Site Commencement from the Employer Concept Schematic Detail

Design Design Design


Design the Project

Site Survey & Site Work Preparation


Detail
Design
Construct TCF Site Offices & Laydown

Procurement Procedure

Establish Temporary Utilities


Demolition of Existing Services

Dewatering & Shoring (Temp. & Permanent)

Excavation @ Diff. Stages (5m to 15m)

Blinding Works

Waterproofing Works + Screed

Tunnel Foundation Base slab

Tunnel Walls

Tunnel Suspended Slab Epoxy & Permanent Utilities


Finishing Works (Inside Tunnels)
Backfilling Works

Permanent Utilities (Outside Tunnels)

Testing & Commissioning Works