#083 CS PIPE-W.ERW, OD: φ219.1, SIZE: 8", THICK: 6.35mm, SCH: Still Under
1 16 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe 20, END: BE, STD: ASME.B36.10M, MATERIAL: A53.GR.B Review
#083 CS PIPE-W.ERW, OD: φ219.1, SIZE: 8", THICK: 6.35mm, SCH: Still Under
2 7 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe 20, END: BE, STD: ASME.B36.10M, MATERIAL: A53.GR.B Review
#083 CS PIPE-W.ERW, OD: φ219.1, SIZE: 8", THICK: 6.35mm, SCH: Still Under
3 1 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe 20, END: BE, STD: ASME.B36.10M, MATERIAL: A53.GR.B Review
#083 CS PIPE-W.ERW, OD: φ219.1, SIZE: 8", THICK: 6.35mm, SCH: Still Under
4 51 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe 20, END: BE, STD: ASME.B36.10M, MATERIAL: A53.GR.B Review
#083 CS PIPE-W.ERW, OD: φ273, SIZE: 10", THICK: 6.35mm, SCH: Still Under
5 2 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe 20, END: BE, STD: ASME.B36.10M, MATERIAL: A53.GR.B Review
#083 CS PIPE-W.ERW, OD: φ273, SIZE: 10", THICK: 6.35mm, SCH: Still Under
6 3 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe 20, END: BE, STD: ASME.B36.10M, MATERIAL: A53.GR.B Review
PIPE-W.ERW, OD: φ88.9, SIZE: 3", THICK: 5.49mm, SCH:
#083 CS Still Under
7 28 EA 6M/LG 40, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ88.9, SIZE: 3", THICK: 5.49mm, SCH:
#083 CS Still Under
8 1 EA 6M/LG 40, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ88.9, SIZE: 3", THICK: 5.49mm, SCH:
#083 CS Still Under
9 8 EA 6M/LG 40, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ114.3, SIZE: 4", THICK: 6.02mm, SCH:
#083 CS Still Under
10 11 EA 6M/LG 40, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ141.3, SIZE: 5", THICK: 6.55mm, SCH:
#083 CS Still Under
11 1 EA 6M/LG 40, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ168.3, SIZE: 6", THICK: 7.11mm, SCH:
#083 CS Still Under
12 4 EA 6M/LG 40, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ168.3, SIZE: 6", THICK: 7.11mm, SCH:
#083 CS Still Under
13 3 EA 6M/LG 40, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ168.3, SIZE: 6", THICK: 7.11mm, SCH:
#083 CS Still Under
14 1 EA 6M/LG 40, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ219.1, SIZE: 8", THICK: 6.35mm, SCH:
#083 CS Still Under
15 49 EA 6M/LG 20, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ219.1, SIZE: 8", THICK: 6.35mm, SCH:
#083 CS Still Under
16 17 EA 6M/LG 20, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ219.1, SIZE: 8", THICK: 6.35mm, SCH:
#083 CS Still Under
17 11 EA 6M/LG 20, END: BE, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.SAWL, OD: φ406.4, SIZE: 16", THICK: 6.00mm,
#083 CS SCH: N/A, END: BE, STD: ASME.B36.10M, MATERIAL: Still Under
18 7 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe API.5L.GR.B- Review
W(EJ=0.85)
PIPE-W.SAWL, OD: φ457, SIZE: 18", THICK: 6.00mm, SCH:
#083 CS N/A, END: BE, STD: ASME.B36.10M, MATERIAL: Still Under
19 3 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe API.5L.GR.B- Review
W(EJ=0.85)
PIPE-W.SAWL, OD: φ508, SIZE: 20", THICK: 6.00mm, SCH:
#083 CS N/A, END: BE, STD: ASME.B36.10M, MATERIAL: Still Under
20 2 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe API.5L.GR.B- Review
W(EJ=0.85)
PIPE-W.SAWL, OD: φ559, SIZE: 22", THICK: 6.00mm, SCH:
#083 CS N/A, END: BE, STD: ASME.B36.10M, MATERIAL: Still Under
21 10 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe API.5L.GR.B- Review
W(EJ=0.85)
PIPE-W.SAWL, OD: φ610, SIZE: 24", THICK: 6.00mm, SCH:
#083 CS N/A, END: BE, STD: ASME.B36.10M, MATERIAL: Still Under
22 1 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe API.5L.GR.B- Review
W(EJ=0.85)
PIPE-W.SAWL, OD: φ762, SIZE: 30", THICK: 6.00mm, SCH:
#083 CS N/A, END: BE, STD: ASME.B36.10M, MATERIAL: Still Under
23 1 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe API.5L.GR.B- Review
W(EJ=0.85)
PIPE-W.SAWL, OD: φ610, SIZE: 24", THICK: 16.00m
#083 CS m, SCH: N/A, END: BE, STD: ASME.B36.10M, MATERIAL: Still Under
26 1 EA 6M/LG CHINA PMC 5-6 WEEKS* 4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe API.5L.GR.B- Review
W(EJ=0.85)
PIPE-W.ERW, OD: φ21.3, SIZE: 1/2", THICK: 3.73mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
31 36 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ21.3, SIZE: 1/2", THICK: 3.73mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
32 1 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ21.3, SIZE: 1/2", THICK: 3.73mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
33 1 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ26.7, SIZE: 3/4", THICK: 3.91mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
34 6 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ26.7, SIZE: 3/4", THICK: 3.91mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
35 1 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ33.4, SIZE: 1", THICK: 4.55mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
36 70 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ33.4, SIZE: 1", THICK: 4.55mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
37 1 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ33.4, SIZE: 1", THICK: 4.55mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
38 1 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ48.3, SIZE: 1 1/2", THICK: 5.08mm,
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
39 7 EA 6M/LG SCH: 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ60.3, SIZE: 2", THICK: 5.54mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
40 87 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ60.3, SIZE: 2", THICK: 5.54mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
41 10 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ60.3, SIZE: 2", THICK: 5.54mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
42 15 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
PIPE-W.ERW, OD: φ60.3, SIZE: 2", THICK: 5.54mm, SCH:
#083 CS APPROVED CHANGE TO SMLS (19 APR Still Under
43 6 EA 6M/LG 80, END: NPT, STD: ASME.B36.10M, MATERIAL: CHINA PMC 5-6 WEEKS* 24), BOTH SIDE NPT
4/20/2024 N/A N/A COMPLY N/A 100% UT COMPLY Ready on 20th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
Welded Pipe Review
A53.GR.B+GALV
ITP Drawing Hydrotest RT UT COLOR CODE
ESTIMATE ESTIMATE DEL.TO
ETD CHINA ETA JKT ETA WAREHOUSE
INSPECTION DATE CABOT
Package Item Approved Approved
QTY UNIT Item Descriptions BRAND DEL. TIME Remarks Submission Date Submission Date Hydrotest RT UT COLOR CODE
Number Number Date Date
90.ELBOW.LR OD: φ88.9, SIZE: 3", THK: 5.49mm, SCH: 40,
#084 CS Fitting 1 139 EA CHINA PMC 5-6 WEEKS* 4/19/2024 N/A N/A N/A 100% COMPLY Ready on 15th May 15-Jun-24 19-Jun-24 20-Jun-24 24-Jun-24
END: BW, STD: ASME.B16.9, MATERIAL: A234.WPB-S