H&S RISK ASSESSMENT

RISK ASSESSMENT

Prepared by K.O’Reilly Signature Date 10/04/2010

HSE Reviewed by W.Lister Signature Date

Activity; Lifting Equipment/Machinery.


Initial Risk
Residual Risk
Who or what (with existing controls) Additional
Health and Safety Hazards
is at risk Risk Control Measures Risk
S L R S L R
Level Level
1) Crane driver to be certified and
competent.
2) Rigger to be certified and
competent.
3) Crane to be on a register and
checked daily.
4) All lifting equipment to be on a
All Personal 3 3 9 M register and colour coded. 2 3 5 M
Property. 5) Only rigger to give signals to the
Load falling
Injury. crane driver.
1) Faulty lifting equipment.
6) Area to be demarcated.
Injury.
7) Barge to be stable on water when
Disability.
lift is to take place
Damage to property.
8) All personal to be removed from
the immediate area.
9) Any lift over 5 tons needs a
rigging study.
10) Training by toolbox talks.
11) Inspections by supervisor.
12) Random checks by Safety Officer.
Severity (S) Values: 1-5 Likelihood (L) Values: 1-5 Note: Use the RAM when determining the values of S and L

Risk (R) = S x L Risk Ranking: 1 – 4 = Low (L) 5 – 12 = Medium (M) 15 – 25: High (H)