SL No.

Description Elevate feedback: BD Technology Feedback

07, As per the NCs description of FPS001’’ Height Factory has provided In order to update the design
08, of the highest occupiable floor is greater than pictorial evidence, as built drawing, we need to clarify the
10, 75 ft (23m) for Production Building above the design drawing, testing information regarding the selection of
11, lowest level of fire department vehicle access. commissioning report and the pump, this design was done in
12, accordance with Accord, Alliance
So, Class III standpipe system is required hydraulic calculation. But
13, Standard. Taking into consideration
14, throughout the building. As the building there are found few
requires automatic sprinkler system discrepancies like showing the most distant pressure 65 PSI. But
15,
throughout the building, Class I standpipe sprinkler quantity are according to the ELEVATE guidelines,
16,
system is allowed. Factory has already found mismatched with the pressure at the furthest point
17,
should be 100psi. If the ELEVATE
18, completed sprinkler piping work & installation floor plan, Fire department
22, requirements is used in the hydraulic
of standpipe system throughout the building connection has been
28, calculation of the sprinkler system,
with listed fire pumps. But hydraulic shown 4way in floor plan,
29, the existing pump meets the
calculation has been prepared considering 65 which is mismatched with
31 requirements. However, the hydraulic
psi at riser remote & hose stream allowance showing legend, in design of the stand piping system may
for sprinkler system has not been considered hydraulic calculation pump not be performed by the existing
following NFPA requirements. Factory is capacity has been found pump. If we consider that plant to be
suggested to prepare hydraulic calculation more than the showing existing prior to 2018, the plant could
properly to ascertain the fire pump capacity capacity in design drawing survive with the installation of the
requirements. During site visit, diesel fire and testing commissioning pump. If not, the factory should
pump was not operational, control valve at report. Detail pump room replace the pump. And update all
diesel fuel line was not locked open, diagram has not shown in conceptual drawings to the new
inadequate ventilation has been provided for design drawing. Also, the requirement. We are therefore
fire pump room, fire pump controller & all factory has not provided waiting for the decision on the
control valves has not been electrically adequate pictorial selection of the pumps and the
supervised yet with FACP, fire pump room is evidence regarding all the information on the pumps.
not separated fully as required, water level above issues. And no video We think, it is better to discuss with
for water reservoir has not been marked etc. record is found for the Brand regarding Remote point
Also, mismatch was observed in provided interfacing as per the pressure consideration.
proposed design/drawing from actual field captioned issues.
condition and testing & commissioning has
not been completed yet. As-built drawing,
hydraulic calculation and testing &
commissioning report need to be prepared
following NFPA requirements & based on
actual on-site condition after installation
finishes fully.’’
24,30 As per the NCs description of FPS031‘’Factory is Factory has installed T & C PA System is interfaced with detection
installing an automatic fire alarm and detection report where Panel & mentioned in Completion
system with listed devices. Detector coverage supplementary pages of report which is captured as below.
and manual call point were not provided yet at devices addressing are not Moreover, Voice evacuation isn’t
all places following requirements. Initiating presented in an organized added with the system. So, those
device i.e., detectors, manual call points need to way for interfaced devices, pages are empty. If you provide
be provided at all places following NFPA 72 and other locations, few pictorial evidence to ELEVATE then it
requirements. During site visit, it was noted that pages are found empty like may be OK.
undersize battery backup has been provided for PA system and other
the system, interfacing of exhaust fan, lift, PA information. As built design
system, fire pump controller, control valves has drawing has been provided
not been completed yet, fire alarm control but need to verify at site
panel (FACP) breaker was not found locked with the existing system. No
open, dedicated branch circuit for FACP was not remediated pictorial
posted at fire command room & fire command evidence and video are
room was not fire separated as required. provided on the above
Moreover, As- drawing, required calculations issues.
and testing & commissioning report need to be
prepared following NFPA 72 requirements &
based on actual on-site condition after
installation finishes fully.’’