RENCANA ANGGARAN BIAYA

PEKERJAAN :
TIPE PROTOTYPE :
TAHUN ANGGARAN :

NO. URAIAN PEKERJAAN VOL.

II.A. PEKERJAAN STRUKTUR STANDART


A.1. PEKERJAAN LANTAI 1
1 Kolom K1 37.38 10,837.20 365.40
-Beton K-300 36.75 36.75
-Besi beton 10,681.87 10,681.87
-Bekisting 357.00 357.00
2 Kolom K2
-Beton K-300 0.63 0.63
-Besi beton 155.33 155.33
-Bekisting 8.40 8.40
3 Dinding SW1
-Beton K-300 16.80
-Besi beton 4,987.21
-Bekisting 119.00
4 Perkerjaan dalam bangunan
- Tanah urug peninggian lantai t=45 cm (dalam ba 106.16
- Pasir urug diatas tanah urug t=10 cm (dalam ban 92.48
- Cor beton lantai kerja t=5 cm (dalam bangunan) 46.24
5 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (dalam bangunan)
-Beton K-300 91.26
-Besi Weremesh M-8 912.63
6 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (luarbngunan/teras)
-Beton K-300 2.45
-Besi beton 206.97
-Besi Weremesh M-8 15.43
7 Pelat Beton Canopy Jendela t= 10 cm
-Beton K-300 12.39
-Besi beton 4,248.44
-Bekisting 123.76
8 Pelat Tangga Service
-Beton K-300 1.29
-Besi beton 291.99
-Bekisting 21.23
9 Anak Tangga Service lt. 1
-Beton K-300 0.04
-Besi beton 93.53
-Bekisting 11.41
10 Bordes Tangga Service
-Beton K-300 1.53
-Besi beton 344.80
-Bekisting 10.20
11 Balok Bordes 20x35 cm (Tangga Service)
-Beton K-300 0.24
-Besi beton 217.01
-Bekisting 1.48
12 Pelat Tangga Utama lt. 1
-Beton K-300 0.98
-Besi beton 213.26
-Bekisting 15.03
13 Anak Tangga Utama lt. 1
-Beton K-300 1.04
-Besi beton 63.66
-Bekisting 7.97
14 Bordes Tangga Utama lt. 1
-Beton K-300 1.08
-Besi beton 239.36
-Bekisting 7.23
15 Balok Bordes 20x35 cm Tangga Utama
-Beton K-300 0.12
-Besi beton 119.38
-Bekisting 0.74

A.2. PEKERJAAN LANTAI 2


1 Kolom K1 36.31 9,702.98 354.96
-Beton K-300 35.70 35.70
-Besi beton 9,566.80 9,566.80
-Bekisting 346.80 346.80
2 Kolom K2
-Beton K-300 0.61 0.61
-Besi beton 136.18 136.18
-Bekisting 8.16 8.16
3 Dinding SW1
-Beton K-300 16.32
-Besi beton 4,950.88
-Bekisting 115.60
4 Balok G1.1 184.88 16,742.21 1,004.73
-Beton K-300 10.72 10.72
-Besi beton 2,413.87 2,413.87
-Bekisting 153.13 153.13
5 Balok G1.2
-Beton K-300 1.10 1.10
-Besi beton 238.20 238.20
-Bekisting 15.75 15.75
6 Balok G1.3
-Beton K-300 14.77 14.77
-Besi beton 3,113.59 3,113.59
-Bekisting 210.94 210.94
7 Balok G1.4
-Beton K-300 13.23 13.23
-Besi beton 3,751.90 3,751.90
-Bekisting 189.00 189.00
8 Balok G2.2
-Beton K-300 1.54 1.54
-Besi beton 319.72 319.72
-Bekisting 17.01 17.01
9 Balok G4.1
-Beton K-300 13.23 13.23
-Besi beton 3,751.90 3,751.90
-Bekisting 189.00 189.00
10 Balok B1.1
-Beton K-300 0.90 0.90
-Besi beton 202.98 202.98
-Bekisting 12.81 12.81
11 Balok B2.1
-Beton K-300 7.02 7.02
-Besi beton 1,601.11 1,601.11
-Bekisting 117.86 117.86
12 Balok BP.1
-Beton K-300 2.29 2.29
-Besi beton 1,348.94 1,348.94
-Bekisting 99.23 99.23
13 Plat lantai dalam, t =130 mm
-Beton K-300 118.64 118.64
-Besi beton 13,117.96 13,117.96
-Bekisting 912.63 912.63
14 Plat lantai balkon, t =130 mm
-Beton K-300 1.44 1.44
-Besi beton 157.66 157.66
-Bekisting 1.78 1.78
15 Pelat Beton Canopy Jendela t= 10 cm 13,275.62 914.41
-Beton K-300 12.52
-Besi beton 4,293.25
-Bekisting 125.10
16 Pelat Tangga Service
-Beton K-300 1.29
-Besi beton 291.99
-Bekisting 21.23
17 Anak Tangga Service lt. 1
-Beton K-300 1.40
-Besi beton 93.53
-Bekisting 11.41
18 Bordes Tangga Service
-Beton K-300 1.53
-Besi beton 344.80
-Bekisting 10.20
19 Balok Bordes 20x35 cm (Tangga Service)
-Beton K-300 0.24
-Besi beton 217.01
-Bekisting 1.48
20 Pelat Tangga Utama lt. 1
-Beton K-300 0.98
-Besi beton 213.26
-Bekisting 15.03
21 Anak Tangga Utama lt. 1
-Beton K-300 1.04
-Besi beton 63.66
-Bekisting 7.97
22 Bordes Tangga Utama lt. 1
-Beton K-300 1.08
-Besi beton 239.36
-Bekisting 7.23
23 Balok Bordes 20x35 cm Tangga Utama
-Beton K-300 0.12
-Besi beton 119.38
-Bekisting 0.74

A.3. PEKERJAAN LANTAI 3


1 Kolom K2
-Beton K-300 0.61
-Besi beton 136.18
-Bekisting 8.16
2 Kolom K3
-Beton K-300 12.24
-Besi beton 3,142.69
-Bekisting 130.56
3 Dinding SW1
-Beton K-300 16.32
-Besi beton 4,950.88
-Bekisting 115.60
4 Balok G1.1 173.95 13,550.47 844.24
-Beton K-300 10.72 10.72
-Besi beton 2,413.87 2,413.87
-Bekisting 153.13 153.13
5 Balok G1.2
-Beton K-300 1.10 1.10
-Besi beton 238.20 238.20
-Bekisting 15.75 15.75
6 Balok G1.3
-Beton K-300 14.77 14.77
-Besi beton 3,113.59 3,113.59
-Bekisting 210.94 210.94
7 Balok G1.4
-Beton K-300 13.23 13.23
-Besi beton 3751.9 3,751.90
-Bekisting 189 189.00
8 Balok G2.2
-Beton K-300 1.54 1.54
-Besi beton 319.72 319.72
-Bekisting 17.01 17.01
9 Balok G4.1
-Beton K-300 2.30 2.30
-Besi beton 560.16 560.16
-Bekisting 28.51 28.51
10 Balok B1.1
-Beton K-300 0.90 0.90
-Besi beton 202.98 202.98
-Bekisting 12.81 12.81
11 Balok B2.1
-Beton K-300 7.02 7.02
-Besi beton 1,601.11 1,601.11
-Bekisting 117.86 117.86
12 Balok BP.1
-Beton K-300 2.29 2.29
-Besi beton 1,348.94 1,348.94
-Bekisting 99.23 99.23
13 Plat lantai dalam, t =130 mm
-Beton K-300 118.64 118.64
-Besi beton 13,117.96 13,117.96
-Bekisting 912.63 912.63
14 Plat lantai balkon, t =130 mm
-Beton K-300 1.44 1.44
-Besi beton 157.66 157.66
-Bekisting 1.78 1.78
15 Pelat Beton Canopy Jendela t= 10 cm 13,275.62 914.41
-Beton K-300 12.52
-Besi beton 4,293.25
-Bekisting 125.10
16 Pelat Tangga Service
-Beton K-300 1.29
-Besi beton 291.99
-Bekisting 21.23
17 Anak Tangga Service lt. 1
-Beton K-300 1.40
-Besi beton 93.53
-Bekisting 11.41
18 Bordes Tangga Service
-Beton K-300 1.53
-Besi beton 344.80
-Bekisting 10.20
19 Balok Bordes 20x35 cm (Tangga Service)
-Beton K-300 0.24
-Besi beton 217.01
-Bekisting 1.48
20 Pelat Tangga Utama lt. 1
-Beton K-300 0.98
-Besi beton 213.26
-Bekisting 15.03
21 Anak Tangga Utama lt. 1
-Beton K-300 1.04
-Besi beton 63.66
-Bekisting 7.97
22 Bordes Tangga Utama lt. 1
-Beton K-300 1.08
-Besi beton 239.36
-Bekisting 7.23
23 Balok Bordes 20x35 cm Tangga Utama
-Beton K-300 0.21
-Besi beton 44.10
-Bekisting 3.00

A.4. PEKERJAAN LANTAI 4


1 Kolom K2
-Beton K-300 0.61
-Besi beton 136.18
-Bekisting 8.16
2 Kolom K3
-Beton K-300 12.24
-Besi beton 3,142.69
-Bekisting 130.56
3 Dinding SW1
-Beton K-300 16.32
-Besi beton 4,950.88
-Bekisting 115.60
4 Balok G1.1 173.95 13,550.47 844.24
-Beton K-300 10.72 10.72
-Besi beton 2,413.87 2,413.87
-Bekisting 153.13 153.13
5 Balok G1.2
-Beton K-300 1.10 1.10
-Besi beton 238.20 238.20
-Bekisting 15.75 15.75
6 Balok G1.3
-Beton K-300 14.77 14.77
-Besi beton 3,113.59 3,113.59
-Bekisting 210.94 210.94
7 Balok G1.4
-Beton K-300 13.23 13.23
-Besi beton 3,751.90 3,751.90
-Bekisting 189.00 189.00
8 Balok G2.2
-Beton K-300 1.54 1.54
-Besi beton 319.72 319.72
-Bekisting 17.01 17.01
9 Balok G4.1
-Beton K-300 2.30 2.30
-Besi beton 560.16 560.16
-Bekisting 28.51 28.51
10 Balok B1.1
-Beton K-300 0.90 0.90
-Besi beton 202.98 202.98
-Bekisting 12.81 12.81
11 Balok B2.1
-Beton K-300 7.02 7.02
-Besi beton 1,601.11 1,601.11
-Bekisting 117.86 117.86
12 Balok BP.1
-Beton K-300 2.29 2.29
-Besi beton 1,348.94 1,348.94
-Bekisting 99.23 99.23
13 Plat lantai dalam, t =130 mm
-Beton K-300 118.64 118.64
-Besi beton 13,117.96 13,117.96
-Bekisting 912.63 912.63
14 Plat lantai balkon, t =130 mm
-Beton K-300 1.44 1.44
-Besi beton 157.66 157.66
-Bekisting 1.78 1.78
15 Pelat Beton Canopy Jendela t= 10 cm 13,275.62 914.41
-Beton K-300 12.52
-Besi beton 4,293.25
-Bekisting 125.10
16 Pelat Tangga Service
-Beton K-300 1.29
-Besi beton 291.99
-Bekisting 21.23
17 Anak Tangga Service lt. 1
-Beton K-300 1.40
-Besi beton 93.53
-Bekisting 11.41
18 Bordes Tangga Service
-Beton K-300 1.53
-Besi beton 344.80
-Bekisting 10.20
19 Balok Bordes 20x35 cm (Tangga Service)
-Beton K-300 0.24
-Besi beton 217.01
-Bekisting 1.48
20 Pelat Tangga Utama lt. 1
-Beton K-300 0.98
-Besi beton 213.26
-Bekisting 15.03
21 Anak Tangga Utama lt. 1
-Beton K-300 1.04
-Besi beton 63.66
-Bekisting 7.97
22 Bordes Tangga Utama lt. 1
-Beton K-300 1.08
-Besi beton 239.36
-Bekisting 7.23
23 Balok Bordes 20x35 cm Tangga Utama
-Beton K-300 0.21
-Besi beton 44.10
-Bekisting 3.00
A.5. PEKERJAAN LANTAI DAK
1 Kolom K4
-Beton K-300 0.32
-Besi beton 75.06
-Bekisting 4.32
2 Kolom K3
-Beton K-300 16.20
-Besi beton 4,329.16
-Bekisting 172.80
3 Dinding SW1
-Beton K-300 16.32
-Besi beton 4,950.88
-Bekisting 115.60
4 Balok G1.2
-Beton K-300 6.30 6.30
-Besi beton 996.53 996.53
-Bekisting 63.00 63.00
5 Balok G1.3
-Beton K-300 3.83 3.83
-Besi beton 617.28 617.28
-Bekisting 38.31 38.31
6 Balok G2.1
-Beton K-300 21.44 21.44
-Besi beton 2,821.28 2,821.28
-Bekisting 165.38 165.38
7 Balok B1.1
-Beton K-300 1.05 1.05
-Besi beton 138.66 138.66
-Bekisting 8.10 8.10
8 Balok B2.1
-Beton K-300 1.05 1.05
-Besi beton 102.80 102.80
-Bekisting 8.10 8.10
9 Plat Dak t=15 cm
-Beton K-300 7.74 7.74
-Besi beton 745.12 745.12
-Bekisting 6.96 6.96
10 Dudukan Water Tank Plat Dak t=20 cm + Beton Pengikat
-Beton K-300 1.94
-Besi beton 126.51
-Bekisting 2.74
11 Beton Tanggulan
-Beton K-300 0.21
-Besi beton 11.16
-Bekisting 2.84

A.6. LANTAI ATAP


1 Balok G3.1
-Beton K-300 46.37
-Besi beton 7,190.06
-Bekisting 486.83

A.7. SOPI-SOPI
1 Kolom K4 (sopi-sopi)
-Beton K-300 1.85
-Besi beton 429.55
-Bekisting 19.68
2 Balok G3.1 (sopi-sopi)
-Beton K-300 4.24
-Besi beton 661.19
-Bekisting 44.52

A.8. RANGKA ATAP BAJA


a Atap Bagian Bawah
1 Pekerjaan Atap Baja Ringan 1,033.77

b Atap Bagian Atas


1 Pipa baja 4", T = 3.2 mm 714.00
2 Base plate t= 6mm 15.07
4 Mur Baut A325 HTB Dia 12 mm 32.00
5 Pekerjaan Groutig (sika grout) 24.00

II.B. PEKERJAAN STRUKTUR NON STANDART


B.1. PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)
A.1. Pondasi Tiang Pancang dan Tie Beam (Sloof)
1 Pekerjaan Pondasi Tiang Pancang 25x25 cm
Tipe Tiang Pondasi 1,640.50
Pemotongan kepala tiang 193.00
Kedalaman Pondasi disesuaikan hasil sondir dan boring stempat*
2 Pile Cap Tipe PC-1
-Beton K-300 0.77
-Besi beton 116.32
-Bekisting 3.84
3 Pile Cap Tipe PC-2
-Beton K-300 22.27
-Besi beton 2,379.04
-Bekisting 83.52
4 Pile Cap Tipe PC-3
-Beton K-300 48.00
-Besi beton 5,305.69
-Bekisting 121.48
5 Pile Cap Tipe PC-4
-Beton K-300 37.54
-Besi beton 5,087.68
-Bekisting 37.84
6 Tie Beam / Sloof TB1
-Beton K-300 49.29
-Besi beton 2,639.70
-Bekisting 394.48
7 Tie Beam / Sloof TBP
-Beton K-300 5.72
-Besi beton 55.69
-Bekisting 76.41
8 Pekerjaan Pas Batu Kali (dibawah Tie beam)
-Pasangan Batu Kali 126.30
-Aanstamping 51.46
-Urugan Pasir 10 cm 32.74
9 Besi Dowel Ø 10-1000 1,338.06
10 Pekerjaan Galian tanah :
- Pile Cap Tipe PC-1 2.36
- Pile Cap Tipe PC-2 55.88
- Pile Cap Tipe PC-3 50.18
- Pile Cap Tipe PC-4 28.05
- Pekerjaan Pas Batu Kali (dibawah Tie beam) 245.58
11 Pekerjaan Urugan Pasir tebal 10 cm :
- Pile Cap Tipe PC-1 0.13
- Pile Cap Tipe PC-2 3.71
- Pile Cap Tipe PC-3 8.00
- Pile Cap Tipe PC-4 6.26
12 Pekerjaan Lantai Kerja tebal 5 cm :
- Pile Cap Tipe PC-1 0.06
- Pile Cap Tipe PC-2 1.86
- Pile Cap Tipe PC-3 4.00
- Pile Cap Tipe PC-4 3.13
13 Urugan tanah kembali bekas galian 354.90
14 Urugan Sertu dalam bangunan 106.16
15 Pemadatan tanah CBR > 6%, 354.90
16 Pekerjaan Test PDA Tiang 2.00

B.2. PEKERJAAN STRUKTUR GWT DAN RUANG POMPA


I PEKERJAAN STRUKTUR GWT
1 Pekerjaan Pondasi Tiang Pancang 25x25 cm
Tipe Tiang Pondasi 102.00
Pemotongan kepala tiang 12.00
2 Pile Cap Tipe PC-1 (GWT)
-Beton K-300 1.08
-Besi beton 138.71
-Bekisting 7.92
3 Pile Cap Tipe PC-2 (GWT)
-Beton K-300 1.13
-Besi beton 239.48
-Bekisting 6.30
4 Pekerjaan Galian tanah :
- Pile Cap Tipe PC-1 (GWT) 4.52
- Pile Cap Tipe PC-2 (GWT) 3.65
5 Pekerjaan Urugan Pasir tebal 10 cm :
- Pile Cap Tipe PC-1 (GWT) 0.18
- Pile Cap Tipe PC-2 (GWT) 0.19
6 Pekerjaan Lantai Kerja tebal 5 cm :
- Pile Cap Tipe PC-1 (GWT) 0.09
- Pile Cap Tipe PC-2 (GWT) 0.09
7 Urugan Tanah Kembali Bekas Galian 7.62
8 Pemadatan tanah CBR > 6% 7.62
9 Pekerjaan Lantai Dasar GWT
-Beton K-300 19.85
-Besi beton 1,634.17
-Bekisting 9.45
10 Pekerjaan Dinding GWT
-Beton K-300 45.50
-Besi beton 5,209.09
-Bekisting 364.00
11 Pekerjaan Pelat Penutup GWT
-Beton K-300 8.46
-Besi beton 1,600.72
-Bekisting 4.73

II PEKERJAAN STRUKTUR RUANG POMPA


1 Pekerjaan Pondasi Tiang Pancang 25x25 cm
Tipe Tiang Pondasi 34.00
Pemotongan kepala tiang 4.00
2 Pile Cap Tipe PC-1 (R.Pompa)
-Beton K-300 0.72
-Besi beton 92.47
-Bekisting 5.28
3 Tie Beam / Sloof TB1
-Beton K-300 2.28
-Besi beton 48.53
-Bekisting 18.50
4 Pekerjaan Galian tanah :
- Pile Cap Tipe PC-1 (R.Pompa) 3.01
- Tie Beam / Sloof TB1 2.28
5 Pekerjaan Urugan Pasir tebal 10 cm :
- Pile Cap Tipe PC-1 (R.Pompa) 0.12
- Tie Beam / Sloof TB1 0.51
6 Pekerjaan Lantai Kerja tebal 5 cm :
- Pile Cap Tipe PC-1 (R.Pompa) 0.06
- Tie Beam / Sloof TB1 0.25
7 Urugan Tanah Kembali Bekas Galian 4.36
8 Pemadatan tanah CBR > 6% 4.36
9 Pekerjaan Lantai Dasar R.Pompa
-Beton K-300 4.98
-Besi beton 428.01
-Bekisting 4.06
10 Pekerjaan Pelat Dak R.Pompa
-Beton K-300 4.10
-Besi beton 732.14
-Bekisting 3.61
11 Kolom K3A (R. Pompa)
-Beton K-300 0.88
-Besi beton 172.10
-Bekisting 14.00
12 Balok B1 (R. Pompa)
-Beton K-300 2.21
-Besi beton 635.15
-Bekisting 33.92
13 Tie Beam Dasar Pelat (R. Pompa)
-Beton K-300 2.28
-Besi beton 110.83
-Bekisting 18.50
14 Lantai Ramp
-Beton K-300 0.32
-Besi beton 36.64
-Bekisting 1.38

III PEKERJAAN STRUKTUR STP


1 Pekerjaan Galian tanah : 181.58
2 Pekerjaan Urugan tanah kembali bekas galian 118.52
3 Pasir urug diatas tanah urug 4.00
4 Cor beton lantai kerja Fc' 8.3 Mpa t=5 cm 2.00
5 Pasang Kolom Praktis 22.80
6 Pekerjaan Lantai Dasar STP
-Beton K-300 6.45
-Besi beton 2,120.81
-Bekisting 7.44
7 Pelat Atas (STP)
-Beton K-300 6.45
-Besi beton 2,120.81
-Bekisting 7.44
8 Pelat Dinding (STP)
-Beton K-300 19.66
-Besi beton 4,936.60
-Bekisting 262.08
PEMBANGUNAN RUMAH SUSUN
TIPE 36
2023
DETIGA INTI TEKNIK SINERGI
HARGA SATUAN JUMLAH HARGA
SAT.
( Rp. ) ( Rp. )

4,516,823,242.35
696,444,036.86

M3 1,129,343.80 41,503,384.65
Kg 15,487.11 165,431,295.70
M2 40,415.54 14,428,347.78

M3 1,129,343.80 711,486.59
Kg 15,487.11 2,405,612.80
M2 40,415.54 339,490.54

M3 1,129,343.80 18,972,975.84
Kg 15,487.11 77,237,469.86
M2 42,440.87 5,050,463.53

M3 161,046.50 17,096,696.44
M3 132,492.88 12,252,941.54
M3 636,964.57 29,453,241.72

M3 1,129,343.80 103,063,915.19
M2 102,174.00 93,247,057.62

M3 1,129,343.80 2,766,892.31
Kg 13,452.90 2,784,346.71
M2 102,174.00 1,576,544.82

M3 1,129,343.80 13,992,569.68
Kg 13,452.90 57,153,838.48
M2 36,824.67 4,557,421.16

M3 1,129,343.80 1,456,853.50
Kg 13,452.90 3,928,112.27
M2 36,824.67 781,787.74

M3 1,129,343.80 45,173.75
Kg 15,487.11 1,448,509.40
M2 46,817.19 534,184.14

M3 1,129,343.80 1,727,896.01
Kg 13,452.90 4,638,559.92
M2 36,824.67 375,611.63

M3 1,129,343.80 271,042.51
Kg 13,452.90 2,919,413.83
M2 46,817.19 69,289.44

M3 1,129,343.80 1,106,756.92
Kg 15,487.11 3,302,781.08
M2 36,824.67 553,474.79

M3 1,129,343.80 1,174,517.55
Kg 15,487.11 985,909.42
M2 46,817.19 373,133.00

M3 1,129,343.80 1,219,691.30
Kg 13,452.90 3,220,086.14
M2 36,824.67 266,242.36

M3 1,129,343.80 135,521.26
Kg 15,487.11 1,848,851.19
M2 46,817.19 34,644.72

1,139,675,576.43

M3 1,129,343.80 40,317,573.66
Kg 15,487.11 148,162,083.95
M2 40,415.54 14,016,109.27

M3 1,129,343.80 688,899.72
Kg 15,487.11 2,109,034.64
M2 40,415.54 329,790.81

M3 1,129,343.80 18,430,890.82
Kg 15,487.11 76,674,823.16
M2 42,440.87 4,906,164.57

M3 1,129,343.80 12,106,565.54
Kg 15,487.11 37,383,870.22
M2 46,817.19 7,169,116.30
M3 1,129,343.80 1,242,278.18
Kg 15,487.11 3,689,029.60
M2 46,817.19 737,370.74

M3 1,129,343.80 16,680,407.93
Kg 15,487.11 48,220,510.82
M2 46,817.19 9,875,618.06

M3 1,129,343.80 14,941,218.47
Kg 15,487.11 58,106,088.01
M2 46,817.19 8,848,448.91

M3 1,129,343.80 1,739,189.45
Kg 15,487.11 4,951,538.81
M2 46,817.19 796,360.40

M3 1,129,343.80 14,941,218.47
Kg 15,487.11 58,106,088.01
M2 46,817.19 8,848,448.91

M3 1,129,343.80 1,016,409.42
Kg 15,487.11 3,143,573.59
M2 46,817.19 599,728.20

M3 1,129,343.80 7,927,993.48
Kg 15,487.11 24,796,566.69
M2 46,817.19 5,517,874.01

M3 1,129,343.80 2,586,197.30
Kg 15,487.11 20,891,182.16
M2 46,817.19 4,645,669.76

M3 1,129,343.80 133,985,348.43
Kg 13,452.90 176,474,604.08
M2 36,824.67 33,607,298.58

M3 1,129,343.80
Kg 13,452.90
M2 36,824.67

M3 1,129,343.80 14,139,384.38
Kg 13,452.90 57,756,662.93
M2 36,824.67 4,606,766.22
M3 1,129,343.80 1,456,853.50
Kg 13,452.90 3,928,112.27
M2 36,824.67 781,787.74

M3 1,129,343.80 1,581,081.32
Kg 15,487.11 1,448,509.40
M2 46,817.19 534,184.14

M3 1,129,343.80 1,727,896.01
Kg 13,452.90 4,638,559.92
M2 36,824.67 375,611.63

M3 1,129,343.80 271,042.51
Kg 15,487.11 3,360,857.74
M2 46,817.19 69,289.44

M3 1,129,343.80 1,106,756.92
Kg 13,452.90 2,868,965.45
M2 36,824.67 553,474.79

M3 1,129,343.80 1,174,517.55
Kg 15,487.11 985,909.42
M2 46,817.19 373,133.00

M3 1,129,343.80 1,219,691.30
Kg 13,452.90 3,220,086.14
M2 36,824.67 266,242.36

M3 1,129,343.80 135,521.26
Kg 15,487.11 1,848,851.19
M2 46,817.19 34,644.72

934,704,147.41

M3 1,129,343.80 688,899.72
Kg 15,487.11 2,109,034.64
M2 40,415.54 329,790.81

M3 1,129,343.80 13,823,168.11
Kg 15,487.11 48,671,185.73
M2 40,415.54 5,276,652.90

M3 1,129,343.80 18,430,890.82
Kg 15,487.11 76,674,823.16
M2 42,440.87 4,906,164.57

M3 1,129,343.80 12,106,565.54
Kg 15,487.11 37,383,870.22
M2 46,817.19 7,169,116.30

M3 1,129,343.80 1,242,278.18
Kg 15,487.11 3,689,029.60
M2 46,817.19 737,370.74

M3 1,129,343.80 16,680,407.93
Kg 15,487.11 48,220,510.82
M2 46,817.19 9,875,618.06

M3 1,129,343.80 14,941,218.47
Kg 15,487.11 58,106,088.01
M2 46,817.19 8,848,448.91

M3 1,129,343.80 1,739,189.45
Kg 15,487.11 4,951,538.81
M2 46,817.19 796,360.40

M3 1,129,343.80 2,597,490.74
Kg 15,487.11 8,675,259.54
M2 46,817.19 1,334,758.09

M3 1,129,343.80 1,016,409.42
Kg 15,487.11 3,143,573.59
M2 46,817.19 599,728.20

M3 1,129,343.80 7,927,993.48
Kg 15,487.11 24,796,566.69
M2 46,817.19 5,517,874.01

M3 1,129,343.80 2,586,197.30
Kg 15,487.11 20,891,182.16
M2 46,817.19 4,645,669.76

M3 1,129,343.80 133,985,348.43
Kg 13,452.90 176,474,604.08
M2 36,824.67 33,607,298.58

M3 1,129,343.80
Kg 13,452.90
M2 36,824.67

M3 1,129,343.80 14,139,384.38
Kg 13,452.90 57,756,662.93
M2 36,824.67 4,606,766.22

M3 1,129,343.80 1,456,853.50
Kg 13,452.90 3,928,112.27
M2 36,824.67 781,787.74

M3 1,129,343.80 1,581,081.32
Kg 15,487.11 1,448,509.40
M2 46,817.19 534,184.14

M3 1,129,343.80 1,727,896.01
Kg 13,452.90 4,638,559.92
M2 36,824.67 375,611.63

M3 1,129,343.80 271,042.51
Kg 15,487.11 3,360,857.74
M2 46,817.19 69,289.44

M3 1,129,343.80 1,106,756.92
Kg 13,452.90 2,868,965.45
M2 36,824.67 553,474.79

M3 1,129,343.80 1,174,517.55
Kg 15,487.11 985,909.42
M2 46,817.19 373,133.00

M3 1,129,343.80 1,219,691.30
Kg 13,452.90 3,220,086.14
M2 36,824.67 266,242.36

M3 1,129,343.80 237,162.20
Kg 15,487.11 682,981.55
M2 46,817.19 140,451.57

934,704,147.41

M3 1,129,343.80 688,899.72
Kg 15,487.11 2,109,034.64
M2 40,415.54 329,790.81
M3 1,129,343.80 13,823,168.11
Kg 15,487.11 48,671,185.73
M2 40,415.54 5,276,652.90

M3 1,129,343.80 18,430,890.82
Kg 15,487.11 76,674,823.16
M2 42,440.87 4,906,164.57

M3 1,129,343.80 12,106,565.54
Kg 15,487.11 37,383,870.22
M2 46,817.19 7,169,116.30

M3 1,129,343.80 1,242,278.18
Kg 15,487.11 3,689,029.60
M2 46,817.19 737,370.74

M3 1,129,343.80 16,680,407.93
Kg 15,487.11 48,220,510.82
M2 46,817.19 9,875,618.06

M3 1,129,343.80 14,941,218.47
Kg 15,487.11 58,106,088.01
M2 46,817.19 8,848,448.91

M3 1,129,343.80 1,739,189.45
Kg 15,487.11 4,951,538.81
M2 46,817.19 796,360.40

M3 1,129,343.80 2,597,490.74
Kg 15,487.11 8,675,259.54
M2 46,817.19 1,334,758.09

M3 1,129,343.80 1,016,409.42
Kg 15,487.11 3,143,573.59
M2 46,817.19 599,728.20

M3 1,129,343.80 7,927,993.48
Kg 15,487.11 24,796,566.69
M2 46,817.19 5,517,874.01

M3 1,129,343.80 2,586,197.30
Kg 15,487.11 20,891,182.16
M2 46,817.19 4,645,669.76
M3 1,129,343.80 133,985,348.43
Kg 13,452.90 176,474,604.08
M2 36,824.67 33,607,298.58

M3 1,129,343.80
Kg 13,452.90
M2 36,824.67

M3 1,129,343.80 14,139,384.38
Kg 13,452.90 57,756,662.93
M2 36,824.67 4,606,766.22

M3 1,129,343.80 1,456,853.50
Kg 13,452.90 3,928,112.27
M2 36,824.67 781,787.74

M3 1,129,343.80 1,581,081.32
Kg 15,487.11 1,448,509.40
M2 46,817.19 534,184.14

M3 1,129,343.80 1,727,896.01
Kg 13,452.90 4,638,559.92
M2 36,824.67 375,611.63

M3 1,129,343.80 271,042.51
Kg 15,487.11 3,360,857.74
M2 46,817.19 69,289.44

M3 1,129,343.80 1,106,756.92
Kg 13,452.90 2,868,965.45
M2 36,824.67 553,474.79

M3 1,129,343.80 1,174,517.55
Kg 15,487.11 985,909.42
M2 46,817.19 373,133.00

M3 1,129,343.80 1,219,691.30
Kg 13,452.90 3,220,086.14
M2 36,824.67 266,242.36

M3 1,129,343.80 237,162.20
Kg 15,487.11 682,981.55
M2 46,817.19 140,451.57
341,043,352.87

M3 1,129,343.80 361,390.02
Kg 15,487.11 1,162,462.48
M2 40,415.54 174,595.13

M3 1,129,343.80 18,295,369.56
Kg 15,487.11 67,046,177.13
M2 40,415.54 6,983,805.31

M3 1,129,343.80 18,430,890.82
Kg 15,487.11 76,674,823.16
M2 40,415.54 4,672,036.42

M3 1,129,343.80 7,114,865.94
Kg 15,487.11 15,433,369.73
M2 46,817.19 2,949,482.97

M3 1,129,343.80 4,325,386.75
Kg 15,487.11 9,559,883.26
M2 46,817.19 1,793,566.55

M3 1,129,343.80 24,213,131.07
Kg 15,487.11 43,693,473.70
M2 46,817.19 7,742,626.88

M3 1,129,343.80 1,185,810.99
Kg 15,487.11 2,147,442.67
M2 46,817.19 379,219.24

M3 1,129,343.80 1,185,810.99
Kg 15,487.11 1,592,074.91
M2 46,817.19 379,219.24

M3 1,129,343.80 8,741,121.01
Kg 13,452.90 10,024,024.85
M2 36,824.67 256,299.70

M3 1,129,343.80 2,190,926.97
Kg 13,452.90 1,701,926.38
M2 39,810.16 109,079.84
M3 1,129,343.80 237,162.20
Kg 15,487.11 172,836.15
M2 39,810.16 113,060.85

186,512,934.74

M3 1,129,343.80 52,367,672.01
Kg 15,487.11 111,353,250.13
M2 46,817.19 22,792,012.61

26,649,793.23

M3 1,129,343.80 2,089,286.03
Kg 15,487.11 6,652,488.10
M2 40,415.54 795,377.83

M3 1,129,343.80 4,788,417.71
Kg 15,487.11 10,239,922.26
M2 46,817.19 2,084,301.30

257,089,253.39

M2 216,250.03 223,552,793.51

Kg 42,005.00 29,991,570.00
Kg 22,484.00 338,833.88
bh 42,371.00 1,355,872.00
titik 77,091.00 1,850,184.00

1,661,415,534.62
1,114,937,748.09
1,114,937,748.09

M1 259,871.53 426,319,244.97
Nos 110,535.36 21,333,324.48

M3 1,129,343.80 869,594.73
Kg 15,487.11 1,801,460.64
M2 39,810.16 152,871.01

M3 1,129,343.80 25,150,486.43
Kg 15,487.11 36,844,454.17
M2 39,810.16 3,324,944.56

M3 1,129,343.80 54,208,502.40
Kg 15,487.11 82,169,804.66
M2 39,810.16 4,836,138.24

M3 1,129,343.80 42,395,566.25
Kg 15,487.11 78,793,459.80
M2 39,810.16 1,506,416.45

M3 1,129,343.80 55,665,355.90
Kg 15,487.11 40,881,324.27
M2 39,810.16 15,704,311.92

M3 1,129,343.80 6,459,846.54
Kg 15,487.11 862,477.16
M2 39,810.16 3,041,894.33

M3 670,602.61 84,697,109.64
M3 315,604.49 16,241,007.06
M3 132,492.88 4,337,816.89
Kg 14,968.41 20,028,630.68

M3 51,859.51 122,388.44
M3 51,859.51 2,897,909.42
M3 51,859.51 2,602,310.21
M3 51,859.51 1,454,659.26
M3 51,859.51 12,735,658.47

M3 132,492.88 17,224.07
M3 132,492.88 491,548.58
M3 132,492.88 1,059,943.04
M3 132,492.88 829,405.43

M3 636,964.57 38,217.87
M3 636,964.57 1,184,754.10
M3 636,964.57 2,547,858.28
M3 636,964.57 1,993,699.10
M3 30,397.22 10,787,973.38
M3 117,800.00 12,505,648.00
M3 50,697.40 17,992,507.26
Titik 9,025,000.00 18,050,000.00

546,477,786.53
M1 259,871.53 26,506,896.06
Nos 110,535.36 1,326,424.32

M3 1,129,343.80 1,219,691.30
Kg 15,487.11 2,148,217.03
M2 39,810.16 315,296.47

M3 1,129,343.80 1,276,158.49
Kg 15,487.11 3,708,853.10
M2 39,810.16 250,804.01

M3 51,859.51 234,404.99
M3 51,859.51 189,287.21

M3 132,492.88 23,848.72
M3 132,492.88 25,173.65

M3 636,964.57 57,326.81
M3 636,964.57 57,326.81
M3 30,397.22 231,626.82
M3 50,697.40 386,314.19

M3 1,129,343.80 22,417,474.43
Kg 15,487.11 25,308,570.55
M2 39,810.16 376,206.01

M3 1,129,343.80 51,385,142.90
Kg 15,487.11 80,673,749.83
M2 42,440.87 15,448,476.68

M3 1,129,343.80 9,554,248.55
Kg 15,487.11 24,790,526.72
M2 36,824.67 174,180.69

M1 259,871.53 8,835,632.02
Nos 110,535.36 442,141.44

M3 1,129,343.80 813,127.54
Kg 15,487.11 1,432,093.06
M2 39,810.16 210,197.64
M3 1,129,343.80 2,574,903.86
Kg 15,487.11 751,589.45
M2 39,810.16 736,487.96

M3 51,859.51 156,097.13
M3 51,859.51 118,239.68

M3 132,492.88 15,899.15
M3 132,492.88 67,571.37

M3 636,964.57 38,217.87
M3 636,964.57 159,241.14
M3 30,397.22 132,531.88
M3 50,697.40 221,040.66

M3 1,129,343.80 5,624,132.12
Kg 15,487.11 6,628,637.95
M2 39,810.16 161,629.25

M3 1,129,343.80 4,630,309.58
Kg 15,487.11 11,338,732.72
M2 36,824.67 132,937.06

M3 1,129,343.80 993,822.54
Kg 15,487.11 2,665,331.63
M2 40,415.54 565,817.56

M3 1,129,343.80 2,495,849.80
Kg 15,487.11 9,836,637.92
M2 46,817.19 1,588,039.08

M3 1,129,343.80 2,574,903.86
Kg 15,487.11 1,716,436.40
M2 46,817.19 866,118.02

M3 1,129,343.80 361,390.02
Kg 15,487.11 567,447.71
M2 39,810.16 54,938.02

M3 70,005.73 12,711,640.45
M3 30,397.22 3,602,678.51
M3 132,492.88 529,971.52
M3 636,964.57 1,273,929.14
M1 72,400.00 1,650,720.00

M3 1,129,343.80 7,284,267.51
Kg 15,487.11 32,845,217.76
M2 36,824.67 273,975.54

M3 1,129,343.80 7,284,267.51
Kg 15,487.11 32,845,217.76
M2 36,824.67 273,975.54

M3 1,129,343.80 22,202,899.11
Kg 15,487.11 76,453,667.23
M2 36,824.67 9,651,009.51
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN
TIPE PROTOTYPE : TIPE 36
TAHUN ANGGARAN : 2023

NO. URAIAN PEKERJAAN VOL. SAT.

I.A. PEKERJAAN PERSIAPAN


1 Pengukuran dan Pemasangan Bouwplank 160.30 M'
2 Direksi Keet, lengkap dengan toilet, Rg. Rapat dan Mushola 24.00 M2
3 Papan Nama Proyek 1.00 ls
4 Foto Proyek 3 Fase (warna) 3.00 Phase
5 Air Kerja 1.00 Ls
6 Listrik Kerja 1.00 Ls
7 Pagar Seng Keliling Proyek, tinggi 1,8m 192.30 M'
8 Pekerjaan mobilisasi dan demobilisasi 1.00 Ls

I.B. PEKERJAAN RK3K KONSTRUKSI


1 Penyiapan RK3K terdiri atas: 1.00 Ls
a Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja
b Pembuatan Kartu Identitas Pekerja (KIP),

2 Sosialisasi dan Promosi


Induksi K3 (Safety K3 terdiri
Induction atas:
), khusus untuk
a pekerja baru 190.00 Org
b Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Saf 190.00 Org

c Pelatihan K3,
- Bekerja di Ketinggian
- K3 Peralatan Konstruksi & Penggunaan bahan Kimia (MSDS)
- Analysis Keselamatan Pekerjaan
- Perilaku Berbasis Keselamatan (Budaya K3)
- P3K
d Simulasi K3, 48.00 Org
e Spanduk (banner), 5.00 Lb
f Poster, 3.00 Lb
g Papan Informasi K3. 1.00 Bh

3 Alat Pelindung Kerja terdiri atas:


a Jaring Pengaman(Polynet/Safety Net),
b Tali Keselamatan (Life Line), 2.00 Ls
c Penahan Jatuh (Safety Deck), 1.00 Ls
d Pagar Pengaman (Guard Railling), 1.00 Ls
e Pembatas Area (Restricted Area ). 1.00 Ls

4 Alat Pelindung Diri terdiri atas:


a Topi Pelindung (Safety Helmet), 190.00 Bh
b Pelindung Mata (Goggles, Spectacles), 57.00 Psg
c Tameng Muka (Face Shield), 54.00 Bh
e Pelindung Telinga (Ear Plug, Ear Muff), 57.00 Psg
f Pelindung Pernafasan Dan Mulut (Masker), 190.00 Bh
g Sarung Tangan (Safety Gloves), 57.00 Psg
h Sepatu Keselamatan (Safety Shoes), untuk Staf 57.00 Psg
h Sepatu Keselamatan (Rubber Safety Shoes and toe cap) 190.00 Psg
i Penunjang Seluruh Tubuh (Full Body Harness), 16.00 Bh
k Rompi Keselamatan (Safety Vest), 190.00 Bh
m Pelindung Jatuh (Fall Arrester), 16.00 Bh

5 Asuransi Dan Perijinan terdiri atas :


a BPJS Ketenagakerjaan Dan Kesehatan Kerja, (BERDASARKAN
KEPMENAKER NOMOR : KEP-196/MEN/1999, untuk
b Surat Ijin Kelaikan Alat,
c Surat Ijin Operator,
d Surat Ijin Pengesahan Panitia Pembina Keselamatan Dan Kesehatan Kerja (P2K3),

6 Personil K3 terdiri atas :


a Ahli K3
b Petugas K3
c Petugas Tanggap Darurat,
d Petugas P3K,
e Ass Petugas K3/ Safety Man/Pengatur Lalu Lintas (Flagman ),
f Petugas Medis.

5 P3K
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, 1.00 Ls
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat 1.00 Ls
c Peralatan Pengasapan (Fogging),
d Obat Pengasapan.

6 Rambu-Rambu terdiri atas : 1.00 ls


a Rambu Petunjuk,
b Rambu Larangan,
c Rambu Peringatan,
d Rambu Kewajiban,
e Rambu Informasi,
f Rambu Pekerjaan Sementara,
g Tongkat Pengatur Lalu Lintas (Warning Lights Stick),
h Kerucut Lalu Lintas (Traffic Cone),
i Lampu Putar (Rotary Lamp ),
j Lampu Selang Lalu Lintas.

7 Lain- Lain Terkait Pengendalian Risiko K3


a Alat Pemadam Api Ringan (APAR), 10Kg 2.00 Bh
b Sirine, 4.00 Bh
c Bendera K3, 2.00 Bh
d Jalur Evakuasi (Escape Route ), 1.00 Ls
e Lampu Darurat (Emergency Lamp ), 2.00 Bh
f Program Inspeksi Dan Audit Internal, 2.00 Org
g Pelaporan dan Penyelidikan Insiden. 1.00 Ls
PEMBANGUNAN RUMAH SUSUN

DETIGA INTI TEKNIK SINERGI


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

111,883,950.00
54,000.00 8,656,200.00
1,881,300.00 45,151,200.00
718,800.00 718,800.00
180,000.00 540,000.00
3,300,000.00 3,300,000.00
4,500,000.00 4,500,000.00
192,500.00 37,017,750.00
12,000,000.00 12,000,000.00

76,170,000.00
1,500,000.00 1,500,000.00

4,500.00 855,000.00
4,500.00 855,000.00

4,500.00 216,000.00
90,000.00 450,000.00
30,000.00 90,000.00
300,000.00 300,000.00

600,000.00 1,200,000.00
3,000,000.00 3,000,000.00
1,800,000.00 1,800,000.00
1,800,000.00 1,800,000.00

45,000.00 8,550,000.00
15,000.00 855,000.00
45,000.00 2,430,000.00
30,000.00 1,710,000.00
3,000.00 570,000.00
3,000.00 171,000.00
162,000.00 9,234,000.00
87,000.00 16,530,000.00
450,000.00 7,200,000.00
15,000.00 2,850,000.00
60,000.00 960,000.00

3,900,000.00 3,900,000.00
3,000,000.00 3,000,000.00

2,100,000.00 2,100,000.00
330,000.00 660,000.00
60,000.00 240,000.00
30,000.00 60,000.00
300,000.00 300,000.00
42,000.00 84,000.00
1,200,000.00 2,400,000.00
300,000.00 300,000.00
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN
TIPE PROTOTYPE : TIPE 36
TAHUN ANGGARAN : 2023
DETIGA INTI TEKNIK SINERGI
HARGA SATUAN
NO. URAIAN PEKERJAAN VOL. SAT.
( Rp. )

II.A. PEKERJAAN STRUKTUR STANDART


A.1. PEKERJAAN LANTAI 1
1 Kolom K1
-Beton K-300 36.75 M3 1,129,343.80
-Besi beton 10,681.87 Kg 15,487.11
-Bekisting 357.00 M2 40,415.54
2 Kolom K2
-Beton K-300 0.63 M3 1,129,343.80
-Besi beton 155.33 Kg 15,487.11
-Bekisting 8.40 M2 40,415.54
3 Dinding SW1
-Beton K-300 16.80 M3 1,129,343.80
-Besi beton 4,987.21 Kg 15,487.11
-Bekisting 119.00 M2 42,440.87
4 Perkerjaan dalam bangunan
- Tanah urug peninggian lantai t=45 cm (dalam ba 106.16 M3 161,046.50
- Pasir urug diatas tanah urug t=10 cm (dalam ban 92.48 M3 132,492.88
- Cor beton lantai kerja t=5 cm (dalam bangunan) 46.24 M3 636,964.57
5 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (dalam bangunan)
-Beton K-300 91.26 M3 1,129,343.80
-Besi Weremesh M-8 912.63 M2 102,174.00
6 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (luarbngunan/teras)
-Beton K-300 2.45 M3 1,129,343.80
-Besi beton 206.97 Kg 13,452.90
-Besi Weremesh M-8 15.43 M2 102,174.00
7 Pelat Beton Canopy Jendela t= 10 cm
-Beton K-300 12.39 M3 1,129,343.80
-Besi beton 4,248.44 Kg 13,452.90
-Bekisting 123.76 M2 36,824.67
8 Pelat Tangga Service
-Beton K-300 1.29 M3 1,129,343.80
-Besi beton 291.99 Kg 13,452.90
-Bekisting 21.23 M2 36,824.67
9 Anak Tangga Service lt. 1
-Beton K-300 0.04 M3 1,129,343.80
-Besi beton 93.53 Kg 15,487.11
-Bekisting 11.41 M2 46,817.19
10 Bordes Tangga Service
-Beton K-300 1.53 M3 1,129,343.80
-Besi beton 344.80 Kg 13,452.90
-Bekisting 10.20 M2 36,824.67
11 Balok Bordes 20x35 cm (Tangga Service)
-Beton K-300 0.24 M3 1,129,343.80
-Besi beton 217.01 Kg 13,452.90
-Bekisting 1.48 M2 46,817.19
12 Pelat Tangga Utama lt. 1
-Beton K-300 0.98 M3 1,129,343.80
-Besi beton 213.26 Kg 15,487.11
-Bekisting 15.03 M2 36,824.67
13 Anak Tangga Utama lt. 1
-Beton K-300 1.04 M3 1,129,343.80
-Besi beton 63.66 Kg 15,487.11
-Bekisting 7.97 M2 46,817.19
14 Bordes Tangga Utama lt. 1
-Beton K-300 1.08 M3 1,129,343.80
-Besi beton 239.36 Kg 13,452.90
-Bekisting 7.23 M2 36,824.67
15 Balok Bordes 20x35 cm Tangga Utama
-Beton K-300 0.12 M3 1,129,343.80
-Besi beton 119.38 Kg 15,487.11
-Bekisting 0.74 M2 46,817.19

A.2. PEKERJAAN LANTAI 2


1 Kolom K1
-Beton K-300 35.70 M3 1,129,343.80
-Besi beton 9,566.80 Kg 15,487.11
-Bekisting 346.80 M2 40,415.54
2 Kolom K2
-Beton K-300 0.61 M3 1,129,343.80
-Besi beton 136.18 Kg 15,487.11
-Bekisting 8.16 M2 40,415.54
3 Dinding SW1
-Beton K-300 16.32 M3 1,129,343.80
-Besi beton 4,950.88 Kg 15,487.11
-Bekisting 115.60 M2 42,440.87
4 Balok G1.1
-Beton K-300 10.72 M3 1,129,343.80
-Besi beton 2,413.87 Kg 15,487.11
-Bekisting 153.13 M2 46,817.19
5 Balok G1.2
-Beton K-300 1.10 M3 1,129,343.80
-Besi beton 238.20 Kg 15,487.11
-Bekisting 15.75 M2 46,817.19
6 Balok G1.3
-Beton K-300 14.77 M3 1,129,343.80
-Besi beton 3,113.59 Kg 15,487.11
-Bekisting 210.94 M2 46,817.19
7 Balok G1.4
-Beton K-300 13.23 M3 1,129,343.80
-Besi beton 3,751.90 Kg 15,487.11
-Bekisting 189.00 M2 46,817.19
8 Balok G2.2
-Beton K-300 1.54 M3 1,129,343.80
-Besi beton 319.72 Kg 15,487.11
-Bekisting 17.01 M2 46,817.19
9 Balok G4.1
-Beton K-300 13.23 M3 1,129,343.80
-Besi beton 3,751.90 Kg 15,487.11
-Bekisting 189.00 M2 46,817.19
10 Balok B1.1
-Beton K-300 0.90 M3 1,129,343.80
-Besi beton 202.98 Kg 15,487.11
-Bekisting 12.81 M2 46,817.19
11 Balok B2.1
-Beton K-300 7.02 M3 1,129,343.80
-Besi beton 1,601.11 Kg 15,487.11
-Bekisting 117.86 M2 46,817.19
12 Balok BP.1
-Beton K-300 2.29 M3 1,129,343.80
-Besi beton 1,348.94 Kg 15,487.11
-Bekisting 99.23 M2 46,817.19
13 Plat lantai dalam, t =130 mm
-Beton K-300 118.64 M3 1,129,343.80
-Besi beton 13,117.96 Kg 13,452.90
-Bekisting 912.63 M2 36,824.67
14 Plat lantai balkon, t =130 mm
-Beton K-300 1.44 M3 1,129,343.80
-Besi beton 157.66 Kg 13,452.90
-Bekisting 1.78 M2 36,824.67
15 Pelat Beton Canopy Jendela t= 10 cm
-Beton K-300 12.52 M3 1,129,343.80
-Besi beton 4,293.25 Kg 13,452.90
-Bekisting 125.10 M2 36,824.67
16 Pelat Tangga Service
-Beton K-300 1.29 M3 1,129,343.80
-Besi beton 291.99 Kg 13,452.90
-Bekisting 21.23 M2 36,824.67
17 Anak Tangga Service lt. 1
-Beton K-300 1.40 M3 1,129,343.80
-Besi beton 93.53 Kg 15,487.11
-Bekisting 11.41 M2 46,817.19
18 Bordes Tangga Service
-Beton K-300 1.53 M3 1,129,343.80
-Besi beton 344.80 Kg 13,452.90
-Bekisting 10.20 M2 36,824.67
19 Balok Bordes 20x35 cm (Tangga Service)
-Beton K-300 0.24 M3 1,129,343.80
-Besi beton 217.01 Kg 15,487.11
-Bekisting 1.48 M2 46,817.19
20 Pelat Tangga Utama lt. 1
-Beton K-300 0.98 M3 1,129,343.80
-Besi beton 213.26 Kg 13,452.90
-Bekisting 15.03 M2 36,824.67
21 Anak Tangga Utama lt. 1
-Beton K-300 1.04 M3 1,129,343.80
-Besi beton 63.66 Kg 15,487.11
-Bekisting 7.97 M2 46,817.19
22 Bordes Tangga Utama lt. 1
-Beton K-300 1.08 M3 1,129,343.80
-Besi beton 239.36 Kg 13,452.90
-Bekisting 7.23 M2 36,824.67
23 Balok Bordes 20x35 cm Tangga Utama
-Beton K-300 0.12 M3 1,129,343.80
-Besi beton 119.38 Kg 15,487.11
-Bekisting 0.74 M2 46,817.19

A.3. PEKERJAAN LANTAI 3


1 Kolom K2
-Beton K-300 0.61 M3 1,129,343.80
-Besi beton 136.18 Kg 15,487.11
-Bekisting 8.16 M2 40,415.54
2 Kolom K3
-Beton K-300 12.24 M3 1,129,343.80
-Besi beton 3,142.69 Kg 15,487.11
-Bekisting 130.56 M2 40,415.54
3 Dinding SW1
-Beton K-300 16.32 M3 1,129,343.80
-Besi beton 4,950.88 Kg 15,487.11
-Bekisting 115.60 M2 42,440.87
4 Balok G1.1
-Beton K-300 10.72 M3 1,129,343.80
-Besi beton 2,413.87 Kg 15,487.11
-Bekisting 153.13 M2 46,817.19
5 Balok G1.2
-Beton K-300 1.10 M3 1,129,343.80
-Besi beton 238.20 Kg 15,487.11
-Bekisting 15.75 M2 46,817.19
6 Balok G1.3
-Beton K-300 14.77 M3 1,129,343.80
-Besi beton 3,113.59 Kg 15,487.11
-Bekisting 210.94 M2 46,817.19
7 Balok G1.4
-Beton K-300 13.23 M3 1,129,343.80
-Besi beton 3751.9 Kg 15,487.11
-Bekisting 189 M2 46,817.19
8 Balok G2.2
-Beton K-300 1.54 M3 1,129,343.80
-Besi beton 319.72 Kg 15,487.11
-Bekisting 17.01 M2 46,817.19
9 Balok G4.1
-Beton K-300 2.30 M3 1,129,343.80
-Besi beton 560.16 Kg 15,487.11
-Bekisting 28.51 M2 46,817.19
10 Balok B1.1
-Beton K-300 0.90 M3 1,129,343.80
-Besi beton 202.98 Kg 15,487.11
-Bekisting 12.81 M2 46,817.19
11 Balok B2.1
-Beton K-300 7.02 M3 1,129,343.80
-Besi beton 1,601.11 Kg 15,487.11
-Bekisting 117.86 M2 46,817.19
12 Balok BP.1
-Beton K-300 2.29 M3 1,129,343.80
-Besi beton 1,348.94 Kg 15,487.11
-Bekisting 99.23 M2 46,817.19
13 Plat lantai dalam, t =130 mm
-Beton K-300 118.64 M3 1,129,343.80
-Besi beton 13,117.96 Kg 13,452.90
-Bekisting 912.63 M2 36,824.67
14 Plat lantai balkon, t =130 mm
-Beton K-300 1.44 M3 1,129,343.80
-Besi beton 157.66 Kg 13,452.90
-Bekisting 1.78 M2 36,824.67
15 Pelat Beton Canopy Jendela t= 10 cm
-Beton K-300 12.52 M3 1,129,343.80
-Besi beton 4,293.25 Kg 13,452.90
-Bekisting 125.10 M2 36,824.67
16 Pelat Tangga Service
-Beton K-300 1.29 M3 1,129,343.80
-Besi beton 291.99 Kg 13,452.90
-Bekisting 21.23 M2 36,824.67
17 Anak Tangga Service lt. 1
-Beton K-300 1.40 M3 1,129,343.80
-Besi beton 93.53 Kg 15,487.11
-Bekisting 11.41 M2 46,817.19
18 Bordes Tangga Service
-Beton K-300 1.53 M3 1,129,343.80
-Besi beton 344.80 Kg 13,452.90
-Bekisting 10.20 M2 36,824.67
19 Balok Bordes 20x35 cm (Tangga Service)
-Beton K-300 0.24 M3 1,129,343.80
-Besi beton 217.01 Kg 15,487.11
-Bekisting 1.48 M2 46,817.19
20 Pelat Tangga Utama lt. 1
-Beton K-300 0.98 M3 1,129,343.80
-Besi beton 213.26 Kg 13,452.90
-Bekisting 15.03 M2 36,824.67
21 Anak Tangga Utama lt. 1
-Beton K-300 1.04 M3 1,129,343.80
-Besi beton 63.66 Kg 15,487.11
-Bekisting 7.97 M2 46,817.19
22 Bordes Tangga Utama lt. 1
-Beton K-300 1.08 M3 1,129,343.80
-Besi beton 239.36 Kg 13,452.90
-Bekisting 7.23 M2 36,824.67
23 Balok Bordes 20x35 cm Tangga Utama
-Beton K-300 0.21 M3 1,129,343.80
-Besi beton 44.10 Kg 15,487.11
-Bekisting 3.00 M2 46,817.19

