Schedule of Payments: Grand Total
Schedule of Payments: Grand Total
SCHEDULE OF PAYMENTS
Grand Total
Schedule 3 Inlet Works, Screens, Grit Removal, Parshall Flume, Oil, Grease and Distribution Chamber 200,542 10349948.42
Schedule 6 Chlorine Building, and Complete Chlorination System (Chlorine Storage and Dosing System) 64,759 3342237.659
Schedule 16 Effluent Facilities Including Pipeline, Drain Effluent Protection at Effluent Point, etc. 376,058 19408339.95
Administration Building of Two Stories, to Include Manager, O&M Staff Offices, Chemists,
Schedule 17 77,601 4004964.649
Lab., and Monitor Rooms, Mess Room, and Kitchen, all with Complete Furniture.
Workshop and Store Buildings as per Annex 2, Volume (2)A of Tender Doc. Construction of
Schedule 18 the Lab. And Internal Finishing of the Laboratory is part of the Administration Building 39,868 2057585.83
Construction Costs.
Complete Furniture, Equipment, Instruments, Glasses, and Chemicals for the Plant
Schedule 19
Laboratory
Complete Facilities for Monitor Room, LED Screen, Furniture, A/C System, Desktop
Schedule 20 Computers, Laser Colour, and Black Printers with Internal Network with the Administration
Building Networks.
Fence, Gate, Guard room, Site Clearance, and Landscape for the Plant Area with the
Schedule 21 502,533 25935708.55
Required Water and Sewer Systems
Schedule 22 Supply, Install and Test SCADA System for the Necessary Operation of the Plant
Schedule 24 Operation, Maintenance, and Training for the Plant for DLP (one year), OPEX
Note: The Tenderer shall submit with his offer separate Tables for each line item above.
· Civil, Mechanical, Electrical works shall be divided in both EGP and Euro
Schedule 25 Operation and Maintenance for additional one year, OPEX (Optional Works) 353,120 18224523.2