
+94.00 MSL
+94.00 MSL
+95.00 MSL
+95.00 MSL
+94.00 MSL
+93.50 MSL
+93.38 MSL
+94.00 MSL
+94.00 MSL
+94.00 MSL PERIMETER
DRAINAGE 04A
PERIMETER
DRAINAGE 05A2
WATCH TOWER ROOM
FIRE POLE
+94.00 MSL
+94.00 MSL
FALL 1:100
GUTTER
+94.00 MSL
FALL 1:100
GUTTER
300mm (W)
300mm (W)
PERIMETER
FALL
FALL
FALL
FALL
FALL
PERIMETER PERIMETER
FALL
FALL
FALL
FALL
FALL
DRAINAGE 06A
GUTTER
300mm (W)
1:100
DRAINAGE 05A DRAINAGE 05A1
FALL
GUTTER
300mm
FALL (W)
1:100
+94.00 MSL
46254
+100.00 MSL
SLOPE 1%
+100.00 MSL
+115.40 MSL
+115.40 MSL
+100.00 MSL
+100.00 MSL
PERIMETER
DRAINAGE 05B
PERIMETER PERIMETER
DRAINAGE 04B DRAINAGE 03B