A.4. PEKERJAAN LANTAI 4


1 Kolom K2
-Beton K-300 0.61 M3 1,129,343.80
-Besi beton 136.18 Kg 15,487.11
-Bekisting 8.16 M2 40,415.54
2 Kolom K3
-Beton K-300 12.24 M3 1,129,343.80
-Besi beton 3,142.69 Kg 15,487.11
-Bekisting 130.56 M2 40,415.54
3 Dinding SW1
-Beton K-300 16.32 M3 1,129,343.80
-Besi beton 4,950.88 Kg 15,487.11
-Bekisting 115.60 M2 42,440.87
4 Balok G1.1
-Beton K-300 10.72 M3 1,129,343.80
-Besi beton 2,413.87 Kg 15,487.11
-Bekisting 153.13 M2 46,817.19
5 Balok G1.2
-Beton K-300 1.10 M3 1,129,343.80
-Besi beton 238.20 Kg 15,487.11
-Bekisting 15.75 M2 46,817.19
6 Balok G1.3
-Beton K-300 14.77 M3 1,129,343.80
-Besi beton 3,113.59 Kg 15,487.11
-Bekisting 210.94 M2 46,817.19
7 Balok G1.4
-Beton K-300 13.23 M3 1,129,343.80
-Besi beton 3,751.90 Kg 15,487.11
-Bekisting 189.00 M2 46,817.19
8 Balok G2.2
-Beton K-300 1.54 M3 1,129,343.80
-Besi beton 319.72 Kg 15,487.11
-Bekisting 17.01 M2 46,817.19
9 Balok G4.1
-Beton K-300 2.30 M3 1,129,343.80
-Besi beton 560.16 Kg 15,487.11
-Bekisting 28.51 M2 46,817.19
10 Balok B1.1
-Beton K-300 0.90 M3 1,129,343.80
-Besi beton 202.98 Kg 15,487.11
-Bekisting 12.81 M2 46,817.19
11 Balok B2.1
-Beton K-300 7.02 M3 1,129,343.80
-Besi beton 1,601.11 Kg 15,487.11
-Bekisting 117.86 M2 46,817.19
12 Balok BP.1
-Beton K-300 2.29 M3 1,129,343.80
-Besi beton 1,348.94 Kg 15,487.11
-Bekisting 99.23 M2 46,817.19
13 Plat lantai dalam, t =130 mm
-Beton K-300 118.64 M3 1,129,343.80
-Besi beton 13,117.96 Kg 13,452.90
-Bekisting 912.63 M2 36,824.67
14 Plat lantai balkon, t =130 mm
-Beton K-300 1.44 M3 1,129,343.80
-Besi beton 157.66 Kg 13,452.90
-Bekisting 1.78 M2 36,824.67
15 Pelat Beton Canopy Jendela t= 10 cm
-Beton K-300 12.52 M3 1,129,343.80
-Besi beton 4,293.25 Kg 13,452.90
-Bekisting 125.10 M2 36,824.67
16 Pelat Tangga Service
-Beton K-300 1.29 M3 1,129,343.80
-Besi beton 291.99 Kg 13,452.90
-Bekisting 21.23 M2 36,824.67
17 Anak Tangga Service lt. 1
-Beton K-300 1.40 M3 1,129,343.80
-Besi beton 93.53 Kg 15,487.11
-Bekisting 11.41 M2 46,817.19
18 Bordes Tangga Service
-Beton K-300 1.53 M3 1,129,343.80
-Besi beton 344.80 Kg 13,452.90
-Bekisting 10.20 M2 36,824.67
19 Balok Bordes 20x35 cm (Tangga Service)
-Beton K-300 0.24 M3 1,129,343.80
-Besi beton 217.01 Kg 15,487.11
-Bekisting 1.48 M2 46,817.19
20 Pelat Tangga Utama lt. 1
-Beton K-300 0.98 M3 1,129,343.80
-Besi beton 213.26 Kg 13,452.90
-Bekisting 15.03 M2 36,824.67
21 Anak Tangga Utama lt. 1
-Beton K-300 1.04 M3 1,129,343.80
-Besi beton 63.66 Kg 15,487.11
-Bekisting 7.97 M2 46,817.19
22 Bordes Tangga Utama lt. 1
-Beton K-300 1.08 M3 1,129,343.80
-Besi beton 239.36 Kg 13,452.90
-Bekisting 7.23 M2 36,824.67
23 Balok Bordes 20x35 cm Tangga Utama
-Beton K-300 0.21 M3 1,129,343.80
-Besi beton 44.10 Kg 15,487.11
-Bekisting 3.00 M2 46,817.19
A.5. PEKERJAAN LANTAI DAK
1 Kolom K4
-Beton K-300 0.32 M3 1,129,343.80
-Besi beton 75.06 Kg 15,487.11
-Bekisting 4.32 M2 40,415.54
2 Kolom K3
-Beton K-300 16.20 M3 1,129,343.80
-Besi beton 4,329.16 Kg 15,487.11
-Bekisting 172.80 M2 40,415.54
3 Dinding SW1
-Beton K-300 16.32 M3 1,129,343.80
-Besi beton 4,950.88 Kg 15,487.11
-Bekisting 115.60 M2 40,415.54
4 Balok G1.2
-Beton K-300 6.30 M3 1,129,343.80
-Besi beton 996.53 Kg 15,487.11
-Bekisting 63.00 M2 46,817.19
5 Balok G1.3
-Beton K-300 3.83 M3 1,129,343.80
-Besi beton 617.28 Kg 15,487.11
-Bekisting 38.31 M2 46,817.19
6 Balok G2.1
-Beton K-300 21.44 M3 1,129,343.80
-Besi beton 2,821.28 Kg 15,487.11
-Bekisting 165.38 M2 46,817.19
7 Balok B1.1
-Beton K-300 1.05 M3 1,129,343.80
-Besi beton 138.66 Kg 15,487.11
-Bekisting 8.10 M2 46,817.19
8 Balok B2.1
-Beton K-300 1.05 M3 1,129,343.80
-Besi beton 102.80 Kg 15,487.11
-Bekisting 8.10 M2 46,817.19
9 Plat Dak t=15 cm
-Beton K-300 7.74 M3 1,129,343.80
-Besi beton 745.12 Kg 13,452.90
-Bekisting 6.96 M2 36,824.67
10 Dudukan Water Tank Plat Dak t=20 cm + Beton Pengikat
-Beton K-300 1.94 M3 1,129,343.80
-Besi beton 126.51 Kg 13,452.90
-Bekisting 2.74 M2 39,810.16
11 Beton Tanggulan
-Beton K-300 0.21 M3 1,129,343.80
-Besi beton 11.16 Kg 15,487.11
-Bekisting 2.84 M2 39,810.16

A.6. LANTAI ATAP


1 Balok G3.1
-Beton K-300 46.37 M3 1,129,343.80
-Besi beton 7,190.06 Kg 15,487.11
-Bekisting 486.83 M2 46,817.19

A.7. SOPI-SOPI
1 Kolom K4 (sopi-sopi)
-Beton K-300 1.85 M3 1,129,343.80
-Besi beton 429.55 Kg 15,487.11
-Bekisting 19.68 M2 40,415.54
2 Balok G3.1 (sopi-sopi)
-Beton K-300 4.24 M3 1,129,343.80
-Besi beton 661.19 Kg 15,487.11
-Bekisting 44.52 M2 46,817.19

A.8. RANGKA ATAP BAJA


a Atap Bagian Bawah
1 Pekerjaan Atap Baja Ringan 1,033.77 M2 216,250.03

b Atap Bagian Atas


1 Pipa baja 4", T = 3.2 mm 714.00 Kg 42,005.00
2 Base plate t= 6mm 15.07 Kg 22,484.00
4 Mur Baut A325 HTB Dia 12 mm 32.00 bh 42,371.00
5 Pekerjaan Groutig (sika grout) 24.00 titik 77,091.00

II.B. PEKERJAAN STRUKTUR NON STANDART


B.1. PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)
A.1. Pondasi Tiang Pancang dan Tie Beam (Sloof)
1 Pekerjaan Pondasi Tiang Pancang 25x25 cm
Tipe Tiang Pondasi 1,640.50 M1 259,871.53
Pemotongan kepala tiang 193.00 Nos 110,535.36
Kedalaman Pondasi disesuaikan hasil sondir dan boring stempat*
2 Pile Cap Tipe PC-1
-Beton K-300 0.77 M3 1,129,343.80
-Besi beton 116.32 Kg 15,487.11
-Bekisting 3.84 M2 39,810.16
3 Pile Cap Tipe PC-2
-Beton K-300 22.27 M3 1,129,343.80
-Besi beton 2,379.04 Kg 15,487.11
-Bekisting 83.52 M2 39,810.16
4 Pile Cap Tipe PC-3
-Beton K-300 48.00 M3 1,129,343.80
-Besi beton 5,305.69 Kg 15,487.11
-Bekisting 121.48 M2 39,810.16
5 Pile Cap Tipe PC-4
-Beton K-300 37.54 M3 1,129,343.80
-Besi beton 5,087.68 Kg 15,487.11
-Bekisting 37.84 M2 39,810.16
6 Tie Beam / Sloof TB1
-Beton K-300 49.29 M3 1,129,343.80
-Besi beton 2,639.70 Kg 15,487.11
-Bekisting 394.48 M2 39,810.16
7 Tie Beam / Sloof TBP
-Beton K-300 5.72 M3 1,129,343.80
-Besi beton 55.69 Kg 15,487.11
-Bekisting 76.41 M2 39,810.16
8 Pekerjaan Pas Batu Kali (dibawah Tie beam)
-Pasangan Batu Kali 126.30 M3 670,602.61
-Aanstamping 51.46 M3 315,604.49
-Urugan Pasir 10 cm 32.74 M3 132,492.88
9 Besi Dowel Ø 10-1000 1,338.06 Kg 14,968.41
10 Pekerjaan Galian tanah :
- Pile Cap Tipe PC-1 2.36 M3 51,859.51
- Pile Cap Tipe PC-2 55.88 M3 51,859.51
- Pile Cap Tipe PC-3 50.18 M3 51,859.51
- Pile Cap Tipe PC-4 28.05 M3 51,859.51
- Pekerjaan Pas Batu Kali (dibawah Tie beam) 245.58 M3 51,859.51
11 Pekerjaan Urugan Pasir tebal 10 cm :
- Pile Cap Tipe PC-1 0.13 M3 132,492.88
- Pile Cap Tipe PC-2 3.71 M3 132,492.88
- Pile Cap Tipe PC-3 8.00 M3 132,492.88
- Pile Cap Tipe PC-4 6.26 M3 132,492.88
12 Pekerjaan Lantai Kerja tebal 5 cm :
- Pile Cap Tipe PC-1 0.06 M3 636,964.57
- Pile Cap Tipe PC-2 1.86 M3 636,964.57
- Pile Cap Tipe PC-3 4.00 M3 636,964.57
- Pile Cap Tipe PC-4 3.13 M3 636,964.57
13 Urugan tanah kembali bekas galian 354.90 M3 30,397.22
14 Urugan Sertu dalam bangunan 106.16 M3 117,800.00
15 Pemadatan tanah CBR > 6%, 354.90 M3 50,697.40
16 Pekerjaan Test PDA Tiang 2.00 Titik 9,025,000.00

B.2. PEKERJAAN STRUKTUR GWT DAN RUANG POMPA


I PEKERJAAN STRUKTUR GWT
1 Pekerjaan Pondasi Tiang Pancang 25x25 cm
Tipe Tiang Pondasi 102.00 M1 259,871.53
Pemotongan kepala tiang 12.00 Nos 110,535.36
2 Pile Cap Tipe PC-1 (GWT)
-Beton K-300 1.08 M3 1,129,343.80
-Besi beton 138.71 Kg 15,487.11
-Bekisting 7.92 M2 39,810.16
3 Pile Cap Tipe PC-2 (GWT)
-Beton K-300 1.13 M3 1,129,343.80
-Besi beton 239.48 Kg 15,487.11
-Bekisting 6.30 M2 39,810.16
4 Pekerjaan Galian tanah :
- Pile Cap Tipe PC-1 (GWT) 4.52 M3 51,859.51
- Pile Cap Tipe PC-2 (GWT) 3.65 M3 51,859.51
5 Pekerjaan Urugan Pasir tebal 10 cm :
- Pile Cap Tipe PC-1 (GWT) 0.18 M3 132,492.88
- Pile Cap Tipe PC-2 (GWT) 0.19 M3 132,492.88
6 Pekerjaan Lantai Kerja tebal 5 cm :
- Pile Cap Tipe PC-1 (GWT) 0.09 M3 636,964.57
- Pile Cap Tipe PC-2 (GWT) 0.09 M3 636,964.57
7 Urugan Tanah Kembali Bekas Galian 7.62 M3 30,397.22
8 Pemadatan tanah CBR > 6% 7.62 M3 50,697.40
9 Pekerjaan Lantai Dasar GWT
-Beton K-300 19.85 M3 1,129,343.80
-Besi beton 1,634.17 Kg 15,487.11
-Bekisting 9.45 M2 39,810.16
10 Pekerjaan Dinding GWT
-Beton K-300 45.50 M3 1,129,343.80
-Besi beton 5,209.09 Kg 15,487.11
-Bekisting 364.00 M2 42,440.87
11 Pekerjaan Pelat Penutup GWT
-Beton K-300 8.46 M3 1,129,343.80
-Besi beton 1,600.72 Kg 15,487.11
-Bekisting 4.73 M2 36,824.67

II PEKERJAAN STRUKTUR RUANG POMPA


1 Pekerjaan Pondasi Tiang Pancang 25x25 cm
Tipe Tiang Pondasi 34.00 M1 259,871.53
Pemotongan kepala tiang 4.00 Nos 110,535.36
2 Pile Cap Tipe PC-1 (R.Pompa)
-Beton K-300 0.72 M3 1,129,343.80
-Besi beton 92.47 Kg 15,487.11
-Bekisting 5.28 M2 39,810.16
3 Tie Beam / Sloof TB1
-Beton K-300 2.28 M3 1,129,343.80
-Besi beton 48.53 Kg 15,487.11
-Bekisting 18.50 M2 39,810.16
4 Pekerjaan Galian tanah :
- Pile Cap Tipe PC-1 (R.Pompa) 3.01 M3 51,859.51
- Tie Beam / Sloof TB1 2.28 M3 51,859.51
5 Pekerjaan Urugan Pasir tebal 10 cm :
- Pile Cap Tipe PC-1 (R.Pompa) 0.12 M3 132,492.88
- Tie Beam / Sloof TB1 0.51 M3 132,492.88
6 Pekerjaan Lantai Kerja tebal 5 cm :
- Pile Cap Tipe PC-1 (R.Pompa) 0.06 M3 636,964.57
- Tie Beam / Sloof TB1 0.25 M3 636,964.57
7 Urugan Tanah Kembali Bekas Galian 4.36 M3 30,397.22
8 Pemadatan tanah CBR > 6% 4.36 M3 50,697.40
9 Pekerjaan Lantai Dasar R.Pompa
-Beton K-300 4.98 M3 1,129,343.80
-Besi beton 428.01 Kg 15,487.11
-Bekisting 4.06 M2 39,810.16
10 Pekerjaan Pelat Dak R.Pompa
-Beton K-300 4.10 M3 1,129,343.80
-Besi beton 732.14 Kg 15,487.11
-Bekisting 3.61 M2 36,824.67
11 Kolom K3A (R. Pompa)
-Beton K-300 0.88 M3 1,129,343.80
-Besi beton 172.10 Kg 15,487.11
-Bekisting 14.00 M2 40,415.54
12 Balok B1 (R. Pompa)
-Beton K-300 2.21 M3 1,129,343.80
-Besi beton 635.15 Kg 15,487.11
-Bekisting 33.92 M2 46,817.19
13 Tie Beam Dasar Pelat (R. Pompa)
-Beton K-300 2.28 M3 1,129,343.80
-Besi beton 110.83 Kg 15,487.11
-Bekisting 18.50 M2 46,817.19
14 Lantai Ramp
-Beton K-300 0.32 M3 1,129,343.80
-Besi beton 36.64 Kg 15,487.11
-Bekisting 1.38 M2 39,810.16

III PEKERJAAN STRUKTUR STP


1 Pekerjaan Galian tanah : 181.58 M3 70,005.73
2 Pekerjaan Urugan tanah kembali bekas galian 118.52 M3 30,397.22
3 Pasir urug diatas tanah urug 4.00 M3 132,492.88
4 Cor beton lantai kerja Fc' 8.3 Mpa t=5 cm 2.00 M3 636,964.57
5 Pasang Kolom Praktis 22.80 M1 72,400.00
6 Pekerjaan Lantai Dasar STP
-Beton K-300 6.45 M3 1,129,343.80
-Besi beton 2,120.81 Kg 15,487.11
-Bekisting 7.44 M2 36,824.67
7 Pelat Atas (STP)
-Beton K-300 6.45 M3 1,129,343.80
-Besi beton 2,120.81 Kg 15,487.11
-Bekisting 7.44 M2 36,824.67
8 Pelat Dinding (STP)
-Beton K-300 19.66 M3 1,129,343.80
-Besi beton 4,936.60 Kg 15,487.11
-Bekisting 262.08 M2 36,824.67
RUMAH SUSUN

GA INTI TEKNIK SINERGI


JUMLAH HARGA
( Rp. )

4,528,261,603.94
696,444,036.86

41,503,384.65
165,431,295.70
14,428,347.78

711,486.59
2,405,612.80
339,490.54

18,972,975.84
77,237,469.86
5,050,463.53

17,096,696.44
12,252,941.54
29,453,241.72

103,063,915.19
93,247,057.62

2,766,892.31
2,784,346.71
1,576,544.82

13,992,569.68
57,153,838.48
4,557,421.16

1,456,853.50
3,928,112.27
781,787.74

45,173.75
1,448,509.40
534,184.14

1,727,896.01
4,638,559.92
375,611.63

271,042.51
2,919,413.83
69,289.44

1,106,756.92
3,302,781.08
553,474.79

1,174,517.55
985,909.42
373,133.00

1,219,691.30
3,220,086.14
266,242.36

135,521.26
1,848,851.19
34,644.72

1,143,488,363.63

40,317,573.66
148,162,083.95
14,016,109.27

688,899.72
2,109,034.64
329,790.81

18,430,890.82
76,674,823.16
4,906,164.57

12,106,565.54
37,383,870.22
7,169,116.30
1,242,278.18
3,689,029.60
737,370.74

16,680,407.93
48,220,510.82
9,875,618.06

14,941,218.47
58,106,088.01
8,848,448.91

1,739,189.45
4,951,538.81
796,360.40

14,941,218.47
58,106,088.01
8,848,448.91

1,016,409.42
3,143,573.59
599,728.20

7,927,993.48
24,796,566.69
5,517,874.01

2,586,197.30
20,891,182.16
4,645,669.76

133,985,348.43
176,474,604.08
33,607,298.58

1,626,255.07
2,120,984.21
65,547.91

14,139,384.38
57,756,662.93
4,606,766.22
1,456,853.50
3,928,112.27
781,787.74

1,581,081.32
1,448,509.40
534,184.14

1,727,896.01
4,638,559.92
375,611.63

271,042.51
3,360,857.74
69,289.44

1,106,756.92
2,868,965.45
553,474.79

1,174,517.55
985,909.42
373,133.00

1,219,691.30
3,220,086.14
266,242.36

135,521.26
1,848,851.19
34,644.72

938,516,934.61

688,899.72
2,109,034.64
329,790.81

13,823,168.11
48,671,185.73
5,276,652.90

18,430,890.82
76,674,823.16
4,906,164.57

12,106,565.54
37,383,870.22
7,169,116.30

1,242,278.18
3,689,029.60
737,370.74

16,680,407.93
48,220,510.82
9,875,618.06

14,941,218.47
58,106,088.01
8,848,448.91

1,739,189.45
4,951,538.81
796,360.40

2,597,490.74
8,675,259.54
1,334,758.09

1,016,409.42
3,143,573.59
599,728.20

7,927,993.48
24,796,566.69
5,517,874.01

2,586,197.30
20,891,182.16
4,645,669.76

133,985,348.43
176,474,604.08
33,607,298.58

1,626,255.07
2,120,984.21
65,547.91

14,139,384.38
57,756,662.93
4,606,766.22

1,456,853.50
3,928,112.27
781,787.74

1,581,081.32
1,448,509.40
534,184.14

1,727,896.01
4,638,559.92
375,611.63

271,042.51
3,360,857.74
69,289.44

1,106,756.92
2,868,965.45
553,474.79

1,174,517.55
985,909.42
373,133.00

1,219,691.30
3,220,086.14
266,242.36

237,162.20
682,981.55
140,451.57

938,516,934.61

688,899.72
2,109,034.64
329,790.81
13,823,168.11
48,671,185.73
5,276,652.90

18,430,890.82
76,674,823.16
4,906,164.57

12,106,565.54
37,383,870.22
7,169,116.30

1,242,278.18
3,689,029.60
737,370.74

16,680,407.93
48,220,510.82
9,875,618.06

14,941,218.47
58,106,088.01
8,848,448.91

1,739,189.45
4,951,538.81
796,360.40

2,597,490.74
8,675,259.54
1,334,758.09

1,016,409.42
3,143,573.59
599,728.20

7,927,993.48
24,796,566.69
5,517,874.01

2,586,197.30
20,891,182.16
4,645,669.76
133,985,348.43
176,474,604.08
33,607,298.58

1,626,255.07
2,120,984.21
65,547.91

14,139,384.38
57,756,662.93
4,606,766.22

1,456,853.50
3,928,112.27
781,787.74

1,581,081.32
1,448,509.40
534,184.14

1,727,896.01
4,638,559.92
375,611.63

271,042.51
3,360,857.74
69,289.44

1,106,756.92
2,868,965.45
553,474.79

1,174,517.55
985,909.42
373,133.00

1,219,691.30
3,220,086.14
266,242.36

237,162.20
682,981.55
140,451.57
341,043,352.87

361,390.02
1,162,462.48
174,595.13

18,295,369.56
67,046,177.13
6,983,805.31

18,430,890.82
76,674,823.16
4,672,036.42

7,114,865.94
15,433,369.73
2,949,482.97

4,325,386.75
9,559,883.26
1,793,566.55

24,213,131.07
43,693,473.70
7,742,626.88

1,185,810.99
2,147,442.67
379,219.24

1,185,810.99
1,592,074.91
379,219.24

8,741,121.01
10,024,024.85
256,299.70

2,190,926.97
1,701,926.38
109,079.84
237,162.20
172,836.15
113,060.85

186,512,934.74

52,367,672.01
111,353,250.13
22,792,012.61

26,649,793.23

2,089,286.03
6,652,488.10
795,377.83

4,788,417.71
10,239,922.26
2,084,301.30

257,089,253.39

223,552,793.51

29,991,570.00
338,833.88
1,355,872.00
1,850,184.00

1,661,415,534.62
1,114,937,748.09
1,114,937,748.09

426,319,244.97
21,333,324.48

869,594.73
1,801,460.64
152,871.01

25,150,486.43
36,844,454.17
3,324,944.56

54,208,502.40
82,169,804.66
4,836,138.24

42,395,566.25
78,793,459.80
1,506,416.45

55,665,355.90
40,881,324.27
15,704,311.92

6,459,846.54
862,477.16
3,041,894.33

84,697,109.64
16,241,007.06
4,337,816.89
20,028,630.68

122,388.44
2,897,909.42
2,602,310.21
1,454,659.26
12,735,658.47

17,224.07
491,548.58
1,059,943.04
829,405.43

38,217.87
1,184,754.10
2,547,858.28
1,993,699.10
10,787,973.38
12,505,648.00
17,992,507.26
18,050,000.00

546,477,786.53
26,506,896.06
1,326,424.32

1,219,691.30
2,148,217.03
315,296.47

1,276,158.49
3,708,853.10
250,804.01

234,404.99
189,287.21

23,848.72
25,173.65

57,326.81
57,326.81
231,626.82
386,314.19

22,417,474.43
25,308,570.55
376,206.01

51,385,142.90
80,673,749.83
15,448,476.68

9,554,248.55
24,790,526.72
174,180.69

8,835,632.02
442,141.44

813,127.54
1,432,093.06
210,197.64
2,574,903.86
751,589.45
736,487.96

156,097.13
118,239.68

15,899.15
67,571.37

38,217.87
159,241.14
132,531.88
221,040.66

5,624,132.12
6,628,637.95
161,629.25

4,630,309.58
11,338,732.72
132,937.06

993,822.54
2,665,331.63
565,817.56

2,495,849.80
9,836,637.92
1,588,039.08

2,574,903.86
1,716,436.40
866,118.02

361,390.02
567,447.71
54,938.02

12,711,640.45
3,602,678.51
529,971.52
1,273,929.14
1,650,720.00

7,284,267.51
32,845,217.76
273,975.54

7,284,267.51
32,845,217.76
273,975.54

22,202,899.11
76,453,667.23
9,651,009.51
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN
TIPE PROTOTYPE : TIPE 36
TAHUN ANGGARAN : 2023
DETIGA INTI TEKNIK SINERG
HARGA SATUAN
NO. URAIAN PEKERJAAN VOL. SAT.
( Rp. )

II III.A. PEKERJAAN ARSITEKTUR STANDAR

A.1. PEKERJAAN LANTAI SATU

I.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


1 Pek. Pasangan Dinding Bata Ringan t=10 cm Ter 1,416.41 M2 112,800.00
2 Pek. Plesteran Trasram (1:2) 596.62 M2 55,600.00
3 Pek. Plester + Aci Mortar Dinding Exterior/dind. T 2,236.21 M2 62,500.00
4 Pek. Perapihan Kolom Beton, Pelat Beton Bawah 1,021.70 M2 15,100.00
5 Kolom/Balok praktis 11 x 11 cm (termasuk balok L 940.33 M1 72,400.00
6 Pek. Partisi Gypsum Rangka Metal Stud Track + 242.64 M2 165,200.00
7 Pek. Cover/Penutup Pipa Air Hujan Bagian Entr 3.41 M2 212,900.00
8 Pek. Pasang Hand Railling Tangga pipa Black St 41.48 M1 91,200.00
9 Pek. Keramik uk. 20x25 Dinding KM/WC, R. Cuci + Dinding
287.66DapurM2 100,200.00
10 Pek. Plint Homogenous Tile 10x60 Dinding Corido 650.96 M1 31,200.00
11 Pek. Keramik uk. 20x20 cm Meja Dapur 17.67 M2 120,400.00

I.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING


1 Kusen Alum. 3" Powder Coating + Daun Pintu Fr 2.00 Unit 4,685,800.00
2 Kusen Alum. 3" Powder Coating + Daun Pintu Fr 1.00 Unit 4,916,000.00
3 Kusen Alum. 3" Powder Coating + Daun Pintu Fr 1.00 Unit 2,272,300.00
4 Kusen Alum. 3" Powder Coating + Daun Pintu Ho 10.00 Unit 2,836,400.00
5 Kusen Alum. 3" Powder Coating + Daun Pintu Ho 2.00 Unit 2,629,400.00
6 Kusen Alum. 3" Powder Coating + Daun Pintu Ho 24.00 Unit 2,404,400.00
7 Kusen Alum. 3" + Daun Pintu Frame Alum. Kaca 1.00 Unit 1,642,400.00
8 Kusen Besi Hollow + Daun Pintu Besi type (leng 3.00 Unit 1,107,000.00
9 Kusen Alum. 3" Powder Coating + Daun Pintu UP 13.00 Unit 2,979,000.00
10 Kusen Alum. 3" Powder Coating + Daun Pintu UP 2.00 Unit 2,833,300.00
11 Kusen Besi Hollow Powder Coating + Daun Pintu 2.00 Unit 2,003,300.00
12 Kusen Alum. 3" Powder Coating + Daun Pintu Alu 13.00 Unit 1,210,000.00
13 Kusen Alum. 3" Powder Coating + Daun Jendela 14.00 Unit 2,307,800.00
14 Kusen Alum. 3" Powder Coating + Daun Jendela 12.00 Unit 1,116,400.00
15 Kusen Alum. 3" Powder Coating + Daun Jendela 3.00 Unit 1,637,700.00
16 Kusen Alum. 3" Powder Coating + Jendela Frame 3.00 Unit 2,398,300.00
17 Glass Block + Rooster 20X20 (lengkap terpasang 6.00 Unit 424,100.00
18 Glass Block + Rooster 20X20 (lengkap terpasang 4.00 Unit 146,800.00
19 Glass Block + Rooster 20X20 (lengkap terpasang 2.00 Unit 254,000.00
20 Glass Block + Rooster 20X20 (lengkap terpasang 2.00 Unit 358,500.00
21 Kusen Alum. 3" Powder Coating + Kaca Clear 5 12.00 Unit 167,800.00
22 Kusen Alum. 3" Powder Coating + Kaca Clear 5 12.00 Unit 304,000.00
23 Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (l 12.00 Unit 472,100.00

I.3 PEKERJAAN PLAFOND


1 Pek. Penutup Plafond Gypsum T=9 mm + Rangka 693.77 M2 178,000.00
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Ho 76.83 M2 170,700.00
3 List plafond gypsum 5 cm 1,025.47 M1 24,700.00

I.4 PEKERJAAN LANTAI


1 Pek. Pasang Homogenous Tile polish lantai Unit Hunian, R.757.89
Serbaguna,MKoridor,
2 168,000.00
Tangga Utama dan Tangga Servis Uk. 60x60 cm
2 Pek. Pasang Lantai Pemandu Orang Tuna Netra / Tactile Uk.9.90
40x40 cmM 2 223,500.00
3 140.67Uk. 60x60
Pek. Pasang Homogenous Tile unpolish lantai keliling bangunan M cm
2 190,900.00
4 Pek. Pasang Homogenous Tile Step Nozing Tangga Tengah87.10 + Tangga M 29,500.00
Entrance + Tangga Servis
1
Uk. 10 x 60 cm
5 Pek. Waterproofing (liquid/cement base) Dinding 316.55 M 2 90,800.00
6 Pek. Waterproofing (liquid/cement base) di Daer 75.53 M2 90,800.00

I.5 PEKERJAAN UTILITAS


1 Pasang Closet Duduk Type Standar Dual Flush - 12.00 Buah 2,005,900.00
2 Pasang Closet Jongkok Type Standar - Toilet Um 3.00 Buah 337,300.00
3 Pasang Urinoir - Toilet Umum (lengkap terpasan 2.00 Buah 539,800.00
4 Pasang Partisi Urinoir - Toilet Umum (lengkap te 1.00 Buah 235,700.00
5 Pasang Cermin - Toilet Umum (lengkap terpasan 2.00 Buah 204,700.00
6 Pasang Wastafel Meja + Kran Stainless + Aksesor 2.00 Buah 792,600.00
7 Pasang Wastafel Dinding + Kran Stainless + Akse 12.00 Buah 478,100.00
8 Pasang Shower + Kran Stainless - Unit Hunian (l 12.00 Buah 355,000.00
9 Pasang Kran Stainless - Unit Hunian, Toilet Umum 24.00 Buah 185,800.00
10 Pasang Jet Washer + Kran Stainless - Unit Hunia 12.00 Buah 517,400.00
11 Pasangan Floor Drain Stainless, di Toilet Hunian 37.00 Buah 33,900.00
12 Kitchen Sink + Kran Leher Angsa Stainless - Uni 12.00 Buah 650,900.00
13 Handrail Pipa Stainless Untuk Toilet Difabel 4.15 M1 91,200.00
14 Grab Bar Untuk Toilet Difabel 2.00 Buah 688,000.00

I.6 PEKERJAAN PENGECATAN


1 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exte 548.28 M2 34,900.00
2 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (int 1,613.33 M2 40,000.00
3 Pek. Cat Canopy 142.40 M2 34,900.00
4 Pek. Cat Plafond 770.60 M2 40,000.00
5 Pek. Cat List Plafond 1,025.47 M1 4,000.00
I.7 PEKERJAAN RAMP DI ENTRANCE TERAS, ASESORIS DI FACADE DAN SELASAR KELILING BANGU
1 Pasang Railing Ramp t.0,85cm: Besi pipa d.2" & 3/ 9.55 M1 91,200.00
2 Pasang Keramik Lantai 60 x 60 HT Unpolished 5.01 M 2 190,900.00

A.2. PEKERJAAN LANTAI DUA

II.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


1 Pek. Pasangan Dinding Bata Ringan t=10 cm Ter 1,539.37 M2 112,800.00
2 Pek. Plesteran Trasram (1:2) 673.88 M2 55,600.00
3 Pek. Plester + Aci Mortar Dinding Exterior/dind. T 2,404.86 M2 62,500.00
4 Pek. Perapihan Kolom Beton, Pelat Beton Bawah 1,009.20 M2 15,100.00
5 Pek. Kolom & Balok praktis 11/11 Openingan Ku 1,024.08 M1 72,400.00
6 Pek. Partisi Gypsum Rangka Metal Stud + Lapis 341.52 M2 165,200.00
7 Pek. Cover/Penutup Pipa Air Hujan Bagian Balk 3.19 M2 212,900.00
8 Pek. Pasang Hand Railling Tangga pipa Black St 41.48 M1 91,200.00
9 Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + D 336.72 M2 100,200.00
10 Pek. Plint 10x60 cm Dinding Coridor/Selasar dan 685.76 M1 111,100.00
11 Pek. Keramik 20x20 cm Meja Dapur 23.56 M2 196,000.00

II.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING


1 Kusen Alum. 3" Powder Coating + Daun Pintu Fr 1.00 Unit 4,685,800.00
2 Kusen Alum. 3" Powder Coating + Daun Pintu Ho 16.00 Unit 2,836,400.00
3 Kusen Alum. 3" Powder Coating + Daun Pintu Ho 32.00 Unit 2,404,400.00
4 Kusen Besi Hollow + Daun Pintu Besi type (leng 3.00 Unit 1,107,000.00
5 Kusen Alum. 3" Powder Coating + Daun Pintu UP 16.00 Unit 2,979,000.00
6 Kusen Alum. 3" Powder Coating + Daun Pintu Alu 17.00 Unit 1,210,000.00
7 Kusen Alum. 3" Powder Coating + Daun Jendela 16.00 Unit 2,307,800.00
8 Kusen Alum. 3" Powder Coating + Daun Jendela 16.00 Unit 1,116,400.00
9 Kusen Alum. 3" Powder Coating + Daun Jendela 2.00 Unit 2,687,600.00
10 Glass Block + Rooster 20X20 (lengkap terpasang 6.00 Unit 424,100.00
11 Glass Block + Rooster 20X20 (lengkap terpasang 4.00 Unit 254,000.00
12 Glass Block + Rooster 20X20 (lengkap terpasang 2.00 Unit 358,500.00
13 Kusen Alum. 3" Powder Coating + Kaca Clear 5 16.00 Unit 167,800.00
14 Kusen Alum. 3" Powder Coating + Kaca Clear 5 16.00 Unit 304,000.00
15 Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (l 16.00 Unit 472,100.00
16 Railing Besi Hollow 40x40 Cm (lengkap terpasang 1.00 Unit 1,114,000.00
17 Railing Besi Hollow 40x40 Cm (lengkap terpasang 2.00 Unit 551,100.00

II.3 PEKERJAAN PLAFOND


1 Pek. Penutup Plafond Gypsum T=9 mm + Rangka 691.64 M2 178,000.00
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Ho 61.12 M2 170,700.00
3 Pek. List Plafond Gypsum 5/5 1,115.80 M2 24,700.00
II.4 PEKERJAAN LANTAI
1 Pek. Pasang Homogenous Tile Polish lantai Unit Hunian, Koridor, M2 Utama, dan Tangga168,000.00
754.29 Tangga Servis Uk. 60x60 cm
2 Pek. Pasang Keramik lantai Balkon, R Cuci dan Toilet Uk. 20x20
54.40 cm M 2 120,400.00
3 Pek. Pasang Homogenous Tile Step Nozing Tangga Tengah87.10+ Tangga M
Servis
1
Uk. 10 x 60 cm29,500.00
4 Pek. Waterproofing (liquid/cement base) Lantai + 202.44 M2 90,800.00
5 Pek. Waterproofing (liquid/cement base) di Daer 76.35 M2 90,800.00

II.5 PEKERJAAN UTILITAS


1 Pasang Closet Duduk Type Standar Dual Flush - 16.00 Buah 2,005,900.00
2 Pasang Wastafel Dinding + Kran Stainless + Akse 16.00 Buah 478,100.00
3 Pasang Shower + Kran Stainless - Unit Hunian (l 16.00 Buah 355,000.00
4 Pasang Kran Stainless - Unit Hunian, dan Janitor 19.00 Buah 185,800.00
5 Pasang Jet Washer + Kran Stainless - Unit Hunia 16.00 Buah 517,400.00
6 Pasangan Floor Drain Stainless, di Toilet Hunian 36.00 Buah 33,900.00
7 Kitchen Sink + Kran Leher Angsa Stainless - Uni 16.00 Buah 650,900.00

II.6 PEKERJAAN PENGECATAN


1 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exte 517.82 M2 34,900.00
2 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (int 1,725.35 M2 40,000.00
3 Pek. Cat Canopy 143.94 M2 34,900.00
4 Pek. Cat Plafond 752.77 M2 40,000.00
5 Pek. Cat List Plafond 1,115.80 M1 4,000.00

A.3. PEKERJAAN LANTAI TIGA

III.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


1 Pek. Pasangan Dinding Bata Ringan t=10 cm Ter 1,539.37 M2 112,800.00
2 Pek. Plesteran Trasram (1:2) 673.88 M2 55,600.00
3 Pek. Plester + Aci Mortar Dinding Exterior/dind. T 2,404.86 M2 62,500.00
4 Pek. Perapihan Kolom Beton, Pelat Beton Bawah 1,009.20 M2 15,100.00
5 Pek. Kolom & Balok praktis 11/11 Openingan Ku 1,024.08 M1 72,400.00
6 Pek. Partisi Gypsum Rangka Metal Stud + Lapis 341.52 M2 165,200.00
7 Pek. Cover/Penutup Pipa Air Hujan Bagian Balk 3.19 M2 212,900.00
8 Pek. Pasang Hand Railling Tangga pipa Black St 43.79 M1 91,200.00
9 Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + D 336.72 M2 100,200.00
10 Pek. Plint 10x60 cm Dinding Coridor/Selasar dan 685.76 M1 111,100.00
11 Pek. Keramik 20x20 cm Meja Dapur 23.56 M2 196,000.00

III.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING


1 Kusen Alum. 3" Powder Coating + Daun Pintu Fr 1.00 Unit 4,685,800.00
2 Kusen Alum. 3" Powder Coating + Daun Pintu Ho 16.00 Unit 2,836,400.00
3 Kusen Alum. 3" Powder Coating + Daun Pintu Ho 32.00 Unit 2,404,400.00
4 Kusen Besi Hollow + Daun Pintu Besi type (leng 3.00 Unit 1,107,000.00
5 Kusen Alum. 3" Powder Coating + Daun Pintu UP 16.00 Unit 2,979,000.00
6 Kusen Alum. 3" Powder Coating + Daun Pintu Alu 17.00 Unit 1,210,000.00
7 Kusen Alum. 3" Powder Coating + Daun Jendela 16.00 Unit 2,307,800.00
8 Kusen Alum. 3" Powder Coating + Daun Jendela 16.00 Unit 1,116,400.00
9 Kusen Alum. 3" Powder Coating + Daun Jendela 2.00 Unit 2,687,600.00
10 Glass Block + Rooster 20X20 (lengkap terpasang 6.00 Unit 424,100.00
11 Glass Block + Rooster 20X20 (lengkap terpasang 4.00 Unit 254,000.00
12 Glass Block + Rooster 20X20 (lengkap terpasang 2.00 Unit 358,500.00
13 Kusen Alum. 3" Powder Coating + Kaca Clear 5 16.00 Unit 167,800.00
14 Kusen Alum. 3" Powder Coating + Kaca Clear 5 16.00 Unit 304,000.00
15 Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (l 16.00 Unit 472,100.00
16 Railing Besi Hollow 40x40 Cm (lengkap terpasang 1.00 Unit 1,114,000.00
17 Railing Besi Hollow 40x40 Cm (lengkap terpasang 2.00 Unit 551,100.00

III.3 PEKERJAAN PLAFOND


1 Pek. Penutup Plafond Gypsum T=9 mm + Rangka 691.64 M2 178,000.00
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Ho 61.12 M2 170,700.00
3 Pek. List Plafond Gypsum 5/5 1,115.80 M2 24,700.00

III.4 PEKERJAAN LANTAI


1 Pek. Pasang Homogenous Tile Polish lantai Unit Hunian, Koridor, M2 Utama, dan Tangga168,000.00
754.29 Tangga Servis Uk. 60x60 cm
2 Pek. Pasang Keramik lantai Balkon, R Cuci dan 54.40 M2 120,400.00
3 Pek. Pasang Homogenous Tile Step Nozing Tangga Tengah87.10 Servis Uk. 10 x 60 cm29,500.00
+ Tangga M 1

4 Pek. Waterproofing (liquid/cement base) Lantai + 202.44 M2 90,800.00


5 Pek. Waterproofing (liquid/cement base) di Daer 76.35 M 2 90,800.00

III.5 PEKERJAAN UTILITAS


1 Pasang Closet Duduk Type Standar Dual Flush - 16.00 Buah 2,005,900.00
2 Pasang Wastafel Dinding + Kran Stainless + Akse 16.00 Buah 478,100.00
3 Pasang Shower + Kran Stainless - Unit Hunian (l 16.00 Buah 355,000.00
4 Pasang Kran Stainless - Unit Hunian, dan Janitor 19.00 Buah 185,800.00
5 Pasang Jet Washer + Kran Stainless - Unit Hunia 16.00 Buah 517,400.00
6 Pasangan Floor Drain Stainless, di Toilet Hunian 36.00 Buah 33,900.00
7 Kitchen Sink + Kran Leher Angsa Stainless - Uni 16.00 Buah 650,900.00

III.6 PEKERJAAN PENGECATAN


1 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exte 517.82 M2 34,900.00
2 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (int 1,725.35 M2 40,000.00
3 Pek. Cat Canopy 143.94 M2 34,900.00
4 Pek. Cat Plafond 752.77 M2 40,000.00
5 Pek. Cat List Plafond 1,115.80 M1 4,000.00
A.4. PEKERJAAN LANTAI EMPAT

IV.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


1 Pek. Pasangan Dinding Bata Ringan t=10 cm Ter 1,539.37 M2 112,800.00
2 Pek. Plesteran Trasram (1:2) 673.88 M2 55,600.00
3 Pek. Plester + Aci Mortar Dinding Exterior/dind. T 2,404.86 M2 62,500.00
4 Pek. Perapihan Kolom Beton, Pelat Beton Bawah 1,009.20 M2 15,100.00
5 Pek. Kolom & Balok praktis 11/11 Openingan Ku 1,024.08 M1 72,400.00
6 Pek. Partisi Gypsum Rangka Metal Stud + Lapis 341.52 M2 165,200.00
7 Pek. Cover/Penutup Pipa Air Hujan Bagian Balk 3.19 M2 212,900.00
8 Pek. Pasang Hand Railling Tangga pipa Black St 43.79 M1 91,200.00
9 Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + D 336.72 M2 100,200.00
10 Pek. Plint 10x60 cm Dinding Coridor/Selasar dan 685.76 M1 111,100.00
11 Pek. Keramik 20x20 cm Meja Dapur 23.56 M2 196,000.00

IV.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING


1 Kusen Alum. 3" Powder Coating + Daun Pintu Fr 1.00 Unit 4,685,800.00
2 Kusen Alum. 3" Powder Coating + Daun Pintu Ho 16.00 Unit 2,836,400.00
3 Kusen Alum. 3" Powder Coating + Daun Pintu Ho 32.00 Unit 2,404,400.00
4 Kusen Besi Hollow + Daun Pintu Besi type (leng 3.00 Unit 1,107,000.00
5 Kusen Alum. 3" Powder Coating + Daun Pintu UP 16.00 Unit 2,979,000.00
6 Kusen Alum. 3" Powder Coating + Daun Pintu Alu 17.00 Unit 1,210,000.00
7 Kusen Alum. 3" Powder Coating + Daun Jendela 16.00 Unit 2,307,800.00
8 Kusen Alum. 3" Powder Coating + Daun Jendela 16.00 Unit 1,116,400.00
9 Kusen Alum. 3" Powder Coating + Daun Jendela 2.00 Unit 2,687,600.00
10 Glass Block + Rooster 20X20 (lengkap terpasang 6.00 Unit 424,100.00
11 Glass Block + Rooster 20X20 (lengkap terpasang 4.00 Unit 254,000.00
12 Glass Block + Rooster 20X20 (lengkap terpasang 2.00 Unit 358,500.00
13 Kusen Alum. 3" Powder Coating + Kaca Clear 5 16.00 Unit 167,800.00
14 Kusen Alum. 3" Powder Coating + Kaca Clear 5 16.00 Unit 304,000.00
15 Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (l 16.00 Unit 472,100.00
16 Railing Besi Hollow 40x40 Cm (lengkap terpasang 1.00 Unit 1,114,000.00
17 Railing Besi Hollow 40x40 Cm (lengkap terpasang 2.00 Unit 551,100.00

IV.3 PEKERJAAN PLAFOND


1 Pek. Penutup Plafond Gypsum T=9 mm + Rangka 691.64 M2 178,000.00
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Ho 61.12 M2 170,700.00
3 Pek. List Plafond Gypsum 5/5 1,115.80 M2 24,700.00

IV.4 PEKERJAAN LANTAI


1 Pek. Pasang Homogenous Tile Polish lantai Unit Hunian, Koridor, M2 Utama, dan Tangga168,000.00
754.29 Tangga Servis Uk. 60x60 cm
2 Pek. Pasang Keramik lantai Balkon, R Cuci dan 54.40 M 2 120,400.00
3 Pek. Pasang Homogenous Tile Step Nozing Tangga Tengah87.10 Servis Uk. 10 x 60 cm29,500.00
+ Tangga M 1
4 Pek. Waterproofing (liquid/cement base) Lantai + 202.44 M2 90,800.00
5 Pek. Waterproofing (liquid/cement base) di Daer 76.35 M2 90,800.00

IV.5 PEKERJAAN UTILITAS


1 Pasang Closet Duduk Type Standar Dual Flush - 16.00 Buah 2,005,900.00
2 Pasang Wastafel Dinding + Kran Stainless + Akse 16.00 Buah 478,100.00
3 Pasang Shower + Kran Stainless - Unit Hunian (l 16.00 Buah 355,000.00
4 Pasang Kran Stainless - Unit Hunian, dan Janitor 19.00 Buah 185,800.00
5 Pasang Jet Washer + Kran Stainless - Unit Hunia 16.00 Buah 517,400.00
6 Pasangan Floor Drain Stainless, di Toilet Hunian 36.00 Buah 33,900.00
7 Kitchen Sink + Kran Leher Angsa Stainless - Uni 16.00 Buah 650,900.00

IV.6 PEKERJAAN PENGECATAN


1 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exte 517.82 M2 34,900.00
2 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (int 1,725.35 M2 40,000.00
3 Pek. Cat Canopy 143.94 M2 34,900.00
4 Pek. Cat Plafond 752.77 M2 40,000.00
5 Pek. Cat List Plafond 1,115.80 M1 4,000.00

A.5. PEKERJAAN LANTAI DAK DAN ATAP

V.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


1 Pek. Pasangan Dinding Bata Ringan t=10 cm 274.95 M2 112,800.00
2 Pek. Plester + Aci Mortar Dinding Bata Exterior/D 549.89 M2 62,500.00
3 Pek. Kolom & Balok Praktis 11/11 Openingan Ku 243.76 M1 72,400.00
4 Pek. Perapihan Kolom 728.15 M2 15,100.00

V.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING


1 Kusen Hollow 60x60 mm + Daun Pintu Lapis Plat 2.00 Unit 1,117,600.00
2 Rooster 20X20 (lengkap terpasang) type RB-3 22.00 Unit 412,800.00
3 Pek. Pasang Logo Signage PU, Baja 3mm uk 80x8 1.00 bh 1,498,500.00

V.3 PEKERJAAN PLAFOND


1 Pek. Beton Expose 33.36 M2 17,300.00
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Ho 41.71 M2 170,700.00
3 Pek. List Plafond Gypsum 5/5 78.40 M1 24,700.00

V.4 PEKERJAAN LANTAI


1 Waterproofing Membran Bakar t=3cm Lantai Dak 48.41 M2 87,800.00
2 Pek. Screed + Aci Lantai Dak Torn (elv. +13,8) 48.41 M2 81,900.00

V.5 PEKERJAAN UTILITAS


1 Pasangan Floor Drain Stainless - di Dak Torn (le 4.00 Buah 33,900.00
V.6 PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exte 274.95 M2 34,900.00
2 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (int 73.69 M2 40,000.00
3 Pek. Cat Plafond 41.71 M2 40,000.00
4 Pek. Cat List Plafond 78.40 M1 4,000.00
5 Pek. Cat Epoxy 500 micron Lantai Dak 48.41 M2 67,100.00

V.7 PEKERJAAN PENUTUP ATAP


1 Pek. Atap Metal Spandeck Berpasir T=0.45 MM 1,006.56 M2 226,900.00
2 Pek. Nok Genteng 68.95 M1 57,300.00
3 Pek. Lisplang GRC Tebal 9 mm Lebar 40 cm + Cat 165.50 M1 69,180.00
4 Talang zincalum t= 0,35mm, L=90 cm 111.56 M1 53,100.00

II III.B. PEKERJAAN ARSITEKTUR NON STANDART

B.1. PEKERJAAN KELILING BAGIAN LUAR BANGUNAN

I PEKERJAAN KELILING BANGUNAN DAN TANAMAN

1 Pek. Tanah Subur t = 10 cm 321.50 M3 215,400.00


2 Pek. Tanaman Rumput Gajah Mini 321.50 M2 26,300.00
3 Pek. Tanaman Pohon Zodia T= 25-40 cm 137.00 Btg 12,000.00
4 Pek. Tanaman Pohon Mangga dia 5-10 cm T 22.00 Btg 188,300.00
5 Pek. Tanaman Pohon Kelengkeng dia 5-10 c 22.00 Btg 313,100.00
6 Pek. Tanaman Pohon Rambutan dia 5-10 cm 22.00 Btg 94,700.00
7 Pek. Pohon Pucuk Merah 56.00 Btg 32,300.00

II PEKERJAAN PERKERASAN AKSES JALAN MASUK

1 Pek. Pasir Urug t = 7 cm di Bawah Paving 38.46 M3 132,400.00


2 Pek. Paving Blok t = 8 cm (standart) 1,788.00 M2 182,300.00
3 Pek. Kanstein uk. 8.40.20 Jalan Sekeliling B 438.00 M1 108,300.00
4 Beton Pengunci Kanstin 6.24 M3 636,964.57

B.2. PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.

I DRAINASE LUAR/SEKELILING BANGUNAN

1 Pek. U-Ditch Uk.40.60.120 FC'30 Mpa Pabrika 167.79 M1 739,200.00


2 Pek. Pasir Urug t = 10 cm 0.13 M3 132,492.88
3 Pek. Galian Tanah Saluran 67.30 M3 51,859.51
4 Pek. Box culvert 100.100.120 cm 45.00 Pcs 5,269,000.00
5 Pek. Grill penutup saluran, besi siku 50.50.5 167.79 M1 122,000.00
II BAK KONTROL

1 Pek. Pasangan 1/2 Bata Bak Kontrol ( 4 unit 6.860 M2 89,500.00


2 Pek. Plester + Aci 3.330 M2 83,900.00
3 Pek. Pasir Urug t = 5 cm 0.140 M3 132,492.88
4 Pek. Galian Tanah 1.740 M3 51,859.51

B.3. PEKERJAAN GROUND TANK DAN R. POMPA DI LUAR BANGUNAN

A PEKERJAAN GROUND WATER TANK


1 Pek. Perapihan Dinding Beton Exterior 111.65 M2 15,100.00
2 Pek. Perapihan Daerah Dak Beton 112.92 M2 15,100.00
3 Pek. Waterproofing (coating tahan asam, anti 314.51 M2 90,800.00
4 Pek. Waterproofing membran bakar t=3cm 112.92 M2 87,800.00
5 Pek. Pasang Lantai Keramik 20x20 ad.5 cm ( 57.96 M2 120,400.00
6 Pek. Pasang Keramik Dinding 20x20 140.00 M2 133,800.00
7 Pek. Cat Dinding dan Dak Bag. Luar (exterior 174.81 M2 34,900.00
8 Pek. Tangga Dalam 'M' GWT + Cat (model ga 3.00 Unit 910,470.00
9 Pek. Tangga Luar 'M' GWT + Cat (model gan 3.00 Unit 646,470.00
10 Pek. Penutup Mainhole Baja + Cat (terpasan 3.00 Unit 546,282.00
11 Pek. Dinding Bata 1:5 Bak Kontrol 5.20 M2 89,500.00

B RUANG POMPA
1 Pek. Pasangan Dinding Bata 1:5 43.36 M2 89,500.00
2 Pek. Plester Dinding Exterior/Dind. Terluar 43.36 M2 53,100.00
3 Pek. Acian Dinding Exterior/Dind. Terluar 43.36 M2 30,800.00
4 Pek. Kolom Praktis & Balok Praktis 11/11 9.32 M1 72,400.00
5 Pek. Perapihan Daerah Dak Beton 26.59 M2 15,100.00
6 Pek. Waterproofing (coating tahan asam, anti 68.26 M2 90,800.00
7 Pek. Waterproofing membran bakar t=3cm 24.90 M2 87,800.00
8 Pek. Pasang Lantai Keramik 20x20 ad.5 cm ( 26.59 M2 120,400.00
9 Pek. Pasang Keramik Dinding 20x20 68.26 M2 133,800.00
10 Pek. Cat Dinding dan Dak Bag. Luar (exterior 68.26 M2 34,900.00
11 Pek. Pintu Besi 1.00 Unit 1,107,000.00

C STP
1 Pek. Penutup Mainhole Baja + Cat (terpasan 12.00 Unit 546,282.00

B.4. PEKERJAAN LAIN-LAIN

A PEKERJAAN AKSESORIS
1 Pek. Pembuatan Lemari Surat 1.00 unit 8,954,100.00
2 Pek. Nama Ruangan 10x20 cm -acrylic (lengk 16.00 unit 73,000.00
3 Pek. Nama Lantai 30x30 -acrylic (lengkap te 4.00 unit 129,100.00
4 Pek. Papan Informasi Denah Bangunan 60x12 1.00 unit 553,700.00
TIGA INTI TEKNIK SINERGI
JUMLAH HARGA
( Rp. )

5,970,107,682.00 1
2
1,304,313,350.00 3
4
512,067,852.00 5
159,771,048.00 6
33,172,072.00 7
139,763,125.00 8
15,427,670.00 9
68,079,892.00 10
40,084,128.00 11
725,989.00 12
3,782,976.00 13
28,823,532.00 14
20,309,952.00 15
2,127,468.00 16
17
250,479,500.00 18
9,371,600.00 19
4,916,000.00 20
2,272,300.00 21
28,364,000.00 22
5,258,800.00 23
57,705,600.00 24
1,642,400.00 25
3,321,000.00 26
38,727,000.00 27
5,666,600.00 28
4,006,600.00 29
15,730,000.00 30
32,309,200.00 31
13,396,800.00 32
4,913,100.00 33
7,194,900.00 34
2,544,600.00 35
587,200.00 36
508,000.00 37
717,000.00 38
2,013,600.00 39
3,648,000.00 40
5,665,200.00 41
42
161,935,050.00 43
123,491,060.00 44
13,114,881.00 45
25,329,109.00 46
47
48
194,562,387.00 49
127,325,520.00 50
2,212,650.00 51
26,853,903.00 52
2,569,450.00 53
28,742,740.00 54
6,858,124.00 55
56
59,877,380.00 57
24,070,800.00 58
1,011,900.00 59
1,079,600.00 60
235,700.00 61
409,400.00 62
1,585,200.00 63
5,737,200.00 64
4,260,000.00 65
4,459,200.00 66
6,208,800.00 67
1,254,300.00 68
7,810,800.00 69
378,480.00 70
1,376,000.00 71
72
123,563,812.00 73
19,134,972.00 74
64,533,200.00 75
4,969,760.00 76
30,824,000.00 77
4,101,880.00 78
79
1,827,369.00 80
870,960.00 81
956,409.00 82
83
1,424,353,847.00 84
85
626,220,997.00 86
173,640,936.00 87
37,467,728.00 88
150,303,750.00 89
15,238,920.00 90
74,143,392.00 91
56,419,104.00 92
679,151.00 93
3,782,976.00 94
33,739,344.00 95
76,187,936.00 96
4,617,760.00 97
98
280,322,600.00 99
4,685,800.00 100
45,382,400.00 101
76,940,800.00 102
3,321,000.00 103
47,664,000.00 104
20,570,000.00 105
36,924,800.00 106
17,862,400.00 107
5,375,200.00 108
2,544,600.00 109
1,016,000.00 110
717,000.00 111
2,684,800.00 112
4,864,000.00 113
7,553,600.00 114
1,114,000.00 115
1,102,200.00 116
117
161,105,364.00 118
123,111,920.00 119
10,433,184.00 120
27,560,260.00 121
122
161,154,062.00 123
126,720,720.00 124
6,549,760.00 125
2,569,450.00 126
18,381,552.00 127
6,932,580.00 128
129
68,867,400.00 130
32,094,400.00 131
7,649,600.00 132
5,680,000.00 133
3,530,200.00 134
8,278,400.00 135
1,220,400.00
10,414,400.00

126,683,424.00
18,071,918.00
69,014,000.00
5,023,506.00
30,110,800.00
4,463,200.00

1,424,564,519.00

626,431,669.00
173,640,936.00
37,467,728.00
150,303,750.00
15,238,920.00
74,143,392.00
56,419,104.00
679,151.00
3,993,648.00
33,739,344.00
76,187,936.00
4,617,760.00

280,322,600.00
4,685,800.00
45,382,400.00
76,940,800.00
3,321,000.00
47,664,000.00
20,570,000.00
36,924,800.00
17,862,400.00
5,375,200.00
2,544,600.00
1,016,000.00
717,000.00
2,684,800.00
4,864,000.00
7,553,600.00
1,114,000.00
1,102,200.00

161,105,364.00
123,111,920.00
10,433,184.00
27,560,260.00

161,154,062.00
126,720,720.00
6,549,760.00
2,569,450.00
18,381,552.00
6,932,580.00

68,867,400.00
32,094,400.00
7,649,600.00
5,680,000.00
3,530,200.00
8,278,400.00
1,220,400.00
10,414,400.00

126,683,424.00
18,071,918.00
69,014,000.00
5,023,506.00
30,110,800.00
4,463,200.00
1,424,564,519.00

626,431,669.00
173,640,936.00
37,467,728.00
150,303,750.00
15,238,920.00
74,143,392.00
56,419,104.00
679,151.00
3,993,648.00
33,739,344.00
76,187,936.00
4,617,760.00

280,322,600.00
4,685,800.00
45,382,400.00
76,940,800.00
3,321,000.00
47,664,000.00
20,570,000.00
36,924,800.00
17,862,400.00
5,375,200.00
2,544,600.00
1,016,000.00
717,000.00
2,684,800.00
4,864,000.00
7,553,600.00
1,114,000.00
1,102,200.00

161,105,364.00
123,111,920.00
10,433,184.00
27,560,260.00

161,154,062.00
126,720,720.00
6,549,760.00
2,569,450.00
18,381,552.00
6,932,580.00

68,867,400.00
32,094,400.00
7,649,600.00
5,680,000.00
3,530,200.00
8,278,400.00
1,220,400.00
10,414,400.00

126,683,424.00
18,071,918.00
69,014,000.00
5,023,506.00
30,110,800.00
4,463,200.00

392,311,447.00

94,025,774.00
31,014,360.00
34,368,125.00
17,648,224.00
10,995,065.00

12,815,300.00
2,235,200.00
9,081,600.00
1,498,500.00

9,633,505.00
577,128.00
7,119,897.00
1,936,480.00

8,215,177.00
4,250,398.00
3,964,779.00

135,600.00
135,600.00
17,773,666.00
9,595,755.00
2,947,600.00
1,668,400.00
313,600.00
3,248,311.00

249,712,425.00
228,388,464.00
3,950,835.00
11,449,290.00
5,923,836.00

993,843,192.56

476,728,112.92

69,251,100.00
8,455,450.00
1,644,000.00
4,142,600.00
6,888,200.00
2,083,400.00
1,808,800.00

5,092,104.00
325,952,400.00
47,435,400.00
3,974,658.92

386,115,258.65

124,030,368.00
17,224.07
3,490,145.02
237,105,000.00
20,470,380.00
613,970.00
279,387.00
18,549.00
90,235.55

119,807,621.00

1,685,915.00
1,705,092.00
28,557,508.00
9,914,376.00
6,978,384.00
18,732,000.00
6,100,869.00
2,731,410.00
1,939,410.00
1,638,846.00
465,400.00

3,880,720.00
2,302,416.00
1,335,488.00
674,768.00
401,509.00
6,198,008.00
2,186,220.00
3,201,436.00
9,133,188.00
2,382,274.00
1,107,000.00

6,555,384.00

11,192,200.00

8,954,100.00
1,168,000.00
516,400.00
553,700.00
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN
TIPE PROTOTYPE : TIPE 36
TAHUN ANGGARAN : 2023
DETIGA INTI TEKNIK SINERGI
HARGA SATUAN
NO. URAIAN PEKERJAAN VOL. SAT.
(Rp.)

