Professional Documents
Culture Documents
Week 02 Task
Week 02 Task
G G
Mansoura – Nasr City– Egypt
TASK-04 Tel: 0020-1093460618
Email: Info@asec.work
F F
Locker Equip Sterilize Clean Utility Recovery Producer Room
54 52 53 64 63
21 m² 8 m² 8 m² 52 m² 42 m²
A. TOTAL LOAD ESTIMATION
B. SUPPLY AIR FLOW
C. FRESH AND EXHAUST AIR FLOW
D. ZONE SELECTION
CFMEX = CFMEX =
.............................................................
A A
1 2 3 4 5 6 7
1 2 3 4 5 6 7
G G
Mansoura – Nasr City– Egypt
TASK-05 Tel: 0020-1093460618
Email: Info@asec.work
F F
Locker Equip Sterilize Clean Utility Recovery Producer Room
54 52 53 64 63
21 m² 8 m² 8 m² 52 m² 42 m²
A. AC EQUIPMENT SELECTION
B. EXHAUST FAN SELECTION
C. AC LOCATION
D. FAN LOCATION
.............................................................
Operation Room Services or Rest
.............................................................
Services
D
49 AC Equip = D
10 m² AC Equip =
Fan =
.............................................................
Sterilize Equip Sterilize
.............................................................
Rest AC Equip = AC Equip =
48
8 m² Fan = Fan =
.............................................................
Clean Corridor Clean Utility
C ............................................................. C
Locker
47
AC Equip = AC Equip =
Male Toilet 17 m²
46 Fan = Fan =
15 m²
.............................................................
General Store Dirty Area
Corridor
Operation Operation .............................................................
Theater Theater
50 AC Equip =
92 m² 58 57
40 m² 44 m² Fan =
Fan =
.............................................................
Dirty Corridor Locker Man or Woman Toliet
B
56 ............................................................. B
46 m²
Fan = Fan =
.............................................................
A A
1 2 3 4 5 6 7
1 2 3 4 5 6 7
G G
Mansoura – Nasr City– Egypt
TASK-06 Tel: 0020-1093460618
Email: Info@asec.work
F F
Locker Equip Sterilize Clean Utility Recovery Producer Room
54 52 53 64 63
21 m² 8 m² 8 m² 52 m² 42 m²
A. SUPPLY AIR TERMINAL DESIGN
B. EXHAUST AIR TERMINAL DESIGN
C. RETURN AIR TERMINAL DESIGN
D. DRAWING BY HAND
A A
1 2 3 4 5 6 7