Professional Documents
Culture Documents
Tugas 2 Irigasi-Model
Tugas 2 Irigasi-Model
Tugas 2 Irigasi-Model
PS
3.71 6.83
Ha Ltr/Dtk
A=11.15 Ha A= Ha
Q=20.50 Ltr/Dtk Q=34.00 Ltr/Dtk
L=180.00 M
SS2
SUNGAI A=11.15 Ha
Q=20.50 Ltr/Dtk
3.71
Ha
st
BS4
INTEK SP1 BB1 SP2 BB2 SS3 SP3 SS4
PS
A=1332.16 Ha A= 521.60 Ha
Ltr/Dtk
A=617.60 Ha
Q=1625.90 Ltr//Dtk
6.83
PP
A=1091.53 Ha
L=170.00 M Q=34.00 Ltr/Dtk
L=400.00 M
SS1
L=180.00 M
st
PS
8. a
01
BENDUNGAN
H t3kb
104.32 154.08
PS 14 tr/Dtk
Q= 70.00 Ltr/Dtk
Ha Ltr/Dtk
L
.1
BS1
A= 48.48 Ha
L= 200.00 M
8
st
PS
SP4
BS
155.94 232.28
5
Ha Ltr/Dtk
5 a tk
SS4.03 H Ltr/D
2 .55
=
A 42
4.38
Ha
st
BB3
Q= BB4
BS6
SP5 SS6
PS
A=25.24 Ha A=13.15 Ha
Ltr/Dtk
7.35
Q=36.00 Ltr/Dtk Q=22.05 Ltr/Dtk
L= 190.00 M
1. SP = SALURAN PRIMER
2. BB = BANGUNAN BAGI
DAVID YEREMIA P. HUTAPEA MATA KULIAH 3. SS = SALURAN SEKUNDER DOSEN PEMBIMBING
(21 111 056) IRIGASI DAN BANGUNAN AIR ARNI ARONGGEAR,MT
4. BS = BANGUNAN SADAP
5. ST = SALURAN TERSIER
6. PS = PETAK SAWAH