IV.A. PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART

A.1. PEKERJAAN LANTAI 1

1. PEMIPAAN AIR BERSIH


Pipa PPR PN10 (Incl. Fitting & Accessories)
-PPR PN10 dia. 15 173.36 M1 26,617.50
-PPR PN10 dia. 20 153.35 M1 28,271.25
-PPR PN10 dia. 40 (1,5") 119.03 M1 70,186.68
-PPR PN10 dia. 50 (Riser dari Tangki Air Atas) 10.40 M1 68,262.93
Peralatan Katup-katup
(Ball Valve & Gate Valve)
-dia. 20 2.00 bh 77,443.29
-dia. 40 12.00 bh 585,237.12
Meter Air c/w BV dia. 20 12.00 bh 484,064.51

2. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
-dia. 150 ( Pipa Air Bekas) 213.62 M1 442,028.41
-dia. 150 ( Pipa Air Kotor ) 201.32 M1 442,028.41
-dia. 100 ( Pipa Air Bekas ) 175.25 M1 213,102.16
Clean Out (CO)
-CO, dia. 150 6.00 bh 306,143.68
-CO, dia. 100 8.00 bh 240,126.22
-Portable Grease Trap 12.00 bh 498,728.71
-Roof drain 2" 2.00 bh 103,041.20

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
-dia. 150 (Air Hujan) 99.17 M1 442,028.41
-dia. 100 (Air Hujan) 48.92 M1 213,102.16
-dia. 80 68.84 M1 105,151.68
-dia. 50 26.64 M1 68,262.93

4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
-Dia. 80 ( pipa riser ) 83.52 M1 65,175.91
5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.1 1.00 unit 5,674,999.08
dengan komponen panel, sbb :
-MCB 3P, 16 A
-MCB 1P, 6 A
-Ampere-meter 50/5 A
-Volt-meter 0-500 Volt
-Volt Selector Switch
-Fuse 2 A
-Indicator Lamp
-Rel MCB 3P
-Cu Bar 5 x 63 A
-Accessories & Termination
-Box Panel

-KW-meter/1ph/6A 12.00 bh 370,302.59

Pengadaan dan pemasangan P-UNIT, dengan 14.00 unit 351,872.46


-MCB 1P, 6 A
-MCB 1P, 6 A
-Box Hanger

6. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari MDP :
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke PP-LT.1 0.88 M1 52,672.77

b. Kabel Distribusi Daya dari KWH Unit ke :


NYM 3 x 4 mm2 ke P-Unit/1 24.60 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/2 36.72 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/3 42.82 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/4 53.70 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/5 55.70 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/6 68.80 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/7 16.20 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/8 23.60 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/9 33.60 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/10 39.46 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/11 62.80 M1 70,873.20
NYM 3 x 4 mm2 ke P-Unit/12 69.40 M1 70,873.20

7. INSTALASI KABEL TRAY


-Kabel Tray W200 x H100 56.11 M1 113,631.09
-Kabel Tray W500 x H100 11.45 M1 202,853.16
-Kabel Leadder W500 x H100 (Riser) 4.00 M1 461,612.11

Fitting-Fitting :
-Elbow W200 x H100 1.00 bh 437,042.93
Elbow W500 x H100 1.00 bh 529,066.37
Tee W500 x H100 1.00 bh 366,881.27
-Material bantu ( mur, baut, hanger rod, supportin 1.00 lot 230,225.89

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


-Lampu LED 9 Watt 98.00 bh 73,403.55
-Lampu LED 9 Watt, c/w battery charger (Selasa 5.00 bh 133,854.36
-Lampu LED 7 Watt 45.00 bh 50,771.36
-Lampu baret isi TL Bulat-20 watt c/w battery ch 1.00 bh 449,211.10
-Exit Lamp-18 watt c/w battery charger 3.00 bh 368,934.99
-Lampu TL 1 x 36 watt, Balk 3.00 bh 166,203.62
-Stop Kontak 1P, 220 Volt, 10A, Wall Type 81.00 bh 41,385.00
-Saklar 1 Gang 17.00 bh 25,166.49
-Saklar 2 Gang 56.00 bh 32,538.54
-Saklar Hotel 1 Gang 1.00 bh 62,026.74
-Saklar Hotel 2 Gang 4.00 bh 98,886.99

9. INSTALASI PENERANGAN & STOP KONTAK


-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 155.00 ttk 286,312.37
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 81.00 ttk 377,936.42

A.2. PEKERJAAN LANTAI 2

1. PEMIPAAN AIR BERSIH


Pipa PPR PN10 (Incl. Fitting & Accessories)
-PPR PN10 dia. 15 189.80 M1 26,617.50
-PPR PN10 dia. 20 176.69 M1 28,271.25
-PPR PN10 dia. 40 123.94 M1 70,186.68
-PPR PN10 dia. 50 (Riser dari Tangki Air Atas) 6.80 M1 68,262.93
Peralatan Katup-katup
(Ball Valve & Gate Valve)
-dia. 40 1.00 bh 585,237.12
-dia. 20 16.00 bh 77,443.29
-Meter Air c/w BV dia. 20 16.00 bh 484,064.51

2. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
-dia. 150 ( Riser Pipa Air Kotor ) 125.02 M1 442,028.41
dia. 100 ( Pipa Air Kotor ) 16.00 M1 213,102.16
-dia. 100 ( Riser Pipa Air Bekas ) 125.02 M1 213,102.16
dia. 50 ( Pipa Air Bekas ) 107.20 M1 68,262.93
-Dop, dia. 50 16.00 M1 54,771.82
V-Trap dia. 50 16.00 bh 58,633.37
-Portable Grease Trap 16.00 bh 498,728.71

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
-dia. 100 ( pipa tegak ) 59.84 M1 213,102.16
-dia. 80 ( Riser Pipa Cucian ) 70.31 M1 105,151.68

Roof Drain, Cast Iron


-dia. 80 2.00 bh 92,615.01

4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
-Dia. 80 250.05 M1 65,175.91
-Dia. 50 16.00 M1 41,836.68
-Dia. 32 115.20 M1 39,001.68

5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.2 1.00 unit 5,674,999.08
dengan komponen panel, sbb :
-MCCB 3P, 16 A
-MCB 1P, 6 A
-Ampere-meter 50/5 A
-Volt-meter 0-500 Volt
-Volt Selector Switch
-Fuse 2 A
-Indicator Lamp
-Rel MCB 3P
-Cu Bar 5 x 63 A
-Accessories & Termination
-Box Panel

-KW-meter/1ph/6A 16.00 bh 370,302.59

Pengadaan dan pemasangan P-UNIT, dengan 16.00 unit 351,872.46


-MCB 1P, 6 A
-MCB 1P, 6 A
-Box Hanger

6. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari MDP :
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke PP-LT.1 3.60 M1 52,672.77

b. Kabel Distribusi Daya dari PP-LT.2 ke :


-NYM 3 x 4 mm2 ke P-Unit/1 23.20 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/2 32.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/3 34.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/4 46.70 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/5 24.20 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/6 33.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/7 35.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/8 47.70 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/9 51.50 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/10 62.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/11 63.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/12 76.30 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/13 52.50 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/14 63.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/15 64.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/16 77.30 M1 70,873.20

7. INSTALASI KABEL TRAY


-Kabel Tray W200 x H100 56.43 M1 113,631.09
-Kabel Leadder W500 x H100 (Riser) 4.00 M1 461,612.11

Fitting-Fitting :
-Elbow W200 x H100 1.00 bh 437,042.93
-Material bantu ( mur, baut, hanger rod, supportin 1.00 lot 173,907.06

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


-Lampu LED 9 Watt 86.00 bh 73,403.55
-Lampu LED 9 Watt, c/w battery charger (Selasa 3.00 bh 133,854.36
-Lampu LED 7 Watt 48.00 bh 50,771.36
-Lampu baret isi TL Bulat-32 watt c/w battery ch 3.00 bh 449,211.10
-Exit Lamp-18 watt c/w battery charger 3.00 bh 368,934.99
-Lampu TL 1 x 36 watt, Balk 3.00 bh 166,203.62
-Stop Kontak 1P, 220 Volt, 10A, Wall Type 99.00 bh 41,385.00
-Saklar 1 gang 23.00 bh 25,166.49
-Saklar 2 gang 65.00 bh 32,538.54
-Saklar Hotel 2 gang 2.00 bh 98,886.99

9. INSTALASI PENERANGAN & STOP KONTAK


-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 146.00 ttk 286,312.37
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 99.00 ttk 377,936.42

A.3. PEKERJAAN LANTAI 3

1. PEMIPAAN AIR BERSIH


Pipa PPR PN10 (Incl. Fitting & Accessories)
-PPR PN10 dia. 15 189.80 M1 26,617.50
-PPR PN10 dia. 20 176.69 M1 28,271.25
-PPR PN10 dia. 40 123.94 M1 70,186.68
-PPR PN10 dia. 50 (Riser dari Tangki Air Atas) 3.40 M1 68,262.93
Peralatan Katup-katup
(Ball Valve & Gate Valve)
-dia. 40 1.00 bh 585,237.12
-dia. 20 16.00 bh 77,443.29
-Meter Air c/w BV dia. 20 16.00 bh 484,064.51
2. PEMIPAAN AIR KOTOR & AIR BEKAS
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
dia. 100 ( Pipa Air Kotor ) 125.02 M1 213,102.16
-dia. 100 ( Riser Pipa Air Bekas ) 16.00 M1 213,102.16
dia. 50 ( Pipa Air Bekas ) 125.02 M1 68,262.93
-Dop, dia. 50 107.20 bh 54,771.82
-V-Trap 16.00 bh 58,633.37
-Portable Grease Trap 16.00 bh 498,728.71

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
-dia. 100 ( pipa tegak ) 54.40 M1 213,102.16
-dia. 80 ( pipa ruang cuci ) 70.31 M1 105,151.68

4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
-Dia. 80 ( pipa riser ) 126.94 M1 65,175.91

5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.3 1.00 unit 5,674,999.08
dengan komponen panel, sbb :
-MCCB 3P, 16 A
-MCB 1P, 6 A
-Ampere-meter 50/5 A
-Volt-meter 0-500 Volt
-Volt Selector Switch
-Fuse 2 A
-Indicator Lamp
-Rel MCB 3P
-Cu Bar 5 x 63 A
-Accessories & Termination
-Box Panel

-KW-meter/1ph/6A 16.00 bh 370,302.59

Pengadaan dan pemasangan P-UNIT, dengan 16.00 unit 351,872.46


-MCB 1P, 6 A
-MCB 1P, 6 A
-Box Hanger

6. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari MDP :
-NYY 4 x 4 mm2 + E-NYA 6 mm2 ke PP-LT.3 7.40 M1 52,672.77

b. Kabel Distribusi Daya dari PP-LT.3 ke :


-NYM 3 x 4 mm2 ke P-Unit/1 28.20 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/2 37.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/3 39.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/4 51.70 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/5 29.20 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/6 38.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/7 40.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/8 52.70 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/9 56.50 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/10 67.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/11 68.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/12 81.30 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/13 57.50 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/14 68.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/15 69.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/16 82.30 M1 70,873.20

7. INSTALASI KABEL TRAY


-Kabel Tray W200 x H100 56.43 M1 113,631.09
-Kabel Leadder W500 x H100 (Riser) 4.00 M1 461,612.11

Fitting-Fitting :
-Elbow W200 x H100 1.00 bh 437,042.93
-Material bantu ( mur, baut, hanger rod, supportin 1.00 lot 173,907.06

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


-Lampu LED 9 Watt 86.00 bh 73,403.55
-Lampu LED 9 Watt, c/w battery charger (Selasa 3.00 bh 133,854.36
-Lampu LED 7 Watt 48.00 bh 50,771.36
-Lampu baret isi TL Bulat-32 watt c/w battery ch 3.00 bh 449,211.10
-Exit Lamp-18 watt c/w battery charger 3.00 bh 368,934.99
-Lampu TL 1 x 36 watt, Balk 3.00 bh 166,203.62
-Stop Kontak 1P, 220 Volt, 10A, Wall Type 99.00 bh 41,385.00
-Saklar 1 gang 23.00 bh 25,166.49
-Saklar 2 gang 65.00 bh 32,538.54
-Saklar Hotel 2 gang 2.00 bh 98,886.99

9. INSTALASI PENERANGAN & STOP KONTAK


-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 146.00 ttk 286,312.37
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 99.00 ttk 377,936.42

A.4. PEKERJAAN LANTAI 4

1. PEMIPAAN AIR BERSIH


PPR PN10 (Incl. Fitting & Accessories)
-PPR PN10 dia. 15 189.80 M1 26,617.50
-PPR PN10 dia. 20 176.69 M1 28,271.25
-PPR PN10 dia. 40 123.94 M1 70,186.68
-PPR PN10 dia. 50 (Riser dari Tangki Air Atas) 3.40 M1 68,262.93
Peralatan Katup-katup
(Ball Valve & Gate Valve)
-dia. 40 1.00 bh 585,237.12
-dia. 20 16.00 bh 77,443.29
-Meter Air c/w BV dia. 20 16.00 bh 484,064.51

2. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
-dia. 150 ( Riser Pipa Air Kotor ) 125.02 M1 442,028.41
dia. 100 ( Pipa Air Kotor ) 16.00 M1 213,102.16
-dia. 100 ( Riser Pipa Air Bekas ) 125.02 M1 213,102.16
dia. 50 ( Pipa Air Bekas ) 107.20 M1 68,262.93
-Dop, dia. 50 16.00 bh 54,771.82
-Dop, dia. 80 16.00 bh 66,356.47
V-Trap dia. 50 16.00 bh 58,633.37

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
-dia. 100 ( pipa tegak ) 54.40 M1 213,102.16
-dia. 80 ( pipa ruang cuci ) 70.31 M1 105,151.68

4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
-Dia. 80 ( pipa riser ) 126.94 M1 65,175.91

5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.3 1.00 unit 5,674,999.08
dengan komponen panel, sbb :
-MCCB 3P, 16 A
-MCB 1P, 6 A
-Ampere-meter 50/5 A
-Volt-meter 0-500 Volt
-Volt Selector Switch
-Fuse 2 A
-Indicator Lamp
-Rel MCB 3P
-Cu Bar 5 x 63 A
-Accessories & Termination
-Box Panel

-KW-meter/1ph/6A 16.00 bh 370,302.59

Pengadaan dan pemasangan P-UNIT, dengan 16.00 unit 351,872.46


-MCB 1P, 6 A
-MCB 1P, 6 A
-Box Hanger

6. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari MDP :
-NYY 4 x 4 mm2 + E-NYA 6 mm2 ke PP-LT.4 7.40 M1 52,672.77

b. Kabel Distribusi Daya dari PP-LT.3 ke :


-NYM 3 x 4 mm2 ke P-Unit/1 33.20 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/2 42.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/3 44.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/4 56.70 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/5 34.20 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/6 43.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/7 45.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/8 57.70 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/9 61.50 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/10 72.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/11 73.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/12 86.30 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/13 62.50 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/14 73.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/15 74.80 M1 70,873.20
-NYM 3 x 4 mm2 ke P-Unit/16 87.30 M1 70,873.20

7. INSTALASI KABEL TRAY


-Kabel Tray W200 x H100 56.43 M1 113,631.09
-Kabel Leadder W500 x H100 (Riser) 4.00 M1 461,612.11

Fitting-Fitting :
-Elbow W200 x H100 1.00 bh 437,042.93
-Material bantu ( mur, baut, hanger rod, supportin 1.00 lot 173,907.06

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


-Lampu LED 9 Watt 86.00 bh 73,403.55
-Lampu LED 9 Watt, c/w battery charger (Selasa 3.00 bh 133,854.36
-Lampu LED 7 Watt 48.00 bh 50,771.36
-Lampu baret isi TL Bulat-32 watt c/w battery ch 3.00 bh 449,211.10
-Exit Lamp-18 watt c/w battery charger 3.00 bh 368,934.99
-Lampu TL 1 x 36 watt, Balk 3.00 bh 166,203.62
-Stop Kontak 1P, 220 Volt, 10A, Wall Type 99.00 bh 41,385.00
-Saklar 1 gang 23.00 bh 25,166.49
-Saklar 2 gang 65.00 bh 32,538.54
-Saklar Hotel 2 gang 2.00 bh 98,886.99

9. INSTALASI PENERANGAN & STOP KONTAK


-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 146.00 ttk 286,312.37
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 99.00 ttk 377,936.42
A.5. PEKERJAAN LANTAI ATAP

1. PEMIPAAN AIR BERSIH


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
-PVC AW dia. 50 19.99 M1 68,262.93
-PVC AW dia. 100 (Header) 4.00 M1 412,253.41

Peralatan Katup-katup
(Ball Valve & Gate Valve)
-dia. 50 12.00 bh 411,690.04

2. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
Roof Drain, Cast Iron
-dia. 100 32.00 bh 127,832.35

Roof Drain, Cast Iron


-dia. 100 4.00 bh 127,832.35
-dia. 80 12.00 bh 92,615.01

A.6. PEKERJAAN UTILITAS

1. INSTALASI PANEL

a. P-MDP
Pengadaan dan pemasangan MDP, dengan kom 1.00 unit 35,200,977.07
sbb :
-Mgs 3P, 200 A
-MCCB 3P, 200 A
-MCCB 3P, 80 A
-MCCB 3P, 32 A
-MCB 3P, 32 A
-Contacto, (timer switch)
-Earth Fault Relay
-Over Current Relay
-Over / Under Voltage Relay
-Power Factor-meter
-Frequency-metr
-Ampere-meter 300/5 A
-Ampere-meter 50/5 A
-Volt-meter 0-500 Volt
-Volt Selector Switch
-CT 300/5 A
-CT 50/5 A
-Fuse Carrier 4 A
-Indicator Lamp
-Rel MCCB 3P
-CU Bar 5 x 400 A
-Accessories & Termination
-Box Panel

b. P-PENGELOLA
Pengadaan dan pemasangan P-PENGELOLA 1.00 unit 13,047,049.08
dengan komponen panel, sbb :
-MCCB 3P, 80 A
-MCB 3P, 63 A
-MCB 3P, 32 A
-MCB 1P, 6 A
-Ampere-meter 50/5 A
-Volt-meter 0-500 Volt
-Volt Selector Switch
-Fuse 2 A
-Indicator Lamp
-Rel MCB 3P
-Cu Bar 5 x 80 A
-Accessories & Termination
-Box Panel

-KW-meter/3ph/80A 1.00 bh 2,876,799.59

c. P-POMPA AIR BERSIH


Pengadaan dan pemasangan P-POMPA AIR B 1.00 unit 9,361,024.08
nen panel, sbb :
-MCB 3P, 32 A
-MCB 3P, 10 A
-WLC 61F G-AP 220 Volt
-DOL ( Direct On Line )
-Radar diantaki air atas
-Fuse 2 A
-Indicator Lamp
-Rel MCB 3P
-Cu Bar 5 x 32 A
-Accessories & Termination
-Box Panel

d. P-POMPA HYDRANT
Pengadaan dan pemasangan P-POMPA HYDR 1.00 unit 9,361,024.08
nen panel, sbb :
-MCB 3P, 40 A
-MCB 3P, 16 A
-WLC 61F G-AP 220 Volt
-DOL ( Direct On Line )
-Fuse 2 A
-Indicator Lamp
-Rel MCB 3P
-Cu Bar 5 x 32 A
-Accessories & Termination
-Box Panel

2. INSTALASI KABEL FEEDER


-NYY 4 x 70 mm2 + E-NYA 35 mm2 Dari P-PL 50.00 M1 818,864.72

Kabel Distribusi Daya dari MDP :


-NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-PEN 57.00 M1 219,543.38
-FRC 4 x 6 mm2 + E-NYA 6 mm2 ke P. Hydran 60.00 M1 150,143.00
-NYY 4 x 6 mm2 + E-NYA 4 mm2 ke P. Pompa 94.00 M1 52,672.77

Kabel Distribusi Daya dari P-PENGELOLA :


-NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bers 40.00 M1 214,898.99
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke P-Shallow 40.00 M1 52,672.77
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke Box MCB 26.50 M1 52,672.77

3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


a. Ruang Pompa
-TL 1 x 18 W, TL Balk Type 2.00 bh 180,947.72
-Stop Kontak 1P, 220 Volt, 13A, Wall Type 1.00 bh 41,385.00
-Saklar 1 gang 2.00 bh 25,166.49

b. Lampu Taman
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) 12.00 bh 1,000,439.84
-Memasang Lampu PJU Tiang Octagonal Single H 4.00 ttk 7,917,675.73

4. INSTALASI PENERANGAN & STOP KONTAK


a. Ruang Pompa
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 2.00 ttk 286,312.37
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk 1.00 ttk 377,936.42

b. Lampu Taman
-NYFGBY 3 x 2,5 mm2 untuk Lampu Taman 12.00 ttk 561,279.02
-Kabel Power Ins. PJU, NYFGBY 3 x 2,5 mm2 4.00 ttk 561,279.02

-Testing & Commissioning 1.00 lot 7,535,146.75

A.7. PEKERJAAN SISTEM PENTANAHAN

1. INSTALASI
Pentanahan (Grounding) Netral Sistem & Pentanahan Body

a. -Body Panel
Item SBB:
-Grounding Rod GIP 1' ( untuk R lebih kecil dari 1.00 bh 3,348,875.50
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
-Termination R.Supporting Material 1.00 lot 363,195.25
-Kabel BC 50 mm2 30.00 M1 100,116.17
-Testing & Commissioning 1.00 lot 7,535,146.75

b. -Body Peralatan pada Sistem Elektronik


Item SBB:
-Grounding Rod GIP 1' ( untuk R lebih kecil dari 1.00 bh 3,348,875.50
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
-Termination R.Supporting Material 1.00 lot 363,195.25
-Kabel BC 50 mm2 30.00 M 1 100,116.17
-Testing & Commissioning 1.00 lot 7,535,146.75

A.8. PEKERJAAN PENANGKAL PETIR (FARADAY)

1. AIR TERMINAL & TERMINATION NETWORK


a. 15 x 500mm alumunium air rod 9.00 bh 289,474.75
b. 15 mm Air terminal base 9.00 bh 584,356.75
c. 25 x 3mm Bare Alumunium Tape 158.00 M1 55,259.28
d. Grey 25x3mm Non-Metallic DC tape clip 11.00 bh 75,532.42
e. 25 x 3mm Alumunium Square tape clamp 10.00 bh 95,958.43

2. DOWN CONDUCTOR
a. 25 x 3mm Bare Alumunium Tape 3.00 M1 55,259.28
b. Grey 25 x 3mm Non-Metallic DC tape clip 3.00 bh 75,532.42
c. 25 x 3mm Alumunium Square tape clamp 15.00 bh 95,958.43
d. Test Connection Link 3.00 bh 436,915.75

3. GROUNDING SYSTEM
a. Polymer Inspection Pit 3.00 bh 879,238.75
b. 5/8" x 1800 mm Extensible Copperbond Rod 3.00 bh 778,978.87
c. 5/8" Rod Coupling 3.00 bh 57,255.17
d. Exothermic weilding 6.00 bh 1,210,981.00
e. Stranded Bar copper conductor 70 mm 188.00 M1 146,509.63

4. MATERIAL SUPPORT
a. Mould for looping 1.00 unit 1,912,431.55
b. Powder 6.00 unit 131,440.11
c. Handle Clamp 1.00 unit 1,643,720.33
d. flint gun 1.00 unit 488,262.08

5. TESTING & COMMISSIONING


a. Testing & Commissioning 1.00 lot 7,535,146.75
b. Biaya Perijinan Depnaker 1.00 lot 3,363,532.42

IV.B. PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART


B.1. PEKERJAAN PEMADAM KEBAKARAN

I INSTALASI APAR

a LANTAI 1
-Pipa BS Sch.40
dia. 4" (Riser) 5.00 m 475,307.74
dia. 3" 35.80 m 299,281.24
-Fitting & Accessories 1.00 lot 1,963,621.05
-Hydrant Box Indoor (Size 100x80x18) 1.00 bh 1,141,596.55
-Gate Valve
dia. 3" 1.00 bh 1,686,898.06
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
-Type Class ABC 3,5 kg DCP Seamless, c/w su 6.00 bh 212,042.22

b LANTAI 2
-Pipa BS Sch.40
dia. 4" (Riser) 4.00 m 475,307.74
dia. 3" 35.60 m 299,281.24
-Fitting & Accessories 1.00 lot 1,963,621.05
-Hydrant Box Indoor (Size 100x80x18) 1.00 bh 1,141,596.55
-Gate Valve
dia. 3" 1.00 bh 1,686,898.06
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
-Type Class ABC 3,5 kg DCP Seamless, c/w su 6.00 bh 212,042.22

c LANTAI 3
-Pipa BS Sch.40
dia. 4" (Riser) 4.00 m 475,307.74
dia. 3" 35.96 m 299,281.24
-Fitting & Accessories 1.00 lot 1,963,621.05
-Hydrant Box Indoor (Size 100x80x18) 1.00 bh 1,141,596.55
-Gate Valve
dia. 3" 1.00 bh 1,686,898.06
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
-Type Class ABC 3,5 kg DCP Seamless, c/w su 6.00 bh 212,042.22

d LANTAI 4
-Pipa BS Sch.40
dia. 4" (Riser) 4.00 m 475,307.74
dia. 3" 35.96 m 299,281.24
-Fitting & Accessories 1.00 lot 1,963,621.05
-Hydrant Box Indoor (Size 100x80x18) 1.00 bh 1,141,596.55
-Gate Valve
dia. 3" 1.00 bh 1,686,898.06
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
-Type Class ABC 3,5 kg DCP Seamless, c/w su 6.00 bh 212,042.22
e SITE PLAN
-Pipa BS Sch.40
dia. 4" 213.00 m 475,307.74
-Fitting & Accessories 1.00 lot 15,186,082.24
-Hydrant Box Outdoor 4.00 bh 1,061,837.99
-Hydrant Pillar 4.00 bh 2,466,788.23
-Seamesse connection 4.00 bh 2,776,484.54
-Gate Valve
dia. 4" 5.00 bh 3,432,870.31
-Check Valve
dia. 4" 1.00 bh 2,389,700.16

B.2. PEKERJAAN VENTILASI UDARA


A Exhaust Fan
1 LANTAI 1 - 4
-Exhaust kap 100 Cfm ( ceiling Mounted ) 305 unit 597,467.04
-Kipas Angin Baling 4 unit 2,776,484.54

Pipa PVC Class D


-dia. 100 834.18 m 82,928.41
-Grille 200 x 200 (Alumunium) 305 bh 184,961.22
-Install Kipas Angin Baling (Kabel NYM 3x2,5 m 4 titik 499,800.92

B.3. PEKERJAAN INSTALASI ELEKTRONIK

I PEKERJAAN SYSTEM TV

a PERALATAN UTAMA SYSTEM TV

Pengadaan dan pemasangan peralatan utama Sistem TV di-


tempatkan di Lantai Atap, dipasang secara lengkap termasuk
pondasi dan tiang penyangga sesuai diuraikan dalam Gam-
bar dan Spesifikasi Teknis.

-Antena UHF 1.00 unit 508,321.32


-Antena VHF 1.00 unit 584,156.86
-MA (Master Amplifier) / Mixer 1.00 bh 375,883.56
-Coaxial 7C/2V, dari Antena ke Mixer 50.00 m 18,463.83
-Termination & supporting material 1.00 lot 239,155.30

b SPLITTER TV

Pengadan dan pemasangan Splitter TV, berikut alat / material


bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis.
LANTAI 1
Splitter 7 ports 3.00 bh 98,766.09
TB-Splitter-TV/LT.1 1.00 bh 192,524.82

Lantai 2
Splitter 7 ports 4.00 bh 98,766.09
TB-Splitter-TV/LT.2 1.00 bh 192,524.82

Lantai 3
Splitter 7 ports 4.00 bh 98,766.09
TB-Splitter-TV/LT.3 1.00 bh 192,524.82

Lantai 4
Splitter 7 ports 4.00 bh 98,766.09
TB-Splitter-TV/LT.3 1.00 bh 192,524.82

c INSTALASI KABEL FEEDER SPLITTER TV

Instalasi Kabel Feeder Splitter TV menggunakan kabel coaxial


berikut semua aksesoris, material / alat bantu pemasangan
sesuai detail Gambar dan Spesifikasi Teknis.

Lantai 1
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Spli 10.00 m 18,463.83

Lantai 2
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Spli 15.00 m 18,463.83

Lantai 3
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Spli 20.00 m 18,463.83

Lantai 4
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Spli 25.00 m 18,463.83

d TV OUTLET

Pengadan dan pemasangan TV Outlet, breikut alat / material


bantu pemasangan lainnya sesuai Gambar dan Spesifikasi
Teknis.

Lantai 1
TV Outlet 13.00 bh 31,432.74

Lantai 2
TV Outlet 16.00 bh 31,432.74
Lantai 3
TV Outlet 16.00 bh 31,432.74

Lantai 4
TV Outlet 16.00 bh 31,432.74

e INSTALASI OUTLET TV

Instalasi kabel Outlet TV menggunakan kabel Coaxial 5C/2V


dalam conduit PVC HI dia.20 mm2 lengkap dengan bobokan
dan perapihan kembali, peralatan bantu dan aksesoris sesuai
detail Gambar dan Spesifikasi Teknis.

Lantai 1
TV Outlet 13.00 ttk 253,246.09

Lantai 2
TV Outlet 16.00 ttk 253,246.09

Lantai 3
TV Outlet 16.00 ttk 253,246.09

Lantai 4
TV Outlet 16.00 ttk 253,246.09

II PEKERJAAN FIRE ALARM


a PERALATAN UTAMA FIRE ALARM SYSTEM

Pengadaan dan pemasangan peralatan Sistem Fire Alarm


ditempatkan di Ruang Kontrol secara lengkap termasuk peng-
kabelan dan koneksi meliputi peralatan sesuai diuraikan dlm
Gambar dan Spesifikasi Teknis, tetapi tidak terbats pada item
sebagai berikut :

MCFA, kapasitas 10 Zone 1.00 unit 6,128,138.35


MDF, kapasitas 10 Zone 1.00 set 1,045,109.87
Rectifier 1.00 bh 683,879.42
Power Surge Arrester 1.00 bh 422,908.85
Battery & Charger 4 jam 1.00 bh 1,553,781.32
Grounding u/ MCFA dan Surge Arrester ( R < 0 1.00 lot 3,348,875.50

b INSTALASI KABEL FEEDER FIRE ALARM

INSTALASI FEEDER MELALUI RISER / SHAFT

Kabel NYA 5 x 2 x 2,5 mm2 in conduit Dia.32 28.00 m 39,999.06


Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 d 2.00 m 30,267.95
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 d 6.00 m 30,267.95
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 d 12.00 m 30,267.95

c PERALATAN PENGINDERA dan PENANDA KEBAKARAN

Pengadaan dan pemasangan peralatan pengindera dan penan-


da kebakaran berikut alat / material bantu lainnya sesuai Gam-
bar dan Spesifikasi Teknis.

Lantai-1
-Smoke Detector 56.00 bh 356,908.74
-Rate Of Rise Temperature - Heat detector 4.00 bh 191,037.62
Fixed Heat Detector 10.00 bh 240,798.96
-Manual push button 1.00 bh 161,549.42
-Lampu Indikator 1.00 bh 143,119.29
-Bell alarm 1.00 bh 299,406.75
-End of Line Resistor 2.00 bh 54,654.69
-TB-FA-LT.1 1.00 bh 251,243.20

Lantai-2
-Smoke Detector 53.00 bh 356,908.74
-Rate Of Rise Temperature - Heat detector 4.00 bh 191,037.62
Fixed Heat Detector 16.00 bh 240,798.96
-Manual push button 1.00 bh 161,549.42
-Lampu Indikator 1.00 bh 143,119.29
-Bell alarm 1.00 bh 299,406.75
-End of Line Resistor 2.00 bh 54,654.69
-TB-FA-LT.2 1.00 bh 251,243.20

Lantai-3
-Smoke Detector 53.00 bh 356,908.74
-Rate Of Rise Temperature - Heat detector 4.00 bh 191,037.62
Fixed Heat Detector 16.00 bh 240,798.96
-Manual push button 1.00 bh 161,549.42
-Lampu Indikator 1.00 bh 143,119.29
-Bell alarm 1.00 bh 299,406.75
-End of Line Resistor 2.00 bh 54,654.69
-TB-FA-LT.3 1.00 bh 251,243.20

Lantai-4
-Smoke Detector 53.00 bh 356,908.74
-Rate Of Rise Temperature - Heat detector 4.00 bh 191,037.62
Fixed Heat Detector 16.00 bh 240,798.96
-Manual push button 1.00 bh 161,549.42
-Lampu Indikator 1.00 bh 143,119.29
-Bell alarm 1.00 bh 299,406.75
-End of Line Resistor 2.00 bh 54,654.69
-TB-FA-LT.3 1.00 bh 251,243.20
d PERALATAN PENGINDERA dan PENANDA KEBAKARAN

Instalasi titik detector dari TB-FA dengan kabel NYA 2 x 1,5 mm2
didalam conduit dia. 20 mm2 lengkap dengan aksesoris dan
semua peralatan / material bantu pemasangan sesuai detail
Gambar dan Spesifikasi Teknis.

Lantai-1
-Detector Fire Alarm 70.00 ttk 165,832.01
-Manual push button 1.00 ttk 179,242.34
-Lampu Indikator 1.00 ttk 212,943.14
-Bell alarm 1.00 ttk 179,242.34

Lantai-2
-Detector Fire Alarm 73.00 ttk 165,832.01
-Manual push button 1.00 ttk 179,242.34
-Lampu Indikator 1.00 ttk 212,943.14
-Bell alarm 1.00 ttk 179,242.34

Lantai-3
-Detector Fire Alarm 73.00 ttk 165,832.01
-Manual push button 1.00 ttk 179,242.34
-Lampu Indikator 1.00 ttk 212,943.14
-Bell alarm 1.00 ttk 179,242.34

Lantai-4
-Detector Fire Alarm 73.00 ttk 165,832.01
-Manual push button 1.00 ttk 179,242.34
-Lampu Indikator 1.00 ttk 212,943.14
-Bell alarm 1.00 ttk 179,242.34

Testing & Comissioning included perijinan 1.00 lot 10,898,679.16

III PEKERJAAN CCTV

a PERALATAN UTAMA CCTV


-Digital Video Recorder (DVR) 1.00 unit 21,122,623.34
16 Channel Real Time Standalone DVR,
2 Ch Output, MPEG4, HDD 1 TB x 2
-LCD Monitor 32" 1.00 bh 2,434,476.59
-UPS 1 Kva 1.00 bh 1,462,945.71
-Surge Arrester (15 KA) 1.00 bh 567,504.92
-Grounding u/ MDF-CCTV dan Surge Arrester ( 1.00 lot 363,195.25

b INSTALASI CCTV
Lantai 1
-Dome Camera Colour Fixed w/ Varifocal Lens 4.00 bh 2,038,228.90
-Instalasi Camera Fixed Dome Indoor 4.00 ttk 625,989.47
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)

Lantai 2
-Dome Camera Colour Fixed w/ Varifocal Lens 4.00 bh 2,038,228.90
-Instalasi Camera Fixed Dome Indoor 4.00 ttk 625,989.47
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)

Lantai 3
-Dome Camera Colour Fixed w/ Varifocal Lens 4.00 bh 2,038,228.90
-Instalasi Camera Fixed Dome Indoor 4.00 ttk 625,989.47
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)

Lantai 4
-Dome Camera Colour Fixed w/ Varifocal Lens 4.00 bh 2,038,228.90
-Instalasi Camera Fixed Dome Indoor 4.00 ttk 625,989.47
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)

IV PEKERJAAN TATA SUARA

a PERALATAN UTAMA TATA SUARA


-MDF-SS 1.00 unit 5,364,866.46
-Speaker selector 10 zone 1.00 unit 4,299,151.85
-Power amplifire (evac) 120 W 2.00 unit 2,386,090.13
-Equalizer 1.00 unit 1,968,194.42
-Mixer Pre-Amp 1.00 unit 5,908,614.12
-Mic paging evac (di ruang operator) 1.00 bh 1,302,866.91
-Sirine module 1.00 set 707,573.87
-UPS 1 Kva 1.00 bh 1,462,945.71
-Surge Arrester (15 KA) 1.00 bh 567,504.92
-Grounding u/ MDF-SS dan Surge Arrester ( R 1.00 lot 363,195.25

b INSTALASI TATA SUARA


Lantai 1
-Ceiling speaker 3 W 8.00 bh 287,367.02
-TBTS-LT.1 1.00 bh 397,421.20
-Instalasi sound system (NYMHY 2 x 1,5 mm2) 8.00 ttk 179,544.02

Lantai 2
-Ceiling speaker 3 W 7.00 bh 287,367.02
-TBTS-LT.2 1.00 bh 397,421.20
-Instalasi sound system (NYMHY 2 x 1,5 mm2) 7.00 ttk 179,544.02

Lantai 3
-Ceiling speaker 3 W 7.00 bh 287,367.02
-TBTS-LT.2 1.00 bh 397,421.20
-Instalasi sound system (NYMHY 2 x 1,5 mm2) 7.00 ttk 179,544.02

Lantai 4
-Ceiling speaker 3 W 7.00 bh 287,367.02
-TBTS-LT.2 1.00 bh 397,421.20
-Instalasi sound system (NYMHY 2 x 1,5 mm2) 7.00 ttk 179,544.02

B.4. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)

I PEKERJAAN INSTALASI PLUMBING

I.1 INSTALASI AIR BERSIH


PERALATAN UTAMA
Pengadaan dan pemasangan unit
1 Lift Pump 2.00 bh 33,166,130.79
Kapasitas
Head
Speed
PI
1 duty, 1 standby ( bergantian), lengkap dengan 1.00 set 8,625,479.04
panel control, wlc di Tanki Air Atas dan accessories

2 Booster Pump / Distribution Pump 1.00 set 67,425,852.54


Type
Kapasitas
Head
Speed
Daya
Operasi
( lengkap dengan Pump & Electromotor, Pressure Tank, Panel Kontrol, Pressure switch,
Presure Gauge, Accessories, Gate Valve, Header & base Plat )

Filter Pump
Type 1.00 set 24,000,000.00
Kapasitas
Power
Speed
Operation
1 duty, 1 standby ( bergantian), lengkap dengan 1.00 set 8,625,479.04
panel control, wlc di Tanki Air Atas dan accessories

3 Sand Filter dan Carbon Filter Tank 1.00 set 90,751,620.54


Type
Kapasitas
Material
Media Filter
c/w : valve & accessories

4 Tangki Air Atas ( Type Cylinder ) 2.00 unit 12,265,217.60


Kapasitas
Toren Tangki Air Stainless Steel, lengkap dengan Assesories dan dudukan/ pondasi

5 PEKERJAAN SHALLOW WELL 1.00 unit 95,663,306.02


a Pembuatan / Pengeboran sumur shallow well
- Kedalaman + 95 Meter
Pipa Casing, Pipa GIP Medium dia 150mm
Pipa Rising dia 80mm
Pipa screen dia 80mm
b Pengadaan dan air)150
- Kapasitas(deb pemasangan pompa
s/d 200 Lpm, shallow well
pengadaan dan pemasangan pipa konstruksi : 1 unit
c Instalasi kabel Kontrol WLC : 1 unit
d Instalasi Pipa GIP dia 50 mm ke GWT : 1 unit
e Gate Valve dia 2" : 1 unit
f Bak Kontrol Valve uk, 600 x 600 mm dengan tutup bordes tebal 2 mm : 1 unit
g Panel kontrol shallow well type outdoor : 1 unit
h Pengujian kwalitas air ke laboratorium : 1 unit
i Testing Comissioning & Training : 1 unit
j Material & Alat Bantu : 1 unit

6 ACCESSORIES POMPA AIR BERSIH


-Gate Valve
dia. 125 ( Untuk Penghubung/penyeimbang G 2.00 bh 4,891,984.56
dia. 80 ( Untuk Penghubung/penyeimbang GW 2.00 bh 1,686,898.06
dia. 50 10.00 bh 1,191,723.14
Butterfly Valve
dia. 100 3.00 bh 4,013,852.50
-Check Valve ( CV )
dia. 50 4.00 bh 1,674,416.89
-Strainer ( STR )
dia. 50 4.00 bh 902,106.89
-Flexible Joint ( FJ )
dia. 50 8.00 bh 338,320.59
-Foot Valve
dia. 50 2.00 bh 1,106,769.04
dia. 80 2.00 bh 2,957,451.82
-Pressure Gauge 4.00 bh 279,402.36
-GIP med dia. 100 ( pipa header ) 2.00 set 965,776.96
GIP med dia. 125 ( Pipa inlet Pompa Hydrant ) 5.00 m 396,098.82
GIP med dia. 125 ( Pipa Penyeimbang GWT) 4.00 m 396,098.82
-Instalasi pemipaan area pompa 1.00 lot 5,152,284.98
c/w fiting-fitting & support.
-Meteran Air c/w GV dia. 50 & Box Meteran 1.00 unit 935,865.86

7 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
a SITE PLAN
1. Dari Box Meter PDAM ke GWT
-PVC AW dia. 50 (Dari Box Meter PDAM ke GW 10.00 m 68,262.93
2. Pemipaan R.Pompa ke Tanki Air Atas
-GIP dia. 50 46.38 m 120,059.10

I.2 INSTALASI AIR KOTOR & AIR BEKAS


1 Septic Tank ( Sewage Treatment Plant ) 2.00 unit 140,652,094.20
Kapasitas

Pipa PVC AW Ø100 (dari STP ke Riol) 50.00 M' 213,102.16

2 TESTING COMMISSIONING 1.00 lot 7,535,146.75

II PEKERJAAN INSTALASI PEMADAM KEBAKARAN

II.1 INSTALASI PEMADAM KEBAKARAN


PERALATAN UTAMA

1 Diesel Fire Pump 1.00 unit 246,617,840.60


Type
Kapasitas
Daya
Operasi
( Pompa sudah termasuk Panel Kontrol Automatic Fire Pump )
Comply to NFPA 20 Standard

2 Jockey Fire Pump 1.00 unit 52,413,700.79


Type
Kapasitas
Daya
Operasi
( Pompa sudah termasuk Panel Kontrol Automatic Fire Pump )
Comply to NFPA 20 Standard

3 ACCESSORIES POMPA HYDRANT


-Gate Valve
dia. 100 mm 6.00 bh 3,432,870.31
dia. 50 mm 2.00 bh 411,690.04
dia. 25 mm 1.00 bh 141,158.87
-Strainer
dia. 100 mm 2.00 bh 2,843,149.94
dia. 50 mm 1.00 bh 1,056,568.89
-Check Valve
dia. 100 mm 1.00 bh 2,389,700.16
dia. 50 mm 1.00 bh 1,674,416.89
-Flexible Joint
dia. 100 mm 3.00 bh 798,073.06
dia. 50 mm 2.00 bh 1,106,769.04
-Foot Valve
dia. 100 mm 1.00 bh 2,957,451.82
dia. 50 mm 1.00 bh 1,106,769.04
-Safety valve dia 100 1.00 bh 3,754,475.74
-Flow Meter (FM) dia 100 2.00 bh 5,299,095.74
-Automatic Air Vent dia 25 1.00 bh 1,231,864.54
-Pressure Gauge 2.00 bh 279,402.36
-Pressure Switch 1.00 bh 511,095.36
-Pipa BSP Sch.40 dia. 200 ( pipa header ) 2.00 set 5,171,021.49
Pipa BSP Sch.40 dia. 100 ( dari header ke rise 40.00 m 475,307.74
-Pemipaan area pompa
Pipa Sch.40 ASTM A-120 (warna Putih )
Dari Pompa ke Ground Tank (dia 100) 6.00 m 424,957.14
Dari Pompa ke Ground Tank (dia 50) 6.00 m 142,912.46

III PENYAMBUNGAN DAYA PLN

1 Pekerjaan Pasang Baru Daya Listrik PLN 131 1 Lot 136,895,000.00


-BP ( Biaya penyambungan )
-UJL ( Uang Jaminan Langanan )
-Biaya Instalatir
-Concuil
-Pemasangan dan material yang dibutuhkan, seperti ;
( kabel, tiang, pondasi, galian & urugan kembali, dll )

IV PEKERJAAN INSTALASI KABEL FEEDER


Kabel Distribusi Daya dari Panel Pompa - Air Bersih
-NYY 4 x 4 mm2 ke LP-1 10.00 m' 52,672.77
-NYY 4 x 4 mm2 ke LP-2 10.00 m' 52,672.77
NYY 4 x 4 mm2 ke FP-1 10.00 m' 52,672.77
NYY 4 x 4 mm2 ke FP-2 10.00 m' 52,672.77

Kabel Distribusi Daya dari Panel Hydrant


-NYY 4 x 4 mm2 ke Jockey Pump 10.00 m' 52,672.77
-NYY 2(3 x 2,5) mm2 ke Diesel Fire Pump 10.00 m' 50,472.89

Kabel Distribusi Daya dari P. Pompa Booster


-NYY 4 x 2,5 mm2 ke Pompa Booster 1 2.00 m' 27,239.19
-NYY 4 x 2,5 mm2 ke Pompa Booster 2 2.00 m' 27,239.19

-Proteksi Kabel dengan Pipa Gip Dia 100 20.00 m' 222,180.00
Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya

-Testing & Commissioning 1.00 lot 7,535,146.75


N RUMAH SUSUN

TIGA INTI TEKNIK SINERGI


JUMLAH HARGA
( Rp. )

1,811,700,005.31 1
2
488,303,330.89 3
4
31,000,567.12 5
6
4,614,409.80 7
4,335,396.19 8
8,354,320.52 9
709,934.47 10
11
12
154,886.58 13
7,022,845.44 14
5,808,774.12 15
16
230,710,120.75 17
18
94,426,108.94 19
88,989,159.50 20
37,346,153.54 21
22
1,836,862.08 23
1,921,009.76 24
5,984,744.52 25
206,082.40 26
27
63,318,081.19 28
29
43,835,957.42 30
10,424,957.67 31
7,238,641.65 32
1,818,524.46 33
34
5,443,492.00 35
36
5,443,492.00 37
38
15,044,844.60 39
5,674,999.08 40
41
42
43
44
45
46
47
48
49
50
51
52
53
4,443,631.08 54
55
4,926,214.44 56
57
58
59
60
37,424,877.72 61
62
46,352.04 63
64
65
1,743,480.72 66
2,602,463.90 67
3,034,790.42 68
3,805,890.84 69
3,947,637.24 70
4,876,076.16 71
1,148,145.84 72
1,672,607.52 73
2,381,339.52 74
2,796,656.47 75
4,450,836.96 76
4,918,600.08 77
78
12,108,174.04 79
6,375,840.46 80
2,322,668.68 81
1,846,448.44 82
83
84
437,042.93 85
529,066.37 86
366,881.27 87
230,225.89 88
89
18,261,906.10 90
7,193,547.90 91
669,271.80 92
2,284,711.20 93
449,211.10 94
1,106,804.97 95
498,610.86 96
3,352,185.00 97
427,830.33 98
1,822,158.24 99
62,026.74 100
395,547.96 101
102
74,991,267.37 103
44,378,417.35 104
30,612,850.02 105
106
353,712,617.34 107
108
28,779,735.63 109
110
5,052,001.50 111
4,995,247.16 112
8,698,937.12 113
464,187.92 114
115
116
585,237.12 117
1,239,092.64 118
7,745,032.16 119
120
102,425,986.92 121
122
55,262,391.82 123
3,409,634.56 124
26,642,032.04 125
7,317,786.10 126
876,349.12 127
938,133.92 128
7,979,659.36 129
130
20,330,477.90 131
132
12,752,033.25 133
7,393,214.62 134
135
136
185,230.02 137
138
21,459,616.71 139
140
16,297,236.30 141
669,386.88 142
4,492,993.54 143
144
17,229,799.88 145
5,674,999.08 146
147
148
149
150
151
152
153
154
155
156
157
158
159
5,924,841.44 160
161
5,629,959.36 162
163
164
165
166
56,307,021.73 167
168
189,621.97 169
170
171
1,644,258.24 172
2,324,640.96 173
2,466,387.36 174
3,309,778.44 175
1,715,131.44 176
2,395,514.16 177
2,537,260.56 178
3,380,651.64 179
3,649,969.80 180
4,450,836.96 181
4,521,710.16 182
5,407,625.16 183
3,720,843.00 184
4,521,710.16 185
4,592,583.36 186
5,478,498.36 187
188
8,869,600.84 189
6,412,202.41 190
1,846,448.44 191
192
193
437,042.93 194
173,907.06 195
196
19,093,066.14 197
6,312,705.30 198
401,563.08 199
2,437,025.28 200
1,347,633.30 201
1,106,804.97 202
498,610.86 203
4,097,115.00 204
578,829.27 205
2,115,005.10 206
197,773.98 207
208
79,217,311.60 209
41,801,606.02 210
37,415,705.58 211
212
295,769,087.02 213
214
28,547,641.66 215
216
5,052,001.50 217
4,995,247.16 218
8,698,937.12 219
232,093.96 220
221
222
585,237.12 223
1,239,092.64 224
7,745,032.16 225
226
53,375,230.50 227
228
26,642,032.04 229
3,409,634.56 230
8,534,231.51 231
5,871,539.10 232
938,133.92 233
7,979,659.36 234
235
18,985,972.12 236
237
11,592,757.50 238
7,393,214.62 239
240
8,273,430.02 241
242
8,273,430.02 243
244
17,229,799.88 245
5,674,999.08 246
247
248
249
250
251
252
253
254
255
256
257
258
259
5,924,841.44 260
261
5,629,959.36 262
263
264
265
266
62,177,034.26 267
268
389,778.50 269
270
271
1,998,624.24 272
2,679,006.96 273
2,820,753.36 274
3,664,144.44 275
2,069,497.44 276
2,749,880.16 277
2,891,626.56 278
3,735,017.64 279
4,004,335.80 280
4,805,202.96 281
4,876,076.16 282
5,761,991.16 283
4,075,209.00 284
4,876,076.16 285
4,946,949.36 286
5,832,864.36 287
288
8,869,600.84 289
6,412,202.41 290
1,846,448.44 291
292
293
437,042.93 294
173,907.06 295
296
19,093,066.14 297
6,312,705.30 298
401,563.08 299
2,437,025.28 300
1,347,633.30 301
1,106,804.97 302
498,610.86 303
4,097,115.00 304
578,829.27 305
2,115,005.10 306
197,773.98 307
308
79,217,311.60 309
41,801,606.02 310
37,415,705.58 311
312
313
343,571,743.60 314
315
28,547,641.66 316
317
5,052,001.50 318
4,995,247.16 319
8,698,937.12 320
232,093.96 321
322
323
585,237.12 324
1,239,092.64 325
7,745,032.16 326
327
95,508,031.08 328
329
55,262,391.82 330
3,409,634.56 331
26,642,032.04 332
7,317,786.10 333
876,349.12 334
1,061,703.52 335
938,133.92 336
337
18,985,972.12 338
339
11,592,757.50 340
7,393,214.62 341
342
8,273,430.02 343
344
8,273,430.02 345
346
17,229,799.88 347
5,674,999.08 348
349
350
351
352
353
354
355
356
357
358
359
360
361
5,924,841.44 362
363
5,629,959.36 364
365
366
367
368
67,846,890.26 369
370
389,778.50 371
372
373
2,352,990.24 374
3,033,372.96 375
3,175,119.36 376
4,018,510.44 377
2,423,863.44 378
3,104,246.16 379
3,245,992.56 380
4,089,383.64 381
4,358,701.80 382
5,159,568.96 383
5,230,442.16 384
6,116,357.16 385
4,429,575.00 386
5,230,442.16 387
5,301,315.36 388
6,187,230.36 389
390
8,869,600.84 391
6,412,202.41 392
1,846,448.44 393
394
395
437,042.93 396
173,907.06 397
398
19,093,066.14 399
6,312,705.30 400
401,563.08 401
2,437,025.28 402
1,347,633.30 403
1,106,804.97 404
498,610.86 405
4,097,115.00 406
578,829.27 407
2,115,005.10 408
197,773.98 409
410
79,217,311.60 411
41,801,606.02 412
37,415,705.58 413
414
415
13,667,214.81 416
417
7,953,870.09 418
419
1,364,575.97 420
1,649,013.64 421
422
423
424
4,940,280.48 425
426
5,713,344.72 427
428
429
4,090,635.20 430
431
432
511,329.40 433
1,111,380.12 434
435
210,958,368.40 436
437
69,846,873.90 438
439
440
35,200,977.07 441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
13,047,049.08 468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
2,876,799.59 484
485
486
9,361,024.08 487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
9,361,024.08 502
503
504
505
506
507
508
509
510
511
512
513
514
79,515,727.84 515
40,943,236.00 516
517
518
12,513,972.66 519
9,008,580.00 520
4,951,240.38 521
522
523
8,595,959.60 524
2,106,910.80 525
1,395,828.41 526
527
44,129,594.42 528
529
361,895.44 530
41,385.00 531
50,332.98 532
533
534
12,005,278.08 535
31,670,702.92 536
537
17,466,172.23 538
539
572,624.74 540
377,936.42 541
542
543
6,735,348.24 544
2,245,116.08 545
546
7,535,146.75 547
548
28,501,405.20 549
550
28,501,405.20 551
552
553
14,250,702.60 554
555
3,348,875.50 556
557
363,195.25 558
3,003,485.10 559
7,535,146.75 560
561
14,250,702.60 562
563
3,348,875.50 564
565
363,195.25 566
3,003,485.10 567
7,535,146.75 568
569
77,216,238.06 570
571
18,385,890.66 572
2,605,272.75 573
5,259,210.75 574
8,730,966.24 575
830,856.62 576
959,584.30 577
578
3,142,498.80 579
165,777.84 580
226,597.26 581
1,439,376.45 582
1,310,747.25 583
584
39,956,114.81 585
2,637,716.25 586
2,336,936.61 587
171,765.51 588
7,265,886.00 589
27,543,810.44 590
591
4,833,054.62 592
1,912,431.55 593
788,640.66 594
1,643,720.33 595
488,262.08 596
597
10,898,679.17 598
7,535,146.75 599
3,363,532.42 600
601
2,169,224,162.98 602
603
236,431,820.43 604
605
606
607
608
609
2,376,538.70 610
10,714,268.39 611
1,963,621.05 612
1,141,596.55 613
614
1,686,898.06 615
616
1,272,253.32 617
618
619
620
1,901,230.96 621
10,654,412.14 622
1,963,621.05 623
1,141,596.55 624
625
1,686,898.06 626
627
1,272,253.32 628
629
630
631
1,901,230.96 632
10,762,153.39 633
1,963,621.05 634
1,141,596.55 635
636
1,686,898.06 637
638
1,272,253.32 639
640
641
642
1,901,230.96 643
10,762,153.39 644
1,963,621.05 645
1,141,596.55 646
647
1,686,898.06 648
649
1,272,253.32 650
651
652
653
101,240,548.62 654
15,186,082.24 655
4,247,351.96 656
9,867,152.92 657
11,105,938.16 658
659
17,164,351.55 660
661
2,389,700.16 662
663
320,922,982.19 664
665
666
182,227,447.20 667
11,105,938.16 668
669
670
69,177,221.05 671
56,413,172.10 672
1,999,203.68 673
674
675
676
307,600,314.54 677
678
23,540,175.90 679
680
681
682
683
684
685
686
687
508,321.32 688
584,156.86 689
375,883.56 690
923,191.50 691
239,155.30 692
693
694
695
696
697
698
699
296,298.27 700
192,524.82 701
702
703
395,064.36 704
192,524.82 705
706
707
395,064.36 708
192,524.82 709
710
711
395,064.36 712
192,524.82 713
714
715
716
717
718
719
720
721
722
184,638.30 723
724
725
276,957.45 726
727
728
369,276.60 729
730
731
461,595.75 732
733
734
735
736
737
738
739
740
408,625.62 741
742
743
502,923.84 744
745
746
502,923.84 747
748
749
502,923.84 750
751
752
753
754
755
756
757
758
759
3,292,199.17 760
761
762
4,051,937.44 763
764
765
4,051,937.44 766
767
768
4,051,937.44 769
770
771
173,634,700.18 772
773
774
775
776
777
778
779
780
6,128,138.35 781
1,045,109.87 782
683,879.42 783
422,908.85 784
1,553,781.32 785
3,348,875.50 786
787
788
789
790
791
1,119,973.68 792
60,535.90 793
181,607.70 794
363,215.40 795
796
797
798
799
800
801
802
803
19,986,889.44 804
764,150.48 805
2,407,989.60 806
161,549.42 807
143,119.29 808
299,406.75 809
109,309.38 810
251,243.20 811
812
813
18,916,163.22 814
764,150.48 815
3,852,783.36 816
161,549.42 817
143,119.29 818
299,406.75 819
109,309.38 820
251,243.20 821
822
823
18,916,163.22 824
764,150.48 825
3,852,783.36 826
161,549.42 827
143,119.29 828
299,406.75 829
109,309.38 830
251,243.20 831
832
833
18,916,163.22 834
764,150.48 835
3,852,783.36 836
161,549.42 837
143,119.29 838
299,406.75 839
109,309.38 840
251,243.20 841
842
843
844
845
846
847
848
849
850
11,608,240.70 851
179,242.34 852
212,943.14 853
179,242.34 854
855
856
12,105,736.73 857
179,242.34 858
212,943.14 859
179,242.34 860
861
862
12,105,736.73 863
179,242.34 864
212,943.14 865
179,242.34 866
867
868
12,105,736.73 869
179,242.34 870
212,943.14 871
179,242.34 872
873
10,898,679.16 874
875
68,578,239.73 876
877
878
21,122,623.34 879
880
881
2,434,476.59 882
1,462,945.71 883
567,504.92 884
363,195.25 885
886
887
888
8,152,915.60 889
2,503,957.88 890
891
892
893
894
8,152,915.60 895
2,503,957.88 896
897
898
899
900
8,152,915.60 901
2,503,957.88 902
903
904
905
906
8,152,915.60 907
2,503,957.88 908
909
910
911
41,847,198.73 912
913
914
5,364,866.46 915
4,299,151.85 916
4,772,180.26 917
1,968,194.42 918
5,908,614.12 919
1,302,866.91 920
707,573.87 921
1,462,945.71 922
567,504.92 923
363,195.25 924
925
926
927
2,298,936.16 928
397,421.20 929
1,436,352.16 930
931
932
2,011,569.14 933
397,421.20 934
1,256,808.14 935
936
937
2,011,569.14 938
397,421.20 939
1,256,808.14 940
941
942
2,011,569.14 943
397,421.20 944
1,256,808.14 945
946
947
948
949
1,304,269,045.82 950
951
952
953
954
955
956
66,332,261.58 957
958
959
960
961
8,625,479.04 962
963
964
67,425,852.54 965
966
967
968
969
970
971
ssure switch, 972
973
974
975
24,000,000.00 976
977
978
979
980
8,625,479.04 981
982
983
90,751,620.54 984
985
986
987
988
989
990
24,530,435.20 991
992
993
994
95,663,306.02 995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
9,783,969.12 1014
3,373,796.12 1015
11,917,231.40 1016
1017
12,041,557.50 1018
1019
6,697,667.56 1020
1021
3,608,427.56 1022

