CSMS
CSMS
CSMS
What is GHSER?
What is CSMS ?
Contractor Safety, Health
& Environmental
Management Systems
CSMS Structure
New
NewProjects
Contracts
Qualification Phase: Select A Qualified Contractor
Qualification
Risk Assessment
Pre-Qualification
Selection CSMS
Contract Award
Contract Data Bank
Implementation Field Implementation
Contract Implementation
Phase
Phase
: Ensure
: Ensure
Field
Field
Safe
Safe
Work
Work
Contracted Work
Risk Assessment
No Pre Job Activity
No Yes
Qualification Phase
Pre Qualification
Required? Pre Job Activity
Contract Award Feedback
Yes
No Mechanisms
Pre Qualification
Work In Progress
Required?
Yes
Selection No Work In Progress
Required?
Data Bank
RISK
ASSESSMENT
Objective
10 EPC contracts H
17 Land transportation H
Risk Assessment Process
Risk Refer to Table 2, 3 or use form
Identification CSMS/RA/01 for determining
the risk level
Prepare CRF
Attach the
Yes
Agreed?
filled RA form
No
• Conclusion
Questionnaires
1. Leadership and Commitment
2. Policy and Strategic Objectives
3. Organization, Responsibility, Resources, Standards
and Documentation
4. Hazards and Effect Management
5. Planning and Procedures
6. Implementation and Performance Monitoring
7. Audit and Review
8. Emergency Response Procedure
9. HSE Management – Additional Features
Pre-Qualification (cont’d..)
No Mgmt No Disq
Risk Pass? Approval
Assessment
Yes
Verification and
Verification and audit audit process
No PQ process (if required) (recommended)
Required?
Yes
Meet BPI No Mgmt Could BPI No
help fill Disq
Yes Criteria? Approval
Listed in
the gaps?
CSMS On-
line? Yes Yes
No
Candidates’ complete CSMS PQ Conditional
questionnaires Acceptance
Put Candidates
into bidders list
(database)
SELECTION
Objective
• HSE Plan
• Risk Assessment as per SOW
• Interface Plan
• Gap Identification and Closure
Plan
What is an HSE Plan...
• Mobilization
• Local kick-off meeting(s) (including HSE Site
Orientation and Inspection & Audit)
• Mobilization of contractor staff and equipment
Kick-off Meeting
To align:
HSE Plan, Interface Plan
Risk Assessment, Work Permit
Resources and Work Plan
Worksite Orientation
Inspection and Audit Plan
Emergency Procedures
Accident and Incident procedures
Communication,
Inspection and Audit
No
Issue
Completed
Yes
Mobilization
Job Execution
PJA CHECKLIST
I. Work Plan
II. Potential Hazards
III. ERP
IV. Pre-job Safety Meeting
V. Site Orientation
VI. Finalized all HSE
Requirements
VII. HSE Training
VIII.Management Commitment
WORK-IN
PROGRESS
Objective
• Competence
• Induction
• Training
• Completion of all agreed-upon
HSE training
• Availability of HSE documents
Work-In Progress
Competence Assurance
Inspection, HSE Auditing and
Interim Evaluation
HSE Plan Implementation
No
I s s u e r e p r im a n d o r
a p p r e c ia t io n le t t e r s f o r
w o r k b e lo w o r o v e r
e x p e c t a t io n s
I n p u t in t o C S M S
d a ta b a n k
CSMS Process “Gate Key”
Risk Pre- Selection Pre-Job Work-In Final
Assessment Qualification Activity Progress Evaluation
DELIV ERABLES
• Risk • Pre-Qualification Form • HSE Plan, and • Pre-Job Activity • Safety Inspection • Final Evaluation
Assessment to CSM S/PQ/02 findings from Form CSM S/PJA/05 Checklist form to be
be attached on inspection or audit HSE Plan;JSA; attached on the
• Result of table top • Safety Program
the CRF prior to process to be contract closed-out
evaluation and inspection • KPI Checklist
TL’s approval process included in bid form
package • Kick-off M OM • Interim Evaluation
• No contract • Pre-Qualification Form • No final payment
Checklist
w ill be • Selection Form • Work can only be to be made and
CSM S/PQ/03: Contractor
proceeded HSE M anagement CSM S/SL/04 commenced after all • No partial payment to contract database
w ithout Risk the above documents the contractor to be updated w ithout
System Evaluation
Assessment approved. made w ithout the above the above
complete documents document
DELIVERY ACCOUNTABILITY