HOURLY PRODUCTION REPORT

PT ASKIMAH CIWI MANDIRI


Priode : 2024
Site Project: Sumbawa Timur Mining

Date 01/06/2024

Digger Type Digger Hauler Location REMARKS 07:00-08:00 08:00-09:00 09:00-10:00 10:00-11:00 11:00-12:00 13:00-14:00 14:00-15:00 15:00-16:00 16:00-17:00 Total Ritasi Production (BCM)
ACM B006 Excavator 20 Ton ACM B016 Extend Danakakila Limited stock material loading, EX-ACM B006 Collect and Prepare material 4 4 3 4 4 5 5 29 290
ACM B006 Excavator 20 Ton ACM B017 Extend Danakakila Limited stock material loading, EX-ACM B006 Collect and Prepare material 4 2 3 1 3 3 4 4 24 240
ACM B005 Excavator 20 Ton ACM B020 Nangadoro Facilities Limited stock material loading (DZ-ACM B010 Breakdown Hose pin lock broke), Demobilization Unit 4 2 5 5 3 1 20 200
ACM B005 Excavator 20 Ton ACM B019 Nangadoro Facilities Limited stock material loading (DZ-ACM B010 Breakdown Hose pin lock broke) 3 3 6 60
ACM B005 Excavator 20 Ton ACM B021 Nangadoro Facilities Limited stock material loading (DZ-ACM B010 Breakdown Hose pin lock broke) 3 3 5 1 2 14 140
Grand Total 15 11 6 4 15 17 13 12 93 930

Digger Location Date Digger Location Date


Pro. Plan (BCM/Hour/DT) Actual Pro. DT (BCM/Hour/DT) Productivity Ach (%) Pro. Plan (BCM/Hour/DT) Actual Pro. DT (BCM/Hour/DT) Productivity Ach (%)
Digger ACM B005
HOURLY PRODUCTIVITY (BCM/hour) - Nangadoro HOURLY PRODUCTIVITY (BCM/hour) - Danakakila Location Nangadoro Facilities
Date 01-Jun-24
Time 17:26
Hauler Actual Pro. DT Productivity Ach (%)
ACM B019 40 30 75% Pro. Plan (BCM/Hour/DT)
(BCM/Hour/DT)
ACM B019 40 30 75%
ACM B017 50 30 60% ACM B020 40 33 83%
Values Values ACM B021 40 28 70%
Hauler Pro. Plan (BCM/Hour/DT) Hauler Pro. Plan (BCM/Hour/DT)
ACM B020 40 33 83% Actual Pro. DT (BCM/Hour/DT) Actual Pro. DT (BCM/Hour/DT)
Digger ACM B005
Productivity Ach (%) Productivity Ach (%)
Location Nangadoro Facilities
Date 01-Jun-24
ACM B016 50 41 83% Time 17:26
ACM B021 40 28 70% Hauler Prod. Plan (BCM) Production (BCM) Production Ach (%)
ACM B019 80 60 75%
ACM B020 200 200 100%
ACM B021 120 140 117%

Digger Location Date Digger Location Date Digger ACM B006


Prod. Plan (BCM) Production (BCM) Production Ach (%) Prod. Plan (BCM) Production (BCM) Production Ach (%) Location Extend Danakakila
HOURLY PRODUCTION (BCM/Day) - Nangadoro HOURLY PRODUCTION (BCM/Day) - Danakakila Date 01-Jun-24
Time 17:26
250 140% 350 120%
Hauler Actual Pro. DT Productivity Ach (%)
Pro. Plan (BCM/Hour/DT)
120% 300 (BCM/Hour/DT)
117% 100% ACM B016 50 41 83%
200 300 97% 300
200 200 290 ACM B017 50 30 60%
100% 100% 250
80% 80%
150 240
80% Values 200 Values
75% Prod. Plan (BCM) Prod. Plan (BCM)
140 60%
120 60% Production (BCM) 150 Production (BCM) Digger ACM B006
100
Location Extend Danakakila
Production Ach (%) 40% Production Ach (%)
40% 100 Date 01-Jun-24
80
50 Time 17:26
60 20%
20% 50 Hauler Prod. Plan (BCM) Production (BCM) Production Ach (%)
ACM B016 300 290 97%
0 0% 0 0% ACM B017 300 240 80%
ACM B019 ACM B020 ACM B021 ACM B016 ACM B017
Hauler Hauler