2,706,564.72

2,213,538.08
5,914,903.64
1,117,609.44
1,931,553.92
1,980,494.10
1,584,395.28
5,152,284.98
935,865.86

682,629.30

5,568,341.06

281,304,188.40

10,655,108.00

7,535,146.75

246,617,840.60

52,413,700.79

20,597,221.86
823,380.08
141,158.87

5,686,299.88
1,056,568.89

2,389,700.16
1,674,416.89

2,394,219.18
2,213,538.08

2,957,451.82
1,106,769.04
3,754,475.74
10,598,191.48
1,231,864.54
558,804.72
511,095.36
10,342,042.98
19,012,309.60

2,549,742.84
857,474.76

136,895,000.00

526,727.70
526,727.70
526,727.70
526,727.70

526,727.70
504,728.90

54,478.38
54,478.38

4,443,600.00
7,535,146.75
PEKERJAAN PERSIAPAN 111,883,950.00
PEKERJAAN RK3K KONSTRUKSI 76,170,000.00

PEKERJAAN STRUKTUR STANDART 4,528,261,603.94


PEKERJAAN STRUKTUR NON STANDART 1,661,415,534.62

PEKERJAAN ARSITEKTUR STANDAR 5,970,107,682.00


PEKERJAAN ARSITEKTUR NON STANDART 993,843,192.56

PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART 1,811,700,005.31


PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART 2,169,224,162.98

17,322,606,131.42
Uraian Pekerjaan VOLUME STN
2EVAS Sumberdaya 0
PEKERJAAN PERSIAPAN Material 0
Pengukuran dan Pemasangan Bouwplank Material 160.3 M'
Direksi Keet, lengkap dengan toilet, Rg. Rapat dan
24 M2
Mushola Material
Papan Nama Proyek Material 1 ls
Foto Proyek 3 Fase (warna) Material 3 Phase
Air Kerja Material 1 Ls
Listrik Kerja Material 1 Ls
Pagar Seng Keliling Proyek, tinggi 1,8m Material 192.3 M'
Pekerjaan mobilisasi dan demobilisasi Material 1 Ls
PEKERJAAN RK3K KONSTRUKSI Material 0
Penyiapan RK3K terdiri atas: Material 1 Ls
Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin
0
Kerja Material
Pembuatan Kartu Identitas Pekerja (KIP), Material 0
Sosialisasi dan Promosi K3 terdiri atas: Material 0
Induksi K3 (Safety Induction ), khusus untuk pekerja
190 Org
baru Material
Pengarahan K3 (safety briefing) : Pertemuan
Keselamatan (Safety Talk dan/atau Tool Box Meeting), 190 Org
setiap hari Material
Pelatihan K3, Material 0
Bekerja di Ketinggian Material 0
K3 Peralatan Konstruksi & Penggunaan bahan Kimia
0
(MSDS) Material
Analysis Keselamatan Pekerjaan Material 0
Perilaku Berbasis Keselamatan (Budaya K3) Material 0
P3K Material 0
Simulasi K3, Material 48 Org
Spanduk (banner), Material 5 Lb
Poster, Material 3 Lb
Papan Informasi K3. Material 1 Bh
Alat Pelindung Kerja terdiri atas: Material 0
Jaring Pengaman(Polynet/Safety Net), Material 0
Tali Keselamatan (Life Line), Material 2 Ls
Penahan Jatuh (Safety Deck), Material 1 Ls
Pagar Pengaman (Guard Railling), Material 1 Ls
Pembatas Area (Restricted Area ). Material 1 Ls
Alat Pelindung Diri terdiri atas: Material 0
Topi Pelindung (Safety Helmet), Material 190 Bh
Pelindung Mata (Goggles, Spectacles), Material 57 Psg
Tameng Muka (Face Shield), Material 54 Bh
Pelindung Telinga (Ear Plug, Ear Muff), Material 57 Psg
Pelindung Pernafasan Dan Mulut (Masker), Material 190 Bh
Sarung Tangan (Safety Gloves), Material 57 Psg
Sepatu Keselamatan (Safety Shoes), untuk Staf Material 57 Psg
Sepatu Keselamatan (Rubber Safety Shoes and toe
190 Psg
cap) Material
Penunjang Seluruh Tubuh (Full Body Harness), Material 16 Bh
Rompi Keselamatan (Safety Vest), Material 190 Bh
Pelindung Jatuh (Fall Arrester), Material 16 Bh
Asuransi Dan Perijinan terdiri atas : Material 0
BPJS Ketenagakerjaan Dan Kesehatan Kerja,
(BERDASARKAN KEPMENAKER NOMOR : 0
KEP-196/MEN/1999, untuk Tenaga harian Proyek) Material
Surat Ijin Kelaikan Alat, Material 0
Surat Ijin Operator, Material 0
Surat Ijin Pengesahan Panitia Pembina Keselamatan
0
Dan Kesehatan Kerja (P2K3), Material
Personil K3 terdiri atas : Material 0
Ahli K3 Material 0
Petugas K3 Material 0
Petugas Tanggap Darurat, Material 0
Petugas P3K, Material 0
Ass Petugas K3/ Safety Man/Pengatur Lalu Lintas
0
(Flagman ), Material
Petugas Medis. Material 0
P3K Material 0
Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen,
1 Ls
Obat Luka, Perban, dll) Material
Ruang P3K (Tempat Tidur Pasien, Stetoskop,
1 Ls
Timbangan Berat Badan, Tensi Meter, dll), Material
Peralatan Pengasapan (Fogging), Material 0
Obat Pengasapan. Material 0
Rambu-Rambu terdiri atas : Material 1 ls
Rambu Petunjuk, Material 0
Rambu Larangan, Material 0
Rambu Peringatan, Material 0
Rambu Kewajiban, Material 0
Rambu Informasi, Material 0
Rambu Pekerjaan Sementara, Material 0
Tongkat Pengatur Lalu Lintas (Warning Lights Stick), Material 0
Kerucut Lalu Lintas (Traffic Cone), Material 0
Lampu Putar (Rotary Lamp ), Material 0
Lampu Selang Lalu Lintas. Material 0
Lain- Lain Terkait Pengendalian Risiko K3 Material 0
Alat Pemadam Api Ringan (APAR), 10Kg Material 2 Bh
Sirine, Material 4 Bh
Bendera K3, Material 2 Bh
Jalur Evakuasi (Escape Route ), Material 1 Ls
Lampu Darurat (Emergency Lamp ), Material 2 Bh
Program Inspeksi Dan Audit Internal, Material 2 Org
Pelaporan dan Penyelidikan Insiden. Material 1 Ls
PEKERJAAN STRUKTUR STANDART Material 0
PEKERJAAN LANTAI 1 Material 0
Kolom K1 Material 0
-Beton K-300 Material 36.75 M3
-Besi beton Material 10681.87 Kg
-Bekisting Material 357 M2
Kolom K2 Material 0
-Beton K-300 Material 0.63 M3
-Besi beton Material 155.33 Kg
-Bekisting Material 8.4 M2
Dinding SW1 Material 0
-Beton K-300 Material 16.8 M3
-Besi beton Material 4987.21 Kg
-Bekisting Material 119 M2
Perkerjaan dalam bangunan Material 0
- Tanah urug peninggian lantai t=45 cm (dalam bangunan)
106.16 M3
+ pemadatan CBR 5% Material
- Pasir urug diatas tanah urug t=10 cm (dalam bangunan) Material 92.48 M3
- Cor beton lantai kerja t=5 cm (dalam bangunan) Material 46.24 M3
Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (dalam
0
bangunan) Material
-Beton K-300 Material 91.26 M3
-Besi Weremesh M-8 Material 912.63 M2
Cor beton Lantai Dasar Fc '25 Mpa t=10 cm
0
(luarbngunan/teras) Material
-Beton K-300 Material 2.45 M3
-Besi beton Material 206.97 Kg
-Besi Weremesh M-8 Material 15.43 M2
Pelat Beton Canopy Jendela t= 10 cm Material 0
-Beton K-300 Material 12.39 M3
-Besi beton Material 4248.44 Kg
-Bekisting Material 123.76 M2
Pelat Tangga Service Material 0
-Beton K-300 Material 1.29 M3
-Besi beton Material 291.99 Kg
-Bekisting Material 21.23 M2
Anak Tangga Service lt. 1 Material 0
-Beton K-300 Material 0.04 M3
-Besi beton Material 93.53 Kg
-Bekisting Material 11.41 M2
Bordes Tangga Service Material 0
-Beton K-300 Material 1.53 M3
-Besi beton Material 344.8 Kg
-Bekisting Material 10.2 M2
Balok Bordes 20x35 cm (Tangga Service) Material 0
-Beton K-300 Material 0.24 M3
-Besi beton Material 217.01 Kg
-Bekisting Material 1.48 M2
Pelat Tangga Utama lt. 1 Material 0
-Beton K-300 Material 0.98 M3
-Besi beton Material 213.26 Kg
-Bekisting Material 15.03 M2
Anak Tangga Utama lt. 1 Material 0
-Beton K-300 Material 1.04 M3
-Besi beton Material 63.66 Kg
-Bekisting Material 7.97 M2
Bordes Tangga Utama lt. 1 Material 0
-Beton K-300 Material 1.08 M3
-Besi beton Material 239.36 Kg
-Bekisting Material 7.23 M2
Balok Bordes 20x35 cm Tangga Utama Material 0
-Beton K-300 Material 0.12 M3
-Besi beton Material 119.38 Kg
-Bekisting Material 0.74 M2
PEKERJAAN LANTAI 2 Material 0
Kolom K1 Material 0
-Beton K-300 Material 35.7 M3
-Besi beton Material 9566.8 Kg
-Bekisting Material 346.8 M2
Kolom K2 Material 0
-Beton K-300 Material 0.61 M3
-Besi beton Material 136.18 Kg
-Bekisting Material 8.16 M2
Dinding SW1 Material 0
-Beton K-300 Material 16.32 M3
-Besi beton Material 4950.88 Kg
-Bekisting Material 115.6 M2
Balok G1.1 Material 0
-Beton K-300 Material 10.72 M3
-Besi beton Material 2413.87 Kg
-Bekisting Material 153.13 M2
Balok G1.2 Material 0
-Beton K-300 Material 1.1 M3
-Besi beton Material 238.2 Kg
-Bekisting Material 15.75 M2
Balok G1.3 Material 0
-Beton K-300 Material 14.77 M3
-Besi beton Material 3113.59 Kg
-Bekisting Material 210.94 M2
Balok G1.4 Material 0
-Beton K-300 Material 13.23 M3
-Besi beton Material 3751.9 Kg
-Bekisting Material 189 M2
Balok G2.2 Material 0
-Beton K-300 Material 1.54 M3
-Besi beton Material 319.72 Kg
-Bekisting Material 17.01 M2
Balok G4.1 Material 0
-Beton K-300 Material 13.23 M3
-Besi beton Material 3751.9 Kg
-Bekisting Material 189 M2
Balok B1.1 Material 0
-Beton K-300 Material 0.9 M3
-Besi beton Material 202.98 Kg
-Bekisting Material 12.81 M2
Balok B2.1 Material 0
-Beton K-300 Material 7.02 M3
-Besi beton Material 1601.11 Kg
-Bekisting Material 117.86 M2
Balok BP.1 Material 0
-Beton K-300 Material 2.29 M3
-Besi beton Material 1348.94 Kg
-Bekisting Material 99.23 M2
Plat lantai dalam, t =130 mm Material 0
-Beton K-300 Material 118.64 M3
-Besi beton Material 13117.96 Kg
-Bekisting Material 912.63 M2
Plat lantai balkon, t =130 mm Material 0
-Beton K-300 Material 1.44 M3
-Besi beton Material 157.66 Kg
-Bekisting Material 1.78 M2
Pelat Beton Canopy Jendela t= 10 cm Material 0
-Beton K-300 Material 12.52 M3
-Besi beton Material 4293.25 Kg
-Bekisting Material 125.1 M2
Pelat Tangga Service Material 0
-Beton K-300 Material 1.29 M3
-Besi beton Material 291.99 Kg
-Bekisting Material 21.23 M2
Anak Tangga Service lt. 1 Material 0
-Beton K-300 Material 1.4 M3
-Besi beton Material 93.53 Kg
-Bekisting Material 11.41 M2
Bordes Tangga Service Material 0
-Beton K-300 Material 1.53 M3
-Besi beton Material 344.8 Kg
-Bekisting Material 10.2 M2
Balok Bordes 20x35 cm (Tangga Service) Material 0
-Beton K-300 Material 0.24 M3
-Besi beton Material 217.01 Kg
-Bekisting Material 1.48 M2
Pelat Tangga Utama lt. 1 Material 0
-Beton K-300 Material 0.98 M3
-Besi beton Material 213.26 Kg
-Bekisting Material 15.03 M2
Anak Tangga Utama lt. 1 Material 0
-Beton K-300 Material 1.04 M3
-Besi beton Material 63.66 Kg
-Bekisting Material 7.97 M2
Bordes Tangga Utama lt. 1 Material 0
-Beton K-300 Material 1.08 M3
-Besi beton Material 239.36 Kg
-Bekisting Material 7.23 M2
Balok Bordes 20x35 cm Tangga Utama Material 0
-Beton K-300 Material 0.12 M3
-Besi beton Material 119.38 Kg
-Bekisting Material 0.74 M2
PEKERJAAN LANTAI 3 Material 0
Kolom K2 Material 0
-Beton K-300 Material 0.61 M3
-Besi beton Material 136.18 Kg
-Bekisting Material 8.16 M2
Kolom K3 Material 0
-Beton K-300 Material 12.24 M3
-Besi beton Material 3142.69 Kg
-Bekisting Material 130.56 M2
Dinding SW1 Material 0
-Beton K-300 Material 16.32 M3
-Besi beton Material 4950.88 Kg
-Bekisting Material 115.6 M2
Balok G1.1 Material 0
-Beton K-300 Material 10.72 M3
-Besi beton Material 2413.87 Kg
-Bekisting Material 153.13 M2
Balok G1.2 Material 0
-Beton K-300 Material 1.1 M3
-Besi beton Material 238.2 Kg
-Bekisting Material 15.75 M2
Balok G1.3 Material 0
-Beton K-300 Material 14.77 M3
-Besi beton Material 3113.59 Kg
-Bekisting Material 210.94 M2
Balok G1.4 Material 0
-Beton K-300 Material 13.23 M3
-Besi beton Material 3751.9 Kg
-Bekisting Material 189 M2
Balok G2.2 Material 0
-Beton K-300 Material 1.54 M3
-Besi beton Material 319.72 Kg
-Bekisting Material 17.01 M2
Balok G4.1 Material 0
-Beton K-300 Material 2.3 M3
-Besi beton Material 560.16 Kg
-Bekisting Material 28.51 M2
Balok B1.1 Material 0
-Beton K-300 Material 0.9 M3
-Besi beton Material 202.98 Kg
-Bekisting Material 12.81 M2
Balok B2.1 Material 0
-Beton K-300 Material 7.02 M3
-Besi beton Material 1601.11 Kg
-Bekisting Material 117.86 M2
Balok BP.1 Material 0
-Beton K-300 Material 2.29 M3
-Besi beton Material 1348.94 Kg
-Bekisting Material 99.23 M2
Plat lantai dalam, t =130 mm Material 0
-Beton K-300 Material 118.64 M3
-Besi beton Material 13117.96 Kg
-Bekisting Material 912.63 M2
Plat lantai balkon, t =130 mm Material 0
-Beton K-300 Material 1.44 M3
-Besi beton Material 157.66 Kg
-Bekisting Material 1.78 M2
Pelat Beton Canopy Jendela t= 10 cm Material 0
-Beton K-300 Material 12.52 M3
-Besi beton Material 4293.25 Kg
-Bekisting Material 125.1 M2
Pelat Tangga Service Material 0
-Beton K-300 Material 1.29 M3
-Besi beton Material 291.99 Kg
-Bekisting Material 21.23 M2
Anak Tangga Service lt. 1 Material 0
-Beton K-300 Material 1.4 M3
-Besi beton Material 93.53 Kg
-Bekisting Material 11.41 M2
Bordes Tangga Service Material 0
-Beton K-300 Material 1.53 M3
-Besi beton Material 344.8 Kg
-Bekisting Material 10.2 M2
Balok Bordes 20x35 cm (Tangga Service) Material 0
-Beton K-300 Material 0.24 M3
-Besi beton Material 217.01 Kg
-Bekisting Material 1.48 M2
Pelat Tangga Utama lt. 1 Material 0
-Beton K-300 Material 0.98 M3
-Besi beton Material 213.26 Kg
-Bekisting Material 15.03 M2
Anak Tangga Utama lt. 1 Material 0
-Beton K-300 Material 1.04 M3
-Besi beton Material 63.66 Kg
-Bekisting Material 7.97 M2
Bordes Tangga Utama lt. 1 Material 0
-Beton K-300 Material 1.08 M3
-Besi beton Material 239.36 Kg
-Bekisting Material 7.23 M2
Balok Bordes 20x35 cm Tangga Utama Material 0
-Beton K-300 Material 0.21 M3
-Besi beton Material 44.1 Kg
-Bekisting Material 3 M2
PEKERJAAN LANTAI 4 Material 0
Kolom K2 Material 0
-Beton K-300 Material 0.61 M3
-Besi beton Material 136.18 Kg
-Bekisting Material 8.16 M2
Kolom K3 Material 0
-Beton K-300 Material 12.24 M3
-Besi beton Material 3142.69 Kg
-Bekisting Material 130.56 M2
Dinding SW1 Material 0
-Beton K-300 Material 16.32 M3
-Besi beton Material 4950.88 Kg
-Bekisting Material 115.6 M2
Balok G1.1 Material 0
-Beton K-300 Material 10.72 M3
-Besi beton Material 2413.87 Kg
-Bekisting Material 153.13 M2
Balok G1.2 Material 0
-Beton K-300 Material 1.1 M3
-Besi beton Material 238.2 Kg
-Bekisting Material 15.75 M2
Balok G1.3 Material 0
-Beton K-300 Material 14.77 M3
-Besi beton Material 3113.59 Kg
-Bekisting Material 210.94 M2
Balok G1.4 Material 0
-Beton K-300 Material 13.23 M3
-Besi beton Material 3751.9 Kg
-Bekisting Material 189 M2
Balok G2.2 Material 0
-Beton K-300 Material 1.54 M3
-Besi beton Material 319.72 Kg
-Bekisting Material 17.01 M2
Balok G4.1 Material 0
-Beton K-300 Material 2.3 M3
-Besi beton Material 560.16 Kg
-Bekisting Material 28.51 M2
Balok B1.1 Material 0
-Beton K-300 Material 0.9 M3
-Besi beton Material 202.98 Kg
-Bekisting Material 12.81 M2
Balok B2.1 Material 0
-Beton K-300 Material 7.02 M3
-Besi beton Material 1601.11 Kg
-Bekisting Material 117.86 M2
Balok BP.1 Material 0
-Beton K-300 Material 2.29 M3
-Besi beton Material 1348.94 Kg
-Bekisting Material 99.23 M2
Plat lantai dalam, t =130 mm Material 0
-Beton K-300 Material 118.64 M3
-Besi beton Material 13117.96 Kg
-Bekisting Material 912.63 M2
Plat lantai balkon, t =130 mm Material 0
-Beton K-300 Material 1.44 M3
-Besi beton Material 157.66 Kg
-Bekisting Material 1.78 M2
Pelat Beton Canopy Jendela t= 10 cm Material 0
-Beton K-300 Material 12.52 M3
-Besi beton Material 4293.25 Kg
-Bekisting Material 125.1 M2
Pelat Tangga Service Material 0
-Beton K-300 Material 1.29 M3
-Besi beton Material 291.99 Kg
-Bekisting Material 21.23 M2
Anak Tangga Service lt. 1 Material 0
-Beton K-300 Material 1.4 M3
-Besi beton Material 93.53 Kg
-Bekisting Material 11.41 M2
Bordes Tangga Service Material 0
-Beton K-300 Material 1.53 M3
-Besi beton Material 344.8 Kg
-Bekisting Material 10.2 M2
Balok Bordes 20x35 cm (Tangga Service) Material 0
-Beton K-300 Material 0.24 M3
-Besi beton Material 217.01 Kg
-Bekisting Material 1.48 M2
Pelat Tangga Utama lt. 1 Material 0
-Beton K-300 Material 0.98 M3
-Besi beton Material 213.26 Kg
-Bekisting Material 15.03 M2
Anak Tangga Utama lt. 1 Material 0
-Beton K-300 Material 1.04 M3
-Besi beton Material 63.66 Kg
-Bekisting Material 7.97 M2
Bordes Tangga Utama lt. 1 Material 0
-Beton K-300 Material 1.08 M3
-Besi beton Material 239.36 Kg
-Bekisting Material 7.23 M2
Balok Bordes 20x35 cm Tangga Utama Material 0
-Beton K-300 Material 0.21 M3
-Besi beton Material 44.1 Kg
-Bekisting Material 3 M2
PEKERJAAN LANTAI DAK Material 0
Kolom K4 Material 0
-Beton K-300 Material 0.32 M3
-Besi beton Material 75.06 Kg
-Bekisting Material 4.32 M2
Kolom K3 Material 0
-Beton K-300 Material 16.2 M3
-Besi beton Material 4329.16 Kg
-Bekisting Material 172.8 M2
Dinding SW1 Material 0
-Beton K-300 Material 16.32 M3
-Besi beton Material 4950.88 Kg
-Bekisting Material 115.6 M2
Balok G1.2 Material 0
-Beton K-300 Material 6.3 M3
-Besi beton Material 996.53 Kg
-Bekisting Material 63 M2
Balok G1.3 Material 0
-Beton K-300 Material 3.83 M3
-Besi beton Material 617.28 Kg
-Bekisting Material 38.31 M2
Balok G2.1 Material 0
-Beton K-300 Material 21.44 M3
-Besi beton Material 2821.28 Kg
-Bekisting Material 165.38 M2
Balok B1.1 Material 0
-Beton K-300 Material 1.05 M3
-Besi beton Material 138.66 Kg
-Bekisting Material 8.1 M2
Balok B2.1 Material 0
-Beton K-300 Material 1.05 M3
-Besi beton Material 102.8 Kg
-Bekisting Material 8.1 M2
Plat Dak t=15 cm Material 0
-Beton K-300 Material 7.74 M3
-Besi beton Material 745.12 Kg
-Bekisting Material 6.96 M2
Dudukan Water Tank Plat Dak t=20 cm + Beton Pengikat Material 0
-Beton K-300 Material 1.94 M3
-Besi beton Material 126.51 Kg
-Bekisting Material 2.74 M2
Beton Tanggulan Material 0
-Beton K-300 Material 0.21 M3
-Besi beton Material 11.16 Kg
-Bekisting Material 2.84 M2
LANTAI ATAP Material 0
Balok G3.1 Material 0
-Beton K-300 Material 46.37 M3
-Besi beton Material 7190.06 Kg
-Bekisting Material 486.83 M2
SOPI-SOPI Material 0
Kolom K4 (sopi-sopi) Material 0
-Beton K-300 Material 1.85 M3
-Besi beton Material 429.55 Kg
-Bekisting Material 19.68 M2
Balok G3.1 (sopi-sopi) Material 0
-Beton K-300 Material 4.24 M3
-Besi beton Material 661.19 Kg
-Bekisting Material 44.52 M2
RANGKA ATAP BAJA Material 0
Atap Bagian Bawah Material 0
Pekerjaan Atap Baja Ringan Material 1033.77 M2
Atap Bagian Atas Material 0
Pipa baja 4", T = 3.2 mm Material 714 Kg
Base plate t= 6mm Material 15.07 Kg
Mur Baut A325 HTB Dia 12 mm Material 32 bh
Pekerjaan Groutig (sika grout) Material 24 titik
PEKERJAAN STRUKTUR NON STANDART Material 0
PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE) Material 0
A.1. Pondasi Tiang Pancang dan Tie Beam (Sloof) Material 0
Pekerjaan Pondasi Tiang Pancang 25x25 cm Material 0
Tipe Tiang Pondasi Material 1640.5 M1
Pemotongan kepala tiang Material 193 Nos
Kedalaman Pondasi disesuaikan hasil sondir dan boring
0
stempat* Material
Pile Cap Tipe PC-1 Material 0
-Beton K-300 Material 0.77 M3
-Besi beton Material 116.32 Kg
-Bekisting Material 3.84 M2
Pile Cap Tipe PC-2 Material 0
-Beton K-300 Material 22.27 M3
-Besi beton Material 2379.04 Kg
-Bekisting Material 83.52 M2
Pile Cap Tipe PC-3 Material 0
-Beton K-300 Material 48 M3
-Besi beton Material 5305.69 Kg
-Bekisting Material 121.48 M2
Pile Cap Tipe PC-4 Material 0
-Beton K-300 Material 37.54 M3
-Besi beton Material 5087.68 Kg
-Bekisting Material 37.84 M2
Tie Beam / Sloof TB1 Material 0
-Beton K-300 Material 49.29 M3
-Besi beton Material 2639.7 Kg
-Bekisting Material 394.48 M2
Tie Beam / Sloof TBP Material 0
-Beton K-300 Material 5.72 M3
-Besi beton Material 55.69 Kg
-Bekisting Material 76.41 M2
Pekerjaan Pas Batu Kali (dibawah Tie beam) Material 0
-Pasangan Batu Kali Material 126.3 M3
-Aanstamping Material 51.46 M3
-Urugan Pasir 10 cm Material 32.74 M3
Besi Dowel Ø 10-1000 Material 1338.06 Kg
Pekerjaan Galian tanah : Material 0
Pile Cap Tipe PC-1 Material 2.36 M3
Pile Cap Tipe PC-2 Material 55.88 M3
Pile Cap Tipe PC-3 Material 50.18 M3
Pile Cap Tipe PC-4 Material 28.05 M3
Pekerjaan Pas Batu Kali (dibawah Tie beam) Material 245.58 M3
Pekerjaan Urugan Pasir tebal 10 cm : Material 0
Pile Cap Tipe PC-1 Material 0.13 M3
Pile Cap Tipe PC-2 Material 3.71 M3
Pile Cap Tipe PC-3 Material 8 M3
Pile Cap Tipe PC-4 Material 6.26 M3
Pekerjaan Lantai Kerja tebal 5 cm : Material 0
Pile Cap Tipe PC-1 Material 0.06 M3
Pile Cap Tipe PC-2 Material 1.86 M3
Pile Cap Tipe PC-3 Material 4 M3
Pile Cap Tipe PC-4 Material 3.13 M3
Urugan tanah kembali bekas galian Material 354.9 M3
Urugan Sertu dalam bangunan Material 106.16 M3
Pemadatan tanah CBR > 6%, Material 354.9 M3
Pekerjaan Test PDA Tiang Material 2 Titik
PEKERJAAN STRUKTUR GWT DAN RUANG POMPA Material 0
PEKERJAAN STRUKTUR GWT Material 0
Pekerjaan Pondasi Tiang Pancang 25x25 cm Material 0
Tipe Tiang Pondasi Material 102 M1
Pemotongan kepala tiang Material 12 Nos
Pile Cap Tipe PC-1 (GWT) Material 0
-Beton K-300 Material 1.08 M3
-Besi beton Material 138.71 Kg
-Bekisting Material 7.92 M2
Pile Cap Tipe PC-2 (GWT) Material 0
-Beton K-300 Material 1.13 M3
-Besi beton Material 239.48 Kg
-Bekisting Material 6.3 M2
Pekerjaan Galian tanah : Material 0
Pile Cap Tipe PC-1 (GWT) Material 4.52 M3
Pile Cap Tipe PC-2 (GWT) Material 3.65 M3
Pekerjaan Urugan Pasir tebal 10 cm : Material 0
Pile Cap Tipe PC-1 (GWT) Material 0.18 M3
Pile Cap Tipe PC-2 (GWT) Material 0.19 M3
Pekerjaan Lantai Kerja tebal 5 cm : Material 0
Pile Cap Tipe PC-1 (GWT) Material 0.09 M3
Pile Cap Tipe PC-2 (GWT) Material 0.09 M3
Urugan Tanah Kembali Bekas Galian Material 7.62 M3
Pemadatan tanah CBR > 6% Material 7.62 M3
Pekerjaan Lantai Dasar GWT Material 0
-Beton K-300 Material 19.85 M3
-Besi beton Material 1634.17 Kg
-Bekisting Material 9.45 M2
Pekerjaan Dinding GWT Material 0
-Beton K-300 Material 45.5 M3
-Besi beton Material 5209.09 Kg
-Bekisting Material 364 M2
Pekerjaan Pelat Penutup GWT Material 0
-Beton K-300 Material 8.46 M3
-Besi beton Material 1600.72 Kg
-Bekisting Material 4.73 M2
PEKERJAAN STRUKTUR RUANG POMPA Material 0
Pekerjaan Pondasi Tiang Pancang 25x25 cm Material 0
Tipe Tiang Pondasi Material 34 M1
Pemotongan kepala tiang Material 4 Nos
Pile Cap Tipe PC-1 (R.Pompa) Material 0
-Beton K-300 Material 0.72 M3
-Besi beton Material 92.47 Kg
-Bekisting Material 5.28 M2
Tie Beam / Sloof TB1 Material 0
-Beton K-300 Material 2.28 M3
-Besi beton Material 48.53 Kg
-Bekisting Material 18.5 M2
Pekerjaan Galian tanah : Material 0
Pile Cap Tipe PC-1 (R.Pompa) Material 3.01 M3
Tie Beam / Sloof TB1 Material 2.28 M3
Pekerjaan Urugan Pasir tebal 10 cm : Material 0
Pile Cap Tipe PC-1 (R.Pompa) Material 0.12 M3
Tie Beam / Sloof TB1 Material 0.51 M3
Pekerjaan Lantai Kerja tebal 5 cm : Material 0
Pile Cap Tipe PC-1 (R.Pompa) Material 0.06 M3
Tie Beam / Sloof TB1 Material 0.25 M3
Urugan Tanah Kembali Bekas Galian Material 4.36 M3
Pemadatan tanah CBR > 6% Material 4.36 M3
Pekerjaan Lantai Dasar R.Pompa Material 0
-Beton K-300 Material 4.98 M3
-Besi beton Material 428.01 Kg
-Bekisting Material 4.06 M2
Pekerjaan Pelat Dak R.Pompa Material 0
-Beton K-300 Material 4.1 M3
-Besi beton Material 732.14 Kg
-Bekisting Material 3.61 M2
Kolom K3A (R. Pompa) Material 0
-Beton K-300 Material 0.88 M3
-Besi beton Material 172.1 Kg
-Bekisting Material 14 M2
Balok B1 (R. Pompa) Material 0
-Beton K-300 Material 2.21 M3
-Besi beton Material 635.15 Kg
-Bekisting Material 33.92 M2
Tie Beam Dasar Pelat (R. Pompa) Material 0
-Beton K-300 Material 2.28 M3
-Besi beton Material 110.83 Kg
-Bekisting Material 18.5 M2
Lantai Ramp Material 0
-Beton K-300 Material 0.32 M3
-Besi beton Material 36.64 Kg
-Bekisting Material 1.38 M2
PEKERJAAN STRUKTUR STP Material 0
Pekerjaan Galian tanah : Material 181.58 M3
Pekerjaan Urugan tanah kembali bekas galian Material 118.52 M3
Pasir urug diatas tanah urug Material 4 M3
Cor beton lantai kerja Fc' 8.3 Mpa t=5 cm Material 2 M3
Pasang Kolom Praktis Material 22.8 M1
Pekerjaan Lantai Dasar STP Material 0
-Beton K-300 Material 6.45 M3
-Besi beton Material 2120.81 Kg
-Bekisting Material 7.44 M2
Pelat Atas (STP) Material 0
-Beton K-300 Material 6.45 M3
-Besi beton Material 2120.81 Kg
-Bekisting Material 7.44 M2
Pelat Dinding (STP) Material 0
-Beton K-300 Material 19.66 M3
-Besi beton Material 4936.6 Kg
-Bekisting Material 262.08 M2
PEKERJAAN ARSITEKTUR STANDAR Material 0
PEKERJAAN LANTAI SATU Material 0
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 0
Material
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk
1416.41 M2
Dinding Railling Tangga Material
Pek. Plesteran Trasram (1:2) Material 596.62 M2
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar
2236.21 M2
dan Interior/Dind. Bag. Dalam Material
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga,
1021.7 M2
Bordes, Canopi Jendela & Entrance Material
Kolom/Balok praktis 11 x 11 cm (termasuk balok Latei) Material 940.33 M1
Pek. Partisi Gypsum Rangka Metal Stud Track + Lapis
242.64 M2
Rockwool Material
Pek. Cover/Penutup Pipa Air Hujan Bagian Entrance
3.41 M2
Gypsum + Rangka Hollow Galvanis Material
Pek. Pasang Hand Railling Tangga pipa Black Steel
Medium dia 3" & dia 1", di Atas Dinding dan Nempel pada 41.48 M1
Didinding Material
Pek. Keramik uk. 20x25 Dinding KM/WC, R. Cuci +
287.66 M2
Dinding Dapur Material
Pek. Plint Homogenous Tile 10x60 Dinding
Coridor/Selasar, R. Serbaguna, & R. Pengelola dan Unit 650.96 M1
Hunian Material
Pek. Keramik uk. 20x20 cm Meja Dapur Material 17.67 M2
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
0
& RAILING Material
Kusen Alum. 3" Powder Coating + Daun Pintu Frame
Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela
2 Unit
Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca
Clear 5 mm (lengkap terpasang ) type PJ-1 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Frame
Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela
1 Unit
Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca
Clear 5 mm (lengkap terpasang ) type PJ-2 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Frame
Alum. Powder Coating, Kaca Clear 5 mm & Daun Jendela
1 Unit
Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca
Clear 5 mm (lengkap terpasang ) type PJ-3 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb
Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) 10 Unit
type P-1 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb
Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) 2 Unit
type P-1' Material
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb
Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) 24 Unit
type P-2 Material
Kusen Alum. 3" + Daun Pintu Frame Alum. Kaca Clear 8
1 Unit
mm + BV Kaca Clear 5 mm (lengkap terpasang ) type P-3 Material
Kusen Besi Hollow + Daun Pintu Besi type (lengkap
3 Unit
terpasang ) P-4 Material
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC
13 Unit
(lengkap terpasang ) type PT Material
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC
2 Unit
(lengkap terpasang ) type PTD Material
Kusen Besi Hollow Powder Coating + Daun Pintu Besi
2 Unit
(lengkap terpasang ) type PB Material
Kusen Alum. 3" Powder Coating + Daun Pintu Alum.
13 Unit
Powder Coating (lengkap terpasang) type PS Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) 14 Unit
type J1 Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) 12 Unit
type J2 Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) 3 Unit
type J4 Material
Kusen Alum. 3" Powder Coating + Jendela Frame Alum.
Powder Coating, Kaca Clear 5 mm (lengkap terpasang) type 3 Unit
J5 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
6 Unit
RB-1 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
4 Unit
RB-2 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
2 Unit
RB-4 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
2 Unit
RB-5 Material
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm
12 Unit
(lengkap terpasang) type BV-1 Material
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm
12 Unit
(lengkap terpasang) type BV-2 Material
Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap
12 Unit
terpasang) type JL-1 Material
PEKERJAAN PLAFOND Material 0
Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow
693.77 M2
Galvanis Uk. Rangka 60x60 cm Material
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow
76.83 M2
Galvanis Uk. Rangka 60x60 Material
List plafond gypsum 5 cm Material 1025.47 M1
PEKERJAAN LANTAI Material 0
Pek. Pasang Homogenous Tile polish lantai Unit Hunian,
R. Serbaguna, Koridor, Tangga Utama dan Tangga Servis Uk. 757.89 M2
60x60 cm Material
Pek. Pasang Lantai Pemandu Orang Tuna Netra / Tactile
9.9 M2
Uk. 40x40 cm Material
Pek. Pasang Homogenous Tile unpolish lantai keliling
140.67 M2
bangunan Uk. 60x60 cm Material
Pek. Pasang Homogenous Tile Step Nozing Tangga
87.1 M1
Tengah + Tangga Entrance + Tangga Servis Uk. 10 x 60 cm Material
Pek. Waterproofing (liquid/cement base) Dinding t=210 cm
316.55 M2
Toilet, R Cuci Material
Pek. Waterproofing (liquid/cement base) di Daerah Canopy
75.53 M2
Jendela + Canopy Entrance Material
PEKERJAAN UTILITAS Material 0
Pasang Closet Duduk Type Standar Dual Flush - Unit
12 Buah
Hunian (lengkap terpasang) Material
Pasang Closet Jongkok Type Standar - Toilet Umum
3 Buah
(lengkap terpasang) Material
Pasang Urinoir - Toilet Umum (lengkap terpasang) Material 2 Buah
Pasang Partisi Urinoir - Toilet Umum (lengkap terpasang) Material 1 Buah
Pasang Cermin - Toilet Umum (lengkap terpasang) Material 2 Buah
Pasang Wastafel Meja + Kran Stainless + Aksesoris -
2 Buah
Toilet Umum (lengkap terpasang) Material
Pasang Wastafel Dinding + Kran Stainless + Aksesoris -
12 Buah
Unit Hunian (lengkap terpasang) Material
Pasang Shower + Kran Stainless - Unit Hunian (lengkap
12 Buah
terpasang) Material
Pasang Kran Stainless - Unit Hunian, Toilet Umum, dan
24 Buah
Janitor (lengkap terpasang) Material
Pasang Jet Washer + Kran Stainless - Unit Hunian
12 Buah
(lengkap terpasang) Material
Pasangan Floor Drain Stainless, di Toilet Hunian, di Toilet
37 Buah
Umum, di Ruang Cuci, di Janitor, dan di Tempat Sampah Material
Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian
12 Buah
(lengkap terpasang) Material
Handrail Pipa Stainless Untuk Toilet Difabel Material 4.15 M1
Grab Bar Untuk Toilet Difabel Material 2 Buah
PEKERJAAN PENGECATAN Material 0
Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) Material 548.28 M2
Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) Material 1613.33 M2
Pek. Cat Canopy Material 142.4 M2
Pek. Cat Plafond Material 770.6 M2
Pek. Cat List Plafond Material 1025.47 M1
PEKERJAAN RAMP DI ENTRANCE TERAS, ASESORIS
0
DI FACADE DAN SELASAR KELILING BANGUNAN Material
Pasang Railing Ramp t.0,85cm: Besi pipa d.2" & 3/4"inc by
9.55 M1
specialist Material
Pasang Keramik Lantai 60 x 60 HT Unpolished (RAMP) Material 5.01 M2
PEKERJAAN LANTAI DUA Material 0
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 0
Material
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk
1539.37 M2
Dinding Railling Tangga Material
Pek. Plesteran Trasram (1:2) Material 673.88 M2
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar
2404.86 M2
dan Interior/Dind. Bag. Dalam Material
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga,
1009.2 M2
Bordes, Canopi Jendela Material
Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan
1024.08 M1
Pertemunan Dinding Material
Pek. Partisi Gypsum Rangka Metal Stud + Lapis Rockwool Material 341.52 M2
Pek. Cover/Penutup Pipa Air Hujan Bagian Balkon
3.19 M2
Gypsum + Rangka Hollow Galvanis Material
Pek. Pasang Hand Railling Tangga pipa Black Steel
Medium dia 3" & dia 1", di Atas Dinding dan Nempel pada 41.48 M1
Didinding Material
Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding
336.72 M2
Dapur Material
Pek. Plint 10x60 cm Dinding Coridor/Selasar dan Unit
685.76 M1
Kamar Material
Pek. Keramik 20x20 cm Meja Dapur Material 23.56 M2
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
0
& RAILING Material
Kusen Alum. 3" Powder Coating + Daun Pintu Frame
Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela
1 Unit
Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca
Clear 5 mm (lengkap terpasang ) type PJ-1 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb
Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) 16 Unit
type P-1 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb
Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) 32 Unit
type P-2 Material
Kusen Besi Hollow + Daun Pintu Besi type (lengkap
3 Unit
terpasang ) P-4 Material
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC
16 Unit
(lengkap terpasang ) type PT Material
Kusen Alum. 3" Powder Coating + Daun Pintu Alum.
17 Unit
Powder Coating (lengkap terpasang) type PS Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) 16 Unit
type J1 Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) 16 Unit
type J2 Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating, Kaca Clear 5 mm & Jendela Krepyak 2 Unit
Alum. Powder Coating (lengkap terpasang) type J3 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
6 Unit
RB-1 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
4 Unit
RB-4 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
2 Unit
RB-5 Material
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm
16 Unit
(lengkap terpasang) type BV-1 Material
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm
16 Unit
(lengkap terpasang) type BV-2 Material
Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap
16 Unit
terpasang) type JL-1 Material
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-
1 Unit
1 Material
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-
2 Unit
2 Material
PEKERJAAN PLAFOND Material 0
Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow
691.64 M2
Galvanis Uk. Rangka 60x60 cm Material
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow
61.12 M2
Galvanis Uk. Rangka 60x60 Material
Pek. List Plafond Gypsum 5/5 Material 1115.8 M2
PEKERJAAN LANTAI Material 0
Pek. Pasang Homogenous Tile Polish lantai Unit Hunian,
754.29 M2
Koridor, Tangga Utama, dan Tangga Servis Uk. 60x60 cm Material
Pek. Pasang Keramik lantai Balkon, R Cuci dan Toilet Uk.
54.4 M2
20x20 cm Material
Pek. Pasang Homogenous Tile Step Nozing Tangga
87.1 M1
Tengah + Tangga Servis Uk. 10 x 60 cm Material
Pek. Waterproofing (liquid/cement base) Lantai + Dinding
202.44 M2
t=210 cm Toilet, R Cuci Material
Pek. Waterproofing (liquid/cement base) di Daerah Canopy
76.35 M2
Jendela Material
PEKERJAAN UTILITAS Material 0
Pasang Closet Duduk Type Standar Dual Flush - Unit
16 Buah
Hunian (lengkap terpasang) Material
Pasang Wastafel Dinding + Kran Stainless + Aksesoris -
16 Buah
Unit Hunian (lengkap terpasang) Material
Pasang Shower + Kran Stainless - Unit Hunian (lengkap
16 Buah
terpasang) Material
Pasang Kran Stainless - Unit Hunian, dan Janitor (lengkap
19 Buah
terpasang) Material
Pasang Jet Washer + Kran Stainless - Unit Hunian
16 Buah
(lengkap terpasang) Material
Pasangan Floor Drain Stainless, di Toilet Hunian, di Ruang
36 Buah
Cuci, di Janitor, dan di Tempat Sampah Material
Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian
16 Buah
(lengkap terpasang) Material
PEKERJAAN PENGECATAN Material 0
Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) Material 517.82 M2
Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) Material 1725.35 M2
Pek. Cat Canopy Material 143.94 M2
Pek. Cat Plafond Material 752.77 M2
Pek. Cat List Plafond Material 1115.8 M1
PEKERJAAN LANTAI TIGA Material 0
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 0
Material
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk
1539.37 M2
Dinding Railling Tangga Material
Pek. Plesteran Trasram (1:2) Material 673.88 M2
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar
2404.86 M2
dan Interior/Dind. Bag. Dalam Material
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga,
1009.2 M2
Bordes, Canopi Jendela Material
Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan
1024.08 M1
Pertemunan Dinding Material
Pek. Partisi Gypsum Rangka Metal Stud + Lapis Rockwool Material 341.52 M2
Pek. Cover/Penutup Pipa Air Hujan Bagian Balkon
3.19 M2
Gypsum + Rangka Hollow Galvanis Material
Pek. Pasang Hand Railling Tangga pipa Black Steel
Medium dia 3" & dia 1", di Atas Dinding dan Nempel pada 43.79 M1
Didinding Material
Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding
336.72 M2
Dapur Material
Pek. Plint 10x60 cm Dinding Coridor/Selasar dan Unit
685.76 M1
Kamar Material
Pek. Keramik 20x20 cm Meja Dapur Material 23.56 M2
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
0
& RAILING Material
Kusen Alum. 3" Powder Coating + Daun Pintu Frame
Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela
1 Unit
Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca
Clear 5 mm (lengkap terpasang ) type PJ-1 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb
Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) 16 Unit
type P-1 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb
Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) 32 Unit
type P-2 Material
Kusen Besi Hollow + Daun Pintu Besi type (lengkap
3 Unit
terpasang ) P-4 Material
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC
16 Unit
(lengkap terpasang ) type PT Material
Kusen Alum. 3" Powder Coating + Daun Pintu Alum.
17 Unit
Powder Coating (lengkap terpasang) type PS Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) 16 Unit
type J1 Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) 16 Unit
type J2 Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating, Kaca Clear 5 mm & Jendela Krepyak 2 Unit
Alum. Powder Coating (lengkap terpasang) type J3 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
6 Unit
RB-1 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
4 Unit
RB-4 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
2 Unit
RB-5 Material
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm
16 Unit
(lengkap terpasang) type BV-1 Material
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm
16 Unit
(lengkap terpasang) type BV-2 Material
Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap
16 Unit
terpasang) type JL-1 Material
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-
1 Unit
1 Material
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-
2 Unit
2 Material
PEKERJAAN PLAFOND Material 0
Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow
691.64 M2
Galvanis Uk. Rangka 60x60 cm Material
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow
61.12 M2
Galvanis Uk. Rangka 60x60 Material
Pek. List Plafond Gypsum 5/5 Material 1115.8 M2
PEKERJAAN LANTAI Material 0
Pek. Pasang Homogenous Tile Polish lantai Unit Hunian,
754.29 M2
Koridor, Tangga Utama, dan Tangga Servis Uk. 60x60 cm Material
Pek. Pasang Keramik lantai Balkon, R Cuci dan Toilet Uk.
54.4 M2
20x20 cm Material
Pek. Pasang Homogenous Tile Step Nozing Tangga
87.1 M1
Tengah + Tangga Servis Uk. 10 x 60 cm Material
Pek. Waterproofing (liquid/cement base) Lantai + Dinding
202.44 M2
t=210 cm Toilet, R Cuci Material
Pek. Waterproofing (liquid/cement base) di Daerah Canopy
76.35 M2
Jendela Material
PEKERJAAN UTILITAS Material 0
Pasang Closet Duduk Type Standar Dual Flush - Unit
16 Buah
Hunian (lengkap terpasang) Material
Pasang Wastafel Dinding + Kran Stainless + Aksesoris -
16 Buah
Unit Hunian (lengkap terpasang) Material
Pasang Shower + Kran Stainless - Unit Hunian (lengkap
16 Buah
terpasang) Material
Pasang Kran Stainless - Unit Hunian, dan Janitor (lengkap
19 Buah
terpasang) Material
Pasang Jet Washer + Kran Stainless - Unit Hunian
16 Buah
(lengkap terpasang) Material
Pasangan Floor Drain Stainless, di Toilet Hunian, di Ruang
36 Buah
Cuci, di Janitor, dan di Tempat Sampah Material
Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian
16 Buah
(lengkap terpasang) Material
PEKERJAAN PENGECATAN Material 0
Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) Material 517.82 M2
Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) Material 1725.35 M2
Pek. Cat Canopy Material 143.94 M2
Pek. Cat Plafond Material 752.77 M2
Pek. Cat List Plafond Material 1115.8 M1
PEKERJAAN LANTAI EMPAT Material 0
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 0
Material
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk
1539.37 M2
Dinding Railling Tangga Material
Pek. Plesteran Trasram (1:2) Material 673.88 M2
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar
2404.86 M2
dan Interior/Dind. Bag. Dalam Material
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga,
1009.2 M2
Bordes, Canopi Jendela Material
Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan
1024.08 M1
Pertemunan Dinding Material
Pek. Partisi Gypsum Rangka Metal Stud + Lapis Rockwool Material 341.52 M2
Pek. Cover/Penutup Pipa Air Hujan Bagian Balkon
3.19 M2
Gypsum + Rangka Hollow Galvanis Material
Pek. Pasang Hand Railling Tangga pipa Black Steel
Medium dia 3" & dia 1", di Atas Dinding dan Nempel pada 43.79 M1
Didinding Material
Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding
336.72 M2
Dapur Material
Pek. Plint 10x60 cm Dinding Coridor/Selasar dan Unit
685.76 M1
Kamar Material
Pek. Keramik 20x20 cm Meja Dapur Material 23.56 M2
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
0
& RAILING Material
Kusen Alum. 3" Powder Coating + Daun Pintu Frame
Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela
1 Unit
Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca
Clear 5 mm (lengkap terpasang ) type PJ-1 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb
Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) 16 Unit
type P-1 Material
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb
Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) 32 Unit
type P-2 Material
Kusen Besi Hollow + Daun Pintu Besi type (lengkap
3 Unit
terpasang ) P-4 Material
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC
16 Unit
(lengkap terpasang ) type PT Material
Kusen Alum. 3" Powder Coating + Daun Pintu Alum.
17 Unit
Powder Coating (lengkap terpasang) type PS Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) 16 Unit
type J1 Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) 16 Unit
type J2 Material
Kusen Alum. 3" Powder Coating + Daun Jendela Frame
Alum. Powder Coating, Kaca Clear 5 mm & Jendela Krepyak 2 Unit
Alum. Powder Coating (lengkap terpasang) type J3 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
6 Unit
RB-1 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
4 Unit
RB-4 Material
Glass Block + Rooster 20X20 (lengkap terpasang) type
2 Unit
RB-5 Material
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm
16 Unit
(lengkap terpasang) type BV-1 Material
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm
16 Unit
(lengkap terpasang) type BV-2 Material
Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap
16 Unit
terpasang) type JL-1 Material
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-
1 Unit
1 Material
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-
2 Unit
2 Material
PEKERJAAN PLAFOND Material 0
Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow
691.64 M2
Galvanis Uk. Rangka 60x60 cm Material
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow
61.12 M2
Galvanis Uk. Rangka 60x60 Material
Pek. List Plafond Gypsum 5/5 Material 1115.8 M2
PEKERJAAN LANTAI Material 0
Pek. Pasang Homogenous Tile Polish lantai Unit Hunian,
754.29 M2
Koridor, Tangga Utama, dan Tangga Servis Uk. 60x60 cm Material
Pek. Pasang Keramik lantai Balkon, R Cuci dan Toilet Uk.
54.4 M2
20x20 cm Material
Pek. Pasang Homogenous Tile Step Nozing Tangga
87.1 M1
Tengah + Tangga Servis Uk. 10 x 60 cm Material
Pek. Waterproofing (liquid/cement base) Lantai + Dinding
202.44 M2
t=210 cm Toilet, R Cuci Material
Pek. Waterproofing (liquid/cement base) di Daerah Canopy
76.35 M2
Jendela Material
PEKERJAAN UTILITAS Material 0
Pasang Closet Duduk Type Standar Dual Flush - Unit
16 Buah
Hunian (lengkap terpasang) Material
Pasang Wastafel Dinding + Kran Stainless + Aksesoris -
16 Buah
Unit Hunian (lengkap terpasang) Material
Pasang Shower + Kran Stainless - Unit Hunian (lengkap
16 Buah
terpasang) Material
Pasang Kran Stainless - Unit Hunian, dan Janitor (lengkap
19 Buah
terpasang) Material
Pasang Jet Washer + Kran Stainless - Unit Hunian
16 Buah
(lengkap terpasang) Material
Pasangan Floor Drain Stainless, di Toilet Hunian, di Ruang
36 Buah
Cuci, di Janitor, dan di Tempat Sampah Material
Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian
16 Buah
(lengkap terpasang) Material
PEKERJAAN PENGECATAN Material 0
Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) Material 517.82 M2
Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) Material 1725.35 M2
Pek. Cat Canopy Material 143.94 M2
Pek. Cat Plafond Material 752.77 M2
Pek. Cat List Plafond Material 1115.8 M1
PEKERJAAN LANTAI DAK DAN ATAP Material 0
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 0
Material
Pek. Pasangan Dinding Bata Ringan t=10 cm Material 274.95 M2
Pek. Plester + Aci Mortar Dinding Bata Exterior/Dind.
549.89 M2
Terluar Material
Pek. Kolom & Balok Praktis 11/11 Openingan Kusen Material 243.76 M1
Pek. Perapihan Kolom Material 728.15 M2
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
0
& RAILING Material
Kusen Hollow 60x60 mm + Daun Pintu Lapis Plat Besi &
2 Unit
Louvre Plat Besi TB 2 mm (lengkap terpasang ) type PD Material
Rooster 20X20 (lengkap terpasang) type RB-3 Material 22 Unit
Pek. Pasang Logo Signage PU, Baja 3mm uk 80x80,Finish
1 bh
Duo Doff (terpasang pada tempatnya) Material
PEKERJAAN PLAFOND Material 0
Pek. Beton Expose Material 33.36 M2
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow
41.71 M2
Galvanis Uk. Rangka 60x60 Material
Pek. List Plafond Gypsum 5/5 Material 78.4 M1
PEKERJAAN LANTAI Material 0
Waterproofing Membran Bakar t=3cm Lantai Dak Torn
48.41 M2
(elv. +13,8) + 15 cm Pada Tanggulan Material
Pek. Screed + Aci Lantai Dak Torn (elv. +13,8) Material 48.41 M2
PEKERJAAN UTILITAS Material 0
Pasangan Floor Drain Stainless - di Dak Torn (lengkap
4 Buah
terpasang) Material
PEKERJAAN PENGECATAN Material 0
Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) Material 274.95 M2
Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) Material 73.69 M2
Pek. Cat Plafond Material 41.71 M2
Pek. Cat List Plafond Material 78.4 M1
Pek. Cat Epoxy 500 micron Lantai Dak Material 48.41 M2
PEKERJAAN PENUTUP ATAP Material 0
Pek. Atap Metal Spandeck Berpasir T=0.45 MM Material 1006.56 M2
Pek. Nok Genteng Material 68.95 M1
Pek. Lisplang GRC Tebal 9 mm Lebar 40 cm + Cat
165.5 M1
Exterior Material
Talang zincalum t= 0,35mm, L=90 cm Material 111.56 M1

