Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Manual No:

ED-HSP-DLH-70-01
ED - HSP-DLH Packer
Revision: A
7” (17-29)(26-32)# x 3-1/2” Revision Date:
19/03/2010

DESCRIPTION
The HSP-DLH Packer is a hydraulic set single string retrievable packer and may be used in virtually any production
application. Tubing pump pressure is used to set the packer and the setting force is locked into the packer by a body lock
ring. A large internal bypass reduces swabbing when running and retrieving. The bypass closes when the packer is set,
and opens during the releasing process to allow pressure equalization. Shear screws are used to control the packer release.
The standard HSP-DLH Packers are designed for differential pressures up to 7500 PSI.

SPECIFICATION GUIDE
CASING
RECOMMENDED TOOL OD TOOL ID THREAD CONNECTION PART
SIZE WEIGHT HOLE SIZE (INCHES) (INCHES) BOX UP / PIN DOWN NUMBER
(INCHES) (LBS/FT)

26-32 6.094 - 6.276 5.875 93573


7” 3.00 3-1/2 EUE
17-29 6.184 - 6.538 6.000 93574

SETTING PROCEDURES
RUNNING SEQUENCE
Running speed is critical, especially in heavy or viscous fluid where excess speed can result in swabbing off the
packing element or in creating pressure waves which could lead to creating a preset condition. It is recommended that
running speed should not be more than 30 seconds per joint (range II or 30 feet). Do not exceed this speed,
particularly when running the packer in the heaviest weight casing for the range for which the packer is dressed.
A run in the well with a junk basket and suitable sized gauge ring or a bit and scraper is strongly recommended
prior to running. The location of any tight spots should be noted and the running speed for the packer through these
spots should be reduced.
Being a hydraulically set packer, it can be subject to preset conditions by pressure waves through the fluid. A slow
steady running speed should be used and sudden stops and starts, such as when setting or pulling slips, should be
avoided.
Make up the packer to the tubing string in the desired position and to the required torque-transmission of make up
torque through the packer should be avoided.
Run the packer to the desired setting depth at the recommended speed and taking precautions listed above.
While running in the hole the packer body is rigidly connected to the packer mandrel and external forces caused by
debris or tight spots are transmitted directly to the tubing. These forces load the mandrel through the chamber and
body locks. Unless the string sequence is initiated by tubing pressure, the packer will not set.
- Typically the tubing will be landed prior to setting.
- Establish a plug in the tubing below the packer using a drop ball, wireline plug or other device.
- Apply pressure to the tubing to the recommended pressure for the given size of packer hold for 5 minutes. If the
well completion allows, apply annulus pressure to test the packer.
CAUTION: If the packer is used in a multi-zone completion above a permanent packer and locator type seal,
care should be taken to ensure that no set down weight can be exerted on the locator as this will
act on the shear system and try to unset the packer.

ED Oil Tools GmbH


Page 1 of 7 Vechtaer Marsch 5 49377 Vechta
PHONE: (+49) 4441-9322500
Manual No:
ED-HSP-DLH-70-01
ED - HSP-DLH Packer
Revision: A
7” (17-29)(26-32)# x 3-1/2” Revision Date:
19/03/2010

