Goshen Livestock Farm
Goshen Livestock Farm
07069465168, 09075751687
ayanfemi4math@yahoo.com
PAGE TITLE
The feasibility study of seven pregnant sows and 30 piglets to mature
stage.
1
TABLE OF CONTENT
1. Introduction
2. Executive summary
3. Aim and objectives
4. Market analysis
5. Sales
6. Project cost
7. Project timeline
8. Risk and problem management
9. Conclusion
2
PIG FARMING
1:0 INTRODUCTION
Pig farming is one of the most profitable livestock farming with ready made
market piggery is the most potential source for meat production and more
efficient feed converter after broilers, they produced more live weight gained
from a given weight of feed than any other class of meat producing animals
except broilers. The advantage of pig farming are
A sow can bred as early as 8-10 months of age and can farrow twice a
year.
Pig farming provides quick return since the marketable weight of
fatteners can be achieved within a period of 6-8 months.
Demand from domestic as well as export market for pig products such as
pork, bacon, land etc.
There are four commercial breed for farming business which are:
Duroc
Large white
Landrace
Yorkshire
3
2.0 EXECUTIVE SUMMARY
This feasibility studies show the likelihood of the proposed action succeeding
or failing through a careful look at the cost and opportunities involve. It helps
to determine if a propose strategic action makes sense operationally and will
produce the desired result to boost livestock production and pig meat
production and supplies.
4
MARKETING PLAN
5
SALES
Total = N 897
Amount per kg
1 kg=
numbers of feed
897
1 kg= =N 149.5 N 150 per kg
6
6
FEEDING OF 30 PIGLETs TO MATURITY STAGE
NOTE: the sows that produced these mature pig will give birth to another set
of piglets after six months in which they are weaned.
7
THE COST OF CONSTRUCTION OF TEN PEN
MATERIALS AMOUNT
Bundle of zinc = 4 x 45, 000 = N180, 000
2 x3 plank 180 x 600 = N108, 000
4inches nail 1 bag
N40, 000
2 X 4 plank N100 x N800 =N80, 000
3 inches nail 1 bag
N40, 000
16 pair of inches 10 x 500 = N5, 000
4 carton of zinc nail 4 x 8 000= N32, 000
10 padlock inches 10 x N1000 = N10, 000
12 bags of cement 12 x N7000 = N84, 000
2 load of sand and granite 40, 000 + 60, 000 = N100, 000
water N10, 000
TOTAL N989, 000
WORKMANSHIP
Bricklayer = N45, 000
Carpenter = N25, 000
Total cost of constructing ten pens = N1, 059, 000
Therefore the capital required to fund 30 piglets to mature pig and the
construction of the pen is N1, 632, 250 + N1, 059, 000 = N2, 691, 250
8
THE CONSTRUCTION TIMELINE
The construction of the building will be completed within one month
preferably.
9
CONCLUSION
The project is technically feasible and commercially viable. It is
10