PEKERJAAN ARSITEKTUR NON STANDART 0


Material
PEKERJAAN KELILING BAGIAN LUAR BANGUNAN Material 0
PEKERJAAN KELILING BANGUNAN DAN TANAMAN Material 0
Pek. Tanah Subur t = 10 cm Material 321.5 M3
Pek. Tanaman Rumput Gajah Mini Material 321.5 M2
Pek. Tanaman Pohon Zodia T= 25-40 cm Material 137 Btg
Pek. Tanaman Pohon Mangga dia 5-10 cm T=1,5 m Material 22 Btg
Pek. Tanaman Pohon Kelengkeng dia 5-10 cm T=1-
22 Btg
1,5 m Material
Pek. Tanaman Pohon Rambutan dia 5-10 cm T=1-1,5
22 Btg
m Material
Pek. Pohon Pucuk Merah Material 56 Btg
PEKERJAAN PERKERASAN AKSES JALAN MASUK Material 0
Pek. Pasir Urug t = 7 cm di Bawah Paving Material 38.46 M3
Pek. Paving Blok t = 8 cm (standart) Material 1788 M2
Pek. Kanstein uk. 8.40.20 Jalan Sekeliling Bangunan Material 438 M1
Beton Pengunci Kanstin Material 6.24 M3
PEKERJAAN DRAINASE KELILING BAGIAN LUAR
0
BANG. Material
DRAINASE LUAR/SEKELILING BANGUNAN Material 0
Pek. U-Ditch Uk.40.60.120 FC'30 Mpa Pabrikan
167.79 M1
Saluran Kliling Material
Pek. Pasir Urug t = 10 cm Material 0.13 M3
Pek. Galian Tanah Saluran Material 67.3 M3
Pek. Box culvert 100.100.120 cm Material 45 Pcs
Pek. Grill penutup saluran, besi siku 50.50.5 + plat
167.79 M1
strip Material
BAK KONTROL Material 0
Pek. Pasangan 1/2 Bata Bak Kontrol ( 4 unit BK ) Material 6.86 M2
Pek. Plester + Aci Material 3.33 M2
Pek. Pasir Urug t = 5 cm Material 0.14 M3
Pek. Galian Tanah Material 1.74 M3
PEKERJAAN GROUND TANK DAN R. POMPA DI
0
LUAR BANGUNAN Material
PEKERJAAN GROUND WATER TANK Material 0
Pek. Perapihan Dinding Beton Exterior Material 111.65 M2
Pek. Perapihan Daerah Dak Beton Material 112.92 M2
Pek. Waterproofing (coating tahan asam, anti toxid
314.51 M2
+ serat fiber) Lantai dan Dinding Material
Pek. Waterproofing membran bakar t=3cm di
112.92 M2
Daerah Dak Material
Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar) Material 57.96 M2
Pek. Pasang Keramik Dinding 20x20 Material 140 M2
Pek. Cat Dinding dan Dak Bag. Luar (exterior) Material 174.81 M2
Pek. Tangga Dalam 'M' GWT + Cat (model gantung
3 Unit
lengkap terpasang) Material
Pek. Tangga Luar 'M' GWT + Cat (model gantung
3 Unit
lengkap terpasang) Material
Pek. Penutup Mainhole Baja + Cat (terpasang) Material 3 Unit
Pek. Dinding Bata 1:5 Bak Kontrol Material 5.2 M2
RUANG POMPA Material 0
Pek. Pasangan Dinding Bata 1:5 Material 43.36 M2
Pek. Plester Dinding Exterior/Dind. Terluar Material 43.36 M2
Pek. Acian Dinding Exterior/Dind. Terluar Material 43.36 M2
Pek. Kolom Praktis & Balok Praktis 11/11 Termasuk
9.32 M1
Opening Kusen Aluminium Material
Pek. Perapihan Daerah Dak Beton Material 26.59 M2
Pek. Waterproofing (coating tahan asam, anti toxid
68.26 M2
+ serat fiber) Lantai dan Dinding Material
Pek. Waterproofing membran bakar t=3cm di
24.9 M2
Daerah Dak Material
Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar) Material 26.59 M2
Pek. Pasang Keramik Dinding 20x20 Material 68.26 M2
Pek. Cat Dinding dan Dak Bag. Luar (exterior) Material 68.26 M2
Pek. Pintu Besi Material 1 Unit
STP Material 0
Pek. Penutup Mainhole Baja + Cat (terpasang) Material 12 Unit
PEKERJAAN LAIN-LAIN Material 0
PEKERJAAN AKSESORIS Material 0
Pek. Pembuatan Lemari Surat Material 1 unit
Pek. Nama Ruangan 10x20 cm -acrylic (lengkap
16 unit
terasang) Material
Pek. Nama Lantai 30x30 -acrylic (lengkap terasang) Material 4 unit
Pek. Papan Informasi Denah Bangunan 60x120 cm -
1 unit
acrylic (lengkap terpasang) Material
PEKERJAAN MEKANIKAL & ELEKTRIKAL
0
STANDART Material
PEKERJAAN LANTAI 1 Material 0
PEMIPAAN AIR BERSIH Material 0
Pipa PPR PN10 (Incl. Fitting & Accessories) Material 0
-PPR PN10 dia. 15 Material 173.36 M1
-PPR PN10 dia. 20 Material 153.35 M1
-PPR PN10 dia. 40 (1,5") Material 119.03 M1
-PPR PN10 dia. 50 (Riser dari Tangki Air Atas) Material 10.4 M1
Peralatan Katup-katup Material 0
(Ball Valve & Gate Valve) Material 0
-dia. 20 Material 2 bh
-dia. 40 Material 12 bh
Meter Air c/w BV dia. 20 Material 12 bh
PEMIPAAN AIR KOTOR & AIR BEKAS Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
-dia. 150 ( Pipa Air Bekas) Material 213.62 M1
-dia. 150 ( Pipa Air Kotor ) Material 201.32 M1
-dia. 100 ( Pipa Air Bekas ) Material 175.25 M1
Clean Out (CO) Material 0
-CO, dia. 150 Material 6 bh
-CO, dia. 100 Material 8 bh
-Portable Grease Trap Material 12 bh
-Roof drain 2" Material 2 bh
PEMIPAAN AIR HUJAN Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
-dia. 150 (Air Hujan) Material 99.17 M1
-dia. 100 (Air Hujan) Material 48.92 M1
-dia. 80 Material 68.84 M1
-dia. 50 Material 26.64 M1
PEMIPAAN VENT Material 0
Pipa PVC Kelas D (Incl. Fitting & Accessories) Material 0
-Dia. 80 ( pipa riser ) Material 83.52 M1
INSTALASI PANEL Material 0
Pengadaan dan pemasangan PP-LT.1 Material 1 unit
dengan komponen panel, sbb : Material 0
-MCB 3P, 16 A Material 0
-MCB 1P, 6 A Material 0
-Ampere-meter 50/5 A Material 0
-Volt-meter 0-500 Volt Material 0
-Volt Selector Switch Material 0
-Fuse 2 A Material 0
-Indicator Lamp Material 0
-Rel MCB 3P Material 0
-Cu Bar 5 x 63 A Material 0
-Accessories & Termination Material 0
-Box Panel Material 0
-KW-meter/1ph/6A Material 12 bh
Pengadaan dan pemasangan P-UNIT, dengan
14 unit
komponen panel sbb : Material
-MCB 1P, 6 A Material 0
-MCB 1P, 6 A Material 0
-Box Hanger Material 0
INSTALASI KABEL FEEDER Material 0
Kabel Distribusi Daya dari MDP : Material 0
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke PP-LT.1 Material 0.88 M1
Kabel Distribusi Daya dari KWH Unit ke : Material 0
NYM 3 x 4 mm2 ke P-Unit/1 Material 24.6 M1
NYM 3 x 4 mm2 ke P-Unit/2 Material 36.72 M1
NYM 3 x 4 mm2 ke P-Unit/3 Material 42.82 M1
NYM 3 x 4 mm2 ke P-Unit/4 Material 53.7 M1
NYM 3 x 4 mm2 ke P-Unit/5 Material 55.7 M1
NYM 3 x 4 mm2 ke P-Unit/6 Material 68.8 M1
NYM 3 x 4 mm2 ke P-Unit/7 Material 16.2 M1
NYM 3 x 4 mm2 ke P-Unit/8 Material 23.6 M1
NYM 3 x 4 mm2 ke P-Unit/9 Material 33.6 M1
NYM 3 x 4 mm2 ke P-Unit/10 Material 39.46 M1
NYM 3 x 4 mm2 ke P-Unit/11 Material 62.8 M1
NYM 3 x 4 mm2 ke P-Unit/12 Material 69.4 M1
INSTALASI KABEL TRAY Material 0
-Kabel Tray W200 x H100 Material 56.11 M1
-Kabel Tray W500 x H100 Material 11.45 M1
-Kabel Leadder W500 x H100 (Riser) Material 4 M1
Fitting-Fitting : Material 0
-Elbow W200 x H100 Material 1 bh
Elbow W500 x H100 Material 1 bh
Tee W500 x H100 Material 1 bh
-Material bantu ( mur, baut, hanger rod, supporting,
1 lot
dll ) Material
INSTALASI ARMATUR LAMPU, SAKLAR & STOP
0
KONTAK Material
-Lampu LED 9 Watt Material 98 bh
-Lampu LED 9 Watt, c/w battery charger (Selasar) Material 5 bh
-Lampu LED 7 Watt Material 45 bh
-Lampu baret isi TL Bulat-20 watt c/w battery
1 bh
charger Material
-Exit Lamp-18 watt c/w battery charger Material 3 bh
-Lampu TL 1 x 36 watt, Balk Material 3 bh
-Stop Kontak 1P, 220 Volt, 10A, Wall Type Material 81 bh
-Saklar 1 Gang Material 17 bh
-Saklar 2 Gang Material 56 bh
-Saklar Hotel 1 Gang Material 1 bh
-Saklar Hotel 2 Gang Material 4 bh
INSTALASI PENERANGAN & STOP KONTAK Material 0
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk
155 ttk
Lampu Material
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop
81 ttk
Kontak Material
PEKERJAAN LANTAI 2 Material 0
PEMIPAAN AIR BERSIH Material 0
Pipa PPR PN10 (Incl. Fitting & Accessories) Material 0
-PPR PN10 dia. 15 Material 189.8 M1
-PPR PN10 dia. 20 Material 176.69 M1
-PPR PN10 dia. 40 Material 123.94 M1
-PPR PN10 dia. 50 (Riser dari Tangki Air Atas) Material 6.8 M1
Peralatan Katup-katup Material 0
(Ball Valve & Gate Valve) Material 0
-dia. 40 Material 1 bh
-dia. 20 Material 16 bh
-Meter Air c/w BV dia. 20 Material 16 bh
PEMIPAAN AIR KOTOR & AIR BEKAS Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
-dia. 150 ( Riser Pipa Air Kotor ) Material 125.02 M1
dia. 100 ( Pipa Air Kotor ) Material 16 M1
-dia. 100 ( Riser Pipa Air Bekas ) Material 125.02 M1
dia. 50 ( Pipa Air Bekas ) Material 107.2 M1
-Dop, dia. 50 Material 16 M1
V-Trap dia. 50 Material 16 bh
-Portable Grease Trap Material 16 bh
PEMIPAAN AIR HUJAN Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
-dia. 100 ( pipa tegak ) Material 59.84 M1
-dia. 80 ( Riser Pipa Cucian ) Material 70.31 M1
Roof Drain, Cast Iron Material 0
-dia. 80 Material 2 bh
PEMIPAAN VENT Material 0
Pipa PVC Kelas D (Incl. Fitting & Accessories) Material 0
-Dia. 80 Material 250.05 M1
-Dia. 50 Material 16 M1
-Dia. 32 Material 115.2 M1
INSTALASI PANEL Material 0
Pengadaan dan pemasangan PP-LT.2 Material 1 unit
dengan komponen panel, sbb : Material 0
-MCCB 3P, 16 A Material 0
-MCB 1P, 6 A Material 0
-Ampere-meter 50/5 A Material 0
-Volt-meter 0-500 Volt Material 0
-Volt Selector Switch Material 0
-Fuse 2 A Material 0
-Indicator Lamp Material 0
-Rel MCB 3P Material 0
-Cu Bar 5 x 63 A Material 0
-Accessories & Termination Material 0
-Box Panel Material 0
-KW-meter/1ph/6A Material 16 bh
Pengadaan dan pemasangan P-UNIT, dengan
16 unit
komponen panel sbb : Material
-MCB 1P, 6 A Material 0
-MCB 1P, 6 A Material 0
-Box Hanger Material 0
INSTALASI KABEL FEEDER Material 0
Kabel Distribusi Daya dari MDP : Material 0
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke PP-LT.1 Material 3.6 M1
Kabel Distribusi Daya dari PP-LT.2 ke : Material 0
-NYM 3 x 4 mm2 ke P-Unit/1 Material 23.2 M1
-NYM 3 x 4 mm2 ke P-Unit/2 Material 32.8 M1
-NYM 3 x 4 mm2 ke P-Unit/3 Material 34.8 M1
-NYM 3 x 4 mm2 ke P-Unit/4 Material 46.7 M1
-NYM 3 x 4 mm2 ke P-Unit/5 Material 24.2 M1
-NYM 3 x 4 mm2 ke P-Unit/6 Material 33.8 M1
-NYM 3 x 4 mm2 ke P-Unit/7 Material 35.8 M1
-NYM 3 x 4 mm2 ke P-Unit/8 Material 47.7 M1
-NYM 3 x 4 mm2 ke P-Unit/9 Material 51.5 M1
-NYM 3 x 4 mm2 ke P-Unit/10 Material 62.8 M1
-NYM 3 x 4 mm2 ke P-Unit/11 Material 63.8 M1
-NYM 3 x 4 mm2 ke P-Unit/12 Material 76.3 M1
-NYM 3 x 4 mm2 ke P-Unit/13 Material 52.5 M1
-NYM 3 x 4 mm2 ke P-Unit/14 Material 63.8 M1
-NYM 3 x 4 mm2 ke P-Unit/15 Material 64.8 M1
-NYM 3 x 4 mm2 ke P-Unit/16 Material 77.3 M1
INSTALASI KABEL TRAY Material 0
-Kabel Tray W200 x H100 Material 56.43 M1
-Kabel Leadder W500 x H100 (Riser) Material 4 M1
Fitting-Fitting : Material 0
-Elbow W200 x H100 Material 1 bh
-Material bantu ( mur, baut, hanger rod, supporting,
1 lot
dll ) Material
INSTALASI ARMATUR LAMPU, SAKLAR & STOP
0
KONTAK Material
-Lampu LED 9 Watt Material 86 bh
-Lampu LED 9 Watt, c/w battery charger (Selasar) Material 3 bh
-Lampu LED 7 Watt Material 48 bh
-Lampu baret isi TL Bulat-32 watt c/w battery
3 bh
charger Material
-Exit Lamp-18 watt c/w battery charger Material 3 bh
-Lampu TL 1 x 36 watt, Balk Material 3 bh
-Stop Kontak 1P, 220 Volt, 10A, Wall Type Material 99 bh
-Saklar 1 gang Material 23 bh
-Saklar 2 gang Material 65 bh
-Saklar Hotel 2 gang Material 2 bh
INSTALASI PENERANGAN & STOP KONTAK Material 0
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk
146 ttk
Lampu Material
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop
99 ttk
Kontak Material
PEKERJAAN LANTAI 3 Material 0
PEMIPAAN AIR BERSIH Material 0
Pipa PPR PN10 (Incl. Fitting & Accessories) Material 0
-PPR PN10 dia. 15 Material 189.8 M1
-PPR PN10 dia. 20 Material 176.69 M1
-PPR PN10 dia. 40 Material 123.94 M1
-PPR PN10 dia. 50 (Riser dari Tangki Air Atas) Material 3.4 M1
Peralatan Katup-katup Material 0
(Ball Valve & Gate Valve) Material 0
-dia. 40 Material 1 bh
-dia. 20 Material 16 bh
-Meter Air c/w BV dia. 20 Material 16 bh
PEMIPAAN AIR KOTOR & AIR BEKAS Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
dia. 100 ( Pipa Air Kotor ) Material 125.02 M1
-dia. 100 ( Riser Pipa Air Bekas ) Material 16 M1
dia. 50 ( Pipa Air Bekas ) Material 125.02 M1
-Dop, dia. 50 Material 107.2 bh
-V-Trap Material 16 bh
-Portable Grease Trap Material 16 bh
PEMIPAAN AIR HUJAN Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
-dia. 100 ( pipa tegak ) Material 54.4 M1
-dia. 80 ( pipa ruang cuci ) Material 70.31 M1
PEMIPAAN VENT Material 0
Pipa PVC Kelas D (Incl. Fitting & Accessories) Material 0
-Dia. 80 ( pipa riser ) Material 126.94 M1
INSTALASI PANEL Material 0
Pengadaan dan pemasangan PP-LT.3 Material 1 unit
dengan komponen panel, sbb : Material 0
-MCCB 3P, 16 A Material 0
-MCB 1P, 6 A Material 0
-Ampere-meter 50/5 A Material 0
-Volt-meter 0-500 Volt Material 0
-Volt Selector Switch Material 0
-Fuse 2 A Material 0
-Indicator Lamp Material 0
-Rel MCB 3P Material 0
-Cu Bar 5 x 63 A Material 0
-Accessories & Termination Material 0
-Box Panel Material 0
-KW-meter/1ph/6A Material 16 bh
Pengadaan dan pemasangan P-UNIT, dengan
16 unit
komponen panel sbb : Material
-MCB 1P, 6 A Material 0
-MCB 1P, 6 A Material 0
-Box Hanger Material 0
INSTALASI KABEL FEEDER Material 0
Kabel Distribusi Daya dari MDP : Material 0
-NYY 4 x 4 mm2 + E-NYA 6 mm2 ke PP-LT.3 Material 7.4 M1
Kabel Distribusi Daya dari PP-LT.3 ke : Material 0
-NYM 3 x 4 mm2 ke P-Unit/1 Material 28.2 M1
-NYM 3 x 4 mm2 ke P-Unit/2 Material 37.8 M1
-NYM 3 x 4 mm2 ke P-Unit/3 Material 39.8 M1
-NYM 3 x 4 mm2 ke P-Unit/4 Material 51.7 M1
-NYM 3 x 4 mm2 ke P-Unit/5 Material 29.2 M1
-NYM 3 x 4 mm2 ke P-Unit/6 Material 38.8 M1
-NYM 3 x 4 mm2 ke P-Unit/7 Material 40.8 M1
-NYM 3 x 4 mm2 ke P-Unit/8 Material 52.7 M1
-NYM 3 x 4 mm2 ke P-Unit/9 Material 56.5 M1
-NYM 3 x 4 mm2 ke P-Unit/10 Material 67.8 M1
-NYM 3 x 4 mm2 ke P-Unit/11 Material 68.8 M1
-NYM 3 x 4 mm2 ke P-Unit/12 Material 81.3 M1
-NYM 3 x 4 mm2 ke P-Unit/13 Material 57.5 M1
-NYM 3 x 4 mm2 ke P-Unit/14 Material 68.8 M1
-NYM 3 x 4 mm2 ke P-Unit/15 Material 69.8 M1
-NYM 3 x 4 mm2 ke P-Unit/16 Material 82.3 M1
INSTALASI KABEL TRAY Material 0
-Kabel Tray W200 x H100 Material 56.43 M1
-Kabel Leadder W500 x H100 (Riser) Material 4 M1
Fitting-Fitting : Material 0
-Elbow W200 x H100 Material 1 bh
-Material bantu ( mur, baut, hanger rod, supporting,
1 lot
dll ) Material
INSTALASI ARMATUR LAMPU, SAKLAR & STOP
0
KONTAK Material
-Lampu LED 9 Watt Material 86 bh
-Lampu LED 9 Watt, c/w battery charger (Selasar) Material 3 bh
-Lampu LED 7 Watt Material 48 bh
-Lampu baret isi TL Bulat-32 watt c/w battery
3 bh
charger Material
-Exit Lamp-18 watt c/w battery charger Material 3 bh
-Lampu TL 1 x 36 watt, Balk Material 3 bh
-Stop Kontak 1P, 220 Volt, 10A, Wall Type Material 99 bh
-Saklar 1 gang Material 23 bh
-Saklar 2 gang Material 65 bh
-Saklar Hotel 2 gang Material 2 bh
INSTALASI PENERANGAN & STOP KONTAK Material 0
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk
146 ttk
Lampu Material
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop
99 ttk
Kontak Material
PEKERJAAN LANTAI 4 Material 0
PEMIPAAN AIR BERSIH Material 0
PPR PN10 (Incl. Fitting & Accessories) Material 0
-PPR PN10 dia. 15 Material 189.8 M1
-PPR PN10 dia. 20 Material 176.69 M1
-PPR PN10 dia. 40 Material 123.94 M1
-PPR PN10 dia. 50 (Riser dari Tangki Air Atas) Material 3.4 M1
Peralatan Katup-katup Material 0
(Ball Valve & Gate Valve) Material 0
-dia. 40 Material 1 bh
-dia. 20 Material 16 bh
-Meter Air c/w BV dia. 20 Material 16 bh
PEMIPAAN AIR KOTOR & AIR BEKAS Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
-dia. 150 ( Riser Pipa Air Kotor ) Material 125.02 M1
dia. 100 ( Pipa Air Kotor ) Material 16 M1
-dia. 100 ( Riser Pipa Air Bekas ) Material 125.02 M1
dia. 50 ( Pipa Air Bekas ) Material 107.2 M1
-Dop, dia. 50 Material 16 bh
-Dop, dia. 80 Material 16 bh
V-Trap dia. 50 Material 16 bh
PEMIPAAN AIR HUJAN Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
-dia. 100 ( pipa tegak ) Material 54.4 M1
-dia. 80 ( pipa ruang cuci ) Material 70.31 M1
PEMIPAAN VENT Material 0
Pipa PVC Kelas D (Incl. Fitting & Accessories) Material 0
-Dia. 80 ( pipa riser ) Material 126.94 M1
INSTALASI PANEL Material 0
Pengadaan dan pemasangan PP-LT.3 Material 1 unit
dengan komponen panel, sbb : Material 0
-MCCB 3P, 16 A Material 0
-MCB 1P, 6 A Material 0
-Ampere-meter 50/5 A Material 0
-Volt-meter 0-500 Volt Material 0
-Volt Selector Switch Material 0
-Fuse 2 A Material 0
-Indicator Lamp Material 0
-Rel MCB 3P Material 0
-Cu Bar 5 x 63 A Material 0
-Accessories & Termination Material 0
-Box Panel Material 0
-KW-meter/1ph/6A Material 16 bh
Pengadaan dan pemasangan P-UNIT, dengan
16 unit
komponen panel sbb : Material
-MCB 1P, 6 A Material 0
-MCB 1P, 6 A Material 0
-Box Hanger Material 0
INSTALASI KABEL FEEDER Material 0
Kabel Distribusi Daya dari MDP : Material 0
-NYY 4 x 4 mm2 + E-NYA 6 mm2 ke PP-LT.4 Material 7.4 M1
Kabel Distribusi Daya dari PP-LT.3 ke : Material 0
-NYM 3 x 4 mm2 ke P-Unit/1 Material 33.2 M1
-NYM 3 x 4 mm2 ke P-Unit/2 Material 42.8 M1
-NYM 3 x 4 mm2 ke P-Unit/3 Material 44.8 M1
-NYM 3 x 4 mm2 ke P-Unit/4 Material 56.7 M1
-NYM 3 x 4 mm2 ke P-Unit/5 Material 34.2 M1
-NYM 3 x 4 mm2 ke P-Unit/6 Material 43.8 M1
-NYM 3 x 4 mm2 ke P-Unit/7 Material 45.8 M1
-NYM 3 x 4 mm2 ke P-Unit/8 Material 57.7 M1
-NYM 3 x 4 mm2 ke P-Unit/9 Material 61.5 M1
-NYM 3 x 4 mm2 ke P-Unit/10 Material 72.8 M1
-NYM 3 x 4 mm2 ke P-Unit/11 Material 73.8 M1
-NYM 3 x 4 mm2 ke P-Unit/12 Material 86.3 M1
-NYM 3 x 4 mm2 ke P-Unit/13 Material 62.5 M1
-NYM 3 x 4 mm2 ke P-Unit/14 Material 73.8 M1
-NYM 3 x 4 mm2 ke P-Unit/15 Material 74.8 M1
-NYM 3 x 4 mm2 ke P-Unit/16 Material 87.3 M1
INSTALASI KABEL TRAY Material 0
-Kabel Tray W200 x H100 Material 56.43 M1
-Kabel Leadder W500 x H100 (Riser) Material 4 M1
Fitting-Fitting : Material 0
-Elbow W200 x H100 Material 1 bh
-Material bantu ( mur, baut, hanger rod, supporting,
1 lot
dll ) Material
INSTALASI ARMATUR LAMPU, SAKLAR & STOP
0
KONTAK Material
-Lampu LED 9 Watt Material 86 bh
-Lampu LED 9 Watt, c/w battery charger (Selasar) Material 3 bh
-Lampu LED 7 Watt Material 48 bh
-Lampu baret isi TL Bulat-32 watt c/w battery
3 bh
charger Material
-Exit Lamp-18 watt c/w battery charger Material 3 bh
-Lampu TL 1 x 36 watt, Balk Material 3 bh
-Stop Kontak 1P, 220 Volt, 10A, Wall Type Material 99 bh
-Saklar 1 gang Material 23 bh
-Saklar 2 gang Material 65 bh
-Saklar Hotel 2 gang Material 2 bh
INSTALASI PENERANGAN & STOP KONTAK Material 0
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk
146 ttk
Lampu Material
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop
99 ttk
Kontak Material
PEKERJAAN LANTAI ATAP Material 0
PEMIPAAN AIR BERSIH Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
-PVC AW dia. 50 Material 19.99 M1
-PVC AW dia. 100 (Header) Material 4 M1
Peralatan Katup-katup Material 0
(Ball Valve & Gate Valve) Material 0
-dia. 50 Material 12 bh
PEMIPAAN AIR HUJAN Material 0
Pipa PVC Kelas AW (Incl. Fitting & Accessories) Material 0
Roof Drain, Cast Iron Material 0
-dia. 100 Material 32 bh
Roof Drain, Cast Iron Material 0
-dia. 100 Material 4 bh
-dia. 80 Material 12 bh
PEKERJAAN UTILITAS Material 0
INSTALASI PANEL Material 0
P-MDP Material 0
Pengadaan dan pemasangan MDP, dengan
1 unit
komponen panel, Material
sbb : Material 0
-Mgs 3P, 200 A Material 0
-MCCB 3P, 200 A Material 0
-MCCB 3P, 80 A Material 0
-MCCB 3P, 32 A Material 0
-MCB 3P, 32 A Material 0
-Contacto, (timer switch) Material 0
-Earth Fault Relay Material 0
-Over Current Relay Material 0
-Over / Under Voltage Relay Material 0
-Power Factor-meter Material 0
-Frequency-metr Material 0
-Ampere-meter 300/5 A Material 0
-Ampere-meter 50/5 A Material 0
-Volt-meter 0-500 Volt Material 0
-Volt Selector Switch Material 0
-CT 300/5 A Material 0
-CT 50/5 A Material 0
-Fuse Carrier 4 A Material 0
-Indicator Lamp Material 0
-Rel MCCB 3P Material 0
-CU Bar 5 x 400 A Material 0
-Accessories & Termination Material 0
-Box Panel Material 0
P-PENGELOLA Material 0
Pengadaan dan pemasangan P-PENGELOLA Material 1 unit
dengan komponen panel, sbb : Material 0
-MCCB 3P, 80 A Material 0
-MCB 3P, 63 A Material 0
-MCB 3P, 32 A Material 0
-MCB 1P, 6 A Material 0
-Ampere-meter 50/5 A Material 0
-Volt-meter 0-500 Volt Material 0
-Volt Selector Switch Material 0
-Fuse 2 A Material 0
-Indicator Lamp Material 0
-Rel MCB 3P Material 0
-Cu Bar 5 x 80 A Material 0
-Accessories & Termination Material 0
-Box Panel Material 0
-KW-meter/3ph/80A Material 1 bh
P-POMPA AIR BERSIH Material 0
Pengadaan dan pemasangan P-POMPA AIR
1 unit
BERSIH, dengan kompo- Material
nen panel, sbb : Material 0
-MCB 3P, 32 A Material 0
-MCB 3P, 10 A Material 0
-WLC 61F G-AP 220 Volt Material 0
-DOL ( Direct On Line ) Material 0
-Radar diantaki air atas Material 0
-Fuse 2 A Material 0
-Indicator Lamp Material 0
-Rel MCB 3P Material 0
-Cu Bar 5 x 32 A Material 0
-Accessories & Termination Material 0
-Box Panel Material 0
P-POMPA HYDRANT Material 0
Pengadaan dan pemasangan P-POMPA
1 unit
HYDRANT, dengan kompo- Material
nen panel, sbb : Material 0
-MCB 3P, 40 A Material 0
-MCB 3P, 16 A Material 0
-WLC 61F G-AP 220 Volt Material 0
-DOL ( Direct On Line ) Material 0
-Fuse 2 A Material 0
-Indicator Lamp Material 0
-Rel MCB 3P Material 0
-Cu Bar 5 x 32 A Material 0
-Accessories & Termination Material 0
-Box Panel Material 0
INSTALASI KABEL FEEDER Material 0
-NYY 4 x 70 mm2 + E-NYA 35 mm2 Dari P-PLN ke
50 M1
MDP Material
Kabel Distribusi Daya dari MDP : Material 0
-NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-
57 M1
PENGELOLA-LT.1 Material
-FRC 4 x 6 mm2 + E-NYA 6 mm2 ke P. Hydrant Material 60 M1
-NYY 4 x 6 mm2 + E-NYA 4 mm2 ke P. Pompa
94 M1
Booster Material
Kabel Distribusi Daya dari P-PENGELOLA : Material 0
-NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih Material 40 M1
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke P-Shallow Well
40 M1
Pump Material
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke Box MCB R.
26.5 M1
Serbaguna Material
INSTALASI ARMATUR LAMPU, SAKLAR & STOP
0
KONTAK Material
Ruang Pompa Material 0
-TL 1 x 18 W, TL Balk Type Material 2 bh
-Stop Kontak 1P, 220 Volt, 13A, Wall Type Material 1 bh
-Saklar 1 gang Material 2 bh
Lampu Taman Material 0
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL
12 bh
26 watt Material
-Memasang Lampu PJU Tiang Octagonal Single
4 ttk
Hotdip Galvanis,(t = 7 m) Material
INSTALASI PENERANGAN & STOP KONTAK Material 0
Ruang Pompa Material 0
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk
2 ttk
Lampu Material
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop
1 ttk
Kontak Material
Lampu Taman Material 0
-NYFGBY 3 x 2,5 mm2 untuk Lampu Taman Material 12 ttk
-Kabel Power Ins. PJU, NYFGBY 3 x 2,5 mm2 dari
4 ttk
P.PJU Material
-Testing & Commissioning Material 1 lot
PEKERJAAN SISTEM PENTANAHAN Material 0
INSTALASI Material 0
Pentanahan (Grounding) Netral Sistem &
0
Pentanahan Body Material
-Body Panel Material 0
Item SBB: Material 0
-Grounding Rod GIP 1' ( untuk R lebih kecil dari 2
1 bh
ohm ) Material
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol
0
Box Material
-Termination R.Supporting Material Material 1 lot
-Kabel BC 50 mm2 Material 30 M1
-Testing & Commissioning Material 1 lot
-Body Peralatan pada Sistem Elektronik Material 0
Item SBB: Material 0
-Grounding Rod GIP 1' ( untuk R lebih kecil dari 2
1 bh
ohm ) Material
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol
0
Box Material
-Termination R.Supporting Material Material 1 lot
-Kabel BC 50 mm2 Material 30 M1
-Testing & Commissioning Material 1 lot
PEKERJAAN PENANGKAL PETIR (FARADAY) Material 0
AIR TERMINAL & TERMINATION NETWORK Material 0
15 x 500mm alumunium air rod Material 9 bh
15 mm Air terminal base Material 9 bh
25 x 3mm Bare Alumunium Tape Material 158 M1
Grey 25x3mm Non-Metallic DC tape clip Material 11 bh
25 x 3mm Alumunium Square tape clamp Material 10 bh
DOWN CONDUCTOR Material 0
25 x 3mm Bare Alumunium Tape Material 3 M1
Grey 25 x 3mm Non-Metallic DC tape clip Material 3 bh
25 x 3mm Alumunium Square tape clamp Material 15 bh
Test Connection Link Material 3 bh
GROUNDING SYSTEM Material 0
Polymer Inspection Pit Material 3 bh
5/8" x 1800 mm Extensible Copperbond Rod Material 3 bh
5/8" Rod Coupling Material 3 bh
Exothermic weilding Material 6 bh
Stranded Bar copper conductor 70 mm Material 188 M1
MATERIAL SUPPORT Material 0
Mould for looping Material 1 unit
Powder Material 6 unit
Handle Clamp Material 1 unit
flint gun Material 1 unit
TESTING & COMMISSIONING Material 0
Testing & Commissioning Material 1 lot
Biaya Perijinan Depnaker Material 1 lot
PEKERJAAN MEKANIKAL & ELEKTRIKAL
0
NON STANDART Material
PEKERJAAN PEMADAM KEBAKARAN Material 0
INSTALASI APAR Material 0
LANTAI 1 Material 0
-Pipa BS Sch.40 Material 0
dia. 4" (Riser) Material 5m
dia. 3" Material 35.8 m
-Fitting & Accessories Material 1 lot
-Hydrant Box Indoor (Size 100x80x18) Material 1 bh
-Gate Valve Material 0
dia. 3" Material 1 bh
Fire Extinguisher Tabung Cat Oven sesuai SPEK &
0
Skedul : Material
-Type Class ABC 3,5 kg DCP Seamless, c/w
6 bh
support Material
LANTAI 2 Material 0
-Pipa BS Sch.40 Material 0
dia. 4" (Riser) Material 4m
dia. 3" Material 35.6 m
-Fitting & Accessories Material 1 lot
-Hydrant Box Indoor (Size 100x80x18) Material 1 bh
-Gate Valve Material 0
dia. 3" Material 1 bh
Fire Extinguisher Tabung Cat Oven sesuai SPEK &
0
Skedul : Material
-Type Class ABC 3,5 kg DCP Seamless, c/w
6 bh
support Material
LANTAI 3 Material 0
-Pipa BS Sch.40 Material 0
dia. 4" (Riser) Material 4m
dia. 3" Material 35.96 m
-Fitting & Accessories Material 1 lot
-Hydrant Box Indoor (Size 100x80x18) Material 1 bh
-Gate Valve Material 0
dia. 3" Material 1 bh
Fire Extinguisher Tabung Cat Oven sesuai SPEK &
0
Skedul : Material
-Type Class ABC 3,5 kg DCP Seamless, c/w
6 bh
support Material
LANTAI 4 Material 0
-Pipa BS Sch.40 Material 0
dia. 4" (Riser) Material 4m
dia. 3" Material 35.96 m
-Fitting & Accessories Material 1 lot
-Hydrant Box Indoor (Size 100x80x18) Material 1 bh
-Gate Valve Material 0
dia. 3" Material 1 bh
Fire Extinguisher Tabung Cat Oven sesuai SPEK &
0
Skedul : Material
-Type Class ABC 3,5 kg DCP Seamless, c/w
6 bh
support Material
SITE PLAN Material 0
-Pipa BS Sch.40 Material 0
dia. 4" Material 213 m
-Fitting & Accessories Material 1 lot
-Hydrant Box Outdoor Material 4 bh
-Hydrant Pillar Material 4 bh
-Seamesse connection Material 4 bh
-Gate Valve Material 0
dia. 4" Material 5 bh
-Check Valve Material 0
dia. 4" Material 1 bh
PEKERJAAN VENTILASI UDARA Material 0
Exhaust Fan Material 0
LANTAI 1 - 4 Material 0
-Exhaust kap 100 Cfm ( ceiling Mounted ) Material 305 unit
-Kipas Angin Baling Material 4 unit
Pipa PVC Class D Material 0
-dia. 100 Material 834.18 m
-Grille 200 x 200 (Alumunium) Material 305 bh
-Install Kipas Angin Baling (Kabel NYM 3x2,5 mm2
4 titik
+ Conduit pipa dia. 20) Material
PEKERJAAN INSTALASI ELEKTRONIK Material 0
PEKERJAAN SYSTEM TV Material 0
PERALATAN UTAMA SYSTEM TV Material 0
Pengadaan dan pemasangan peralatan utama
0
Sistem TV di- Material
tempatkan di Lantai Atap, dipasang secara lengkap
0
termasuk Material
pondasi dan tiang penyangga sesuai diuraikan
0
dalam Gam- Material
bar dan Spesifikasi Teknis. Material 0
-Antena UHF Material 1 unit
-Antena VHF Material 1 unit
-MA (Master Amplifier) / Mixer Material 1 bh
-Coaxial 7C/2V, dari Antena ke Mixer Material 50 m
-Termination & supporting material Material 1 lot
SPLITTER TV Material 0
Pengadan dan pemasangan Splitter TV, berikut
0
alat / material Material
bantu pemasangan lainnya sesuai Gambar dan
0
Spesifikasi Teknis. Material
LANTAI 1 Material 0
Splitter 7 ports Material 3 bh
TB-Splitter-TV/LT.1 Material 1 bh
Lantai 2 Material 0
Splitter 7 ports Material 4 bh
TB-Splitter-TV/LT.2 Material 1 bh
Lantai 3 Material 0
Splitter 7 ports Material 4 bh
TB-Splitter-TV/LT.3 Material 1 bh
Lantai 4 Material 0
Splitter 7 ports Material 4 bh
TB-Splitter-TV/LT.3 Material 1 bh
INSTALASI KABEL FEEDER SPLITTER TV Material 0
Instalasi Kabel Feeder Splitter TV menggunakan
0
kabel coaxial Material
berikut semua aksesoris, material / alat bantu
0
pemasangan Material
sesuai detail Gambar dan Spesifikasi Teknis. Material 0
Lantai 1 Material 0
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Splitter-
10 m
Lt.1 Material
Lantai 2 Material 0
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Splitter-
15 m
Lt.2 Material
Lantai 3 Material 0
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-
20 m
Lt.3 Material
Lantai 4 Material 0
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-
25 m
Lt.3 Material
TV OUTLET Material 0
Pengadan dan pemasangan TV Outlet, breikut alat /
0
material Material
bantu pemasangan lainnya sesuai Gambar dan
0
Spesifikasi Material
Teknis. Material 0
Lantai 1 Material 0
TV Outlet Material 13 bh
Lantai 2 Material 0
TV Outlet Material 16 bh
Lantai 3 Material 0
TV Outlet Material 16 bh
Lantai 4 Material 0
TV Outlet Material 16 bh
INSTALASI OUTLET TV Material 0
Instalasi kabel Outlet TV menggunakan kabel
0
Coaxial 5C/2V Material
dalam conduit PVC HI dia.20 mm2 lengkap dengan
0
bobokan Material
dan perapihan kembali, peralatan bantu dan
0
aksesoris sesuai Material
detail Gambar dan Spesifikasi Teknis. Material 0
Lantai 1 Material 0
TV Outlet Material 13 ttk
Lantai 2 Material 0
TV Outlet Material 16 ttk
Lantai 3 Material 0
TV Outlet Material 16 ttk
Lantai 4 Material 0
TV Outlet Material 16 ttk
PEKERJAAN FIRE ALARM Material 0
PERALATAN UTAMA FIRE ALARM SYSTEM Material 0
Pengadaan dan pemasangan peralatan Sistem Fire
0
Alarm Material
ditempatkan di Ruang Kontrol secara lengkap
0
termasuk peng- Material
kabelan dan koneksi meliputi peralatan sesuai
0
diuraikan dlm Material
Gambar dan Spesifikasi Teknis, tetapi tidak terbats
0
pada item Material
sebagai berikut : Material 0
MCFA, kapasitas 10 Zone Material 1 unit
MDF, kapasitas 10 Zone Material 1 set
Rectifier Material 1 bh
Power Surge Arrester Material 1 bh
Battery & Charger 4 jam Material 1 bh
Grounding u/ MCFA dan Surge Arrester ( R < 0,5
1 lot
Ohm ) Material
INSTALASI KABEL FEEDER FIRE ALARM Material 0
INSTALASI FEEDER MELALUI RISER / SHAFT Material 0
Kabel NYA 5 x 2 x 2,5 mm2 in conduit Dia.32 dari
28 m
MCFA ke MDF Material
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari
2m
MDF ke TB-FA-LT.1 Material
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari
6m
MDF ke TB-FA-LT.2 Material
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari
12 m
MDF ke TB-FA-LT.3 Material
PERALATAN PENGINDERA dan PENANDA
0
KEBAKARAN Material
Pengadaan dan pemasangan peralatan pengindera
0
dan penan- Material
da kebakaran berikut alat / material bantu lainnya
0
sesuai Gam- Material
bar dan Spesifikasi Teknis. Material 0
Lantai-1 Material 0
-Smoke Detector Material 56 bh
-Rate Of Rise Temperature - Heat detector Material 4 bh
Fixed Heat Detector Material 10 bh
-Manual push button Material 1 bh
-Lampu Indikator Material 1 bh
-Bell alarm Material 1 bh
-End of Line Resistor Material 2 bh
-TB-FA-LT.1 Material 1 bh
Lantai-2 Material 0
-Smoke Detector Material 53 bh
-Rate Of Rise Temperature - Heat detector Material 4 bh
Fixed Heat Detector Material 16 bh
-Manual push button Material 1 bh
-Lampu Indikator Material 1 bh
-Bell alarm Material 1 bh
-End of Line Resistor Material 2 bh
-TB-FA-LT.2 Material 1 bh
Lantai-3 Material 0
-Smoke Detector Material 53 bh
-Rate Of Rise Temperature - Heat detector Material 4 bh
Fixed Heat Detector Material 16 bh
-Manual push button Material 1 bh
-Lampu Indikator Material 1 bh
-Bell alarm Material 1 bh
-End of Line Resistor Material 2 bh
-TB-FA-LT.3 Material 1 bh
Lantai-4 Material 0
-Smoke Detector Material 53 bh
-Rate Of Rise Temperature - Heat detector Material 4 bh
Fixed Heat Detector Material 16 bh
-Manual push button Material 1 bh
-Lampu Indikator Material 1 bh
-Bell alarm Material 1 bh
-End of Line Resistor Material 2 bh
-TB-FA-LT.3 Material 1 bh
PERALATAN PENGINDERA dan PENANDA
0
KEBAKARAN Material
Instalasi titik detector dari TB-FA dengan kabel NYA
0
2 x 1,5 mm2 Material
didalam conduit dia. 20 mm2 lengkap dengan
0
aksesoris dan Material
semua peralatan / material bantu pemasangan
0
sesuai detail Material
Gambar dan Spesifikasi Teknis. Material 0
Lantai-1 Material 0
-Detector Fire Alarm Material 70 ttk
-Manual push button Material 1 ttk
-Lampu Indikator Material 1 ttk
-Bell alarm Material 1 ttk
Lantai-2 Material 0
-Detector Fire Alarm Material 73 ttk
-Manual push button Material 1 ttk
-Lampu Indikator Material 1 ttk
-Bell alarm Material 1 ttk
Lantai-3 Material 0
-Detector Fire Alarm Material 73 ttk
-Manual push button Material 1 ttk
-Lampu Indikator Material 1 ttk
-Bell alarm Material 1 ttk
Lantai-4 Material 0
-Detector Fire Alarm Material 73 ttk
-Manual push button Material 1 ttk
-Lampu Indikator Material 1 ttk
-Bell alarm Material 1 ttk
Testing & Comissioning included perijinan dari
1 lot
DEPNAKER Material
PEKERJAAN CCTV Material 0
PERALATAN UTAMA CCTV Material 0
-Digital Video Recorder (DVR) Material 1 unit
16 Channel Real Time Standalone DVR, Material 0
2 Ch Output, MPEG4, HDD 1 TB x 2 Material 0
-LCD Monitor 32" Material 1 bh
-UPS 1 Kva Material 1 bh
-Surge Arrester (15 KA) Material 1 bh
-Grounding u/ MDF-CCTV dan Surge Arrester ( R <
1 lot
1 Ohm ) Material
INSTALASI CCTV Material 0
Lantai 1 Material 0
-Dome Camera Colour Fixed w/ Varifocal Lens Material 4 bh
-Instalasi Camera Fixed Dome Indoor Material 4 ttk
Coaxial Cable (Kabel Data) Material 0
NYM 3 x 1,5 mm2 (Kabel Power) Material 0
Lantai 2 Material 0
-Dome Camera Colour Fixed w/ Varifocal Lens Material 4 bh
-Instalasi Camera Fixed Dome Indoor Material 4 ttk
Coaxial Cable (Kabel Data) Material 0
NYM 3 x 1,5 mm2 (Kabel Power) Material 0
Lantai 3 Material 0
-Dome Camera Colour Fixed w/ Varifocal Lens Material 4 bh
-Instalasi Camera Fixed Dome Indoor Material 4 ttk
Coaxial Cable (Kabel Data) Material 0
NYM 3 x 1,5 mm2 (Kabel Power) Material 0
Lantai 4 Material 0
-Dome Camera Colour Fixed w/ Varifocal Lens Material 4 bh
-Instalasi Camera Fixed Dome Indoor Material 4 ttk
Coaxial Cable (Kabel Data) Material 0
NYM 3 x 1,5 mm2 (Kabel Power) Material 0
PEKERJAAN TATA SUARA Material 0
PERALATAN UTAMA TATA SUARA Material 0
-MDF-SS Material 1 unit
-Speaker selector 10 zone Material 1 unit
-Power amplifire (evac) 120 W Material 2 unit
-Equalizer Material 1 unit
-Mixer Pre-Amp Material 1 unit
-Mic paging evac (di ruang operator) Material 1 bh
-Sirine module Material 1 set
-UPS 1 Kva Material 1 bh
-Surge Arrester (15 KA) Material 1 bh
-Grounding u/ MDF-SS dan Surge Arrester ( R < 1
1 lot
Ohm ) Material
INSTALASI TATA SUARA Material 0
Lantai 1 Material 0
-Ceiling speaker 3 W Material 8 bh
-TBTS-LT.1 Material 1 bh
-Instalasi sound system (NYMHY 2 x 1,5 mm2) Material 8 ttk
Lantai 2 Material 0
-Ceiling speaker 3 W Material 7 bh
-TBTS-LT.2 Material 1 bh
-Instalasi sound system (NYMHY 2 x 1,5 mm2) Material 7 ttk
Lantai 3 Material 0
-Ceiling speaker 3 W Material 7 bh
-TBTS-LT.2 Material 1 bh
-Instalasi sound system (NYMHY 2 x 1,5 mm2) Material 7 ttk
Lantai 4 Material 0
-Ceiling speaker 3 W Material 7 bh
-TBTS-LT.2 Material 1 bh
-Instalasi sound system (NYMHY 2 x 1,5 mm2) Material 7 ttk
PEKERJAAN SARANA DAN PRASARANA
0
LINGKUNGAN (LUAR BANGUNAN) Material
PEKERJAAN INSTALASI PLUMBING Material 0
INSTALASI AIR BERSIH Material 0
PERALATAN UTAMA Material 0
Pengadaan dan pemasangan unit Material 0
Lift Pump Material 2 bh
Kapasitas Material 0
Head Material 0
Speed Material 0
PI Material 0
1 duty, 1 standby ( bergantian), lengkap dengan Material 1 set
panel control, wlc di Tanki Air Atas dan accessories 0
Material
Booster Pump / Distribution Pump Material 1 set
Type Material 0
Kapasitas Material 0
Head Material 0
Speed Material 0
Daya Material 0
Operasi Material 0
( lengkap dengan Pump & Electromotor, Pressure
0
Tank, Panel Kontrol, Pressure switch, Material
Presure Gauge, Accessories, Gate Valve, Header &
0
base Plat ) Material
Filter Pump Material 0
Type Material 1 set
Kapasitas Material 0
Power Material 0
Speed Material 0
Operation Material 0
1 duty, 1 standby ( bergantian), lengkap dengan Material 1 set
panel control, wlc di Tanki Air Atas dan accessories 0
Material
Sand Filter dan Carbon Filter Tank Material 1 set
Type Material 0
Kapasitas Material 0
Material Material 0
Media Filter Material 0
c/w : valve & accessories Material 0
Tangki Air Atas ( Type Cylinder ) Material 2 unit
Kapasitas Material 0
Toren Tangki Air Stainless Steel, lengkap dengan
0
Assesories dan dudukan/ pondasi Material
PEKERJAAN SHALLOW WELL Material 1 unit
Pembuatan / Pengeboran sumur shallow well Material 0
- Kedalaman + 95 Meter Material 0
Pipa Casing, Pipa GIP Medium dia 150mm Material 0
Pipa Rising dia 80mm Material 0
Pipa screen dia 80mm Material 0
Pengadaan dan pemasangan pompa shallow well Material 0
- Kapasitas(deb air)150 s/d 200 Lpm, pengadaan
0
dan pemasangan pipa konstruksi : 1 unit Material
Instalasi kabel Kontrol WLC : 1 unit Material 0
Instalasi Pipa GIP dia 50 mm ke GWT : 1 unit Material 0
Gate Valve dia 2" : 1 unit Material 0
Bak Kontrol Valve uk, 600 x 600 mm dengan tutup
0
bordes tebal 2 mm : 1 unit Material
Panel kontrol shallow well type outdoor : 1 unit Material 0
Pengujian kwalitas air ke laboratorium : 1 unit Material 0
Testing Comissioning & Training : 1 unit Material 0
Material & Alat Bantu : 1 unit Material 0
ACCESSORIES POMPA AIR BERSIH Material 0
-Gate Valve Material 0
dia. 125 ( Untuk Penghubung/penyeimbang GWT) Material 2 bh
dia. 80 ( Untuk Penghubung/penyeimbang GWT) Material 2 bh
dia. 50 Material 10 bh
Butterfly Valve Material 0
dia. 100 Material 3 bh
-Check Valve ( CV ) Material 0
dia. 50 Material 4 bh
-Strainer ( STR ) Material 0
dia. 50 Material 4 bh
-Flexible Joint ( FJ ) Material 0
dia. 50 Material 8 bh
-Foot Valve Material 0
dia. 50 Material 2 bh
dia. 80 Material 2 bh
-Pressure Gauge Material 4 bh
-GIP med dia. 100 ( pipa header ) Material 2 set
GIP med dia. 125 ( Pipa inlet Pompa Hydrant ) Material 5m
GIP med dia. 125 ( Pipa Penyeimbang GWT) Material 4m
-Instalasi pemipaan area pompa Material 1 lot
c/w fiting-fitting & support. Material 0
-Meteran Air c/w GV dia. 50 & Box Meteran Material 1 unit
INSTALASI PEMIPAAN Material 0
Pengadaan dan pemasangan unit. Material 0
Pemipaan PPR PN-10 (Incl. Fitting & All
0
Accessories) Material
SITE PLAN Material 0
1. Dari Box Meter PDAM ke GWT Material 0
-PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) Material 10 m
2. Pemipaan R.Pompa ke Tanki Air Atas Material 0
-GIP dia. 50 Material 46.38 m
INSTALASI AIR KOTOR & AIR BEKAS Material 0
Septic Tank ( Sewage Treatment Plant ) Material 2 unit
Kapasitas Material 0
Pipa PVC AW Ø100 (dari STP ke Riol) Material 50 M'
TESTING COMMISSIONING Material 1 lot
PEKERJAAN INSTALASI PEMADAM
0
KEBAKARAN Material
INSTALASI PEMADAM KEBAKARAN Material 0
PERALATAN UTAMA Material 0
Diesel Fire Pump Material 1 unit
Type Material 0
Kapasitas Material 0
Daya Material 0
Operasi Material 0
( Pompa sudah termasuk Panel Kontrol Automatic
0
Fire Pump ) Material
Comply to NFPA 20 Standard Material 0
Jockey Fire Pump Material 1 unit
Type Material 0
Kapasitas Material 0
Daya Material 0
Operasi Material 0
( Pompa sudah termasuk Panel Kontrol Automatic
0
Fire Pump ) Material
Comply to NFPA 20 Standard Material 0
ACCESSORIES POMPA HYDRANT Material 0
-Gate Valve Material 0
dia. 100 mm Material 6 bh
dia. 50 mm Material 2 bh
dia. 25 mm Material 1 bh
-Strainer Material 0
dia. 100 mm Material 2 bh
dia. 50 mm Material 1 bh
-Check Valve Material 0
dia. 100 mm Material 1 bh
dia. 50 mm Material 1 bh
-Flexible Joint Material 0
dia. 100 mm Material 3 bh
dia. 50 mm Material 2 bh
-Foot Valve Material 0
dia. 100 mm Material 1 bh
dia. 50 mm Material 1 bh
-Safety valve dia 100 Material 1 bh
-Flow Meter (FM) dia 100 Material 2 bh
-Automatic Air Vent dia 25 Material 1 bh
-Pressure Gauge Material 2 bh
-Pressure Switch Material 1 bh
-Pipa BSP Sch.40 dia. 200 ( pipa header ) Material 2 set
Pipa BSP Sch.40 dia. 100 ( dari header ke riser
40 m
gedung) Material
-Pemipaan area pompa Material 0
Pipa Sch.40 ASTM A-120 (warna Putih ) Material 0
Dari Pompa ke Ground Tank (dia 100) Material 6m
Dari Pompa ke Ground Tank (dia 50) Material 6m
PENYAMBUNGAN DAYA PLN Material 0
Pekerjaan Pasang Baru Daya Listrik PLN 131 KVA
1 Lot
(131.000 VA) Material
-BP ( Biaya penyambungan ) Material 0
-UJL ( Uang Jaminan Langanan ) Material 0
-Biaya Instalatir Material 0
-Concuil Material 0
-Pemasangan dan material yang dibutuhkan,
0
seperti, Material
( kabel, tiang, pondasi, galian & urugan kembali, dll ) 0
Material
PEKERJAAN INSTALASI KABEL FEEDER Material 0
Kabel Distribusi Daya dari Panel Pompa - Air
0
Bersih Material
-NYY 4 x 4 mm2 ke LP-1 Material 10 m'
-NYY 4 x 4 mm2 ke LP-2 Material 10 m'
NYY 4 x 4 mm2 ke FP-1 Material 10 m'
NYY 4 x 4 mm2 ke FP-2 Material 10 m'
Kabel Distribusi Daya dari Panel Hydrant Material 0
-NYY 4 x 4 mm2 ke Jockey Pump Material 10 m'
-NYY 2(3 x 2,5) mm2 ke Diesel Fire Pump Material 10 m'
Kabel Distribusi Daya dari P. Pompa Booster Material 0
-NYY 4 x 2,5 mm2 ke Pompa Booster 1 Material 2 m'
-NYY 4 x 2,5 mm2 ke Pompa Booster 2 Material 2 m'
-Proteksi Kabel dengan Pipa Gip Dia 100 Material 20 m'
Pengadaan Pipa Gip Dia 100, termasuk galian dan
0
material bantu lainya Material
-Testing & Commissioning Material 1 lot
Hrg Stn Jlh Hrg
Rp0.00 Rp17,322,606,131.42
Rp0.00 Rp111,883,950.00 PEKERJAAN PERSIAPAN[0];TiPe
Rp54,000.00 Rp8,656,200.00 Pengukuran dan Pemasangan Bouwplank[160,3];TiPe
Rp1,881,300.00 Rp45,151,200.00
Direksi Keet, lengkap dengan toilet, Rg. Rapat dan Mushola[24];TiPe
Rp718,800.00 Rp718,800.00 Papan Nama Proyek[1];TiPe
Rp180,000.00 Rp540,000.00 Foto Proyek 3 Fase (warna)[3];TiPe
Rp3,300,000.00 Rp3,300,000.00 Air Kerja[1];TiPe
Rp4,500,000.00 Rp4,500,000.00 Listrik Kerja[1];TiPe
Rp192,500.00 Rp37,017,750.00 Pagar Seng Keliling Proyek, tinggi 1,8m[192,3];TiPe
Rp12,000,000.00 Rp12,000,000.00 Pekerjaan mobilisasi dan demobilisasi[1];TiPe
Rp0.00 Rp76,170,000.00 PEKERJAAN RK3K KONSTRUKSI[0];TiPe
Rp1,500,000.00 Rp1,500,000.00 Penyiapan RK3K terdiri atas:[1];TiPe
Rp0.00 Rp0.00
Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja[0];TiPe
Rp0.00 Rp0.00 Pembuatan Kartu Identitas Pekerja (KIP),[0];TiPe
Rp0.00 Rp0.00 Sosialisasi dan Promosi K3 terdiri atas:[0];TiPe
Rp4,500.00 Rp855,000.00
Induksi K3 (Safety Induction ), khusus untuk pekerja baru [190];TiPe