SETTING SEQUENCE
Internal tubing pressure enters the setting chamber through the setting port and acts upward on the setting sleeve
and downwards on the setting chamber/lower cone.
When the applied load acting on these pistons exceeds the value of the setting initiation shear screws, they will
shear and allow the setting process to proceed.
The setting sleeve pushes up through the setting shear pins between the rubber mandrel and setting sleeve closing
the valve and setting the upper slips. The setting chamber/lower cone pushes down setting the lower slips.
Further pressuring shears the setting shear pins and packs off the packer elements.
All this setting force is mechanically locked in place by the packer lock ring as it slides over the threads on the
setting sleeve.
NOTE: No mandrel movement occurs during the setting sequence, however, some residual tension will remain
in the tubing due to the tubing elongation caused by piston effects. This should be taken into
consideration when deciding on field shear out adjustments.
RELEASING PROCEDURES
The packer is released by tension on the tubing string which triggers the following sequence of events:
- The upper and lower shear screws shear as the tension exceeds the shear value.
- The mandrel begins to move up relative to the packer body.
- The bypass valve opens and movement upward raises the upper slip support thereby releasing the upper slips.
- Continued upward movement lifts the packer body, relaxing the packer elements and pulling the bottom cone
upwards releasing the lower slips.
- The final stage of unsetting occurs when the lower section (lower slip body and lower slips) reach the bottom sub.
They are then latched down by a Spirolox ring snapping into groove in the bottom sub, thus allowing the tool to
move freely up or down.
- After unsetting, wait 10 minutes to allow the rubber to relax and then pull out of the hole. The valve will be open
allowing fluid to by-pass the rubber through the passage under the rubber mandrel.
The shear release value is adjustable by adding or removing screws from the shear housing or by use of steel screws.
Upper shear screws (DL51775) are rated to 5000 lbs/screw, lower brass shear screws are rated to 6000 lbs/screw (alternate
steel lower shear screws are available - rated to 10,000 lbs/screw). Two (2ea) upper shear screws should always be used in
the upper slip support. The recommended shear screw arrangement is two (2ea) upper screws (10,000 lbs shear) plus four
(4ea) lower brass shear screws (24,000 lbs) for a total shear value of 34,000 lbs.
AREA GUIDE
BALANCE BALANCE SETTING SETTING RECOMMENDED
PACKER VALVE ID
AREA ABOVE AREA BELOW AREA INITIATION SETTING
SIZE (INCHES)
(SQ. INCHES) (SQ. INCHES) (SQ. INCHES) (PSI) (PSI)
7” X 3-1/2” 3.630 3.015 7.466 9.584 1000 2500

Page 2 of 7 ED Oil Tools GmbH


Vechtaer Marsch 5 49377 Vechta
PHONE: (+49) 4441-9322500
Manual No:
ED-HSP-DLH-70-01
ED - HSP-DLH Packer
Revision: A
7” (17-29)(26-32)# x 3-1/2” Revision Date:
19/03/2010

DISASSEMBLY
1) Clamp top sub (12) in vise.
1.1) Unscrew and remove bottom sub (42) from inner mandrel (1).
NOTE: A back-up wrench can be placed on inner mandrel just above bottom sub while wrenching on bottom
sub.
1.2) Unscrew and remove shear screws (41).
1.3) Slide lower slip body assembly off of inner mandrel (1).
1.4) Disassemble lower slip body assembly:
1.4.1) Remove Spirolox ring (40) from lower slip body (37).
1.4.2) Remove lower slips (38) and lower slip springs (39) from lower slip body (37).
1.5) Unscrew setting chamber (33) from lower cone (36). Slide lock ring (32), setting chamber cap (34) and setting
chamber (33) up out of way temporarily.
1.6) Unscrew and remove shear screws (29).
1.7) Slide lower cone (36) off of setting mandrel (28).
1.7.1) Remove o-rings (27, 35) from lower cone (36).
1.8) Unscrew setting chamber cap (34) from setting chamber (33).
1.9) Unscrew lock ring (32) from setting chamber (33) and slide setting chamber (33) off of setting sleeve (28).
NOTE: Lock ring is left hand threads.
1.10) Slide lock ring (32) and setting chamber cap (34) off of setting sleeve (28).
1.11) Remove snap ring (31) from inner mandrel (1).
1.12) Remove shear screws (29) from setting sleeve (28).
1.13) Unscrew setting sleeve (28) from rubber retainer (30) and slide setting sleeve (28) off of inner mandrel (1).
1.13.1) Remove o-rings (4, 27) from setting sleeve (28).
1.14) Unscrew rubber mandrel (23) from center coupling (19).
1.15) Slide rubber mandrel assembly off of inner mandrel (1) and disassemble
1.15.1) Slide elements (24, 25), rubber spacers (26) and rubber retainer (30) off of rubber mandrel (23).
1.16) Unscrew and remove gage ring (22) from center coupling (19).
1.17) Unscrew and remove center coupling (19) from bypass housing (15).
1.17.1) Remove o-rings (20, 21) from center coupling.
1.18) Unscrew and remove bypass housing (15) from upper cone (5).
1.18.1) Remove o-ring (16) from bypass housing (15).
1.18.2) Remove seal (17) from bypass housing (15).
1.18.2.1) Remove O-ring (18) from seal (17).
1.19) Unscrew and remove set screws (14) from valve piston (13).
1.20) Unscrew and remove valve piston (13) from inner mandrel (1).
1.20.1) Remove o-ring (4) from valve piston (13).
2) Remove top sub (12) from vise and reposition vise on inner mandrel (1) so bottom is accessible.
NOTE: Do NOT wrench or clamp on seal surface.
2.1) Unscrew and remove shear screws (7) from upper slip support (6).
2.2) Unscrew and remove top sub (12) from inner mandrel (1).
2.3) Unscrew and remove upper slip support (6) from upper slip body (8).

