X01 X02 X03 X04 X05 X06 X07 X08 Y09 NOTES:
4120 1905 2035 3990 3950 3050 5740 Y01 Y02 Y03 Y04 Y05 Y06 Y07 Y08 1. ALL DIMENSIONS ARE IN MM.
2. ALL DIMENSIONS ARE TO BE READ AND NOT
24790 4185 3815 3980 1240 945 1695 2075 600 MEASURED.
18540 3. ALL LEVELS ARE IN METERS.
4. GRID DIMENSIONS AND PLOT LINES ARE TO BE
STRICTLY ADHERED TO.
5. ALL LEVELS INCLUDING FLOOR LEVELS, CILL &
LINTEL LEVELS, LANDING LEVELS, PARAPET HEIGHT/
MUMTY LVL LEVELS, LEVELS OF HORIZONTAL PROJECTION &
+10800MM
BONDS INCLUDING ANY SURFACE FEATURES
MUMTY LVL
INDICATED IN THE DRAWINGS ARE TO BE STRICTLY
+10800MM
ADHERED TO.
6. IN CASE OF ANY DISCREPANCY BETWEEN ANY

2600
LVL + 2675
DRAWING, ARCHITECT HAS TO BE INFORMED PRIOR
TO ANY EXECUTION.
PARAPET LVL

2600
ELEVATION 1
+8200MM
KEY PLAN
PARAPET LVL
400

+8200MM

400
TERRACE LVL - 2655
LVL + 2075
FLOOR (TOS) GYM HALL
11800X11865

+7800MM TERRACE

ELEVATION 4
LVL ± 00 LVL ± 00 LVL ± 00 LVL-4070

ELEVATION 2
LVL + 425

LVL + 3645
FLOOR (TOS)
3600

LVL + 2500
OFFICE
2935X3855
+7800MM
SPA

LVL + 425
3600
FHC

LV & MV
SHAFT
5500X5000

101
1
2000 WIDE CORRIDOR
FIRST FLOOR UP
GENTS TOILET

LVL +4200MM 3955 X 3655


ENT LOBBY

CLOCK ROOM/

FIRST FLOOR LVL CHANGE ROOM


7750X3585
LVL+600mm

LVL ± 00 LVL + 2075 +4200MM


LVL LVL LVL - 2655
LVL ± 00 LVL ± 00 LVL ± 00 LVL-4070 LVL 1

+4850 +4850 -11525


101 UP

LVL + 425

LVL + 3645
LVL + 2500 ELEVATION 1
3600

NOTES:

LVL + 425
1. PRELIMINARY DRAWINGS HAVE BEEN

3600
LVL + 2675
GROUND FLOOR APPROVED BY CISF HEAD QUARTER ON DATED
LVL +600MM LVL ± 00 LVL + 2075
20/05/2020.
GROUND FLOOR LVL
LVL ± 00 LVL ± 00 LVL ± 00 LVL-4070 2. DETAILED DRAWINGS HAVE BEEN PREPARED
600

LVL +600MM -11525


BASED ON PRELIMINARY DRAWINGS ALREADY
APPROVED BY CISF HEAD QUARTER AND MADE

600
ROAD
PART OF EPC TENDER.
LVL ±00MM ELEVATION 1
ROAD 3. PRESENT DRAWINGS ARE SAME AS
LVL ±00MM PRELIMINARY DRAWING ALREADY APPROVED
ELEVATION 2 WITH MINOR CHANGES OWNING TO
REQUIREMENT OF LOCAL BODY PROVISIONS
Y09 AND FOR ACCOMMODATING VARIOUS CIVIL
X08 X07 X06 X05 X04 X03 X02 X01
Y08 Y07 Y06 Y05 Y04 Y03 Y02 Y01 AND ELECTRICAL /MECHANICAL SERVICES,
5740 3050 3950 3990 2035 1905 4120 SHAFTS ETC.
600 2075 1695 945 1240 3980 3815 4185
24790 METAL SHEET
18540 AS/SPEC.
MS BEAM
AS/STR.
MS PURLIN
AS/STR.
MUMTY LVL 3 MM THK.
+10800 MM MUMTY LVL MS SHEET
+10800MM
2600

MS PLATE
AS / STR. R1 06.03.2024 WORKING DRAWING

2600
LVL -5730

861
PARAPET LVL
R0 27.10.2022

733
+8200MM PARAPET LVL WORKING DRAWING
+8800MM MARK DATE DESCRIPTION
400

BEAM AS /

600
400
DETAIL EXECUTING AGENCY

18°
TERRACE GUTTER
LVL -11980 LVL ± 00 LVL ± 00 TERRACE
FLOOR (TOS) FLOOR (TOS) MS FRAME
+7800MM LVL ± 00 LVL -12730 400 AS/STR. O/O SE-CUM-PD
LVL -8000 +7800MM CPWD , GOA
LVL + 425