Rp4,500.00 Rp855,000.00
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk dan/a
Rp0.00 Rp0.00 Pelatihan K3,[0];TiPe
Rp0.00 Rp0.00 Bekerja di Ketinggian[0];TiPe
Rp0.00 Rp0.00
K3 Peralatan Konstruksi & Penggunaan bahan Kimia (MSDS)[0];TiPe
Rp0.00 Rp0.00 Analysis Keselamatan Pekerjaan[0];TiPe
Rp0.00 Rp0.00 Perilaku Berbasis Keselamatan (Budaya K3)[0];TiPe
Rp0.00 Rp0.00 P3K[0];TiPe
Rp4,500.00 Rp216,000.00 Simulasi K3,[48];TiPe
Rp90,000.00 Rp450,000.00 Spanduk (banner),[5];TiPe
Rp30,000.00 Rp90,000.00 Poster,[3];TiPe
Rp300,000.00 Rp300,000.00 Papan Informasi K3.[1];TiPe
Rp0.00 Rp0.00 Alat Pelindung Kerja terdiri atas:[0];TiPe
Rp0.00 Rp0.00 Jaring Pengaman(Polynet/Safety Net),[0];TiPe
Rp600,000.00 Rp1,200,000.00 Tali Keselamatan (Life Line),[2];TiPe
Rp3,000,000.00 Rp3,000,000.00 Penahan Jatuh (Safety Deck),[1];TiPe
Rp1,800,000.00 Rp1,800,000.00 Pagar Pengaman (Guard Railling),[1];TiPe
Rp1,800,000.00 Rp1,800,000.00 Pembatas Area (Restricted Area ).[1];TiPe
Rp0.00 Rp0.00 Alat Pelindung Diri terdiri atas:[0];TiPe
Rp45,000.00 Rp8,550,000.00 Topi Pelindung (Safety Helmet),[190];TiPe
Rp15,000.00 Rp855,000.00 Pelindung Mata (Goggles, Spectacles),[57];TiPe
Rp45,000.00 Rp2,430,000.00 Tameng Muka (Face Shield),[54];TiPe
Rp30,000.00 Rp1,710,000.00 Pelindung Telinga (Ear Plug, Ear Muff),[57];TiPe
Rp3,000.00 Rp570,000.00 Pelindung Pernafasan Dan Mulut (Masker),[190];TiPe
Rp3,000.00 Rp171,000.00 Sarung Tangan (Safety Gloves),[57];TiPe
Rp162,000.00 Rp9,234,000.00 Sepatu Keselamatan (Safety Shoes), untuk Staf[57];TiPe
Rp87,000.00 Rp16,530,000.00
Sepatu Keselamatan (Rubber Safety Shoes and toe cap)[190];TiPe
Rp450,000.00 Rp7,200,000.00 Penunjang Seluruh Tubuh (Full Body Harness),[16];TiPe
Rp15,000.00 Rp2,850,000.00 Rompi Keselamatan (Safety Vest),[190];TiPe
Rp60,000.00 Rp960,000.00 Pelindung Jatuh (Fall Arrester),[16];TiPe
Rp0.00 Rp0.00 Asuransi Dan Perijinan terdiri atas :[0];TiPe

Rp0.00 Rp0.00
BPJS Ketenagakerjaan Dan Kesehatan Kerja, (BERDASARKAN KEPMENAKER N
Rp0.00 Rp0.00 Surat Ijin Kelaikan Alat,[0];TiPe
Rp0.00 Rp0.00 Surat Ijin Operator,[0];TiPe
Rp0.00 Rp0.00
Surat Ijin Pengesahan Panitia Pembina Keselamatan Dan Kesehatan Kerja (P
Rp0.00 Rp0.00 Personil K3 terdiri atas :[0];TiPe
Rp0.00 Rp0.00 Ahli K3[0];TiPe
Rp0.00 Rp0.00 Petugas K3[0];TiPe
Rp0.00 Rp0.00 Petugas Tanggap Darurat,[0];TiPe
Rp0.00 Rp0.00 Petugas P3K,[0];TiPe
Rp0.00 Rp0.00
Ass Petugas K3/ Safety Man/Pengatur Lalu Lintas (Flagman ),[0];TiPe
Rp0.00 Rp0.00 Petugas Medis.[0];TiPe
Rp0.00 Rp0.00 P3K[0];TiPe
Rp3,900,000.00 Rp3,900,000.00
Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll)[1
Rp3,000,000.00 Rp3,000,000.00
Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi
Rp0.00 Rp0.00 Peralatan Pengasapan (Fogging),[0];TiPe
Rp0.00 Rp0.00 Obat Pengasapan.[0];TiPe
Rp2,100,000.00 Rp2,100,000.00 Rambu-Rambu terdiri atas :[1];TiPe
Rp0.00 Rp0.00 Rambu Petunjuk,[0];TiPe
Rp0.00 Rp0.00 Rambu Larangan,[0];TiPe
Rp0.00 Rp0.00 Rambu Peringatan,[0];TiPe
Rp0.00 Rp0.00 Rambu Kewajiban,[0];TiPe
Rp0.00 Rp0.00 Rambu Informasi,[0];TiPe
Rp0.00 Rp0.00 Rambu Pekerjaan Sementara,[0];TiPe
Rp0.00 Rp0.00 Tongkat Pengatur Lalu Lintas (Warning Lights Stick),[0];TiPe
Rp0.00 Rp0.00 Kerucut Lalu Lintas (Traffic Cone),[0];TiPe
Rp0.00 Rp0.00 Lampu Putar (Rotary Lamp ),[0];TiPe
Rp0.00 Rp0.00 Lampu Selang Lalu Lintas.[0];TiPe
Rp0.00 Rp0.00 Lain- Lain Terkait Pengendalian Risiko K3[0];TiPe
Rp330,000.00 Rp660,000.00 Alat Pemadam Api Ringan (APAR), 10Kg[2];TiPe
Rp60,000.00 Rp240,000.00 Sirine,[4];TiPe
Rp30,000.00 Rp60,000.00 Bendera K3,[2];TiPe
Rp300,000.00 Rp300,000.00 Jalur Evakuasi (Escape Route ),[1];TiPe
Rp42,000.00 Rp84,000.00 Lampu Darurat (Emergency Lamp ),[2];TiPe
Rp1,200,000.00 Rp2,400,000.00 Program Inspeksi Dan Audit Internal,[2];TiPe
Rp300,000.00 Rp300,000.00 Pelaporan dan Penyelidikan Insiden.[1];TiPe
Rp0.00 Rp4,528,261,603.94 PEKERJAAN STRUKTUR STANDART[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI 1[0];TiPe
Rp0.00 Rp0.00 Kolom K1[0];TiPe
Rp1,129,343.80 Rp41,503,384.65 -Beton K-300[36,75];TiPe
Rp15,487.11 Rp165,431,295.70 -Besi beton[10681,87];TiPe
Rp40,415.54 Rp14,428,347.78 -Bekisting[357];TiPe
Rp0.00 Rp0.00 Kolom K2[0];TiPe
Rp1,129,343.80 Rp711,486.59 -Beton K-300[0,63];TiPe
Rp15,487.11 Rp2,405,612.80 -Besi beton[155,33];TiPe
Rp40,415.54 Rp339,490.54 -Bekisting[8,4];TiPe
Rp0.00 Rp0.00 Dinding SW1[0];TiPe
Rp1,129,343.80 Rp18,972,975.84 -Beton K-300[16,8];TiPe
Rp15,487.11 Rp77,237,469.86 -Besi beton[4987,21];TiPe
Rp42,440.87 Rp5,050,463.53 -Bekisting[119];TiPe
Rp0.00 Rp0.00 Perkerjaan dalam bangunan[0];TiPe
Rp161,046.50 Rp17,096,696.44
- Tanah urug peninggian lantai t=45 cm (dalam bangunan) + pemadatan CBR
Rp132,492.88 Rp12,252,941.54 - Pasir urug diatas tanah urug t=10 cm (dalam bangunan)[92,48];TiPe
Rp636,964.57 Rp29,453,241.72 - Cor beton lantai kerja t=5 cm (dalam bangunan)[46,24];TiPe
Rp0.00 Rp0.00
Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (dalam bangunan)[0];TiPe
Rp1,129,343.80 Rp103,063,915.19 -Beton K-300[91,26];TiPe
Rp102,174.00 Rp93,247,057.62 -Besi Weremesh M-8[912,63];TiPe
Rp0.00 Rp0.00
Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (luarbngunan/teras)[0];TiPe
Rp1,129,343.80 Rp2,766,892.31 -Beton K-300[2,45];TiPe
Rp13,452.90 Rp2,784,346.71 -Besi beton[206,97];TiPe
Rp102,174.00 Rp1,576,544.82 -Besi Weremesh M-8[15,43];TiPe
Rp0.00 Rp0.00 Pelat Beton Canopy Jendela t= 10 cm[0];TiPe
Rp1,129,343.80 Rp13,992,569.68 -Beton K-300[12,39];TiPe
Rp13,452.90 Rp57,153,838.48 -Besi beton[4248,44];TiPe
Rp36,824.67 Rp4,557,421.16 -Bekisting[123,76];TiPe
Rp0.00 Rp0.00 Pelat Tangga Service[0];TiPe
Rp1,129,343.80 Rp1,456,853.50 -Beton K-300[1,29];TiPe
Rp13,452.90 Rp3,928,112.27 -Besi beton[291,99];TiPe
Rp36,824.67 Rp781,787.74 -Bekisting[21,23];TiPe
Rp0.00 Rp0.00 Anak Tangga Service lt. 1[0];TiPe
Rp1,129,343.80 Rp45,173.75 -Beton K-300[0,04];TiPe
Rp15,487.11 Rp1,448,509.40 -Besi beton[93,53];TiPe
Rp46,817.19 Rp534,184.14 -Bekisting[11,41];TiPe
Rp0.00 Rp0.00 Bordes Tangga Service[0];TiPe
Rp1,129,343.80 Rp1,727,896.01 -Beton K-300[1,53];TiPe
Rp13,452.90 Rp4,638,559.92 -Besi beton[344,8];TiPe
Rp36,824.67 Rp375,611.63 -Bekisting[10,2];TiPe
Rp0.00 Rp0.00 Balok Bordes 20x35 cm (Tangga Service)[0];TiPe
Rp1,129,343.80 Rp271,042.51 -Beton K-300[0,24];TiPe
Rp13,452.90 Rp2,919,413.83 -Besi beton[217,01];TiPe
Rp46,817.19 Rp69,289.44 -Bekisting[1,48];TiPe
Rp0.00 Rp0.00 Pelat Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,106,756.92 -Beton K-300[0,98];TiPe
Rp15,487.11 Rp3,302,781.08 -Besi beton[213,26];TiPe
Rp36,824.67 Rp553,474.79 -Bekisting[15,03];TiPe
Rp0.00 Rp0.00 Anak Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,174,517.55 -Beton K-300[1,04];TiPe
Rp15,487.11 Rp985,909.42 -Besi beton[63,66];TiPe
Rp46,817.19 Rp373,133.00 -Bekisting[7,97];TiPe
Rp0.00 Rp0.00 Bordes Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,219,691.30 -Beton K-300[1,08];TiPe
Rp13,452.90 Rp3,220,086.14 -Besi beton[239,36];TiPe
Rp36,824.67 Rp266,242.36 -Bekisting[7,23];TiPe
Rp0.00 Rp0.00 Balok Bordes 20x35 cm Tangga Utama[0];TiPe
Rp1,129,343.80 Rp135,521.26 -Beton K-300[0,12];TiPe
Rp15,487.11 Rp1,848,851.19 -Besi beton[119,38];TiPe
Rp46,817.19 Rp34,644.72 -Bekisting[0,74];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI 2[0];TiPe
Rp0.00 Rp0.00 Kolom K1[0];TiPe
Rp1,129,343.80 Rp40,317,573.66 -Beton K-300[35,7];TiPe
Rp15,487.11 Rp148,162,083.95 -Besi beton[9566,8];TiPe
Rp40,415.54 Rp14,016,109.27 -Bekisting[346,8];TiPe
Rp0.00 Rp0.00 Kolom K2[0];TiPe
Rp1,129,343.80 Rp688,899.72 -Beton K-300[0,61];TiPe
Rp15,487.11 Rp2,109,034.64 -Besi beton[136,18];TiPe
Rp40,415.54 Rp329,790.81 -Bekisting[8,16];TiPe
Rp0.00 Rp0.00 Dinding SW1[0];TiPe
Rp1,129,343.80 Rp18,430,890.82 -Beton K-300[16,32];TiPe
Rp15,487.11 Rp76,674,823.16 -Besi beton[4950,88];TiPe
Rp42,440.87 Rp4,906,164.57 -Bekisting[115,6];TiPe
Rp0.00 Rp0.00 Balok G1.1[0];TiPe
Rp1,129,343.80 Rp12,106,565.54 -Beton K-300[10,72];TiPe
Rp15,487.11 Rp37,383,870.22 -Besi beton[2413,87];TiPe
Rp46,817.19 Rp7,169,116.30 -Bekisting[153,13];TiPe
Rp0.00 Rp0.00 Balok G1.2[0];TiPe
Rp1,129,343.80 Rp1,242,278.18 -Beton K-300[1,1];TiPe
Rp15,487.11 Rp3,689,029.60 -Besi beton[238,2];TiPe
Rp46,817.19 Rp737,370.74 -Bekisting[15,75];TiPe
Rp0.00 Rp0.00 Balok G1.3[0];TiPe
Rp1,129,343.80 Rp16,680,407.93 -Beton K-300[14,77];TiPe
Rp15,487.11 Rp48,220,510.82 -Besi beton[3113,59];TiPe
Rp46,817.19 Rp9,875,618.06 -Bekisting[210,94];TiPe
Rp0.00 Rp0.00 Balok G1.4[0];TiPe
Rp1,129,343.80 Rp14,941,218.47 -Beton K-300[13,23];TiPe
Rp15,487.11 Rp58,106,088.01 -Besi beton[3751,9];TiPe
Rp46,817.19 Rp8,848,448.91 -Bekisting[189];TiPe
Rp0.00 Rp0.00 Balok G2.2[0];TiPe
Rp1,129,343.80 Rp1,739,189.45 -Beton K-300[1,54];TiPe
Rp15,487.11 Rp4,951,538.81 -Besi beton[319,72];TiPe
Rp46,817.19 Rp796,360.40 -Bekisting[17,01];TiPe
Rp0.00 Rp0.00 Balok G4.1[0];TiPe
Rp1,129,343.80 Rp14,941,218.47 -Beton K-300[13,23];TiPe
Rp15,487.11 Rp58,106,088.01 -Besi beton[3751,9];TiPe
Rp46,817.19 Rp8,848,448.91 -Bekisting[189];TiPe
Rp0.00 Rp0.00 Balok B1.1[0];TiPe
Rp1,129,343.80 Rp1,016,409.42 -Beton K-300[0,9];TiPe
Rp15,487.11 Rp3,143,573.59 -Besi beton[202,98];TiPe
Rp46,817.19 Rp599,728.20 -Bekisting[12,81];TiPe
Rp0.00 Rp0.00 Balok B2.1[0];TiPe
Rp1,129,343.80 Rp7,927,993.48 -Beton K-300[7,02];TiPe
Rp15,487.11 Rp24,796,566.69 -Besi beton[1601,11];TiPe
Rp46,817.19 Rp5,517,874.01 -Bekisting[117,86];TiPe
Rp0.00 Rp0.00 Balok BP.1[0];TiPe
Rp1,129,343.80 Rp2,586,197.30 -Beton K-300[2,29];TiPe
Rp15,487.11 Rp20,891,182.16 -Besi beton[1348,94];TiPe
Rp46,817.19 Rp4,645,669.76 -Bekisting[99,23];TiPe
Rp0.00 Rp0.00 Plat lantai dalam, t =130 mm[0];TiPe
Rp1,129,343.80 Rp133,985,348.43 -Beton K-300[118,64];TiPe
Rp13,452.90 Rp176,474,604.08 -Besi beton[13117,96];TiPe
Rp36,824.67 Rp33,607,298.58 -Bekisting[912,63];TiPe
Rp0.00 Rp0.00 Plat lantai balkon, t =130 mm[0];TiPe
Rp1,129,343.80 Rp1,626,255.07 -Beton K-300[1,44];TiPe
Rp13,452.90 Rp2,120,984.21 -Besi beton[157,66];TiPe
Rp36,824.67 Rp65,547.91 -Bekisting[1,78];TiPe
Rp0.00 Rp0.00 Pelat Beton Canopy Jendela t= 10 cm[0];TiPe
Rp1,129,343.80 Rp14,139,384.38 -Beton K-300[12,52];TiPe
Rp13,452.90 Rp57,756,662.93 -Besi beton[4293,25];TiPe
Rp36,824.67 Rp4,606,766.22 -Bekisting[125,1];TiPe
Rp0.00 Rp0.00 Pelat Tangga Service[0];TiPe
Rp1,129,343.80 Rp1,456,853.50 -Beton K-300[1,29];TiPe
Rp13,452.90 Rp3,928,112.27 -Besi beton[291,99];TiPe
Rp36,824.67 Rp781,787.74 -Bekisting[21,23];TiPe
Rp0.00 Rp0.00 Anak Tangga Service lt. 1[0];TiPe
Rp1,129,343.80 Rp1,581,081.32 -Beton K-300[1,4];TiPe
Rp15,487.11 Rp1,448,509.40 -Besi beton[93,53];TiPe
Rp46,817.19 Rp534,184.14 -Bekisting[11,41];TiPe
Rp0.00 Rp0.00 Bordes Tangga Service[0];TiPe
Rp1,129,343.80 Rp1,727,896.01 -Beton K-300[1,53];TiPe
Rp13,452.90 Rp4,638,559.92 -Besi beton[344,8];TiPe
Rp36,824.67 Rp375,611.63 -Bekisting[10,2];TiPe
Rp0.00 Rp0.00 Balok Bordes 20x35 cm (Tangga Service)[0];TiPe
Rp1,129,343.80 Rp271,042.51 -Beton K-300[0,24];TiPe
Rp15,487.11 Rp3,360,857.74 -Besi beton[217,01];TiPe
Rp46,817.19 Rp69,289.44 -Bekisting[1,48];TiPe
Rp0.00 Rp0.00 Pelat Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,106,756.92 -Beton K-300[0,98];TiPe
Rp13,452.90 Rp2,868,965.45 -Besi beton[213,26];TiPe
Rp36,824.67 Rp553,474.79 -Bekisting[15,03];TiPe
Rp0.00 Rp0.00 Anak Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,174,517.55 -Beton K-300[1,04];TiPe
Rp15,487.11 Rp985,909.42 -Besi beton[63,66];TiPe
Rp46,817.19 Rp373,133.00 -Bekisting[7,97];TiPe
Rp0.00 Rp0.00 Bordes Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,219,691.30 -Beton K-300[1,08];TiPe
Rp13,452.90 Rp3,220,086.14 -Besi beton[239,36];TiPe
Rp36,824.67 Rp266,242.36 -Bekisting[7,23];TiPe
Rp0.00 Rp0.00 Balok Bordes 20x35 cm Tangga Utama[0];TiPe
Rp1,129,343.80 Rp135,521.26 -Beton K-300[0,12];TiPe
Rp15,487.11 Rp1,848,851.19 -Besi beton[119,38];TiPe
Rp46,817.19 Rp34,644.72 -Bekisting[0,74];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI 3[0];TiPe
Rp0.00 Rp0.00 Kolom K2[0];TiPe
Rp1,129,343.80 Rp688,899.72 -Beton K-300[0,61];TiPe
Rp15,487.11 Rp2,109,034.64 -Besi beton[136,18];TiPe
Rp40,415.54 Rp329,790.81 -Bekisting[8,16];TiPe
Rp0.00 Rp0.00 Kolom K3[0];TiPe
Rp1,129,343.80 Rp13,823,168.11 -Beton K-300[12,24];TiPe
Rp15,487.11 Rp48,671,185.73 -Besi beton[3142,69];TiPe
Rp40,415.54 Rp5,276,652.90 -Bekisting[130,56];TiPe
Rp0.00 Rp0.00 Dinding SW1[0];TiPe
Rp1,129,343.80 Rp18,430,890.82 -Beton K-300[16,32];TiPe
Rp15,487.11 Rp76,674,823.16 -Besi beton[4950,88];TiPe
Rp42,440.87 Rp4,906,164.57 -Bekisting[115,6];TiPe
Rp0.00 Rp0.00 Balok G1.1[0];TiPe
Rp1,129,343.80 Rp12,106,565.54 -Beton K-300[10,72];TiPe
Rp15,487.11 Rp37,383,870.22 -Besi beton[2413,87];TiPe
Rp46,817.19 Rp7,169,116.30 -Bekisting[153,13];TiPe
Rp0.00 Rp0.00 Balok G1.2[0];TiPe
Rp1,129,343.80 Rp1,242,278.18 -Beton K-300[1,1];TiPe
Rp15,487.11 Rp3,689,029.60 -Besi beton[238,2];TiPe
Rp46,817.19 Rp737,370.74 -Bekisting[15,75];TiPe
Rp0.00 Rp0.00 Balok G1.3[0];TiPe
Rp1,129,343.80 Rp16,680,407.93 -Beton K-300[14,77];TiPe
Rp15,487.11 Rp48,220,510.82 -Besi beton[3113,59];TiPe
Rp46,817.19 Rp9,875,618.06 -Bekisting[210,94];TiPe
Rp0.00 Rp0.00 Balok G1.4[0];TiPe
Rp1,129,343.80 Rp14,941,218.47 -Beton K-300[13,23];TiPe
Rp15,487.11 Rp58,106,088.01 -Besi beton[3751,9];TiPe
Rp46,817.19 Rp8,848,448.91 -Bekisting[189];TiPe
Rp0.00 Rp0.00 Balok G2.2[0];TiPe
Rp1,129,343.80 Rp1,739,189.45 -Beton K-300[1,54];TiPe
Rp15,487.11 Rp4,951,538.81 -Besi beton[319,72];TiPe
Rp46,817.19 Rp796,360.40 -Bekisting[17,01];TiPe
Rp0.00 Rp0.00 Balok G4.1[0];TiPe
Rp1,129,343.80 Rp2,597,490.74 -Beton K-300[2,3];TiPe
Rp15,487.11 Rp8,675,259.54 -Besi beton[560,16];TiPe
Rp46,817.19 Rp1,334,758.09 -Bekisting[28,51];TiPe
Rp0.00 Rp0.00 Balok B1.1[0];TiPe
Rp1,129,343.80 Rp1,016,409.42 -Beton K-300[0,9];TiPe
Rp15,487.11 Rp3,143,573.59 -Besi beton[202,98];TiPe
Rp46,817.19 Rp599,728.20 -Bekisting[12,81];TiPe
Rp0.00 Rp0.00 Balok B2.1[0];TiPe
Rp1,129,343.80 Rp7,927,993.48 -Beton K-300[7,02];TiPe
Rp15,487.11 Rp24,796,566.69 -Besi beton[1601,11];TiPe
Rp46,817.19 Rp5,517,874.01 -Bekisting[117,86];TiPe
Rp0.00 Rp0.00 Balok BP.1[0];TiPe
Rp1,129,343.80 Rp2,586,197.30 -Beton K-300[2,29];TiPe
Rp15,487.11 Rp20,891,182.16 -Besi beton[1348,94];TiPe
Rp46,817.19 Rp4,645,669.76 -Bekisting[99,23];TiPe
Rp0.00 Rp0.00 Plat lantai dalam, t =130 mm[0];TiPe
Rp1,129,343.80 Rp133,985,348.43 -Beton K-300[118,64];TiPe
Rp13,452.90 Rp176,474,604.08 -Besi beton[13117,96];TiPe
Rp36,824.67 Rp33,607,298.58 -Bekisting[912,63];TiPe
Rp0.00 Rp0.00 Plat lantai balkon, t =130 mm[0];TiPe
Rp1,129,343.80 Rp1,626,255.07 -Beton K-300[1,44];TiPe
Rp13,452.90 Rp2,120,984.21 -Besi beton[157,66];TiPe
Rp36,824.67 Rp65,547.91 -Bekisting[1,78];TiPe
Rp0.00 Rp0.00 Pelat Beton Canopy Jendela t= 10 cm[0];TiPe
Rp1,129,343.80 Rp14,139,384.38 -Beton K-300[12,52];TiPe
Rp13,452.90 Rp57,756,662.93 -Besi beton[4293,25];TiPe
Rp36,824.67 Rp4,606,766.22 -Bekisting[125,1];TiPe
Rp0.00 Rp0.00 Pelat Tangga Service[0];TiPe
Rp1,129,343.80 Rp1,456,853.50 -Beton K-300[1,29];TiPe
Rp13,452.90 Rp3,928,112.27 -Besi beton[291,99];TiPe
Rp36,824.67 Rp781,787.74 -Bekisting[21,23];TiPe
Rp0.00 Rp0.00 Anak Tangga Service lt. 1[0];TiPe
Rp1,129,343.80 Rp1,581,081.32 -Beton K-300[1,4];TiPe
Rp15,487.11 Rp1,448,509.40 -Besi beton[93,53];TiPe
Rp46,817.19 Rp534,184.14 -Bekisting[11,41];TiPe
Rp0.00 Rp0.00 Bordes Tangga Service[0];TiPe
Rp1,129,343.80 Rp1,727,896.01 -Beton K-300[1,53];TiPe
Rp13,452.90 Rp4,638,559.92 -Besi beton[344,8];TiPe
Rp36,824.67 Rp375,611.63 -Bekisting[10,2];TiPe
Rp0.00 Rp0.00 Balok Bordes 20x35 cm (Tangga Service)[0];TiPe
Rp1,129,343.80 Rp271,042.51 -Beton K-300[0,24];TiPe
Rp15,487.11 Rp3,360,857.74 -Besi beton[217,01];TiPe
Rp46,817.19 Rp69,289.44 -Bekisting[1,48];TiPe
Rp0.00 Rp0.00 Pelat Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,106,756.92 -Beton K-300[0,98];TiPe
Rp13,452.90 Rp2,868,965.45 -Besi beton[213,26];TiPe
Rp36,824.67 Rp553,474.79 -Bekisting[15,03];TiPe
Rp0.00 Rp0.00 Anak Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,174,517.55 -Beton K-300[1,04];TiPe
Rp15,487.11 Rp985,909.42 -Besi beton[63,66];TiPe
Rp46,817.19 Rp373,133.00 -Bekisting[7,97];TiPe
Rp0.00 Rp0.00 Bordes Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,219,691.30 -Beton K-300[1,08];TiPe
Rp13,452.90 Rp3,220,086.14 -Besi beton[239,36];TiPe
Rp36,824.67 Rp266,242.36 -Bekisting[7,23];TiPe
Rp0.00 Rp0.00 Balok Bordes 20x35 cm Tangga Utama[0];TiPe
Rp1,129,343.80 Rp237,162.20 -Beton K-300[0,21];TiPe
Rp15,487.11 Rp682,981.55 -Besi beton[44,1];TiPe
Rp46,817.19 Rp140,451.57 -Bekisting[3];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI 4[0];TiPe
Rp0.00 Rp0.00 Kolom K2[0];TiPe
Rp1,129,343.80 Rp688,899.72 -Beton K-300[0,61];TiPe
Rp15,487.11 Rp2,109,034.64 -Besi beton[136,18];TiPe
Rp40,415.54 Rp329,790.81 -Bekisting[8,16];TiPe
Rp0.00 Rp0.00 Kolom K3[0];TiPe
Rp1,129,343.80 Rp13,823,168.11 -Beton K-300[12,24];TiPe
Rp15,487.11 Rp48,671,185.73 -Besi beton[3142,69];TiPe
Rp40,415.54 Rp5,276,652.90 -Bekisting[130,56];TiPe
Rp0.00 Rp0.00 Dinding SW1[0];TiPe
Rp1,129,343.80 Rp18,430,890.82 -Beton K-300[16,32];TiPe
Rp15,487.11 Rp76,674,823.16 -Besi beton[4950,88];TiPe
Rp42,440.87 Rp4,906,164.57 -Bekisting[115,6];TiPe
Rp0.00 Rp0.00 Balok G1.1[0];TiPe
Rp1,129,343.80 Rp12,106,565.54 -Beton K-300[10,72];TiPe
Rp15,487.11 Rp37,383,870.22 -Besi beton[2413,87];TiPe
Rp46,817.19 Rp7,169,116.30 -Bekisting[153,13];TiPe
Rp0.00 Rp0.00 Balok G1.2[0];TiPe
Rp1,129,343.80 Rp1,242,278.18 -Beton K-300[1,1];TiPe
Rp15,487.11 Rp3,689,029.60 -Besi beton[238,2];TiPe
Rp46,817.19 Rp737,370.74 -Bekisting[15,75];TiPe
Rp0.00 Rp0.00 Balok G1.3[0];TiPe
Rp1,129,343.80 Rp16,680,407.93 -Beton K-300[14,77];TiPe
Rp15,487.11 Rp48,220,510.82 -Besi beton[3113,59];TiPe
Rp46,817.19 Rp9,875,618.06 -Bekisting[210,94];TiPe
Rp0.00 Rp0.00 Balok G1.4[0];TiPe
Rp1,129,343.80 Rp14,941,218.47 -Beton K-300[13,23];TiPe
Rp15,487.11 Rp58,106,088.01 -Besi beton[3751,9];TiPe
Rp46,817.19 Rp8,848,448.91 -Bekisting[189];TiPe
Rp0.00 Rp0.00 Balok G2.2[0];TiPe
Rp1,129,343.80 Rp1,739,189.45 -Beton K-300[1,54];TiPe
Rp15,487.11 Rp4,951,538.81 -Besi beton[319,72];TiPe
Rp46,817.19 Rp796,360.40 -Bekisting[17,01];TiPe
Rp0.00 Rp0.00 Balok G4.1[0];TiPe
Rp1,129,343.80 Rp2,597,490.74 -Beton K-300[2,3];TiPe
Rp15,487.11 Rp8,675,259.54 -Besi beton[560,16];TiPe
Rp46,817.19 Rp1,334,758.09 -Bekisting[28,51];TiPe
Rp0.00 Rp0.00 Balok B1.1[0];TiPe
Rp1,129,343.80 Rp1,016,409.42 -Beton K-300[0,9];TiPe
Rp15,487.11 Rp3,143,573.59 -Besi beton[202,98];TiPe
Rp46,817.19 Rp599,728.20 -Bekisting[12,81];TiPe
Rp0.00 Rp0.00 Balok B2.1[0];TiPe
Rp1,129,343.80 Rp7,927,993.48 -Beton K-300[7,02];TiPe
Rp15,487.11 Rp24,796,566.69 -Besi beton[1601,11];TiPe
Rp46,817.19 Rp5,517,874.01 -Bekisting[117,86];TiPe
Rp0.00 Rp0.00 Balok BP.1[0];TiPe
Rp1,129,343.80 Rp2,586,197.30 -Beton K-300[2,29];TiPe
Rp15,487.11 Rp20,891,182.16 -Besi beton[1348,94];TiPe
Rp46,817.19 Rp4,645,669.76 -Bekisting[99,23];TiPe
Rp0.00 Rp0.00 Plat lantai dalam, t =130 mm[0];TiPe
Rp1,129,343.80 Rp133,985,348.43 -Beton K-300[118,64];TiPe
Rp13,452.90 Rp176,474,604.08 -Besi beton[13117,96];TiPe
Rp36,824.67 Rp33,607,298.58 -Bekisting[912,63];TiPe
Rp0.00 Rp0.00 Plat lantai balkon, t =130 mm[0];TiPe
Rp1,129,343.80 Rp1,626,255.07 -Beton K-300[1,44];TiPe
Rp13,452.90 Rp2,120,984.21 -Besi beton[157,66];TiPe
Rp36,824.67 Rp65,547.91 -Bekisting[1,78];TiPe
Rp0.00 Rp0.00 Pelat Beton Canopy Jendela t= 10 cm[0];TiPe
Rp1,129,343.80 Rp14,139,384.38 -Beton K-300[12,52];TiPe
Rp13,452.90 Rp57,756,662.93 -Besi beton[4293,25];TiPe
Rp36,824.67 Rp4,606,766.22 -Bekisting[125,1];TiPe
Rp0.00 Rp0.00 Pelat Tangga Service[0];TiPe
Rp1,129,343.80 Rp1,456,853.50 -Beton K-300[1,29];TiPe
Rp13,452.90 Rp3,928,112.27 -Besi beton[291,99];TiPe
Rp36,824.67 Rp781,787.74 -Bekisting[21,23];TiPe
Rp0.00 Rp0.00 Anak Tangga Service lt. 1[0];TiPe
Rp1,129,343.80 Rp1,581,081.32 -Beton K-300[1,4];TiPe
Rp15,487.11 Rp1,448,509.40 -Besi beton[93,53];TiPe
Rp46,817.19 Rp534,184.14 -Bekisting[11,41];TiPe
Rp0.00 Rp0.00 Bordes Tangga Service[0];TiPe
Rp1,129,343.80 Rp1,727,896.01 -Beton K-300[1,53];TiPe
Rp13,452.90 Rp4,638,559.92 -Besi beton[344,8];TiPe
Rp36,824.67 Rp375,611.63 -Bekisting[10,2];TiPe
Rp0.00 Rp0.00 Balok Bordes 20x35 cm (Tangga Service)[0];TiPe
Rp1,129,343.80 Rp271,042.51 -Beton K-300[0,24];TiPe
Rp15,487.11 Rp3,360,857.74 -Besi beton[217,01];TiPe
Rp46,817.19 Rp69,289.44 -Bekisting[1,48];TiPe
Rp0.00 Rp0.00 Pelat Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,106,756.92 -Beton K-300[0,98];TiPe
Rp13,452.90 Rp2,868,965.45 -Besi beton[213,26];TiPe
Rp36,824.67 Rp553,474.79 -Bekisting[15,03];TiPe
Rp0.00 Rp0.00 Anak Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,174,517.55 -Beton K-300[1,04];TiPe
Rp15,487.11 Rp985,909.42 -Besi beton[63,66];TiPe
Rp46,817.19 Rp373,133.00 -Bekisting[7,97];TiPe
Rp0.00 Rp0.00 Bordes Tangga Utama lt. 1[0];TiPe
Rp1,129,343.80 Rp1,219,691.30 -Beton K-300[1,08];TiPe
Rp13,452.90 Rp3,220,086.14 -Besi beton[239,36];TiPe
Rp36,824.67 Rp266,242.36 -Bekisting[7,23];TiPe
Rp0.00 Rp0.00 Balok Bordes 20x35 cm Tangga Utama[0];TiPe
Rp1,129,343.80 Rp237,162.20 -Beton K-300[0,21];TiPe
Rp15,487.11 Rp682,981.55 -Besi beton[44,1];TiPe
Rp46,817.19 Rp140,451.57 -Bekisting[3];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI DAK[0];TiPe
Rp0.00 Rp0.00 Kolom K4[0];TiPe
Rp1,129,343.80 Rp361,390.02 -Beton K-300[0,32];TiPe
Rp15,487.11 Rp1,162,462.48 -Besi beton[75,06];TiPe
Rp40,415.54 Rp174,595.13 -Bekisting[4,32];TiPe
Rp0.00 Rp0.00 Kolom K3[0];TiPe
Rp1,129,343.80 Rp18,295,369.56 -Beton K-300[16,2];TiPe
Rp15,487.11 Rp67,046,177.13 -Besi beton[4329,16];TiPe
Rp40,415.54 Rp6,983,805.31 -Bekisting[172,8];TiPe
Rp0.00 Rp0.00 Dinding SW1[0];TiPe
Rp1,129,343.80 Rp18,430,890.82 -Beton K-300[16,32];TiPe
Rp15,487.11 Rp76,674,823.16 -Besi beton[4950,88];TiPe
Rp40,415.54 Rp4,672,036.42 -Bekisting[115,6];TiPe
Rp0.00 Rp0.00 Balok G1.2[0];TiPe
Rp1,129,343.80 Rp7,114,865.94 -Beton K-300[6,3];TiPe
Rp15,487.11 Rp15,433,369.73 -Besi beton[996,53];TiPe
Rp46,817.19 Rp2,949,482.97 -Bekisting[63];TiPe
Rp0.00 Rp0.00 Balok G1.3[0];TiPe
Rp1,129,343.80 Rp4,325,386.75 -Beton K-300[3,83];TiPe
Rp15,487.11 Rp9,559,883.26 -Besi beton[617,28];TiPe
Rp46,817.19 Rp1,793,566.55 -Bekisting[38,31];TiPe
Rp0.00 Rp0.00 Balok G2.1[0];TiPe
Rp1,129,343.80 Rp24,213,131.07 -Beton K-300[21,44];TiPe
Rp15,487.11 Rp43,693,473.70 -Besi beton[2821,28];TiPe
Rp46,817.19 Rp7,742,626.88 -Bekisting[165,38];TiPe
Rp0.00 Rp0.00 Balok B1.1[0];TiPe
Rp1,129,343.80 Rp1,185,810.99 -Beton K-300[1,05];TiPe
Rp15,487.11 Rp2,147,442.67 -Besi beton[138,66];TiPe
Rp46,817.19 Rp379,219.24 -Bekisting[8,1];TiPe
Rp0.00 Rp0.00 Balok B2.1[0];TiPe
Rp1,129,343.80 Rp1,185,810.99 -Beton K-300[1,05];TiPe
Rp15,487.11 Rp1,592,074.91 -Besi beton[102,8];TiPe
Rp46,817.19 Rp379,219.24 -Bekisting[8,1];TiPe
Rp0.00 Rp0.00 Plat Dak t=15 cm[0];TiPe
Rp1,129,343.80 Rp8,741,121.01 -Beton K-300[7,74];TiPe
Rp13,452.90 Rp10,024,024.85 -Besi beton[745,12];TiPe
Rp36,824.67 Rp256,299.70 -Bekisting[6,96];TiPe
Rp0.00 Rp0.00 Dudukan Water Tank Plat Dak t=20 cm + Beton Pengikat[0];TiPe
Rp1,129,343.80 Rp2,190,926.97 -Beton K-300[1,94];TiPe
Rp13,452.90 Rp1,701,926.38 -Besi beton[126,51];TiPe
Rp39,810.16 Rp109,079.84 -Bekisting[2,74];TiPe
Rp0.00 Rp0.00 Beton Tanggulan[0];TiPe
Rp1,129,343.80 Rp237,162.20 -Beton K-300[0,21];TiPe
Rp15,487.11 Rp172,836.15 -Besi beton[11,16];TiPe
Rp39,810.16 Rp113,060.85 -Bekisting[2,84];TiPe
Rp0.00 Rp0.00 LANTAI ATAP[0];TiPe
Rp0.00 Rp0.00 Balok G3.1[0];TiPe
Rp1,129,343.80 Rp52,367,672.01 -Beton K-300[46,37];TiPe
Rp15,487.11 Rp111,353,250.13 -Besi beton[7190,06];TiPe
Rp46,817.19 Rp22,792,012.61 -Bekisting[486,83];TiPe
Rp0.00 Rp0.00 SOPI-SOPI[0];TiPe
Rp0.00 Rp0.00 Kolom K4 (sopi-sopi)[0];TiPe
Rp1,129,343.80 Rp2,089,286.03 -Beton K-300[1,85];TiPe
Rp15,487.11 Rp6,652,488.10 -Besi beton[429,55];TiPe
Rp40,415.54 Rp795,377.83 -Bekisting[19,68];TiPe
Rp0.00 Rp0.00 Balok G3.1 (sopi-sopi)[0];TiPe
Rp1,129,343.80 Rp4,788,417.71 -Beton K-300[4,24];TiPe
Rp15,487.11 Rp10,239,922.26 -Besi beton[661,19];TiPe
Rp46,817.19 Rp2,084,301.30 -Bekisting[44,52];TiPe
Rp0.00 Rp0.00 RANGKA ATAP BAJA[0];TiPe
Rp0.00 Rp0.00 Atap Bagian Bawah[0];TiPe
Rp216,250.03 Rp223,552,793.51 Pekerjaan Atap Baja Ringan[1033,77];TiPe
Rp0.00 Rp0.00 Atap Bagian Atas[0];TiPe
Rp42,005.00 Rp29,991,570.00 Pipa baja 4", T = 3.2 mm[714];TiPe
Rp22,484.00 Rp338,833.88 Base plate t= 6mm[15,07];TiPe
Rp42,371.00 Rp1,355,872.00 Mur Baut A325 HTB Dia 12 mm[32];TiPe
Rp77,091.00 Rp1,850,184.00 Pekerjaan Groutig (sika grout)[24];TiPe
Rp0.00 Rp1,661,415,534.62 PEKERJAAN STRUKTUR NON STANDART[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)[0];TiPe
Rp0.00 Rp0.00 A.1. Pondasi Tiang Pancang dan Tie Beam (Sloof)[0];TiPe
Rp0.00 Rp0.00 Pekerjaan Pondasi Tiang Pancang 25x25 cm[0];TiPe
Rp259,871.53 Rp426,319,244.97 Tipe Tiang Pondasi[1640,5];TiPe
Rp110,535.36 Rp21,333,324.48 Pemotongan kepala tiang[193];TiPe
Rp0.00 Rp0.00
Kedalaman Pondasi disesuaikan hasil sondir dan boring stempat*[0];TiPe
Rp0.00 Rp0.00 Pile Cap Tipe PC-1[0];TiPe
Rp1,129,343.80 Rp869,594.73 -Beton K-300[0,77];TiPe
Rp15,487.11 Rp1,801,460.64 -Besi beton[116,32];TiPe
Rp39,810.16 Rp152,871.01 -Bekisting[3,84];TiPe
Rp0.00 Rp0.00 Pile Cap Tipe PC-2[0];TiPe
Rp1,129,343.80 Rp25,150,486.43 -Beton K-300[22,27];TiPe
Rp15,487.11 Rp36,844,454.17 -Besi beton[2379,04];TiPe
Rp39,810.16 Rp3,324,944.56 -Bekisting[83,52];TiPe
Rp0.00 Rp0.00 Pile Cap Tipe PC-3[0];TiPe
Rp1,129,343.80 Rp54,208,502.40 -Beton K-300[48];TiPe
Rp15,487.11 Rp82,169,804.66 -Besi beton[5305,69];TiPe
Rp39,810.16 Rp4,836,138.24 -Bekisting[121,48];TiPe
Rp0.00 Rp0.00 Pile Cap Tipe PC-4[0];TiPe
Rp1,129,343.80 Rp42,395,566.25 -Beton K-300[37,54];TiPe
Rp15,487.11 Rp78,793,459.80 -Besi beton[5087,68];TiPe
Rp39,810.16 Rp1,506,416.45 -Bekisting[37,84];TiPe
Rp0.00 Rp0.00 Tie Beam / Sloof TB1[0];TiPe
Rp1,129,343.80 Rp55,665,355.90 -Beton K-300[49,29];TiPe
Rp15,487.11 Rp40,881,324.27 -Besi beton[2639,7];TiPe
Rp39,810.16 Rp15,704,311.92 -Bekisting[394,48];TiPe
Rp0.00 Rp0.00 Tie Beam / Sloof TBP[0];TiPe
Rp1,129,343.80 Rp6,459,846.54 -Beton K-300[5,72];TiPe
Rp15,487.11 Rp862,477.16 -Besi beton[55,69];TiPe
Rp39,810.16 Rp3,041,894.33 -Bekisting[76,41];TiPe
Rp0.00 Rp0.00 Pekerjaan Pas Batu Kali (dibawah Tie beam)[0];TiPe
Rp670,602.61 Rp84,697,109.64 -Pasangan Batu Kali[126,3];TiPe
Rp315,604.49 Rp16,241,007.06 -Aanstamping[51,46];TiPe
Rp132,492.88 Rp4,337,816.89 -Urugan Pasir 10 cm[32,74];TiPe
Rp14,968.41 Rp20,028,630.68 Besi Dowel Ø 10-1000[1338,06];TiPe
Rp0.00 Rp0.00 Pekerjaan Galian tanah :[0];TiPe
Rp51,859.51 Rp122,388.44 Pile Cap Tipe PC-1[2,36];TiPe
Rp51,859.51 Rp2,897,909.42 Pile Cap Tipe PC-2[55,88];TiPe
Rp51,859.51 Rp2,602,310.21 Pile Cap Tipe PC-3[50,18];TiPe
Rp51,859.51 Rp1,454,659.26 Pile Cap Tipe PC-4[28,05];TiPe
Rp51,859.51 Rp12,735,658.47 Pekerjaan Pas Batu Kali (dibawah Tie beam)[245,58];TiPe
Rp0.00 Rp0.00 Pekerjaan Urugan Pasir tebal 10 cm :[0];TiPe
Rp132,492.88 Rp17,224.07 Pile Cap Tipe PC-1[0,13];TiPe
Rp132,492.88 Rp491,548.58 Pile Cap Tipe PC-2[3,71];TiPe
Rp132,492.88 Rp1,059,943.04 Pile Cap Tipe PC-3[8];TiPe
Rp132,492.88 Rp829,405.43 Pile Cap Tipe PC-4[6,26];TiPe
Rp0.00 Rp0.00 Pekerjaan Lantai Kerja tebal 5 cm :[0];TiPe
Rp636,964.57 Rp38,217.87 Pile Cap Tipe PC-1[0,06];TiPe
Rp636,964.57 Rp1,184,754.10 Pile Cap Tipe PC-2[1,86];TiPe
Rp636,964.57 Rp2,547,858.28 Pile Cap Tipe PC-3[4];TiPe
Rp636,964.57 Rp1,993,699.10 Pile Cap Tipe PC-4[3,13];TiPe
Rp30,397.22 Rp10,787,973.38 Urugan tanah kembali bekas galian[354,9];TiPe
Rp117,800.00 Rp12,505,648.00 Urugan Sertu dalam bangunan[106,16];TiPe
Rp50,697.40 Rp17,992,507.26 Pemadatan tanah CBR > 6%,[354,9];TiPe
Rp9,025,000.00 Rp18,050,000.00 Pekerjaan Test PDA Tiang[2];TiPe
Rp0.00 Rp0.00 PEKERJAAN STRUKTUR GWT DAN RUANG POMPA[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN STRUKTUR GWT[0];TiPe
Rp0.00 Rp0.00 Pekerjaan Pondasi Tiang Pancang 25x25 cm[0];TiPe
Rp259,871.53 Rp26,506,896.06 Tipe Tiang Pondasi[102];TiPe
Rp110,535.36 Rp1,326,424.32 Pemotongan kepala tiang[12];TiPe
Rp0.00 Rp0.00 Pile Cap Tipe PC-1 (GWT)[0];TiPe
Rp1,129,343.80 Rp1,219,691.30 -Beton K-300[1,08];TiPe
Rp15,487.11 Rp2,148,217.03 -Besi beton[138,71];TiPe
Rp39,810.16 Rp315,296.47 -Bekisting[7,92];TiPe
Rp0.00 Rp0.00 Pile Cap Tipe PC-2 (GWT)[0];TiPe
Rp1,129,343.80 Rp1,276,158.49 -Beton K-300[1,13];TiPe
Rp15,487.11 Rp3,708,853.10 -Besi beton[239,48];TiPe
Rp39,810.16 Rp250,804.01 -Bekisting[6,3];TiPe
Rp0.00 Rp0.00 Pekerjaan Galian tanah :[0];TiPe
Rp51,859.51 Rp234,404.99 Pile Cap Tipe PC-1 (GWT)[4,52];TiPe
Rp51,859.51 Rp189,287.21 Pile Cap Tipe PC-2 (GWT)[3,65];TiPe
Rp0.00 Rp0.00 Pekerjaan Urugan Pasir tebal 10 cm :[0];TiPe
Rp132,492.88 Rp23,848.72 Pile Cap Tipe PC-1 (GWT)[0,18];TiPe
Rp132,492.88 Rp25,173.65 Pile Cap Tipe PC-2 (GWT)[0,19];TiPe
Rp0.00 Rp0.00 Pekerjaan Lantai Kerja tebal 5 cm :[0];TiPe
Rp636,964.57 Rp57,326.81 Pile Cap Tipe PC-1 (GWT)[0,09];TiPe
Rp636,964.57 Rp57,326.81 Pile Cap Tipe PC-2 (GWT)[0,09];TiPe
Rp30,397.22 Rp231,626.82 Urugan Tanah Kembali Bekas Galian[7,62];TiPe
Rp50,697.40 Rp386,314.19 Pemadatan tanah CBR > 6%[7,62];TiPe
Rp0.00 Rp0.00 Pekerjaan Lantai Dasar GWT[0];TiPe
Rp1,129,343.80 Rp22,417,474.43 -Beton K-300[19,85];TiPe
Rp15,487.11 Rp25,308,570.55 -Besi beton[1634,17];TiPe
Rp39,810.16 Rp376,206.01 -Bekisting[9,45];TiPe
Rp0.00 Rp0.00 Pekerjaan Dinding GWT[0];TiPe
Rp1,129,343.80 Rp51,385,142.90 -Beton K-300[45,5];TiPe
Rp15,487.11 Rp80,673,749.83 -Besi beton[5209,09];TiPe
Rp42,440.87 Rp15,448,476.68 -Bekisting[364];TiPe
Rp0.00 Rp0.00 Pekerjaan Pelat Penutup GWT[0];TiPe
Rp1,129,343.80 Rp9,554,248.55 -Beton K-300[8,46];TiPe
Rp15,487.11 Rp24,790,526.72 -Besi beton[1600,72];TiPe
Rp36,824.67 Rp174,180.69 -Bekisting[4,73];TiPe
Rp0.00 Rp0.00 PEKERJAAN STRUKTUR RUANG POMPA[0];TiPe
Rp0.00 Rp0.00 Pekerjaan Pondasi Tiang Pancang 25x25 cm[0];TiPe
Rp259,871.53 Rp8,835,632.02 Tipe Tiang Pondasi[34];TiPe
Rp110,535.36 Rp442,141.44 Pemotongan kepala tiang[4];TiPe
Rp0.00 Rp0.00 Pile Cap Tipe PC-1 (R.Pompa)[0];TiPe
Rp1,129,343.80 Rp813,127.54 -Beton K-300[0,72];TiPe
Rp15,487.11 Rp1,432,093.06 -Besi beton[92,47];TiPe
Rp39,810.16 Rp210,197.64 -Bekisting[5,28];TiPe
Rp0.00 Rp0.00 Tie Beam / Sloof TB1[0];TiPe
Rp1,129,343.80 Rp2,574,903.86 -Beton K-300[2,28];TiPe
Rp15,487.11 Rp751,589.45 -Besi beton[48,53];TiPe
Rp39,810.16 Rp736,487.96 -Bekisting[18,5];TiPe
Rp0.00 Rp0.00 Pekerjaan Galian tanah :[0];TiPe
Rp51,859.51 Rp156,097.13 Pile Cap Tipe PC-1 (R.Pompa)[3,01];TiPe
Rp51,859.51 Rp118,239.68 Tie Beam / Sloof TB1[2,28];TiPe
Rp0.00 Rp0.00 Pekerjaan Urugan Pasir tebal 10 cm :[0];TiPe
Rp132,492.88 Rp15,899.15 Pile Cap Tipe PC-1 (R.Pompa)[0,12];TiPe
Rp132,492.88 Rp67,571.37 Tie Beam / Sloof TB1[0,51];TiPe
Rp0.00 Rp0.00 Pekerjaan Lantai Kerja tebal 5 cm :[0];TiPe
Rp636,964.57 Rp38,217.87 Pile Cap Tipe PC-1 (R.Pompa)[0,06];TiPe
Rp636,964.57 Rp159,241.14 Tie Beam / Sloof TB1[0,25];TiPe
Rp30,397.22 Rp132,531.88 Urugan Tanah Kembali Bekas Galian[4,36];TiPe
Rp50,697.40 Rp221,040.66 Pemadatan tanah CBR > 6%[4,36];TiPe
Rp0.00 Rp0.00 Pekerjaan Lantai Dasar R.Pompa[0];TiPe
Rp1,129,343.80 Rp5,624,132.12 -Beton K-300[4,98];TiPe
Rp15,487.11 Rp6,628,637.95 -Besi beton[428,01];TiPe
Rp39,810.16 Rp161,629.25 -Bekisting[4,06];TiPe
Rp0.00 Rp0.00 Pekerjaan Pelat Dak R.Pompa[0];TiPe
Rp1,129,343.80 Rp4,630,309.58 -Beton K-300[4,1];TiPe
Rp15,487.11 Rp11,338,732.72 -Besi beton[732,14];TiPe
Rp36,824.67 Rp132,937.06 -Bekisting[3,61];TiPe
Rp0.00 Rp0.00 Kolom K3A (R. Pompa)[0];TiPe
Rp1,129,343.80 Rp993,822.54 -Beton K-300[0,88];TiPe
Rp15,487.11 Rp2,665,331.63 -Besi beton[172,1];TiPe
Rp40,415.54 Rp565,817.56 -Bekisting[14];TiPe
Rp0.00 Rp0.00 Balok B1 (R. Pompa)[0];TiPe
Rp1,129,343.80 Rp2,495,849.80 -Beton K-300[2,21];TiPe
Rp15,487.11 Rp9,836,637.92 -Besi beton[635,15];TiPe
Rp46,817.19 Rp1,588,039.08 -Bekisting[33,92];TiPe
Rp0.00 Rp0.00 Tie Beam Dasar Pelat (R. Pompa)[0];TiPe
Rp1,129,343.80 Rp2,574,903.86 -Beton K-300[2,28];TiPe
Rp15,487.11 Rp1,716,436.40 -Besi beton[110,83];TiPe
Rp46,817.19 Rp866,118.02 -Bekisting[18,5];TiPe
Rp0.00 Rp0.00 Lantai Ramp[0];TiPe
Rp1,129,343.80 Rp361,390.02 -Beton K-300[0,32];TiPe
Rp15,487.11 Rp567,447.71 -Besi beton[36,64];TiPe
Rp39,810.16 Rp54,938.02 -Bekisting[1,38];TiPe
Rp0.00 Rp0.00 PEKERJAAN STRUKTUR STP[0];TiPe
Rp70,005.73 Rp12,711,640.45 Pekerjaan Galian tanah :[181,58];TiPe
Rp30,397.22 Rp3,602,678.51 Pekerjaan Urugan tanah kembali bekas galian[118,52];TiPe
Rp132,492.88 Rp529,971.52 Pasir urug diatas tanah urug[4];TiPe
Rp636,964.57 Rp1,273,929.14 Cor beton lantai kerja Fc' 8.3 Mpa t=5 cm[2];TiPe
Rp72,400.00 Rp1,650,720.00 Pasang Kolom Praktis[22,8];TiPe
Rp0.00 Rp0.00 Pekerjaan Lantai Dasar STP[0];TiPe
Rp1,129,343.80 Rp7,284,267.51 -Beton K-300[6,45];TiPe
Rp15,487.11 Rp32,845,217.76 -Besi beton[2120,81];TiPe
Rp36,824.67 Rp273,975.54 -Bekisting[7,44];TiPe
Rp0.00 Rp0.00 Pelat Atas (STP)[0];TiPe
Rp1,129,343.80 Rp7,284,267.51 -Beton K-300[6,45];TiPe
Rp15,487.11 Rp32,845,217.76 -Besi beton[2120,81];TiPe
Rp36,824.67 Rp273,975.54 -Bekisting[7,44];TiPe
Rp0.00 Rp0.00 Pelat Dinding (STP)[0];TiPe
Rp1,129,343.80 Rp22,202,899.11 -Beton K-300[19,66];TiPe
Rp15,487.11 Rp76,453,667.23 -Besi beton[4936,6];TiPe
Rp36,824.67 Rp9,651,009.51 -Bekisting[262,08];TiPe
Rp0.00 Rp5,970,107,682.00 PEKERJAAN ARSITEKTUR STANDAR[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI SATU[0];TiPe
Rp0.00 Rp0.00
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS[0];TiPe
Rp112,800.00 Rp159,771,048.00
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk Dinding Railling Tang
Rp55,600.00 Rp33,172,072.00 Pek. Plesteran Trasram (1:2)[596,62];TiPe
Rp62,500.00 Rp139,763,125.00
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar dan Interior/Dind. B
Rp15,100.00 Rp15,427,670.00
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jen
Rp72,400.00 Rp68,079,892.00 Kolom/Balok praktis 11 x 11 cm (termasuk balok Latei)[940,33];TiPe
Rp165,200.00 Rp40,084,128.00
Pek. Partisi Gypsum Rangka Metal Stud Track + Lapis Rockwool[242,64];TiPe
Rp212,900.00 Rp725,989.00
Pek. Cover/Penutup Pipa Air Hujan Bagian Entrance Gypsum + Rangka Hollo