ED Oil Tools GmbH


Page 3 of 7 Vechtaer Marsch 5 49377 Vechta
PHONE: (+49) 4441-9322500
Manual No:
ED-HSP-DLH-70-01
ED - HSP-DLH Packer
Revision: A
7” (17-29)(26-32)# x 3-1/2” Revision Date:
19/03/2010

DISASSEMBLY (cont’d)
2.4) Slide upper slip assembly off of inner mandrel (1) and disassemble:
2.4.1) Remove upper slips (10), releasing slip (9) and slip springs (11) from upper slip body (8).
2.5) Slide upper cone (5) and balance piston (2) off of inner mandrel (1).
2.5.1) Remove o-rings (3, 4) from balance piston (2).
3) Remove inner mandrel (1) from vise.

ASSEMBLY
1) Clamp inner mandrel (1) in vise. Clamp in center bypass area of inner mandrel.
NOTE: Do NOT wrench or clamp on seal surface.
1.1) Install o-rings (3, 4) onto balance piston (2), then slide balance piston (2) on inner mandrel (1).
CAUTION: Do not rip or tear o-rings during installation.
1.2) Slide upper cone (5) on inner mandrel (1).
1.3) Assemble upper slip assembly:
1.3.1) Install upper slips (10), releasing slip (9), and slip springs (11) into upper slip body (8).
1.4) Slide upper slip assembly onto inner mandrel (1).
1.5) Screw upper slip support (6) into upper slip body (8).
1.6) Screw top sub (12) onto inner mandrel (1).
1.7) Install shear screws (7) into upper slip support (6). Tighten shear screws, then back off 1/4 turn.
2) Remove inner mandrel (1) from vise and reposition vise on top sub (12) so bottom is accessible.
2.1) Install o-ring (4) on valve piston (13), then slide valve piston (13) onto inner mandrel (1).
CAUTION: Do not rip or tear o-rings during installation.
2.2) Screw valve piston (13) onto inner mandrel (1).
2.3) Install set screws (14) in valve piston (13).
2.4) Install O-ring (18) on seal, then slide seal (17) into bypass housing (15).
CAUTION: Do not rip or tear o-ring during installation.
2.5) Install o-ring (16) in bypass housing (15), then slide bypass housing (15) onto inner mandrel (1). Screw bypass
housing (15) onto upper cone (5).
CAUTION: Do not rip or tear o-rings during installation.
2.6) Install O-rings (20, 21) on center coupling. Slide center coupling (19) onto inner mandrel and screw into bypass
housing (15)
CAUTION: Do not rip or tear o-rings during installation.
2.7) Screw gage ring (22) onto center coupling (19).
2.8) Assemble rubber mandrel assembly:
2.8.1) Slide rubber retainer (30), elements (24, 25) and rubber spacers (26) onto rubber mandrel (23).
NOTE: Install parts in proper order & orientation.
2.9) Slide rubber mandrel assembly on inner mandrel (1) and screw rubber mandrel (23) into center coupling (19).
CAUTION: Do not rip or tear o-rings during installation.
2.10) Install O-rings (4, 27) on setting sleeve (28) and slide setting sleeve (28) onto inner mandrel, then screw into
rubber mandrel (23).
CAUTION: Do not rip or tear o-rings during installation.
Page 4 of 7 ED Oil Tools GmbH
Vechtaer Marsch 5 49377 Vechta
PHONE: (+49) 4441-9322500
Manual No:
ED-HSP-DLH-70-01
ED - HSP-DLH Packer
Revision: A
7” (17-29)(26-32)# x 3-1/2” Revision Date:
19/03/2010