LVL + 425
LVL + 7575

LVL + 7575
3600

1000

LVL + 425

LVL + 425
3600

LVL - 12305
LVL -5730

1600
FIRST FLOOR

600
LVL+4200MM FIRST FLOOR BIRD MESH EPC AGENCY
BRACKET
LVL +4200MM
LVL -8000 LVL -11980 LVL ± 00 LVL ± 00 IN GRC
LVL ± 00 LVL -12730 MANISHA PROJECTS PVT LTD
'B' D-23, RDC, Ghaziabad
LVL PARAPET
RCC COLUMN
LVL + 7575

LVL + 7575

-8255
LVL + 425

LVL + 425
3600

IN ELEVATION

LVL - 12305
LVL + 425

LVL + 425

400
3600
UP TO MS
LVL -8000 TRUSS MEMBER ARCHITECTURAL AND ENGINEERING
GROUND FLOOR
LVL +600MM
LVL LVL -5730 CONSULTANTS OF EPC AGENCY :
GROUND FLOOR -8255
LVL +600MM LVL -12730
600

600

ROAD
LVL ±00MM ROAD ELEVATION 4
ELEVATION 3 LVL ±00MM STRUCTURE CONSULTANT
Y09
Y01 Y02 Y03 Y04 Y05 Y06 Y07 Y08 LKT Engineering Consultants Ltd.
10 / 49, Subhash Nagar,
X08 X07 X06 X05 X04 X03 X02 X01 DETAIL - A New Delhi-110027
4185 3815 3980 1240 945 1695 2075 600 SCALE 1 :20
5740 3050 3950 3990 2035 1905 4120
18540
24790
MEP CONSULTANT
ARK CONSULTANTS
1/30, Roshan Garden - II, Najafgarh,
New Delhi - 110043
2140

Email:- consultants.ark@gmail.com
MUMTY LVL Phone: 09599932606
MUMTY LVL +10800MM
+10800MM METAL SHEET
AS / SPECS.
MS BEAM

300
AS / STR.
MS PURLIN
PROJECT
AS / STR. 'A'
PROPOSED ESTABLISHMENT OF
2000

2600

OH DOM. TANK O.H FLU. TANK


CAP. = 2KL O.H FIRE TANK CAP.=3KL

1000
PARAPET LVL CAP.=20KL WATER DEPTH CISF 6TH RESERVE BATTALION

2080
WATER DEPTH
PARAPET LVL +8200MM =1.0M WATER DEPTH=1.0M =1.0M M.S ANGLE
+8800MM SCREWED TO BIRD
MESH & BEAM
AT PERNEM, GOA
1000

600
400

VOID VOID VOID


DRAWING TITLE
TERRACE BEAM BEAM BEAM BEAM BEAM BEAM 6
TERRACE AS/STR AS/STR AS/STR AS/STR AS/STR AS/STR
FLOOR (TOS) M.S ANGLE SCREWED
GYMNASIUM

65
TO BIRD MESH &
FLOOR (TOS) +7800MM PARAPET WALL
+7800MM ELEVATIONS & SECTION
3600
3600

COLUMN IN
ELEVATION 65

FIRST FLOOR LVL AEROBICS HALL 2000 MM WIDE CLOCK ROOM /


DRAWING PURPOSE
FIRST FLOOR +4200MM CORRIDOR CHANGE ROOM
STORE LOBBY 2000MM WIDE CORRIDOR LADIES TOILET
LVL +4200MM
WORKING DRAWING
BEAM BEAM BEAM BEAM BEAM BEAM
AS/STR AS/STR AS/STR AS/STR AS/STR AS/STR

JOB NO. DATE


3600

D1102 06.03.2024
3600

COLUMN IN
ELEVATION

GROUND FLOOR SCALE REVISION


GROUND FLOOR LVL +600MM
GYM HALL 2000 MM WIDE CLOCK ROOM /
SPA LOBBY 2000MM WIDE CORRIDOR GENTS TOILET CORRIDOR CHANGE ROOM
LVL +600MM
DETAIL - B 1:100 R1
600

SCALE 1 :20
600

ROAD
DRAWING NO
ROAD LVL ±00MM
LVL ±00MM
SECTION - 2 D1102-CISFG-GYM-WD-AR-301
SECTION 1-1
SHEET SIZE SHEET NO

A1 01 OF 01
DRAWN BY CHECKED BY
YASH PUNEET