Rp91,200.00 Rp3,782,976.00
Pek. Pasang Hand Railling Tangga pipa Black Steel Medium dia 3" & dia 1", d
Rp100,200.00 Rp28,823,532.00
Pek. Keramik uk. 20x25 Dinding KM/WC, R. Cuci + Dinding Dapur[287,66];TiP

Rp31,200.00 Rp20,309,952.00
Pek. Plint Homogenous Tile 10x60 Dinding Coridor/Selasar, R. Serbaguna, &
Rp120,400.00 Rp2,127,468.00 Pek. Keramik uk. 20x20 cm Meja Dapur[17,67];TiPe
Rp0.00 Rp0.00
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING[0];TiPe

Rp4,685,800.00 Rp9,371,600.00
Kusen Alum. 3" Powder Coating + Daun Pintu Frame Alum. Powder Coating,

Rp4,916,000.00 Rp4,916,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu Frame Alum. Powder Coating,

Rp2,272,300.00 Rp2,272,300.00
Kusen Alum. 3" Powder Coating + Daun Pintu Frame Alum. Powder Coating,

Rp2,836,400.00 Rp28,364,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb Engineering Door

Rp2,629,400.00 Rp5,258,800.00
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb Engineering Door

Rp2,404,400.00 Rp57,705,600.00
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb Engineering Door
Rp1,642,400.00 Rp1,642,400.00
Kusen Alum. 3" + Daun Pintu Frame Alum. Kaca Clear 8 mm + BV Kaca Clear
Rp1,107,000.00 Rp3,321,000.00
Kusen Besi Hollow + Daun Pintu Besi type (lengkap terpasang ) P-4[3];TiPe
Rp2,979,000.00 Rp38,727,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC (lengkap terpasang ) typ
Rp2,833,300.00 Rp5,666,600.00
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC (lengkap terpasang ) typ
Rp2,003,300.00 Rp4,006,600.00
Kusen Besi Hollow Powder Coating + Daun Pintu Besi (lengkap terpasang ) ty
Rp1,210,000.00 Rp15,730,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu Alum. Powder Coating (lengka

Rp2,307,800.00 Rp32,309,200.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin

Rp1,116,400.00 Rp13,396,800.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin

Rp1,637,700.00 Rp4,913,100.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin

Rp2,398,300.00 Rp7,194,900.00
Kusen Alum. 3" Powder Coating + Jendela Frame Alum. Powder Coating, Kac
Rp424,100.00 Rp2,544,600.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-1[6];TiPe
Rp146,800.00 Rp587,200.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-2[4];TiPe
Rp254,000.00 Rp508,000.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-4[2];TiPe
Rp358,500.00 Rp717,000.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-5[2];TiPe
Rp167,800.00 Rp2,013,600.00
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type
Rp304,000.00 Rp3,648,000.00
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type
Rp472,100.00 Rp5,665,200.00
Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap terpasang) type JL-1
Rp0.00 Rp0.00 PEKERJAAN PLAFOND[0];TiPe
Rp178,000.00 Rp123,491,060.00
Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangk
Rp170,700.00 Rp13,114,881.00
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60
Rp24,700.00 Rp25,329,109.00 List plafond gypsum 5 cm[1025,47];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI[0];TiPe

Rp168,000.00 Rp127,325,520.00
Pek. Pasang Homogenous Tile polish lantai Unit Hunian, R. Serbaguna, Korid
Rp223,500.00 Rp2,212,650.00
Pek. Pasang Lantai Pemandu Orang Tuna Netra / Tactile Uk. 40x40 cm[9,9];T
Rp190,900.00 Rp26,853,903.00
Pek. Pasang Homogenous Tile unpolish lantai keliling bangunan Uk. 60x60 c
Rp29,500.00 Rp2,569,450.00
Pek. Pasang Homogenous Tile Step Nozing Tangga Tengah + Tangga Entranc
Rp90,800.00 Rp28,742,740.00
Pek. Waterproofing (liquid/cement base) Dinding t=210 cm Toilet, R Cuci[31
Rp90,800.00 Rp6,858,124.00
Pek. Waterproofing (liquid/cement base) di Daerah Canopy Jendela + Canop
Rp0.00 Rp0.00 PEKERJAAN UTILITAS[0];TiPe
Rp2,005,900.00 Rp24,070,800.00
Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpas
Rp337,300.00 Rp1,011,900.00
Pasang Closet Jongkok Type Standar - Toilet Umum (lengkap terpasang)[3];T
Rp539,800.00 Rp1,079,600.00 Pasang Urinoir - Toilet Umum (lengkap terpasang)[2];TiPe
Rp235,700.00 Rp235,700.00 Pasang Partisi Urinoir - Toilet Umum (lengkap terpasang)[1];TiPe
Rp204,700.00 Rp409,400.00 Pasang Cermin - Toilet Umum (lengkap terpasang)[2];TiPe
Rp792,600.00 Rp1,585,200.00
Pasang Wastafel Meja + Kran Stainless + Aksesoris - Toilet Umum (lengkap t
Rp478,100.00 Rp5,737,200.00
Pasang Wastafel Dinding + Kran Stainless + Aksesoris - Unit Hunian (lengkap
Rp355,000.00 Rp4,260,000.00
Pasang Shower + Kran Stainless - Unit Hunian (lengkap terpasang)[12];TiPe
Rp185,800.00 Rp4,459,200.00
Pasang Kran Stainless - Unit Hunian, Toilet Umum, dan Janitor (lengkap terp
Rp517,400.00 Rp6,208,800.00
Pasang Jet Washer + Kran Stainless - Unit Hunian (lengkap terpasang)[12];Ti
Rp33,900.00 Rp1,254,300.00
Pasangan Floor Drain Stainless, di Toilet Hunian, di Toilet Umum, di Ruang C
Rp650,900.00 Rp7,810,800.00
Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian (lengkap terpasang)
Rp91,200.00 Rp378,480.00 Handrail Pipa Stainless Untuk Toilet Difabel[4,15];TiPe
Rp688,000.00 Rp1,376,000.00 Grab Bar Untuk Toilet Difabel[2];TiPe
Rp0.00 Rp0.00 PEKERJAAN PENGECATAN[0];TiPe
Rp34,900.00 Rp19,134,972.00 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior)[548,28];TiPe
Rp40,000.00 Rp64,533,200.00 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior)[1613,33];TiPe
Rp34,900.00 Rp4,969,760.00 Pek. Cat Canopy[142,4];TiPe
Rp40,000.00 Rp30,824,000.00 Pek. Cat Plafond[770,6];TiPe
Rp4,000.00 Rp4,101,880.00 Pek. Cat List Plafond[1025,47];TiPe
Rp0.00 Rp0.00
PEKERJAAN RAMP DI ENTRANCE TERAS, ASESORIS DI FACADE DAN SELASAR
Rp91,200.00 Rp870,960.00
Pasang Railing Ramp t.0,85cm: Besi pipa d.2" & 3/4"inc by specialist[9,55];T
Rp190,900.00 Rp956,409.00 Pasang Keramik Lantai 60 x 60 HT Unpolished (RAMP)[5,01];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI DUA[0];TiPe
Rp0.00 Rp0.00
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS[0];TiPe
Rp112,800.00 Rp173,640,936.00
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk Dinding Railling Tang
Rp55,600.00 Rp37,467,728.00 Pek. Plesteran Trasram (1:2)[673,88];TiPe
Rp62,500.00 Rp150,303,750.00
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar dan Interior/Dind. B
Rp15,100.00 Rp15,238,920.00
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jen
Rp72,400.00 Rp74,143,392.00
Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan Pertemunan Dindin
Rp165,200.00 Rp56,419,104.00 Pek. Partisi Gypsum Rangka Metal Stud + Lapis Rockwool[341,52];TiPe
Rp212,900.00 Rp679,151.00
Pek. Cover/Penutup Pipa Air Hujan Bagian Balkon Gypsum + Rangka Hollow
Rp91,200.00 Rp3,782,976.00
Pek. Pasang Hand Railling Tangga pipa Black Steel Medium dia 3" & dia 1", d
Rp100,200.00 Rp33,739,344.00
Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding Dapur[336,72];TiPe
Rp111,100.00 Rp76,187,936.00
Pek. Plint 10x60 cm Dinding Coridor/Selasar dan Unit Kamar[685,76];TiPe
Rp196,000.00 Rp4,617,760.00 Pek. Keramik 20x20 cm Meja Dapur[23,56];TiPe
Rp0.00 Rp0.00
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING[0];TiPe

Rp4,685,800.00 Rp4,685,800.00
Kusen Alum. 3" Powder Coating + Daun Pintu Frame Alum. Powder Coating,

Rp2,836,400.00 Rp45,382,400.00
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb Engineering Door

Rp2,404,400.00 Rp76,940,800.00
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb Engineering Door
Rp1,107,000.00 Rp3,321,000.00
Kusen Besi Hollow + Daun Pintu Besi type (lengkap terpasang ) P-4[3];TiPe
Rp2,979,000.00 Rp47,664,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC (lengkap terpasang ) typ
Rp1,210,000.00 Rp20,570,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu Alum. Powder Coating (lengka

Rp2,307,800.00 Rp36,924,800.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin

Rp1,116,400.00 Rp17,862,400.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin

Rp2,687,600.00 Rp5,375,200.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin
Rp424,100.00 Rp2,544,600.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-1[6];TiPe
Rp254,000.00 Rp1,016,000.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-4[4];TiPe
Rp358,500.00 Rp717,000.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-5[2];TiPe
Rp167,800.00 Rp2,684,800.00
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type
Rp304,000.00 Rp4,864,000.00
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type
Rp472,100.00 Rp7,553,600.00
Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap terpasang) type JL-1
Rp1,114,000.00 Rp1,114,000.00
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-1[1];TiPe
Rp551,100.00 Rp1,102,200.00
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-2[2];TiPe
Rp0.00 Rp0.00 PEKERJAAN PLAFOND[0];TiPe
Rp178,000.00 Rp123,111,920.00
Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangk
Rp170,700.00 Rp10,433,184.00
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60
Rp24,700.00 Rp27,560,260.00 Pek. List Plafond Gypsum 5/5[1115,8];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI[0];TiPe
Rp168,000.00 Rp126,720,720.00
Pek. Pasang Homogenous Tile Polish lantai Unit Hunian, Koridor, Tangga Uta
Rp120,400.00 Rp6,549,760.00
Pek. Pasang Keramik lantai Balkon, R Cuci dan Toilet Uk. 20x20 cm[54,4];TiP
Rp29,500.00 Rp2,569,450.00
Pek. Pasang Homogenous Tile Step Nozing Tangga Tengah + Tangga Servis U
Rp90,800.00 Rp18,381,552.00
Pek. Waterproofing (liquid/cement base) Lantai + Dinding t=210 cm Toilet, R
Rp90,800.00 Rp6,932,580.00
Pek. Waterproofing (liquid/cement base) di Daerah Canopy Jendela[76,35];T
Rp0.00 Rp0.00 PEKERJAAN UTILITAS[0];TiPe
Rp2,005,900.00 Rp32,094,400.00
Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpas
Rp478,100.00 Rp7,649,600.00
Pasang Wastafel Dinding + Kran Stainless + Aksesoris - Unit Hunian (lengkap
Rp355,000.00 Rp5,680,000.00
Pasang Shower + Kran Stainless - Unit Hunian (lengkap terpasang)[16];TiPe
Rp185,800.00 Rp3,530,200.00
Pasang Kran Stainless - Unit Hunian, dan Janitor (lengkap terpasang)[19];TiP
Rp517,400.00 Rp8,278,400.00
Pasang Jet Washer + Kran Stainless - Unit Hunian (lengkap terpasang)[16];Ti
Rp33,900.00 Rp1,220,400.00
Pasangan Floor Drain Stainless, di Toilet Hunian, di Ruang Cuci, di Janitor, da
Rp650,900.00 Rp10,414,400.00
Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian (lengkap terpasang)
Rp0.00 Rp0.00 PEKERJAAN PENGECATAN[0];TiPe
Rp34,900.00 Rp18,071,918.00 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior)[517,82];TiPe
Rp40,000.00 Rp69,014,000.00 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior)[1725,35];TiPe
Rp34,900.00 Rp5,023,506.00 Pek. Cat Canopy[143,94];TiPe
Rp40,000.00 Rp30,110,800.00 Pek. Cat Plafond[752,77];TiPe
Rp4,000.00 Rp4,463,200.00 Pek. Cat List Plafond[1115,8];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI TIGA[0];TiPe
Rp0.00 Rp0.00
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS[0];TiPe
Rp112,800.00 Rp173,640,936.00
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk Dinding Railling Tang
Rp55,600.00 Rp37,467,728.00 Pek. Plesteran Trasram (1:2)[673,88];TiPe
Rp62,500.00 Rp150,303,750.00
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar dan Interior/Dind. B
Rp15,100.00 Rp15,238,920.00
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jen
Rp72,400.00 Rp74,143,392.00
Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan Pertemunan Dindin
Rp165,200.00 Rp56,419,104.00 Pek. Partisi Gypsum Rangka Metal Stud + Lapis Rockwool[341,52];TiPe
Rp212,900.00 Rp679,151.00
Pek. Cover/Penutup Pipa Air Hujan Bagian Balkon Gypsum + Rangka Hollow

Rp91,200.00 Rp3,993,648.00
Pek. Pasang Hand Railling Tangga pipa Black Steel Medium dia 3" & dia 1", d
Rp100,200.00 Rp33,739,344.00
Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding Dapur[336,72];TiPe
Rp111,100.00 Rp76,187,936.00
Pek. Plint 10x60 cm Dinding Coridor/Selasar dan Unit Kamar[685,76];TiPe
Rp196,000.00 Rp4,617,760.00 Pek. Keramik 20x20 cm Meja Dapur[23,56];TiPe
Rp0.00 Rp0.00
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING[0];TiPe

Rp4,685,800.00 Rp4,685,800.00
Kusen Alum. 3" Powder Coating + Daun Pintu Frame Alum. Powder Coating,

Rp2,836,400.00 Rp45,382,400.00
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb Engineering Door

Rp2,404,400.00 Rp76,940,800.00
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb Engineering Door
Rp1,107,000.00 Rp3,321,000.00
Kusen Besi Hollow + Daun Pintu Besi type (lengkap terpasang ) P-4[3];TiPe
Rp2,979,000.00 Rp47,664,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC (lengkap terpasang ) typ
Rp1,210,000.00 Rp20,570,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu Alum. Powder Coating (lengka

Rp2,307,800.00 Rp36,924,800.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin

Rp1,116,400.00 Rp17,862,400.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin

Rp2,687,600.00 Rp5,375,200.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin
Rp424,100.00 Rp2,544,600.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-1[6];TiPe
Rp254,000.00 Rp1,016,000.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-4[4];TiPe
Rp358,500.00 Rp717,000.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-5[2];TiPe
Rp167,800.00 Rp2,684,800.00
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type
Rp304,000.00 Rp4,864,000.00
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type
Rp472,100.00 Rp7,553,600.00
Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap terpasang) type JL-1
Rp1,114,000.00 Rp1,114,000.00
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-1[1];TiPe
Rp551,100.00 Rp1,102,200.00
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-2[2];TiPe
Rp0.00 Rp0.00 PEKERJAAN PLAFOND[0];TiPe
Rp178,000.00 Rp123,111,920.00
Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangk
Rp170,700.00 Rp10,433,184.00
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60
Rp24,700.00 Rp27,560,260.00 Pek. List Plafond Gypsum 5/5[1115,8];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI[0];TiPe
Rp168,000.00 Rp126,720,720.00
Pek. Pasang Homogenous Tile Polish lantai Unit Hunian, Koridor, Tangga Uta
Rp120,400.00 Rp6,549,760.00
Pek. Pasang Keramik lantai Balkon, R Cuci dan Toilet Uk. 20x20 cm[54,4];TiP
Rp29,500.00 Rp2,569,450.00
Pek. Pasang Homogenous Tile Step Nozing Tangga Tengah + Tangga Servis U
Rp90,800.00 Rp18,381,552.00
Pek. Waterproofing (liquid/cement base) Lantai + Dinding t=210 cm Toilet, R
Rp90,800.00 Rp6,932,580.00
Pek. Waterproofing (liquid/cement base) di Daerah Canopy Jendela[76,35];T
Rp0.00 Rp0.00 PEKERJAAN UTILITAS[0];TiPe
Rp2,005,900.00 Rp32,094,400.00
Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpas
Rp478,100.00 Rp7,649,600.00
Pasang Wastafel Dinding + Kran Stainless + Aksesoris - Unit Hunian (lengkap
Rp355,000.00 Rp5,680,000.00
Pasang Shower + Kran Stainless - Unit Hunian (lengkap terpasang)[16];TiPe
Rp185,800.00 Rp3,530,200.00
Pasang Kran Stainless - Unit Hunian, dan Janitor (lengkap terpasang)[19];TiP
Rp517,400.00 Rp8,278,400.00
Pasang Jet Washer + Kran Stainless - Unit Hunian (lengkap terpasang)[16];Ti
Rp33,900.00 Rp1,220,400.00
Pasangan Floor Drain Stainless, di Toilet Hunian, di Ruang Cuci, di Janitor, da
Rp650,900.00 Rp10,414,400.00
Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian (lengkap terpasang)
Rp0.00 Rp0.00 PEKERJAAN PENGECATAN[0];TiPe
Rp34,900.00 Rp18,071,918.00 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior)[517,82];TiPe
Rp40,000.00 Rp69,014,000.00 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior)[1725,35];TiPe
Rp34,900.00 Rp5,023,506.00 Pek. Cat Canopy[143,94];TiPe
Rp40,000.00 Rp30,110,800.00 Pek. Cat Plafond[752,77];TiPe
Rp4,000.00 Rp4,463,200.00 Pek. Cat List Plafond[1115,8];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI EMPAT[0];TiPe
Rp0.00 Rp0.00
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS[0];TiPe
Rp112,800.00 Rp173,640,936.00
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk Dinding Railling Tang
Rp55,600.00 Rp37,467,728.00 Pek. Plesteran Trasram (1:2)[673,88];TiPe
Rp62,500.00 Rp150,303,750.00
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar dan Interior/Dind. B
Rp15,100.00 Rp15,238,920.00
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jen
Rp72,400.00 Rp74,143,392.00
Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan Pertemunan Dindin
Rp165,200.00 Rp56,419,104.00 Pek. Partisi Gypsum Rangka Metal Stud + Lapis Rockwool[341,52];TiPe
Rp212,900.00 Rp679,151.00
Pek. Cover/Penutup Pipa Air Hujan Bagian Balkon Gypsum + Rangka Hollow

Rp91,200.00 Rp3,993,648.00
Pek. Pasang Hand Railling Tangga pipa Black Steel Medium dia 3" & dia 1", d
Rp100,200.00 Rp33,739,344.00
Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding Dapur[336,72];TiPe
Rp111,100.00 Rp76,187,936.00
Pek. Plint 10x60 cm Dinding Coridor/Selasar dan Unit Kamar[685,76];TiPe
Rp196,000.00 Rp4,617,760.00 Pek. Keramik 20x20 cm Meja Dapur[23,56];TiPe
Rp0.00 Rp0.00
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING[0];TiPe

Rp4,685,800.00 Rp4,685,800.00
Kusen Alum. 3" Powder Coating + Daun Pintu Frame Alum. Powder Coating,

Rp2,836,400.00 Rp45,382,400.00
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb Engineering Door

Rp2,404,400.00 Rp76,940,800.00
Kusen Alum. 3" Powder Coating + Daun Pintu Honeycomb Engineering Door
Rp1,107,000.00 Rp3,321,000.00
Kusen Besi Hollow + Daun Pintu Besi type (lengkap terpasang ) P-4[3];TiPe
Rp2,979,000.00 Rp47,664,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu UPVC (lengkap terpasang ) typ
Rp1,210,000.00 Rp20,570,000.00
Kusen Alum. 3" Powder Coating + Daun Pintu Alum. Powder Coating (lengka

Rp2,307,800.00 Rp36,924,800.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin

Rp1,116,400.00 Rp17,862,400.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin

Rp2,687,600.00 Rp5,375,200.00
Kusen Alum. 3" Powder Coating + Daun Jendela Frame Alum. Powder Coatin
Rp424,100.00 Rp2,544,600.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-1[6];TiPe
Rp254,000.00 Rp1,016,000.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-4[4];TiPe
Rp358,500.00 Rp717,000.00
Glass Block + Rooster 20X20 (lengkap terpasang) type RB-5[2];TiPe
Rp167,800.00 Rp2,684,800.00
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type
Rp304,000.00 Rp4,864,000.00
Kusen Alum. 3" Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type
Rp472,100.00 Rp7,553,600.00
Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap terpasang) type JL-1
Rp1,114,000.00 Rp1,114,000.00
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-1[1];TiPe
Rp551,100.00 Rp1,102,200.00
Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-2[2];TiPe
Rp0.00 Rp0.00 PEKERJAAN PLAFOND[0];TiPe
Rp178,000.00 Rp123,111,920.00
Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangk
Rp170,700.00 Rp10,433,184.00
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60
Rp24,700.00 Rp27,560,260.00 Pek. List Plafond Gypsum 5/5[1115,8];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI[0];TiPe
Rp168,000.00 Rp126,720,720.00
Pek. Pasang Homogenous Tile Polish lantai Unit Hunian, Koridor, Tangga Uta
Rp120,400.00 Rp6,549,760.00
Pek. Pasang Keramik lantai Balkon, R Cuci dan Toilet Uk. 20x20 cm[54,4];TiP
Rp29,500.00 Rp2,569,450.00
Pek. Pasang Homogenous Tile Step Nozing Tangga Tengah + Tangga Servis U
Rp90,800.00 Rp18,381,552.00
Pek. Waterproofing (liquid/cement base) Lantai + Dinding t=210 cm Toilet, R
Rp90,800.00 Rp6,932,580.00
Pek. Waterproofing (liquid/cement base) di Daerah Canopy Jendela[76,35];T
Rp0.00 Rp0.00 PEKERJAAN UTILITAS[0];TiPe
Rp2,005,900.00 Rp32,094,400.00
Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpas
Rp478,100.00 Rp7,649,600.00
Pasang Wastafel Dinding + Kran Stainless + Aksesoris - Unit Hunian (lengkap
Rp355,000.00 Rp5,680,000.00
Pasang Shower + Kran Stainless - Unit Hunian (lengkap terpasang)[16];TiPe
Rp185,800.00 Rp3,530,200.00
Pasang Kran Stainless - Unit Hunian, dan Janitor (lengkap terpasang)[19];TiP
Rp517,400.00 Rp8,278,400.00
Pasang Jet Washer + Kran Stainless - Unit Hunian (lengkap terpasang)[16];Ti
Rp33,900.00 Rp1,220,400.00
Pasangan Floor Drain Stainless, di Toilet Hunian, di Ruang Cuci, di Janitor, da
Rp650,900.00 Rp10,414,400.00
Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian (lengkap terpasang)
Rp0.00 Rp0.00 PEKERJAAN PENGECATAN[0];TiPe
Rp34,900.00 Rp18,071,918.00 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior)[517,82];TiPe
Rp40,000.00 Rp69,014,000.00 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior)[1725,35];TiPe
Rp34,900.00 Rp5,023,506.00 Pek. Cat Canopy[143,94];TiPe
Rp40,000.00 Rp30,110,800.00 Pek. Cat Plafond[752,77];TiPe
Rp4,000.00 Rp4,463,200.00 Pek. Cat List Plafond[1115,8];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI DAK DAN ATAP[0];TiPe
Rp0.00 Rp0.00
PEKERJAAN PASANGAN DINDING & BETON PRAKTIS[0];TiPe
Rp112,800.00 Rp31,014,360.00 Pek. Pasangan Dinding Bata Ringan t=10 cm[274,95];TiPe
Rp62,500.00 Rp34,368,125.00
Pek. Plester + Aci Mortar Dinding Bata Exterior/Dind. Terluar[549,89];TiPe
Rp72,400.00 Rp17,648,224.00 Pek. Kolom & Balok Praktis 11/11 Openingan Kusen[243,76];TiPe
Rp15,100.00 Rp10,995,065.00 Pek. Perapihan Kolom[728,15];TiPe
Rp0.00 Rp0.00
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING[0];TiPe
Rp1,117,600.00 Rp2,235,200.00
Kusen Hollow 60x60 mm + Daun Pintu Lapis Plat Besi & Louvre Plat Besi TB 2
Rp412,800.00 Rp9,081,600.00 Rooster 20X20 (lengkap terpasang) type RB-3[22];TiPe
Rp1,498,500.00 Rp1,498,500.00
Pek. Pasang Logo Signage PU, Baja 3mm uk 80x80,Finish Duo Doff (terpasan
Rp0.00 Rp0.00 PEKERJAAN PLAFOND[0];TiPe
Rp17,300.00 Rp577,128.00 Pek. Beton Expose[33,36];TiPe
Rp170,700.00 Rp7,119,897.00
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60
Rp24,700.00 Rp1,936,480.00 Pek. List Plafond Gypsum 5/5[78,4];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI[0];TiPe
Rp87,800.00 Rp4,250,398.00
Waterproofing Membran Bakar t=3cm Lantai Dak Torn (elv. +13,8) + 15 cm P
Rp81,900.00 Rp3,964,779.00 Pek. Screed + Aci Lantai Dak Torn (elv. +13,8)[48,41];TiPe
Rp0.00 Rp0.00 PEKERJAAN UTILITAS[0];TiPe
Rp33,900.00 Rp135,600.00
Pasangan Floor Drain Stainless - di Dak Torn (lengkap terpasang)[4];TiPe
Rp0.00 Rp0.00 PEKERJAAN PENGECATAN[0];TiPe
Rp34,900.00 Rp9,595,755.00 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior)[274,95];TiPe
Rp40,000.00 Rp2,947,600.00 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior)[73,69];TiPe
Rp40,000.00 Rp1,668,400.00 Pek. Cat Plafond[41,71];TiPe
Rp4,000.00 Rp313,600.00 Pek. Cat List Plafond[78,4];TiPe
Rp67,100.00 Rp3,248,311.00 Pek. Cat Epoxy 500 micron Lantai Dak[48,41];TiPe
Rp0.00 Rp0.00 PEKERJAAN PENUTUP ATAP[0];TiPe
Rp226,900.00 Rp228,388,464.00 Pek. Atap Metal Spandeck Berpasir T=0.45 MM[1006,56];TiPe
Rp57,300.00 Rp3,950,835.00 Pek. Nok Genteng[68,95];TiPe
Rp69,180.00 Rp11,449,290.00
Pek. Lisplang GRC Tebal 9 mm Lebar 40 cm + Cat Exterior[165,5];TiPe
Rp53,100.00 Rp5,923,836.00 Talang zincalum t= 0,35mm, L=90 cm[111,56];TiPe

Rp0.00 Rp993,843,192.56
PEKERJAAN ARSITEKTUR NON STANDART[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN KELILING BAGIAN LUAR BANGUNAN[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN KELILING BANGUNAN DAN TANAMAN[0];TiPe
Rp215,400.00 Rp69,251,100.00 Pek. Tanah Subur t = 10 cm[321,5];TiPe
Rp26,300.00 Rp8,455,450.00 Pek. Tanaman Rumput Gajah Mini[321,5];TiPe
Rp12,000.00 Rp1,644,000.00 Pek. Tanaman Pohon Zodia T= 25-40 cm[137];TiPe
Rp188,300.00 Rp4,142,600.00 Pek. Tanaman Pohon Mangga dia 5-10 cm T=1,5 m[22];TiPe
Rp313,100.00 Rp6,888,200.00
Pek. Tanaman Pohon Kelengkeng dia 5-10 cm T=1-1,5 m[22];TiPe
Rp94,700.00 Rp2,083,400.00
Pek. Tanaman Pohon Rambutan dia 5-10 cm T=1-1,5 m[22];TiPe
Rp32,300.00 Rp1,808,800.00 Pek. Pohon Pucuk Merah[56];TiPe
Rp0.00 Rp0.00 PEKERJAAN PERKERASAN AKSES JALAN MASUK[0];TiPe
Rp132,400.00 Rp5,092,104.00 Pek. Pasir Urug t = 7 cm di Bawah Paving[38,46];TiPe
Rp182,300.00 Rp325,952,400.00 Pek. Paving Blok t = 8 cm (standart)[1788];TiPe
Rp108,300.00 Rp47,435,400.00 Pek. Kanstein uk. 8.40.20 Jalan Sekeliling Bangunan[438];TiPe
Rp636,964.57 Rp3,974,658.92 Beton Pengunci Kanstin[6,24];TiPe
Rp0.00 Rp0.00
PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.[0];TiPe
Rp0.00 Rp0.00 DRAINASE LUAR/SEKELILING BANGUNAN[0];TiPe
Rp739,200.00 Rp124,030,368.00
Pek. U-Ditch Uk.40.60.120 FC'30 Mpa Pabrikan Saluran Kliling[167,79];TiPe
Rp132,492.88 Rp17,224.07 Pek. Pasir Urug t = 10 cm[0,13];TiPe
Rp51,859.51 Rp3,490,145.02 Pek. Galian Tanah Saluran[67,3];TiPe
Rp5,269,000.00 Rp237,105,000.00 Pek. Box culvert 100.100.120 cm[45];TiPe
Rp122,000.00 Rp20,470,380.00
Pek. Grill penutup saluran, besi siku 50.50.5 + plat strip[167,79];TiPe
Rp0.00 Rp0.00 BAK KONTROL[0];TiPe
Rp89,500.00 Rp613,970.00 Pek. Pasangan 1/2 Bata Bak Kontrol ( 4 unit BK )[6,86];TiPe
Rp83,900.00 Rp279,387.00 Pek. Plester + Aci[3,33];TiPe
Rp132,492.88 Rp18,549.00 Pek. Pasir Urug t = 5 cm[0,14];TiPe
Rp51,859.51 Rp90,235.55 Pek. Galian Tanah[1,74];TiPe
Rp0.00 Rp0.00
PEKERJAAN GROUND TANK DAN R. POMPA DI LUAR BANGUNAN[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN GROUND WATER TANK[0];TiPe
Rp15,100.00 Rp1,685,915.00 Pek. Perapihan Dinding Beton Exterior[111,65];TiPe
Rp15,100.00 Rp1,705,092.00 Pek. Perapihan Daerah Dak Beton[112,92];TiPe
Rp90,800.00 Rp28,557,508.00
Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan
Rp87,800.00 Rp9,914,376.00
Pek. Waterproofing membran bakar t=3cm di Daerah Dak[112,92];TiPe
Rp120,400.00 Rp6,978,384.00 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar)[57,96];TiPe
Rp133,800.00 Rp18,732,000.00 Pek. Pasang Keramik Dinding 20x20[140];TiPe
Rp34,900.00 Rp6,100,869.00 Pek. Cat Dinding dan Dak Bag. Luar (exterior)[174,81];TiPe
Rp910,470.00 Rp2,731,410.00
Pek. Tangga Dalam 'M' GWT + Cat (model gantung lengkap terpasang)[3];TiP
Rp646,470.00 Rp1,939,410.00
Pek. Tangga Luar 'M' GWT + Cat (model gantung lengkap terpasang)[3];TiPe
Rp546,282.00 Rp1,638,846.00 Pek. Penutup Mainhole Baja + Cat (terpasang)[3];TiPe
Rp89,500.00 Rp465,400.00 Pek. Dinding Bata 1:5 Bak Kontrol[5,2];TiPe
Rp0.00 Rp0.00 RUANG POMPA[0];TiPe
Rp89,500.00 Rp3,880,720.00 Pek. Pasangan Dinding Bata 1:5[43,36];TiPe
Rp53,100.00 Rp2,302,416.00 Pek. Plester Dinding Exterior/Dind. Terluar[43,36];TiPe
Rp30,800.00 Rp1,335,488.00 Pek. Acian Dinding Exterior/Dind. Terluar[43,36];TiPe
Rp72,400.00 Rp674,768.00
Pek. Kolom Praktis & Balok Praktis 11/11 Termasuk Opening Kusen Aluminiu
Rp15,100.00 Rp401,509.00 Pek. Perapihan Daerah Dak Beton[26,59];TiPe
Rp90,800.00 Rp6,198,008.00
Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan
Rp87,800.00 Rp2,186,220.00
Pek. Waterproofing membran bakar t=3cm di Daerah Dak[24,9];TiPe
Rp120,400.00 Rp3,201,436.00 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar)[26,59];TiPe
Rp133,800.00 Rp9,133,188.00 Pek. Pasang Keramik Dinding 20x20[68,26];TiPe
Rp34,900.00 Rp2,382,274.00 Pek. Cat Dinding dan Dak Bag. Luar (exterior)[68,26];TiPe
Rp1,107,000.00 Rp1,107,000.00 Pek. Pintu Besi[1];TiPe
Rp0.00 Rp0.00 STP[0];TiPe
Rp546,282.00 Rp6,555,384.00 Pek. Penutup Mainhole Baja + Cat (terpasang)[12];TiPe
Rp0.00 Rp0.00 PEKERJAAN LAIN-LAIN[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN AKSESORIS[0];TiPe
Rp8,954,100.00 Rp8,954,100.00 Pek. Pembuatan Lemari Surat[1];TiPe
Rp73,000.00 Rp1,168,000.00
Pek. Nama Ruangan 10x20 cm -acrylic (lengkap terasang)[16];TiPe
Rp129,100.00 Rp516,400.00 Pek. Nama Lantai 30x30 -acrylic (lengkap terasang)[4];TiPe
Rp553,700.00 Rp553,700.00
Pek. Papan Informasi Denah Bangunan 60x120 cm -acrylic (lengkap terpasan

Rp0.00 Rp1,811,700,005.31
PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI 1[0];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR BERSIH[0];TiPe
Rp0.00 Rp0.00 Pipa PPR PN10 (Incl. Fitting & Accessories)[0];TiPe
Rp26,617.50 Rp4,614,409.80 -PPR PN10 dia. 15[173,36];TiPe
Rp28,271.25 Rp4,335,396.19 -PPR PN10 dia. 20[153,35];TiPe
Rp70,186.68 Rp8,354,320.52 -PPR PN10 dia. 40 (1,5")[119,03];TiPe
Rp68,262.93 Rp709,934.47 -PPR PN10 dia. 50 (Riser dari Tangki Air Atas)[10,4];TiPe
Rp0.00 Rp0.00 Peralatan Katup-katup[0];TiPe
Rp0.00 Rp0.00 (Ball Valve & Gate Valve)[0];TiPe
Rp77,443.29 Rp154,886.58 -dia. 20[2];TiPe
Rp585,237.12 Rp7,022,845.44 -dia. 40[12];TiPe
Rp484,064.51 Rp5,808,774.12 Meter Air c/w BV dia. 20[12];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR KOTOR & AIR BEKAS[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp442,028.41 Rp94,426,108.94 -dia. 150 ( Pipa Air Bekas)[213,62];TiPe
Rp442,028.41 Rp88,989,159.50 -dia. 150 ( Pipa Air Kotor )[201,32];TiPe
Rp213,102.16 Rp37,346,153.54 -dia. 100 ( Pipa Air Bekas )[175,25];TiPe
Rp0.00 Rp0.00 Clean Out (CO)[0];TiPe
Rp306,143.68 Rp1,836,862.08 -CO, dia. 150[6];TiPe
Rp240,126.22 Rp1,921,009.76 -CO, dia. 100[8];TiPe
Rp498,728.71 Rp5,984,744.52 -Portable Grease Trap[12];TiPe
Rp103,041.20 Rp206,082.40 -Roof drain 2"[2];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR HUJAN[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp442,028.41 Rp43,835,957.42 -dia. 150 (Air Hujan)[99,17];TiPe
Rp213,102.16 Rp10,424,957.67 -dia. 100 (Air Hujan)[48,92];TiPe
Rp105,151.68 Rp7,238,641.65 -dia. 80[68,84];TiPe
Rp68,262.93 Rp1,818,524.46 -dia. 50[26,64];TiPe
Rp0.00 Rp0.00 PEMIPAAN VENT[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas D (Incl. Fitting & Accessories)[0];TiPe
Rp65,175.91 Rp5,443,492.00 -Dia. 80 ( pipa riser )[83,52];TiPe
Rp0.00 Rp0.00 INSTALASI PANEL[0];TiPe
Rp5,674,999.08 Rp5,674,999.08 Pengadaan dan pemasangan PP-LT.1[1];TiPe
Rp0.00 Rp0.00 dengan komponen panel, sbb :[0];TiPe
Rp0.00 Rp0.00 -MCB 3P, 16 A[0];TiPe
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -Ampere-meter 50/5 A[0];TiPe
Rp0.00 Rp0.00 -Volt-meter 0-500 Volt[0];TiPe
Rp0.00 Rp0.00 -Volt Selector Switch[0];TiPe
Rp0.00 Rp0.00 -Fuse 2 A[0];TiPe
Rp0.00 Rp0.00 -Indicator Lamp[0];TiPe
Rp0.00 Rp0.00 -Rel MCB 3P[0];TiPe
Rp0.00 Rp0.00 -Cu Bar 5 x 63 A[0];TiPe
Rp0.00 Rp0.00 -Accessories & Termination[0];TiPe
Rp0.00 Rp0.00 -Box Panel[0];TiPe
Rp370,302.59 Rp4,443,631.08 -KW-meter/1ph/6A[12];TiPe
Rp351,872.46 Rp4,926,214.44
Pengadaan dan pemasangan P-UNIT, dengan komponen panel sbb :[14];TiP
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -Box Hanger[0];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL FEEDER[0];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari MDP :[0];TiPe
Rp52,672.77 Rp46,352.04 -NYY 4 x 4 mm2 + E-NYA 4 mm2 ke PP-LT.1[0,88];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari KWH Unit ke :[0];TiPe
Rp70,873.20 Rp1,743,480.72 NYM 3 x 4 mm2 ke P-Unit/1[24,6];TiPe
Rp70,873.20 Rp2,602,463.90 NYM 3 x 4 mm2 ke P-Unit/2[36,72];TiPe
Rp70,873.20 Rp3,034,790.42 NYM 3 x 4 mm2 ke P-Unit/3[42,82];TiPe
Rp70,873.20 Rp3,805,890.84 NYM 3 x 4 mm2 ke P-Unit/4[53,7];TiPe
Rp70,873.20 Rp3,947,637.24 NYM 3 x 4 mm2 ke P-Unit/5[55,7];TiPe
Rp70,873.20 Rp4,876,076.16 NYM 3 x 4 mm2 ke P-Unit/6[68,8];TiPe
Rp70,873.20 Rp1,148,145.84 NYM 3 x 4 mm2 ke P-Unit/7[16,2];TiPe
Rp70,873.20 Rp1,672,607.52 NYM 3 x 4 mm2 ke P-Unit/8[23,6];TiPe
Rp70,873.20 Rp2,381,339.52 NYM 3 x 4 mm2 ke P-Unit/9[33,6];TiPe
Rp70,873.20 Rp2,796,656.47 NYM 3 x 4 mm2 ke P-Unit/10[39,46];TiPe
Rp70,873.20 Rp4,450,836.96 NYM 3 x 4 mm2 ke P-Unit/11[62,8];TiPe
Rp70,873.20 Rp4,918,600.08 NYM 3 x 4 mm2 ke P-Unit/12[69,4];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL TRAY[0];TiPe
Rp113,631.09 Rp6,375,840.46 -Kabel Tray W200 x H100[56,11];TiPe
Rp202,853.16 Rp2,322,668.68 -Kabel Tray W500 x H100[11,45];TiPe
Rp461,612.11 Rp1,846,448.44 -Kabel Leadder W500 x H100 (Riser)[4];TiPe
Rp0.00 Rp0.00 Fitting-Fitting :[0];TiPe
Rp437,042.93 Rp437,042.93 -Elbow W200 x H100[1];TiPe
Rp529,066.37 Rp529,066.37 Elbow W500 x H100[1];TiPe
Rp366,881.27 Rp366,881.27 Tee W500 x H100[1];TiPe
Rp230,225.89 Rp230,225.89
-Material bantu ( mur, baut, hanger rod, supporting, dll )[1];TiPe
Rp0.00 Rp0.00
INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK[0];TiPe
Rp73,403.55 Rp7,193,547.90 -Lampu LED 9 Watt[98];TiPe
Rp133,854.36 Rp669,271.80 -Lampu LED 9 Watt, c/w battery charger (Selasar)[5];TiPe
Rp50,771.36 Rp2,284,711.20 -Lampu LED 7 Watt[45];TiPe
Rp449,211.10 Rp449,211.10
-Lampu baret isi TL Bulat-20 watt c/w battery charger[1];TiPe
Rp368,934.99 Rp1,106,804.97 -Exit Lamp-18 watt c/w battery charger[3];TiPe
Rp166,203.62 Rp498,610.86 -Lampu TL 1 x 36 watt, Balk[3];TiPe
Rp41,385.00 Rp3,352,185.00 -Stop Kontak 1P, 220 Volt, 10A, Wall Type[81];TiPe
Rp25,166.49 Rp427,830.33 -Saklar 1 Gang[17];TiPe
Rp32,538.54 Rp1,822,158.24 -Saklar 2 Gang[56];TiPe
Rp62,026.74 Rp62,026.74 -Saklar Hotel 1 Gang[1];TiPe
Rp98,886.99 Rp395,547.96 -Saklar Hotel 2 Gang[4];TiPe
Rp0.00 Rp0.00 INSTALASI PENERANGAN & STOP KONTAK[0];TiPe
Rp286,312.37 Rp44,378,417.35
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu[155];TiPe
Rp377,936.42 Rp30,612,850.02
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak[81];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI 2[0];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR BERSIH[0];TiPe
Rp0.00 Rp0.00 Pipa PPR PN10 (Incl. Fitting & Accessories)[0];TiPe
Rp26,617.50 Rp5,052,001.50 -PPR PN10 dia. 15[189,8];TiPe
Rp28,271.25 Rp4,995,247.16 -PPR PN10 dia. 20[176,69];TiPe
Rp70,186.68 Rp8,698,937.12 -PPR PN10 dia. 40[123,94];TiPe
Rp68,262.93 Rp464,187.92 -PPR PN10 dia. 50 (Riser dari Tangki Air Atas)[6,8];TiPe
Rp0.00 Rp0.00 Peralatan Katup-katup[0];TiPe
Rp0.00 Rp0.00 (Ball Valve & Gate Valve)[0];TiPe
Rp585,237.12 Rp585,237.12 -dia. 40[1];TiPe
Rp77,443.29 Rp1,239,092.64 -dia. 20[16];TiPe
Rp484,064.51 Rp7,745,032.16 -Meter Air c/w BV dia. 20[16];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR KOTOR & AIR BEKAS[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp442,028.41 Rp55,262,391.82 -dia. 150 ( Riser Pipa Air Kotor )[125,02];TiPe
Rp213,102.16 Rp3,409,634.56 dia. 100 ( Pipa Air Kotor )[16];TiPe
Rp213,102.16 Rp26,642,032.04 -dia. 100 ( Riser Pipa Air Bekas )[125,02];TiPe
Rp68,262.93 Rp7,317,786.10 dia. 50 ( Pipa Air Bekas )[107,2];TiPe
Rp54,771.82 Rp876,349.12 -Dop, dia. 50[16];TiPe
Rp58,633.37 Rp938,133.92 V-Trap dia. 50[16];TiPe
Rp498,728.71 Rp7,979,659.36 -Portable Grease Trap[16];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR HUJAN[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp213,102.16 Rp12,752,033.25 -dia. 100 ( pipa tegak )[59,84];TiPe
Rp105,151.68 Rp7,393,214.62 -dia. 80 ( Riser Pipa Cucian )[70,31];TiPe
Rp0.00 Rp0.00 Roof Drain, Cast Iron[0];TiPe
Rp92,615.01 Rp185,230.02 -dia. 80[2];TiPe
Rp0.00 Rp0.00 PEMIPAAN VENT[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas D (Incl. Fitting & Accessories)[0];TiPe
Rp65,175.91 Rp16,297,236.30 -Dia. 80[250,05];TiPe
Rp41,836.68 Rp669,386.88 -Dia. 50[16];TiPe
Rp39,001.68 Rp4,492,993.54 -Dia. 32[115,2];TiPe
Rp0.00 Rp0.00 INSTALASI PANEL[0];TiPe
Rp5,674,999.08 Rp5,674,999.08 Pengadaan dan pemasangan PP-LT.2[1];TiPe
Rp0.00 Rp0.00 dengan komponen panel, sbb :[0];TiPe
Rp0.00 Rp0.00 -MCCB 3P, 16 A[0];TiPe
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -Ampere-meter 50/5 A[0];TiPe
Rp0.00 Rp0.00 -Volt-meter 0-500 Volt[0];TiPe
Rp0.00 Rp0.00 -Volt Selector Switch[0];TiPe
Rp0.00 Rp0.00 -Fuse 2 A[0];TiPe
Rp0.00 Rp0.00 -Indicator Lamp[0];TiPe
Rp0.00 Rp0.00 -Rel MCB 3P[0];TiPe
Rp0.00 Rp0.00 -Cu Bar 5 x 63 A[0];TiPe
Rp0.00 Rp0.00 -Accessories & Termination[0];TiPe
Rp0.00 Rp0.00 -Box Panel[0];TiPe
Rp370,302.59 Rp5,924,841.44 -KW-meter/1ph/6A[16];TiPe
Rp351,872.46 Rp5,629,959.36
Pengadaan dan pemasangan P-UNIT, dengan komponen panel sbb :[16];TiP
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -Box Hanger[0];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL FEEDER[0];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari MDP :[0];TiPe
Rp52,672.77 Rp189,621.97 -NYY 4 x 4 mm2 + E-NYA 4 mm2 ke PP-LT.1[3,6];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari PP-LT.2 ke :[0];TiPe
Rp70,873.20 Rp1,644,258.24 -NYM 3 x 4 mm2 ke P-Unit/1[23,2];TiPe
Rp70,873.20 Rp2,324,640.96 -NYM 3 x 4 mm2 ke P-Unit/2[32,8];TiPe
Rp70,873.20 Rp2,466,387.36 -NYM 3 x 4 mm2 ke P-Unit/3[34,8];TiPe
Rp70,873.20 Rp3,309,778.44 -NYM 3 x 4 mm2 ke P-Unit/4[46,7];TiPe
Rp70,873.20 Rp1,715,131.44 -NYM 3 x 4 mm2 ke P-Unit/5[24,2];TiPe
Rp70,873.20 Rp2,395,514.16 -NYM 3 x 4 mm2 ke P-Unit/6[33,8];TiPe
Rp70,873.20 Rp2,537,260.56 -NYM 3 x 4 mm2 ke P-Unit/7[35,8];TiPe
Rp70,873.20 Rp3,380,651.64 -NYM 3 x 4 mm2 ke P-Unit/8[47,7];TiPe
Rp70,873.20 Rp3,649,969.80 -NYM 3 x 4 mm2 ke P-Unit/9[51,5];TiPe
Rp70,873.20 Rp4,450,836.96 -NYM 3 x 4 mm2 ke P-Unit/10[62,8];TiPe
Rp70,873.20 Rp4,521,710.16 -NYM 3 x 4 mm2 ke P-Unit/11[63,8];TiPe
Rp70,873.20 Rp5,407,625.16 -NYM 3 x 4 mm2 ke P-Unit/12[76,3];TiPe
Rp70,873.20 Rp3,720,843.00 -NYM 3 x 4 mm2 ke P-Unit/13[52,5];TiPe
Rp70,873.20 Rp4,521,710.16 -NYM 3 x 4 mm2 ke P-Unit/14[63,8];TiPe
Rp70,873.20 Rp4,592,583.36 -NYM 3 x 4 mm2 ke P-Unit/15[64,8];TiPe
Rp70,873.20 Rp5,478,498.36 -NYM 3 x 4 mm2 ke P-Unit/16[77,3];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL TRAY[0];TiPe
Rp113,631.09 Rp6,412,202.41 -Kabel Tray W200 x H100[56,43];TiPe
Rp461,612.11 Rp1,846,448.44 -Kabel Leadder W500 x H100 (Riser)[4];TiPe
Rp0.00 Rp0.00 Fitting-Fitting :[0];TiPe
Rp437,042.93 Rp437,042.93 -Elbow W200 x H100[1];TiPe
Rp173,907.06 Rp173,907.06
-Material bantu ( mur, baut, hanger rod, supporting, dll )[1];TiPe
Rp0.00 Rp0.00
INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK[0];TiPe
Rp73,403.55 Rp6,312,705.30 -Lampu LED 9 Watt[86];TiPe
Rp133,854.36 Rp401,563.08 -Lampu LED 9 Watt, c/w battery charger (Selasar)[3];TiPe
Rp50,771.36 Rp2,437,025.28 -Lampu LED 7 Watt[48];TiPe
Rp449,211.10 Rp1,347,633.30
-Lampu baret isi TL Bulat-32 watt c/w battery charger[3];TiPe
Rp368,934.99 Rp1,106,804.97 -Exit Lamp-18 watt c/w battery charger[3];TiPe
Rp166,203.62 Rp498,610.86 -Lampu TL 1 x 36 watt, Balk[3];TiPe
Rp41,385.00 Rp4,097,115.00 -Stop Kontak 1P, 220 Volt, 10A, Wall Type[99];TiPe
Rp25,166.49 Rp578,829.27 -Saklar 1 gang[23];TiPe
Rp32,538.54 Rp2,115,005.10 -Saklar 2 gang[65];TiPe
Rp98,886.99 Rp197,773.98 -Saklar Hotel 2 gang[2];TiPe
Rp0.00 Rp0.00 INSTALASI PENERANGAN & STOP KONTAK[0];TiPe
Rp286,312.37 Rp41,801,606.02
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu[146];TiPe
Rp377,936.42 Rp37,415,705.58
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak[99];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI 3[0];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR BERSIH[0];TiPe
Rp0.00 Rp0.00 Pipa PPR PN10 (Incl. Fitting & Accessories)[0];TiPe
Rp26,617.50 Rp5,052,001.50 -PPR PN10 dia. 15[189,8];TiPe
Rp28,271.25 Rp4,995,247.16 -PPR PN10 dia. 20[176,69];TiPe
Rp70,186.68 Rp8,698,937.12 -PPR PN10 dia. 40[123,94];TiPe
Rp68,262.93 Rp232,093.96 -PPR PN10 dia. 50 (Riser dari Tangki Air Atas)[3,4];TiPe
Rp0.00 Rp0.00 Peralatan Katup-katup[0];TiPe
Rp0.00 Rp0.00 (Ball Valve & Gate Valve)[0];TiPe
Rp585,237.12 Rp585,237.12 -dia. 40[1];TiPe
Rp77,443.29 Rp1,239,092.64 -dia. 20[16];TiPe
Rp484,064.51 Rp7,745,032.16 -Meter Air c/w BV dia. 20[16];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR KOTOR & AIR BEKAS[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp213,102.16 Rp26,642,032.04 dia. 100 ( Pipa Air Kotor )[125,02];TiPe
Rp213,102.16 Rp3,409,634.56 -dia. 100 ( Riser Pipa Air Bekas )[16];TiPe
Rp68,262.93 Rp8,534,231.51 dia. 50 ( Pipa Air Bekas )[125,02];TiPe
Rp54,771.82 Rp5,871,539.10 -Dop, dia. 50[107,2];TiPe
Rp58,633.37 Rp938,133.92 -V-Trap[16];TiPe
Rp498,728.71 Rp7,979,659.36 -Portable Grease Trap[16];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR HUJAN[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp213,102.16 Rp11,592,757.50 -dia. 100 ( pipa tegak )[54,4];TiPe
Rp105,151.68 Rp7,393,214.62 -dia. 80 ( pipa ruang cuci )[70,31];TiPe
Rp0.00 Rp0.00 PEMIPAAN VENT[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas D (Incl. Fitting & Accessories)[0];TiPe
Rp65,175.91 Rp8,273,430.02 -Dia. 80 ( pipa riser )[126,94];TiPe
Rp0.00 Rp0.00 INSTALASI PANEL[0];TiPe
Rp5,674,999.08 Rp5,674,999.08 Pengadaan dan pemasangan PP-LT.3[1];TiPe
Rp0.00 Rp0.00 dengan komponen panel, sbb :[0];TiPe
Rp0.00 Rp0.00 -MCCB 3P, 16 A[0];TiPe
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -Ampere-meter 50/5 A[0];TiPe
Rp0.00 Rp0.00 -Volt-meter 0-500 Volt[0];TiPe
Rp0.00 Rp0.00 -Volt Selector Switch[0];TiPe
Rp0.00 Rp0.00 -Fuse 2 A[0];TiPe
Rp0.00 Rp0.00 -Indicator Lamp[0];TiPe
Rp0.00 Rp0.00 -Rel MCB 3P[0];TiPe
Rp0.00 Rp0.00 -Cu Bar 5 x 63 A[0];TiPe
Rp0.00 Rp0.00 -Accessories & Termination[0];TiPe
Rp0.00 Rp0.00 -Box Panel[0];TiPe
Rp370,302.59 Rp5,924,841.44 -KW-meter/1ph/6A[16];TiPe
Rp351,872.46 Rp5,629,959.36
Pengadaan dan pemasangan P-UNIT, dengan komponen panel sbb :[16];TiP
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -Box Hanger[0];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL FEEDER[0];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari MDP :[0];TiPe
Rp52,672.77 Rp389,778.50 -NYY 4 x 4 mm2 + E-NYA 6 mm2 ke PP-LT.3[7,4];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari PP-LT.3 ke :[0];TiPe
Rp70,873.20 Rp1,998,624.24 -NYM 3 x 4 mm2 ke P-Unit/1[28,2];TiPe
Rp70,873.20 Rp2,679,006.96 -NYM 3 x 4 mm2 ke P-Unit/2[37,8];TiPe
Rp70,873.20 Rp2,820,753.36 -NYM 3 x 4 mm2 ke P-Unit/3[39,8];TiPe
Rp70,873.20 Rp3,664,144.44 -NYM 3 x 4 mm2 ke P-Unit/4[51,7];TiPe
Rp70,873.20 Rp2,069,497.44 -NYM 3 x 4 mm2 ke P-Unit/5[29,2];TiPe
Rp70,873.20 Rp2,749,880.16 -NYM 3 x 4 mm2 ke P-Unit/6[38,8];TiPe
Rp70,873.20 Rp2,891,626.56 -NYM 3 x 4 mm2 ke P-Unit/7[40,8];TiPe
Rp70,873.20 Rp3,735,017.64 -NYM 3 x 4 mm2 ke P-Unit/8[52,7];TiPe
Rp70,873.20 Rp4,004,335.80 -NYM 3 x 4 mm2 ke P-Unit/9[56,5];TiPe
Rp70,873.20 Rp4,805,202.96 -NYM 3 x 4 mm2 ke P-Unit/10[67,8];TiPe
Rp70,873.20 Rp4,876,076.16 -NYM 3 x 4 mm2 ke P-Unit/11[68,8];TiPe
Rp70,873.20 Rp5,761,991.16 -NYM 3 x 4 mm2 ke P-Unit/12[81,3];TiPe
Rp70,873.20 Rp4,075,209.00 -NYM 3 x 4 mm2 ke P-Unit/13[57,5];TiPe
Rp70,873.20 Rp4,876,076.16 -NYM 3 x 4 mm2 ke P-Unit/14[68,8];TiPe
Rp70,873.20 Rp4,946,949.36 -NYM 3 x 4 mm2 ke P-Unit/15[69,8];TiPe
Rp70,873.20 Rp5,832,864.36 -NYM 3 x 4 mm2 ke P-Unit/16[82,3];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL TRAY[0];TiPe
Rp113,631.09 Rp6,412,202.41 -Kabel Tray W200 x H100[56,43];TiPe
Rp461,612.11 Rp1,846,448.44 -Kabel Leadder W500 x H100 (Riser)[4];TiPe
Rp0.00 Rp0.00 Fitting-Fitting :[0];TiPe
Rp437,042.93 Rp437,042.93 -Elbow W200 x H100[1];TiPe
Rp173,907.06 Rp173,907.06
-Material bantu ( mur, baut, hanger rod, supporting, dll )[1];TiPe
Rp0.00 Rp0.00
INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK[0];TiPe
Rp73,403.55 Rp6,312,705.30 -Lampu LED 9 Watt[86];TiPe
Rp133,854.36 Rp401,563.08 -Lampu LED 9 Watt, c/w battery charger (Selasar)[3];TiPe
Rp50,771.36 Rp2,437,025.28 -Lampu LED 7 Watt[48];TiPe
Rp449,211.10 Rp1,347,633.30
-Lampu baret isi TL Bulat-32 watt c/w battery charger[3];TiPe
Rp368,934.99 Rp1,106,804.97 -Exit Lamp-18 watt c/w battery charger[3];TiPe
Rp166,203.62 Rp498,610.86 -Lampu TL 1 x 36 watt, Balk[3];TiPe
Rp41,385.00 Rp4,097,115.00 -Stop Kontak 1P, 220 Volt, 10A, Wall Type[99];TiPe
Rp25,166.49 Rp578,829.27 -Saklar 1 gang[23];TiPe
Rp32,538.54 Rp2,115,005.10 -Saklar 2 gang[65];TiPe
Rp98,886.99 Rp197,773.98 -Saklar Hotel 2 gang[2];TiPe
Rp0.00 Rp0.00 INSTALASI PENERANGAN & STOP KONTAK[0];TiPe
Rp286,312.37 Rp41,801,606.02
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu[146];TiPe
Rp377,936.42 Rp37,415,705.58
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak[99];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI 4[0];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR BERSIH[0];TiPe
Rp0.00 Rp0.00 PPR PN10 (Incl. Fitting & Accessories)[0];TiPe
Rp26,617.50 Rp5,052,001.50 -PPR PN10 dia. 15[189,8];TiPe
Rp28,271.25 Rp4,995,247.16 -PPR PN10 dia. 20[176,69];TiPe
Rp70,186.68 Rp8,698,937.12 -PPR PN10 dia. 40[123,94];TiPe
Rp68,262.93 Rp232,093.96 -PPR PN10 dia. 50 (Riser dari Tangki Air Atas)[3,4];TiPe
Rp0.00 Rp0.00 Peralatan Katup-katup[0];TiPe
Rp0.00 Rp0.00 (Ball Valve & Gate Valve)[0];TiPe
Rp585,237.12 Rp585,237.12 -dia. 40[1];TiPe
Rp77,443.29 Rp1,239,092.64 -dia. 20[16];TiPe
Rp484,064.51 Rp7,745,032.16 -Meter Air c/w BV dia. 20[16];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR KOTOR & AIR BEKAS[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp442,028.41 Rp55,262,391.82 -dia. 150 ( Riser Pipa Air Kotor )[125,02];TiPe
Rp213,102.16 Rp3,409,634.56 dia. 100 ( Pipa Air Kotor )[16];TiPe
Rp213,102.16 Rp26,642,032.04 -dia. 100 ( Riser Pipa Air Bekas )[125,02];TiPe
Rp68,262.93 Rp7,317,786.10 dia. 50 ( Pipa Air Bekas )[107,2];TiPe
Rp54,771.82 Rp876,349.12 -Dop, dia. 50[16];TiPe
Rp66,356.47 Rp1,061,703.52 -Dop, dia. 80[16];TiPe
Rp58,633.37 Rp938,133.92 V-Trap dia. 50[16];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR HUJAN[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp213,102.16 Rp11,592,757.50 -dia. 100 ( pipa tegak )[54,4];TiPe
Rp105,151.68 Rp7,393,214.62 -dia. 80 ( pipa ruang cuci )[70,31];TiPe
Rp0.00 Rp0.00 PEMIPAAN VENT[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas D (Incl. Fitting & Accessories)[0];TiPe
Rp65,175.91 Rp8,273,430.02 -Dia. 80 ( pipa riser )[126,94];TiPe
Rp0.00 Rp0.00 INSTALASI PANEL[0];TiPe
Rp5,674,999.08 Rp5,674,999.08 Pengadaan dan pemasangan PP-LT.3[1];TiPe
Rp0.00 Rp0.00 dengan komponen panel, sbb :[0];TiPe
Rp0.00 Rp0.00 -MCCB 3P, 16 A[0];TiPe
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -Ampere-meter 50/5 A[0];TiPe
Rp0.00 Rp0.00 -Volt-meter 0-500 Volt[0];TiPe
Rp0.00 Rp0.00 -Volt Selector Switch[0];TiPe
Rp0.00 Rp0.00 -Fuse 2 A[0];TiPe
Rp0.00 Rp0.00 -Indicator Lamp[0];TiPe
Rp0.00 Rp0.00 -Rel MCB 3P[0];TiPe
Rp0.00 Rp0.00 -Cu Bar 5 x 63 A[0];TiPe
Rp0.00 Rp0.00 -Accessories & Termination[0];TiPe
Rp0.00 Rp0.00 -Box Panel[0];TiPe
Rp370,302.59 Rp5,924,841.44 -KW-meter/1ph/6A[16];TiPe
Rp351,872.46 Rp5,629,959.36
Pengadaan dan pemasangan P-UNIT, dengan komponen panel sbb :[16];TiP
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -Box Hanger[0];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL FEEDER[0];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari MDP :[0];TiPe
Rp52,672.77 Rp389,778.50 -NYY 4 x 4 mm2 + E-NYA 6 mm2 ke PP-LT.4[7,4];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari PP-LT.3 ke :[0];TiPe
Rp70,873.20 Rp2,352,990.24 -NYM 3 x 4 mm2 ke P-Unit/1[33,2];TiPe
Rp70,873.20 Rp3,033,372.96 -NYM 3 x 4 mm2 ke P-Unit/2[42,8];TiPe
Rp70,873.20 Rp3,175,119.36 -NYM 3 x 4 mm2 ke P-Unit/3[44,8];TiPe
Rp70,873.20 Rp4,018,510.44 -NYM 3 x 4 mm2 ke P-Unit/4[56,7];TiPe
Rp70,873.20 Rp2,423,863.44 -NYM 3 x 4 mm2 ke P-Unit/5[34,2];TiPe
Rp70,873.20 Rp3,104,246.16 -NYM 3 x 4 mm2 ke P-Unit/6[43,8];TiPe
Rp70,873.20 Rp3,245,992.56 -NYM 3 x 4 mm2 ke P-Unit/7[45,8];TiPe
Rp70,873.20 Rp4,089,383.64 -NYM 3 x 4 mm2 ke P-Unit/8[57,7];TiPe
Rp70,873.20 Rp4,358,701.80 -NYM 3 x 4 mm2 ke P-Unit/9[61,5];TiPe
Rp70,873.20 Rp5,159,568.96 -NYM 3 x 4 mm2 ke P-Unit/10[72,8];TiPe
Rp70,873.20 Rp5,230,442.16 -NYM 3 x 4 mm2 ke P-Unit/11[73,8];TiPe
Rp70,873.20 Rp6,116,357.16 -NYM 3 x 4 mm2 ke P-Unit/12[86,3];TiPe
Rp70,873.20 Rp4,429,575.00 -NYM 3 x 4 mm2 ke P-Unit/13[62,5];TiPe
Rp70,873.20 Rp5,230,442.16 -NYM 3 x 4 mm2 ke P-Unit/14[73,8];TiPe
Rp70,873.20 Rp5,301,315.36 -NYM 3 x 4 mm2 ke P-Unit/15[74,8];TiPe
Rp70,873.20 Rp6,187,230.36 -NYM 3 x 4 mm2 ke P-Unit/16[87,3];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL TRAY[0];TiPe
Rp113,631.09 Rp6,412,202.41 -Kabel Tray W200 x H100[56,43];TiPe
Rp461,612.11 Rp1,846,448.44 -Kabel Leadder W500 x H100 (Riser)[4];TiPe
Rp0.00 Rp0.00 Fitting-Fitting :[0];TiPe
Rp437,042.93 Rp437,042.93 -Elbow W200 x H100[1];TiPe
Rp173,907.06 Rp173,907.06
-Material bantu ( mur, baut, hanger rod, supporting, dll )[1];TiPe
Rp0.00 Rp0.00
INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK[0];TiPe
Rp73,403.55 Rp6,312,705.30 -Lampu LED 9 Watt[86];TiPe
Rp133,854.36 Rp401,563.08 -Lampu LED 9 Watt, c/w battery charger (Selasar)[3];TiPe
Rp50,771.36 Rp2,437,025.28 -Lampu LED 7 Watt[48];TiPe
Rp449,211.10 Rp1,347,633.30
-Lampu baret isi TL Bulat-32 watt c/w battery charger[3];TiPe
Rp368,934.99 Rp1,106,804.97 -Exit Lamp-18 watt c/w battery charger[3];TiPe
Rp166,203.62 Rp498,610.86 -Lampu TL 1 x 36 watt, Balk[3];TiPe
Rp41,385.00 Rp4,097,115.00 -Stop Kontak 1P, 220 Volt, 10A, Wall Type[99];TiPe
Rp25,166.49 Rp578,829.27 -Saklar 1 gang[23];TiPe
Rp32,538.54 Rp2,115,005.10 -Saklar 2 gang[65];TiPe
Rp98,886.99 Rp197,773.98 -Saklar Hotel 2 gang[2];TiPe
Rp0.00 Rp0.00 INSTALASI PENERANGAN & STOP KONTAK[0];TiPe
Rp286,312.37 Rp41,801,606.02
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu[146];TiPe
Rp377,936.42 Rp37,415,705.58
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak[99];TiPe
Rp0.00 Rp0.00 PEKERJAAN LANTAI ATAP[0];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR BERSIH[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp68,262.93 Rp1,364,575.97 -PVC AW dia. 50[19,99];TiPe
Rp412,253.41 Rp1,649,013.64 -PVC AW dia. 100 (Header)[4];TiPe
Rp0.00 Rp0.00 Peralatan Katup-katup[0];TiPe
Rp0.00 Rp0.00 (Ball Valve & Gate Valve)[0];TiPe
Rp411,690.04 Rp4,940,280.48 -dia. 50[12];TiPe
Rp0.00 Rp0.00 PEMIPAAN AIR HUJAN[0];TiPe
Rp0.00 Rp0.00 Pipa PVC Kelas AW (Incl. Fitting & Accessories)[0];TiPe
Rp0.00 Rp0.00 Roof Drain, Cast Iron[0];TiPe
Rp127,832.35 Rp4,090,635.20 -dia. 100[32];TiPe
Rp0.00 Rp0.00 Roof Drain, Cast Iron[0];TiPe
Rp127,832.35 Rp511,329.40 -dia. 100[4];TiPe
Rp92,615.01 Rp1,111,380.12 -dia. 80[12];TiPe
Rp0.00 Rp0.00 PEKERJAAN UTILITAS[0];TiPe
Rp0.00 Rp0.00 INSTALASI PANEL[0];TiPe
Rp0.00 Rp0.00 P-MDP[0];TiPe
Rp35,200,977.07 Rp35,200,977.07
Pengadaan dan pemasangan MDP, dengan komponen panel,[1];TiPe
Rp0.00 Rp0.00 sbb :[0];TiPe
Rp0.00 Rp0.00 -Mgs 3P, 200 A[0];TiPe
Rp0.00 Rp0.00 -MCCB 3P, 200 A[0];TiPe
Rp0.00 Rp0.00 -MCCB 3P, 80 A[0];TiPe
Rp0.00 Rp0.00 -MCCB 3P, 32 A[0];TiPe
Rp0.00 Rp0.00 -MCB 3P, 32 A[0];TiPe
Rp0.00 Rp0.00 -Contacto, (timer switch)[0];TiPe
Rp0.00 Rp0.00 -Earth Fault Relay[0];TiPe
Rp0.00 Rp0.00 -Over Current Relay[0];TiPe
Rp0.00 Rp0.00 -Over / Under Voltage Relay[0];TiPe
Rp0.00 Rp0.00 -Power Factor-meter[0];TiPe
Rp0.00 Rp0.00 -Frequency-metr[0];TiPe
Rp0.00 Rp0.00 -Ampere-meter 300/5 A[0];TiPe
Rp0.00 Rp0.00 -Ampere-meter 50/5 A[0];TiPe
Rp0.00 Rp0.00 -Volt-meter 0-500 Volt[0];TiPe
Rp0.00 Rp0.00 -Volt Selector Switch[0];TiPe
Rp0.00 Rp0.00 -CT 300/5 A[0];TiPe
Rp0.00 Rp0.00 -CT 50/5 A[0];TiPe
Rp0.00 Rp0.00 -Fuse Carrier 4 A[0];TiPe
Rp0.00 Rp0.00 -Indicator Lamp[0];TiPe
Rp0.00 Rp0.00 -Rel MCCB 3P[0];TiPe
Rp0.00 Rp0.00 -CU Bar 5 x 400 A[0];TiPe
Rp0.00 Rp0.00 -Accessories & Termination[0];TiPe
Rp0.00 Rp0.00 -Box Panel[0];TiPe
Rp0.00 Rp0.00 P-PENGELOLA[0];TiPe
Rp13,047,049.08 Rp13,047,049.08 Pengadaan dan pemasangan P-PENGELOLA[1];TiPe
Rp0.00 Rp0.00 dengan komponen panel, sbb :[0];TiPe
Rp0.00 Rp0.00 -MCCB 3P, 80 A[0];TiPe
Rp0.00 Rp0.00 -MCB 3P, 63 A[0];TiPe
Rp0.00 Rp0.00 -MCB 3P, 32 A[0];TiPe
Rp0.00 Rp0.00 -MCB 1P, 6 A[0];TiPe
Rp0.00 Rp0.00 -Ampere-meter 50/5 A[0];TiPe
Rp0.00 Rp0.00 -Volt-meter 0-500 Volt[0];TiPe
Rp0.00 Rp0.00 -Volt Selector Switch[0];TiPe
Rp0.00 Rp0.00 -Fuse 2 A[0];TiPe
Rp0.00 Rp0.00 -Indicator Lamp[0];TiPe
Rp0.00 Rp0.00 -Rel MCB 3P[0];TiPe
Rp0.00 Rp0.00 -Cu Bar 5 x 80 A[0];TiPe
Rp0.00 Rp0.00 -Accessories & Termination[0];TiPe
Rp0.00 Rp0.00 -Box Panel[0];TiPe
Rp2,876,799.59 Rp2,876,799.59 -KW-meter/3ph/80A[1];TiPe
Rp0.00 Rp0.00 P-POMPA AIR BERSIH[0];TiPe
Rp9,361,024.08 Rp9,361,024.08
Pengadaan dan pemasangan P-POMPA AIR BERSIH, dengan kompo-[1];TiPe
Rp0.00 Rp0.00 nen panel, sbb :[0];TiPe
Rp0.00 Rp0.00 -MCB 3P, 32 A[0];TiPe
Rp0.00 Rp0.00 -MCB 3P, 10 A[0];TiPe
Rp0.00 Rp0.00 -WLC 61F G-AP 220 Volt[0];TiPe
Rp0.00 Rp0.00 -DOL ( Direct On Line )[0];TiPe
Rp0.00 Rp0.00 -Radar diantaki air atas[0];TiPe
Rp0.00 Rp0.00 -Fuse 2 A[0];TiPe
Rp0.00 Rp0.00 -Indicator Lamp[0];TiPe
Rp0.00 Rp0.00 -Rel MCB 3P[0];TiPe
Rp0.00 Rp0.00 -Cu Bar 5 x 32 A[0];TiPe
Rp0.00 Rp0.00 -Accessories & Termination[0];TiPe
Rp0.00 Rp0.00 -Box Panel[0];TiPe
Rp0.00 Rp0.00 P-POMPA HYDRANT[0];TiPe
Rp9,361,024.08 Rp9,361,024.08
Pengadaan dan pemasangan P-POMPA HYDRANT, dengan kompo-[1];TiPe
Rp0.00 Rp0.00 nen panel, sbb :[0];TiPe
Rp0.00 Rp0.00 -MCB 3P, 40 A[0];TiPe
Rp0.00 Rp0.00 -MCB 3P, 16 A[0];TiPe
Rp0.00 Rp0.00 -WLC 61F G-AP 220 Volt[0];TiPe
Rp0.00 Rp0.00 -DOL ( Direct On Line )[0];TiPe
Rp0.00 Rp0.00 -Fuse 2 A[0];TiPe
Rp0.00 Rp0.00 -Indicator Lamp[0];TiPe
Rp0.00 Rp0.00 -Rel MCB 3P[0];TiPe
Rp0.00 Rp0.00 -Cu Bar 5 x 32 A[0];TiPe
Rp0.00 Rp0.00 -Accessories & Termination[0];TiPe
Rp0.00 Rp0.00 -Box Panel[0];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL FEEDER[0];TiPe
Rp818,864.72 Rp40,943,236.00
-NYY 4 x 70 mm2 + E-NYA 35 mm2 Dari P-PLN ke MDP[50];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari MDP :[0];TiPe
Rp219,543.38 Rp12,513,972.66
-NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-PENGELOLA-LT.1[57];TiPe
Rp150,143.00 Rp9,008,580.00 -FRC 4 x 6 mm2 + E-NYA 6 mm2 ke P. Hydrant[60];TiPe
Rp52,672.77 Rp4,951,240.38
-NYY 4 x 6 mm2 + E-NYA 4 mm2 ke P. Pompa Booster[94];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari P-PENGELOLA :[0];TiPe
Rp214,898.99 Rp8,595,959.60 -NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih[40];TiPe
Rp52,672.77 Rp2,106,910.80
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke P-Shallow Well Pump[40];TiPe
Rp52,672.77 Rp1,395,828.41
-NYY 4 x 4 mm2 + E-NYA 4 mm2 ke Box MCB R. Serbaguna[26,5];TiPe
Rp0.00 Rp0.00
INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK[0];TiPe
Rp0.00 Rp0.00 Ruang Pompa[0];TiPe
Rp180,947.72 Rp361,895.44 -TL 1 x 18 W, TL Balk Type[2];TiPe
Rp41,385.00 Rp41,385.00 -Stop Kontak 1P, 220 Volt, 13A, Wall Type[1];TiPe
Rp25,166.49 Rp50,332.98 -Saklar 1 gang[2];TiPe
Rp0.00 Rp0.00 Lampu Taman[0];TiPe
Rp1,000,439.84 Rp12,005,278.08
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt[12];TiPe
Rp7,917,675.73 Rp31,670,702.92
-Memasang Lampu PJU Tiang Octagonal Single Hotdip Galvanis,(t = 7 m)[4];T
Rp0.00 Rp0.00 INSTALASI PENERANGAN & STOP KONTAK[0];TiPe
Rp0.00 Rp0.00 Ruang Pompa[0];TiPe
Rp286,312.37 Rp572,624.74
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu[2];TiPe
Rp377,936.42 Rp377,936.42
-NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak[1];TiPe
Rp0.00 Rp0.00 Lampu Taman[0];TiPe
Rp561,279.02 Rp6,735,348.24 -NYFGBY 3 x 2,5 mm2 untuk Lampu Taman[12];TiPe
Rp561,279.02 Rp2,245,116.08
-Kabel Power Ins. PJU, NYFGBY 3 x 2,5 mm2 dari P.PJU[4];TiPe
Rp7,535,146.75 Rp7,535,146.75 -Testing & Commissioning[1];TiPe
Rp0.00 Rp0.00 PEKERJAAN SISTEM PENTANAHAN[0];TiPe
Rp0.00 Rp0.00 INSTALASI[0];TiPe
Rp0.00 Rp0.00
Pentanahan (Grounding) Netral Sistem & Pentanahan Body[0];TiPe
Rp0.00 Rp0.00 -Body Panel[0];TiPe
Rp0.00 Rp0.00 Item SBB:[0];TiPe
Rp3,348,875.50 Rp3,348,875.50
-Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm )[1];TiPe
Rp0.00 Rp0.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box[0];TiPe
Rp363,195.25 Rp363,195.25 -Termination R.Supporting Material[1];TiPe
Rp100,116.17 Rp3,003,485.10 -Kabel BC 50 mm2[30];TiPe
Rp7,535,146.75 Rp7,535,146.75 -Testing & Commissioning[1];TiPe
Rp0.00 Rp0.00 -Body Peralatan pada Sistem Elektronik[0];TiPe
Rp0.00 Rp0.00 Item SBB:[0];TiPe
Rp3,348,875.50 Rp3,348,875.50
-Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm )[1];TiPe
Rp0.00 Rp0.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box[0];TiPe
Rp363,195.25 Rp363,195.25 -Termination R.Supporting Material[1];TiPe
Rp100,116.17 Rp3,003,485.10 -Kabel BC 50 mm2[30];TiPe
Rp7,535,146.75 Rp7,535,146.75 -Testing & Commissioning[1];TiPe
Rp0.00 Rp0.00 PEKERJAAN PENANGKAL PETIR (FARADAY)[0];TiPe
Rp0.00 Rp0.00 AIR TERMINAL & TERMINATION NETWORK[0];TiPe
Rp289,474.75 Rp2,605,272.75 15 x 500mm alumunium air rod[9];TiPe
Rp584,356.75 Rp5,259,210.75 15 mm Air terminal base[9];TiPe
Rp55,259.28 Rp8,730,966.24 25 x 3mm Bare Alumunium Tape[158];TiPe
Rp75,532.42 Rp830,856.62 Grey 25x3mm Non-Metallic DC tape clip[11];TiPe
Rp95,958.43 Rp959,584.30 25 x 3mm Alumunium Square tape clamp[10];TiPe
Rp0.00 Rp0.00 DOWN CONDUCTOR[0];TiPe
Rp55,259.28 Rp165,777.84 25 x 3mm Bare Alumunium Tape[3];TiPe
Rp75,532.42 Rp226,597.26 Grey 25 x 3mm Non-Metallic DC tape clip[3];TiPe
Rp95,958.43 Rp1,439,376.45 25 x 3mm Alumunium Square tape clamp[15];TiPe
Rp436,915.75 Rp1,310,747.25 Test Connection Link[3];TiPe
Rp0.00 Rp0.00 GROUNDING SYSTEM[0];TiPe
Rp879,238.75 Rp2,637,716.25 Polymer Inspection Pit[3];TiPe
Rp778,978.87 Rp2,336,936.61 5/8" x 1800 mm Extensible Copperbond Rod[3];TiPe
Rp57,255.17 Rp171,765.51 5/8" Rod Coupling[3];TiPe
Rp1,210,981.00 Rp7,265,886.00 Exothermic weilding[6];TiPe
Rp146,509.63 Rp27,543,810.44 Stranded Bar copper conductor 70 mm[188];TiPe
Rp0.00 Rp0.00 MATERIAL SUPPORT[0];TiPe
Rp1,912,431.55 Rp1,912,431.55 Mould for looping[1];TiPe
Rp131,440.11 Rp788,640.66 Powder[6];TiPe
Rp1,643,720.33 Rp1,643,720.33 Handle Clamp[1];TiPe
Rp488,262.08 Rp488,262.08 flint gun[1];TiPe
Rp0.00 Rp0.00 TESTING & COMMISSIONING[0];TiPe
Rp7,535,146.75 Rp7,535,146.75 Testing & Commissioning[1];TiPe
Rp3,363,532.42 Rp3,363,532.42 Biaya Perijinan Depnaker[1];TiPe