ASSEMBLY (cont’d)
2.11) Align threaded holes in setting sleeve (28) with recessed holes in rubber mandrel (23) and install shear screws
(29). Tighten shear screws, then back off 1/4 turn.
2.12) Install snap ring (31) onto inner mandrel (1).
2.13) Slide setting chamber cap (34) and lock ring (32) onto setting sleeve (28).
2.14) Slide setting chamber (33) onto setting sleeve (28).
2.15) Screw lock ring (32) into setting chamber (33).
NOTE: Lock ring has left hand threads.
2.16) Screw setting chamber cap (34) onto setting chamber (33).
2.17) Slide lock ring (32), setting chamber cap (34) and setting chamber (33) up out of way temporarily.
2.18) Install o-rings (27, 35) on lower cone (36), then slide onto inner mandrel (1).
2.19) Align threaded holes in setting sleeve (28) with groove in lower cone (36) and install shear screws (29). Tighten
shear screws, then back off 1/4 turn.
2.20) Slide setting chamber (33) down and screw onto lower cone (36).
2.21) Assemble lower slip body assembly:
2.21.1) Install lower slips (38) and lower slip springs (39) into lower slip body (37).
2.21.2) Install Spirolox ring (40) in groove in lower slip body (37).
2.22) Slide lower slip body assembly onto inner mandrel (1).
2.23) Align threaded holes in lower slip body (37) with recessed holes in inner mandrel (1) and install shear screws
(41). Tighten shear screws, then back off 1/4 turn.
2.24) Screw bottom sub (42) onto inner mandrel (1).
NOTE: A back-up wrench can be placed on inner mandrel just above bottom sub while wrenching on bottom
sub.
3) Remove assembly from vise.

ED Oil Tools GmbH


Page 5 of 7 Vechtaer Marsch 5 49377 Vechta
PHONE: (+49) 4441-9322500
Manual No:
ED-HSP-DLH-70-01
ED - HSP-DLH Packer
Revision: A
7” (17-29)(26-32)# x 3-1/2” Revision Date:
19/03/2010

PARTS LIST
P/N 93573 P/N 93574
ITEM QTY MATERIAL DESCRIPTION
(26-32#) (17-29#)
1 1 INNER MANDREL L-80 93573210
2 1 BALANCE PISTON 1018 93573918
3 1 342-90 O-RING 90342
4 3 351-90 O-RING 90351
5 1 UPPER CONE L-80 93573410
6 1 UPPER SLIP SUPPORT L-80 93573810
7 2 SHEAR SCREW 5/8-18 (5000#) BRASS DL51775
8 1 UPPER SLIP BODY 93573320
9 2 UPPER SLIP 1018 60073115
10 1 RELEASE SLIP 1018 60073125
11 6 UPPER SLIP SPRING 7170902
12 1 TOP SUB L-80 93573610
13 1 VALVE PISTON P-110 93573960
14 2 SET SCREW 1/4-20 X 3/8 STEEL SSS025C037
15 1 BY-PASS HOUSING L-80 93573311
16 1 346-90 O-RING 90346
17 1 SEAL 93573520
18 1 156-90 O-RING 90156
19 1 CENTER COUPLING L-80 93573230
20 1 245-90 O-RING 90245
21 1 248-90 O-RING 90248
22 1 GAGE RING 1018 60273830 60274830
23 1 RUBBER MANDREL L-80 93573220
24 2 ELEMENT (OUTER) 90 DURO NITRILE 60273513 60274513
25 1 ELEMENT (CENTER) 70 DURO NITRILE 60273511 60274511
26 2 RUBBER SPACER 1018 60273840 60274840
27 2 344-90 O-RING 90344
28 1 SETTING SLEEVE L-80 93573751
29 12 SHEAR SCREW (2375#) BRASS 60100990
30 1 RUBBER RETAINER 1018 93573850 93574850
31 1 SNAP RING P-110 93573980
32 1 LOCK RING L-80 93573011
33 1 SETTING CHAMBER P-110 93573314
34 1 SETTING CHAMBER CAP 1018 93573315
35 1 249-90 O-RING 90249
36 1 LOWER CONE L-80 93573420
37 1 LOWER SLIP BODY 93573325
38 4 LOWER SLIP 1018 60073135
39 4 LOWER SLIP SPRING 7170901
40 1 SPIROLOX RING RRT-475
41 8 SHEAR SCREW (6000#) BRASS DL60442
42 1 BOTTOM SUB L-80 93573630

ED Oil Tools GmbH


Page 6 of 7 Vechtaer Marsch 5 49377 Vechta
PHONE: (+49) 4441-9322500
Manual No:
ED-HSP-DLH-70-01
ED - HSP-DLH Packer
Revision: A
7” (17-29)(26-32)# x 3-1/2” Revision Date:
19/03/2010

CASING WEIGHT ASSEMBLED WEIGHT


P/N (LBS/FT) (LBSMASS)
93573 26-32# 268
93574 17-29# 269

Page 7 of 7 ED Oil Tools GmbH


Vechtaer Marsch 5 49377 Vechta
PHONE: (+49) 4441-9322500

You might also like