BID WORKSHEET FOR BRIDGE FRAMING SYSTEM

Date: Company Name:

CONSTRUCTION MATERIALS

Bridge material $300/Bar length – $


1/8X1/4X36”
Construction Mat Rental $10 ea per $
day
Bridge material-$200/Bar length – $
1/8X1/8X24”
Knife rent ($10/hr) $
Wood glue rent ($10/hr) $
Welder rental ($20/hr) $______________

Total material $
cost

PROFESSIONAL SERVICES

Bridge Inspection service (must) $


Construction permit (must) $

Total services $

LABOR COSTS Each day is equal to one month (real time) – calculate for 15 days

Architectural Engineer $
Structural/Mechanical Engineer $
Accountant $
Project Manager _$________________
$
Total Labor

GRAND TOTAL OF BID……………………………… $