STRUCTURAL
HEADING/PROJECT: SLAB WORK
4.3
3.5
0.15 2.26 m3
Reinforcement
Length = 4.30
less(-) cover
2 x 0.020 0.04
4.26
Add (+)
bend 2x5.5d=
2 x 5.5x 0.010 = 0.11
4.37
No of steel
say. 35
Reinforcement
Length = 3500.00
less(-) cover
2 x 0.020 0.05
3499.95
Add (+)
bend 2x5.5d=
2 x 5.5x 0.010 = 0.11
3500.06
No of steel
Say. 40
140308.30 m 86461 kg
TIMBER /FORMWORK
3.50
2 0.15 1.05 m2
2.25 m2
3.60
3.32
1 3.60
3.32 11.95 m2