Rp0.00 Rp2,169,224,162.98
PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN PEMADAM KEBAKARAN[0];TiPe
Rp0.00 Rp0.00 INSTALASI APAR[0];TiPe
Rp0.00 Rp0.00 LANTAI 1[0];TiPe
Rp0.00 Rp0.00 -Pipa BS Sch.40[0];TiPe
Rp475,307.74 Rp2,376,538.70 dia. 4" (Riser)[5];TiPe
Rp299,281.24 Rp10,714,268.39 dia. 3"[35,8];TiPe
Rp1,963,621.05 Rp1,963,621.05 -Fitting & Accessories[1];TiPe
Rp1,141,596.55 Rp1,141,596.55 -Hydrant Box Indoor (Size 100x80x18)[1];TiPe
Rp0.00 Rp0.00 -Gate Valve[0];TiPe
Rp1,686,898.06 Rp1,686,898.06 dia. 3"[1];TiPe
Rp0.00 Rp0.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :[0];TiPe
Rp212,042.22 Rp1,272,253.32
-Type Class ABC 3,5 kg DCP Seamless, c/w support[6];TiPe
Rp0.00 Rp0.00 LANTAI 2[0];TiPe
Rp0.00 Rp0.00 -Pipa BS Sch.40[0];TiPe
Rp475,307.74 Rp1,901,230.96 dia. 4" (Riser)[4];TiPe
Rp299,281.24 Rp10,654,412.14 dia. 3"[35,6];TiPe
Rp1,963,621.05 Rp1,963,621.05 -Fitting & Accessories[1];TiPe
Rp1,141,596.55 Rp1,141,596.55 -Hydrant Box Indoor (Size 100x80x18)[1];TiPe
Rp0.00 Rp0.00 -Gate Valve[0];TiPe
Rp1,686,898.06 Rp1,686,898.06 dia. 3"[1];TiPe
Rp0.00 Rp0.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :[0];TiPe
Rp212,042.22 Rp1,272,253.32
-Type Class ABC 3,5 kg DCP Seamless, c/w support[6];TiPe
Rp0.00 Rp0.00 LANTAI 3[0];TiPe
Rp0.00 Rp0.00 -Pipa BS Sch.40[0];TiPe
Rp475,307.74 Rp1,901,230.96 dia. 4" (Riser)[4];TiPe
Rp299,281.24 Rp10,762,153.39 dia. 3"[35,96];TiPe
Rp1,963,621.05 Rp1,963,621.05 -Fitting & Accessories[1];TiPe
Rp1,141,596.55 Rp1,141,596.55 -Hydrant Box Indoor (Size 100x80x18)[1];TiPe
Rp0.00 Rp0.00 -Gate Valve[0];TiPe
Rp1,686,898.06 Rp1,686,898.06 dia. 3"[1];TiPe
Rp0.00 Rp0.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :[0];TiPe
Rp212,042.22 Rp1,272,253.32
-Type Class ABC 3,5 kg DCP Seamless, c/w support[6];TiPe
Rp0.00 Rp0.00 LANTAI 4[0];TiPe
Rp0.00 Rp0.00 -Pipa BS Sch.40[0];TiPe
Rp475,307.74 Rp1,901,230.96 dia. 4" (Riser)[4];TiPe
Rp299,281.24 Rp10,762,153.39 dia. 3"[35,96];TiPe
Rp1,963,621.05 Rp1,963,621.05 -Fitting & Accessories[1];TiPe
Rp1,141,596.55 Rp1,141,596.55 -Hydrant Box Indoor (Size 100x80x18)[1];TiPe
Rp0.00 Rp0.00 -Gate Valve[0];TiPe
Rp1,686,898.06 Rp1,686,898.06 dia. 3"[1];TiPe
Rp0.00 Rp0.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :[0];TiPe
Rp212,042.22 Rp1,272,253.32
-Type Class ABC 3,5 kg DCP Seamless, c/w support[6];TiPe
Rp0.00 Rp0.00 SITE PLAN[0];TiPe
Rp0.00 Rp0.00 -Pipa BS Sch.40[0];TiPe
Rp475,307.74 Rp101,240,548.62 dia. 4"[213];TiPe
Rp15,186,082.24 Rp15,186,082.24 -Fitting & Accessories[1];TiPe
Rp1,061,837.99 Rp4,247,351.96 -Hydrant Box Outdoor[4];TiPe
Rp2,466,788.23 Rp9,867,152.92 -Hydrant Pillar[4];TiPe
Rp2,776,484.54 Rp11,105,938.16 -Seamesse connection[4];TiPe
Rp0.00 Rp0.00 -Gate Valve[0];TiPe
Rp3,432,870.31 Rp17,164,351.55 dia. 4"[5];TiPe
Rp0.00 Rp0.00 -Check Valve[0];TiPe
Rp2,389,700.16 Rp2,389,700.16 dia. 4"[1];TiPe
Rp0.00 Rp0.00 PEKERJAAN VENTILASI UDARA[0];TiPe
Rp0.00 Rp0.00 Exhaust Fan[0];TiPe
Rp0.00 Rp0.00 LANTAI 1 - 4[0];TiPe
Rp597,467.04 Rp182,227,447.20 -Exhaust kap 100 Cfm ( ceiling Mounted )[305];TiPe
Rp2,776,484.54 Rp11,105,938.16 -Kipas Angin Baling[4];TiPe
Rp0.00 Rp0.00 Pipa PVC Class D[0];TiPe
Rp82,928.41 Rp69,177,221.05 -dia. 100[834,18];TiPe
Rp184,961.22 Rp56,413,172.10 -Grille 200 x 200 (Alumunium)[305];TiPe
Rp499,800.92 Rp1,999,203.68
-Install Kipas Angin Baling (Kabel NYM 3x2,5 mm2 + Conduit pipa dia. 20)[4]
Rp0.00 Rp0.00 PEKERJAAN INSTALASI ELEKTRONIK[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN SYSTEM TV[0];TiPe
Rp0.00 Rp0.00 PERALATAN UTAMA SYSTEM TV[0];TiPe
Rp0.00 Rp0.00
Pengadaan dan pemasangan peralatan utama Sistem TV di-[0];TiPe
Rp0.00 Rp0.00
tempatkan di Lantai Atap, dipasang secara lengkap termasuk[0];TiPe
Rp0.00 Rp0.00
pondasi dan tiang penyangga sesuai diuraikan dalam Gam-[0];TiPe
Rp0.00 Rp0.00 bar dan Spesifikasi Teknis.[0];TiPe
Rp508,321.32 Rp508,321.32 -Antena UHF[1];TiPe
Rp584,156.86 Rp584,156.86 -Antena VHF[1];TiPe
Rp375,883.56 Rp375,883.56 -MA (Master Amplifier) / Mixer[1];TiPe
Rp18,463.83 Rp923,191.50 -Coaxial 7C/2V, dari Antena ke Mixer[50];TiPe
Rp239,155.30 Rp239,155.30 -Termination & supporting material[1];TiPe
Rp0.00 Rp0.00 SPLITTER TV[0];TiPe
Rp0.00 Rp0.00
Pengadan dan pemasangan Splitter TV, berikut alat / material[0];TiPe
Rp0.00 Rp0.00
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis.[0];TiPe
Rp0.00 Rp0.00 LANTAI 1[0];TiPe
Rp98,766.09 Rp296,298.27 Splitter 7 ports[3];TiPe
Rp192,524.82 Rp192,524.82 TB-Splitter-TV/LT.1[1];TiPe
Rp0.00 Rp0.00 Lantai 2[0];TiPe
Rp98,766.09 Rp395,064.36 Splitter 7 ports[4];TiPe
Rp192,524.82 Rp192,524.82 TB-Splitter-TV/LT.2[1];TiPe
Rp0.00 Rp0.00 Lantai 3[0];TiPe
Rp98,766.09 Rp395,064.36 Splitter 7 ports[4];TiPe
Rp192,524.82 Rp192,524.82 TB-Splitter-TV/LT.3[1];TiPe
Rp0.00 Rp0.00 Lantai 4[0];TiPe
Rp98,766.09 Rp395,064.36 Splitter 7 ports[4];TiPe
Rp192,524.82 Rp192,524.82 TB-Splitter-TV/LT.3[1];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL FEEDER SPLITTER TV[0];TiPe
Rp0.00 Rp0.00
Instalasi Kabel Feeder Splitter TV menggunakan kabel coaxial[0];TiPe
Rp0.00 Rp0.00
berikut semua aksesoris, material / alat bantu pemasangan[0];TiPe
Rp0.00 Rp0.00 sesuai detail Gambar dan Spesifikasi Teknis.[0];TiPe
Rp0.00 Rp0.00 Lantai 1[0];TiPe
Rp18,463.83 Rp184,638.30
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Splitter-Lt.1[10];TiPe
Rp0.00 Rp0.00 Lantai 2[0];TiPe
Rp18,463.83 Rp276,957.45
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Splitter-Lt.2[15];TiPe
Rp0.00 Rp0.00 Lantai 3[0];TiPe
Rp18,463.83 Rp369,276.60
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-Lt.3[20];TiPe
Rp0.00 Rp0.00 Lantai 4[0];TiPe
Rp18,463.83 Rp461,595.75
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-Lt.3[25];TiPe
Rp0.00 Rp0.00 TV OUTLET[0];TiPe
Rp0.00 Rp0.00
Pengadan dan pemasangan TV Outlet, breikut alat / material[0];TiPe
Rp0.00 Rp0.00
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi[0];TiPe
Rp0.00 Rp0.00 Teknis.[0];TiPe
Rp0.00 Rp0.00 Lantai 1[0];TiPe
Rp31,432.74 Rp408,625.62 TV Outlet[13];TiPe
Rp0.00 Rp0.00 Lantai 2[0];TiPe
Rp31,432.74 Rp502,923.84 TV Outlet[16];TiPe
Rp0.00 Rp0.00 Lantai 3[0];TiPe
Rp31,432.74 Rp502,923.84 TV Outlet[16];TiPe
Rp0.00 Rp0.00 Lantai 4[0];TiPe
Rp31,432.74 Rp502,923.84 TV Outlet[16];TiPe
Rp0.00 Rp0.00 INSTALASI OUTLET TV[0];TiPe
Rp0.00 Rp0.00
Instalasi kabel Outlet TV menggunakan kabel Coaxial 5C/2V[0];TiPe
Rp0.00 Rp0.00
dalam conduit PVC HI dia.20 mm2 lengkap dengan bobokan[0];TiPe
Rp0.00 Rp0.00
dan perapihan kembali, peralatan bantu dan aksesoris sesuai[0];TiPe
Rp0.00 Rp0.00 detail Gambar dan Spesifikasi Teknis.[0];TiPe
Rp0.00 Rp0.00 Lantai 1[0];TiPe
Rp253,246.09 Rp3,292,199.17 TV Outlet[13];TiPe
Rp0.00 Rp0.00 Lantai 2[0];TiPe
Rp253,246.09 Rp4,051,937.44 TV Outlet[16];TiPe
Rp0.00 Rp0.00 Lantai 3[0];TiPe
Rp253,246.09 Rp4,051,937.44 TV Outlet[16];TiPe
Rp0.00 Rp0.00 Lantai 4[0];TiPe
Rp253,246.09 Rp4,051,937.44 TV Outlet[16];TiPe
Rp0.00 Rp0.00 PEKERJAAN FIRE ALARM[0];TiPe
Rp0.00 Rp0.00 PERALATAN UTAMA FIRE ALARM SYSTEM[0];TiPe
Rp0.00 Rp0.00
Pengadaan dan pemasangan peralatan Sistem Fire Alarm[0];TiPe
Rp0.00 Rp0.00
ditempatkan di Ruang Kontrol secara lengkap termasuk peng-[0];TiPe
Rp0.00 Rp0.00
kabelan dan koneksi meliputi peralatan sesuai diuraikan dlm[0];TiPe
Rp0.00 Rp0.00
Gambar dan Spesifikasi Teknis, tetapi tidak terbats pada item[0];TiPe
Rp0.00 Rp0.00 sebagai berikut :[0];TiPe
Rp6,128,138.35 Rp6,128,138.35 MCFA, kapasitas 10 Zone[1];TiPe
Rp1,045,109.87 Rp1,045,109.87 MDF, kapasitas 10 Zone[1];TiPe
Rp683,879.42 Rp683,879.42 Rectifier[1];TiPe
Rp422,908.85 Rp422,908.85 Power Surge Arrester[1];TiPe
Rp1,553,781.32 Rp1,553,781.32 Battery & Charger 4 jam[1];TiPe
Rp3,348,875.50 Rp3,348,875.50
Grounding u/ MCFA dan Surge Arrester ( R < 0,5 Ohm )[1];TiPe
Rp0.00 Rp0.00 INSTALASI KABEL FEEDER FIRE ALARM[0];TiPe
Rp0.00 Rp0.00 INSTALASI FEEDER MELALUI RISER / SHAFT[0];TiPe
Rp39,999.06 Rp1,119,973.68
Kabel NYA 5 x 2 x 2,5 mm2 in conduit Dia.32 dari MCFA ke MDF[28];TiPe
Rp30,267.95 Rp60,535.90
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.1[2];TiPe
Rp30,267.95 Rp181,607.70
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.2[6];TiPe
Rp30,267.95 Rp363,215.40
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.3[12];TiP
Rp0.00 Rp0.00
PERALATAN PENGINDERA dan PENANDA KEBAKARAN[0];TiPe
Rp0.00 Rp0.00
Pengadaan dan pemasangan peralatan pengindera dan penan-[0];TiPe
Rp0.00 Rp0.00
da kebakaran berikut alat / material bantu lainnya sesuai Gam-[0];TiPe
Rp0.00 Rp0.00 bar dan Spesifikasi Teknis.[0];TiPe
Rp0.00 Rp0.00 Lantai-1[0];TiPe
Rp356,908.74 Rp19,986,889.44 -Smoke Detector[56];TiPe
Rp191,037.62 Rp764,150.48 -Rate Of Rise Temperature - Heat detector[4];TiPe
Rp240,798.96 Rp2,407,989.60 Fixed Heat Detector[10];TiPe
Rp161,549.42 Rp161,549.42 -Manual push button[1];TiPe
Rp143,119.29 Rp143,119.29 -Lampu Indikator[1];TiPe
Rp299,406.75 Rp299,406.75 -Bell alarm[1];TiPe
Rp54,654.69 Rp109,309.38 -End of Line Resistor[2];TiPe
Rp251,243.20 Rp251,243.20 -TB-FA-LT.1[1];TiPe
Rp0.00 Rp0.00 Lantai-2[0];TiPe
Rp356,908.74 Rp18,916,163.22 -Smoke Detector[53];TiPe
Rp191,037.62 Rp764,150.48 -Rate Of Rise Temperature - Heat detector[4];TiPe
Rp240,798.96 Rp3,852,783.36 Fixed Heat Detector[16];TiPe
Rp161,549.42 Rp161,549.42 -Manual push button[1];TiPe
Rp143,119.29 Rp143,119.29 -Lampu Indikator[1];TiPe
Rp299,406.75 Rp299,406.75 -Bell alarm[1];TiPe
Rp54,654.69 Rp109,309.38 -End of Line Resistor[2];TiPe
Rp251,243.20 Rp251,243.20 -TB-FA-LT.2[1];TiPe
Rp0.00 Rp0.00 Lantai-3[0];TiPe
Rp356,908.74 Rp18,916,163.22 -Smoke Detector[53];TiPe
Rp191,037.62 Rp764,150.48 -Rate Of Rise Temperature - Heat detector[4];TiPe
Rp240,798.96 Rp3,852,783.36 Fixed Heat Detector[16];TiPe
Rp161,549.42 Rp161,549.42 -Manual push button[1];TiPe
Rp143,119.29 Rp143,119.29 -Lampu Indikator[1];TiPe
Rp299,406.75 Rp299,406.75 -Bell alarm[1];TiPe
Rp54,654.69 Rp109,309.38 -End of Line Resistor[2];TiPe
Rp251,243.20 Rp251,243.20 -TB-FA-LT.3[1];TiPe
Rp0.00 Rp0.00 Lantai-4[0];TiPe
Rp356,908.74 Rp18,916,163.22 -Smoke Detector[53];TiPe
Rp191,037.62 Rp764,150.48 -Rate Of Rise Temperature - Heat detector[4];TiPe
Rp240,798.96 Rp3,852,783.36 Fixed Heat Detector[16];TiPe
Rp161,549.42 Rp161,549.42 -Manual push button[1];TiPe
Rp143,119.29 Rp143,119.29 -Lampu Indikator[1];TiPe
Rp299,406.75 Rp299,406.75 -Bell alarm[1];TiPe
Rp54,654.69 Rp109,309.38 -End of Line Resistor[2];TiPe
Rp251,243.20 Rp251,243.20 -TB-FA-LT.3[1];TiPe
Rp0.00 Rp0.00
PERALATAN PENGINDERA dan PENANDA KEBAKARAN[0];TiPe
Rp0.00 Rp0.00
Instalasi titik detector dari TB-FA dengan kabel NYA 2 x 1,5 mm2[0];TiPe
Rp0.00 Rp0.00
didalam conduit dia. 20 mm2 lengkap dengan aksesoris dan[0];TiPe
Rp0.00 Rp0.00
semua peralatan / material bantu pemasangan sesuai detail[0];TiPe
Rp0.00 Rp0.00 Gambar dan Spesifikasi Teknis.[0];TiPe
Rp0.00 Rp0.00 Lantai-1[0];TiPe
Rp165,832.01 Rp11,608,240.70 -Detector Fire Alarm[70];TiPe
Rp179,242.34 Rp179,242.34 -Manual push button[1];TiPe
Rp212,943.14 Rp212,943.14 -Lampu Indikator[1];TiPe
Rp179,242.34 Rp179,242.34 -Bell alarm[1];TiPe
Rp0.00 Rp0.00 Lantai-2[0];TiPe
Rp165,832.01 Rp12,105,736.73 -Detector Fire Alarm[73];TiPe
Rp179,242.34 Rp179,242.34 -Manual push button[1];TiPe
Rp212,943.14 Rp212,943.14 -Lampu Indikator[1];TiPe
Rp179,242.34 Rp179,242.34 -Bell alarm[1];TiPe
Rp0.00 Rp0.00 Lantai-3[0];TiPe
Rp165,832.01 Rp12,105,736.73 -Detector Fire Alarm[73];TiPe
Rp179,242.34 Rp179,242.34 -Manual push button[1];TiPe
Rp212,943.14 Rp212,943.14 -Lampu Indikator[1];TiPe
Rp179,242.34 Rp179,242.34 -Bell alarm[1];TiPe
Rp0.00 Rp0.00 Lantai-4[0];TiPe
Rp165,832.01 Rp12,105,736.73 -Detector Fire Alarm[73];TiPe
Rp179,242.34 Rp179,242.34 -Manual push button[1];TiPe
Rp212,943.14 Rp212,943.14 -Lampu Indikator[1];TiPe
Rp179,242.34 Rp179,242.34 -Bell alarm[1];TiPe
Rp10,898,679.16 Rp10,898,679.16
Testing & Comissioning included perijinan dari DEPNAKER[1];TiPe
Rp0.00 Rp0.00 PEKERJAAN CCTV[0];TiPe
Rp0.00 Rp0.00 PERALATAN UTAMA CCTV[0];TiPe
Rp21,122,623.34 Rp21,122,623.34 -Digital Video Recorder (DVR)[1];TiPe
Rp0.00 Rp0.00 16 Channel Real Time Standalone DVR,[0];TiPe
Rp0.00 Rp0.00 2 Ch Output, MPEG4, HDD 1 TB x 2[0];TiPe
Rp2,434,476.59 Rp2,434,476.59 -LCD Monitor 32"[1];TiPe
Rp1,462,945.71 Rp1,462,945.71 -UPS 1 Kva[1];TiPe
Rp567,504.92 Rp567,504.92 -Surge Arrester (15 KA)[1];TiPe
Rp363,195.25 Rp363,195.25
-Grounding u/ MDF-CCTV dan Surge Arrester ( R < 1 Ohm )[1];TiPe
Rp0.00 Rp0.00 INSTALASI CCTV[0];TiPe
Rp0.00 Rp0.00 Lantai 1[0];TiPe
Rp2,038,228.90 Rp8,152,915.60 -Dome Camera Colour Fixed w/ Varifocal Lens[4];TiPe
Rp625,989.47 Rp2,503,957.88 -Instalasi Camera Fixed Dome Indoor[4];TiPe
Rp0.00 Rp0.00 Coaxial Cable (Kabel Data)[0];TiPe
Rp0.00 Rp0.00 NYM 3 x 1,5 mm2 (Kabel Power)[0];TiPe
Rp0.00 Rp0.00 Lantai 2[0];TiPe
Rp2,038,228.90 Rp8,152,915.60 -Dome Camera Colour Fixed w/ Varifocal Lens[4];TiPe
Rp625,989.47 Rp2,503,957.88 -Instalasi Camera Fixed Dome Indoor[4];TiPe
Rp0.00 Rp0.00 Coaxial Cable (Kabel Data)[0];TiPe
Rp0.00 Rp0.00 NYM 3 x 1,5 mm2 (Kabel Power)[0];TiPe
Rp0.00 Rp0.00 Lantai 3[0];TiPe
Rp2,038,228.90 Rp8,152,915.60 -Dome Camera Colour Fixed w/ Varifocal Lens[4];TiPe
Rp625,989.47 Rp2,503,957.88 -Instalasi Camera Fixed Dome Indoor[4];TiPe
Rp0.00 Rp0.00 Coaxial Cable (Kabel Data)[0];TiPe
Rp0.00 Rp0.00 NYM 3 x 1,5 mm2 (Kabel Power)[0];TiPe
Rp0.00 Rp0.00 Lantai 4[0];TiPe
Rp2,038,228.90 Rp8,152,915.60 -Dome Camera Colour Fixed w/ Varifocal Lens[4];TiPe
Rp625,989.47 Rp2,503,957.88 -Instalasi Camera Fixed Dome Indoor[4];TiPe
Rp0.00 Rp0.00 Coaxial Cable (Kabel Data)[0];TiPe
Rp0.00 Rp0.00 NYM 3 x 1,5 mm2 (Kabel Power)[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN TATA SUARA[0];TiPe
Rp0.00 Rp0.00 PERALATAN UTAMA TATA SUARA[0];TiPe
Rp5,364,866.46 Rp5,364,866.46 -MDF-SS[1];TiPe
Rp4,299,151.85 Rp4,299,151.85 -Speaker selector 10 zone[1];TiPe
Rp2,386,090.13 Rp4,772,180.26 -Power amplifire (evac) 120 W[2];TiPe
Rp1,968,194.42 Rp1,968,194.42 -Equalizer[1];TiPe
Rp5,908,614.12 Rp5,908,614.12 -Mixer Pre-Amp[1];TiPe
Rp1,302,866.91 Rp1,302,866.91 -Mic paging evac (di ruang operator)[1];TiPe
Rp707,573.87 Rp707,573.87 -Sirine module[1];TiPe
Rp1,462,945.71 Rp1,462,945.71 -UPS 1 Kva[1];TiPe
Rp567,504.92 Rp567,504.92 -Surge Arrester (15 KA)[1];TiPe
Rp363,195.25 Rp363,195.25
-Grounding u/ MDF-SS dan Surge Arrester ( R < 1 Ohm )[1];TiPe
Rp0.00 Rp0.00 INSTALASI TATA SUARA[0];TiPe
Rp0.00 Rp0.00 Lantai 1[0];TiPe
Rp287,367.02 Rp2,298,936.16 -Ceiling speaker 3 W[8];TiPe
Rp397,421.20 Rp397,421.20 -TBTS-LT.1[1];TiPe
Rp179,544.02 Rp1,436,352.16 -Instalasi sound system (NYMHY 2 x 1,5 mm2)[8];TiPe
Rp0.00 Rp0.00 Lantai 2[0];TiPe
Rp287,367.02 Rp2,011,569.14 -Ceiling speaker 3 W[7];TiPe
Rp397,421.20 Rp397,421.20 -TBTS-LT.2[1];TiPe
Rp179,544.02 Rp1,256,808.14 -Instalasi sound system (NYMHY 2 x 1,5 mm2)[7];TiPe
Rp0.00 Rp0.00 Lantai 3[0];TiPe
Rp287,367.02 Rp2,011,569.14 -Ceiling speaker 3 W[7];TiPe
Rp397,421.20 Rp397,421.20 -TBTS-LT.2[1];TiPe
Rp179,544.02 Rp1,256,808.14 -Instalasi sound system (NYMHY 2 x 1,5 mm2)[7];TiPe
Rp0.00 Rp0.00 Lantai 4[0];TiPe
Rp287,367.02 Rp2,011,569.14 -Ceiling speaker 3 W[7];TiPe
Rp397,421.20 Rp397,421.20 -TBTS-LT.2[1];TiPe
Rp179,544.02 Rp1,256,808.14 -Instalasi sound system (NYMHY 2 x 1,5 mm2)[7];TiPe
Rp0.00 Rp0.00
PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)[0]
Rp0.00 Rp0.00 PEKERJAAN INSTALASI PLUMBING[0];TiPe
Rp0.00 Rp0.00 INSTALASI AIR BERSIH[0];TiPe
Rp0.00 Rp0.00 PERALATAN UTAMA[0];TiPe
Rp0.00 Rp0.00 Pengadaan dan pemasangan unit[0];TiPe
Rp33,166,130.79 Rp66,332,261.58 Lift Pump[2];TiPe
Rp0.00 Rp0.00 Kapasitas[0];TiPe
Rp0.00 Rp0.00 Head[0];TiPe
Rp0.00 Rp0.00 Speed[0];TiPe
Rp0.00 Rp0.00 PI[0];TiPe
Rp8,625,479.04 Rp8,625,479.04 1 duty, 1 standby ( bergantian), lengkap dengan[1];TiPe
Rp0.00 Rp0.00
panel control, wlc di Tanki Air Atas dan accessories[0];TiPe
Rp67,425,852.54 Rp67,425,852.54 Booster Pump / Distribution Pump[1];TiPe
Rp0.00 Rp0.00 Type[0];TiPe
Rp0.00 Rp0.00 Kapasitas[0];TiPe
Rp0.00 Rp0.00 Head[0];TiPe
Rp0.00 Rp0.00 Speed[0];TiPe
Rp0.00 Rp0.00 Daya[0];TiPe
Rp0.00 Rp0.00 Operasi[0];TiPe
Rp0.00 Rp0.00
( lengkap dengan Pump & Electromotor, Pressure Tank, Panel Kontrol, Press
Rp0.00 Rp0.00
Presure Gauge, Accessories, Gate Valve, Header & base Plat )[0];TiPe
Rp0.00 Rp0.00 Filter Pump[0];TiPe
Rp24,000,000.00 Rp24,000,000.00 Type[1];TiPe
Rp0.00 Rp0.00 Kapasitas[0];TiPe
Rp0.00 Rp0.00 Power[0];TiPe
Rp0.00 Rp0.00 Speed[0];TiPe
Rp0.00 Rp0.00 Operation[0];TiPe
Rp8,625,479.04 Rp8,625,479.04 1 duty, 1 standby ( bergantian), lengkap dengan[1];TiPe
Rp0.00 Rp0.00
panel control, wlc di Tanki Air Atas dan accessories[0];TiPe
Rp90,751,620.54 Rp90,751,620.54 Sand Filter dan Carbon Filter Tank[1];TiPe
Rp0.00 Rp0.00 Type[0];TiPe
Rp0.00 Rp0.00 Kapasitas[0];TiPe
Rp0.00 Rp0.00 Material[0];TiPe
Rp0.00 Rp0.00 Media Filter[0];TiPe
Rp0.00 Rp0.00 c/w : valve & accessories[0];TiPe
Rp12,265,217.60 Rp24,530,435.20 Tangki Air Atas ( Type Cylinder )[2];TiPe
Rp0.00 Rp0.00 Kapasitas[0];TiPe
Rp0.00 Rp0.00
Toren Tangki Air Stainless Steel, lengkap dengan Assesories dan dudukan/ p
Rp95,663,306.02 Rp95,663,306.02 PEKERJAAN SHALLOW WELL[1];TiPe
Rp0.00 Rp0.00 Pembuatan / Pengeboran sumur shallow well[0];TiPe
Rp0.00 Rp0.00 - Kedalaman + 95 Meter[0];TiPe
Rp0.00 Rp0.00 Pipa Casing, Pipa GIP Medium dia 150mm[0];TiPe
Rp0.00 Rp0.00 Pipa Rising dia 80mm[0];TiPe
Rp0.00 Rp0.00 Pipa screen dia 80mm[0];TiPe
Rp0.00 Rp0.00 Pengadaan dan pemasangan pompa shallow well[0];TiPe
Rp0.00 Rp0.00
- Kapasitas(deb air)150 s/d 200 Lpm, pengadaan dan pemasangan pipa kons
Rp0.00 Rp0.00 Instalasi kabel Kontrol WLC : 1 unit[0];TiPe
Rp0.00 Rp0.00 Instalasi Pipa GIP dia 50 mm ke GWT : 1 unit[0];TiPe
Rp0.00 Rp0.00 Gate Valve dia 2" : 1 unit[0];TiPe
Rp0.00 Rp0.00
Bak Kontrol Valve uk, 600 x 600 mm dengan tutup bordes tebal 2 mm : 1 un
Rp0.00 Rp0.00 Panel kontrol shallow well type outdoor : 1 unit[0];TiPe
Rp0.00 Rp0.00 Pengujian kwalitas air ke laboratorium : 1 unit[0];TiPe
Rp0.00 Rp0.00 Testing Comissioning & Training : 1 unit[0];TiPe
Rp0.00 Rp0.00 Material & Alat Bantu : 1 unit[0];TiPe
Rp0.00 Rp0.00 ACCESSORIES POMPA AIR BERSIH[0];TiPe
Rp0.00 Rp0.00 -Gate Valve[0];TiPe
Rp4,891,984.56 Rp9,783,969.12 dia. 125 ( Untuk Penghubung/penyeimbang GWT)[2];TiPe
Rp1,686,898.06 Rp3,373,796.12 dia. 80 ( Untuk Penghubung/penyeimbang GWT)[2];TiPe
Rp1,191,723.14 Rp11,917,231.40 dia. 50[10];TiPe
Rp0.00 Rp0.00 Butterfly Valve[0];TiPe
Rp4,013,852.50 Rp12,041,557.50 dia. 100[3];TiPe
Rp0.00 Rp0.00 -Check Valve ( CV )[0];TiPe
Rp1,674,416.89 Rp6,697,667.56 dia. 50[4];TiPe
Rp0.00 Rp0.00 -Strainer ( STR )[0];TiPe
Rp902,106.89 Rp3,608,427.56 dia. 50[4];TiPe
Rp0.00 Rp0.00 -Flexible Joint ( FJ )[0];TiPe
Rp338,320.59 Rp2,706,564.72 dia. 50[8];TiPe
Rp0.00 Rp0.00 -Foot Valve[0];TiPe
Rp1,106,769.04 Rp2,213,538.08 dia. 50[2];TiPe
Rp2,957,451.82 Rp5,914,903.64 dia. 80[2];TiPe
Rp279,402.36 Rp1,117,609.44 -Pressure Gauge[4];TiPe
Rp965,776.96 Rp1,931,553.92 -GIP med dia. 100 ( pipa header )[2];TiPe
Rp396,098.82 Rp1,980,494.10 GIP med dia. 125 ( Pipa inlet Pompa Hydrant )[5];TiPe
Rp396,098.82 Rp1,584,395.28 GIP med dia. 125 ( Pipa Penyeimbang GWT)[4];TiPe
Rp5,152,284.98 Rp5,152,284.98 -Instalasi pemipaan area pompa[1];TiPe
Rp0.00 Rp0.00 c/w fiting-fitting & support.[0];TiPe
Rp935,865.86 Rp935,865.86 -Meteran Air c/w GV dia. 50 & Box Meteran[1];TiPe
Rp0.00 Rp0.00 INSTALASI PEMIPAAN[0];TiPe
Rp0.00 Rp0.00 Pengadaan dan pemasangan unit.[0];TiPe
Rp0.00 Rp0.00
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)[0];TiPe
Rp0.00 Rp0.00 SITE PLAN[0];TiPe
Rp0.00 Rp0.00 1. Dari Box Meter PDAM ke GWT[0];TiPe
Rp68,262.93 Rp682,629.30 -PVC AW dia. 50 (Dari Box Meter PDAM ke GWT)[10];TiPe
Rp0.00 Rp0.00 2. Pemipaan R.Pompa ke Tanki Air Atas[0];TiPe
Rp120,059.10 Rp5,568,341.06 -GIP dia. 50[46,38];TiPe
Rp0.00 Rp0.00 INSTALASI AIR KOTOR & AIR BEKAS[0];TiPe
Rp140,652,094.20 Rp281,304,188.40 Septic Tank ( Sewage Treatment Plant )[2];TiPe
Rp0.00 Rp0.00 Kapasitas[0];TiPe
Rp213,102.16 Rp10,655,108.00 Pipa PVC AW Ø100 (dari STP ke Riol)[50];TiPe
Rp7,535,146.75 Rp7,535,146.75 TESTING COMMISSIONING[1];TiPe
Rp0.00 Rp0.00
PEKERJAAN INSTALASI PEMADAM KEBAKARAN[0];TiPe
Rp0.00 Rp0.00 INSTALASI PEMADAM KEBAKARAN[0];TiPe
Rp0.00 Rp0.00 PERALATAN UTAMA[0];TiPe
Rp246,617,840.60 Rp246,617,840.60 Diesel Fire Pump[1];TiPe
Rp0.00 Rp0.00 Type[0];TiPe
Rp0.00 Rp0.00 Kapasitas[0];TiPe
Rp0.00 Rp0.00 Daya[0];TiPe
Rp0.00 Rp0.00 Operasi[0];TiPe
Rp0.00 Rp0.00
( Pompa sudah termasuk Panel Kontrol Automatic Fire Pump )[0];TiPe
Rp0.00 Rp0.00 Comply to NFPA 20 Standard[0];TiPe
Rp52,413,700.79 Rp52,413,700.79 Jockey Fire Pump[1];TiPe
Rp0.00 Rp0.00 Type[0];TiPe
Rp0.00 Rp0.00 Kapasitas[0];TiPe
Rp0.00 Rp0.00 Daya[0];TiPe
Rp0.00 Rp0.00 Operasi[0];TiPe
Rp0.00 Rp0.00
( Pompa sudah termasuk Panel Kontrol Automatic Fire Pump )[0];TiPe
Rp0.00 Rp0.00 Comply to NFPA 20 Standard[0];TiPe
Rp0.00 Rp0.00 ACCESSORIES POMPA HYDRANT[0];TiPe
Rp0.00 Rp0.00 -Gate Valve[0];TiPe
Rp3,432,870.31 Rp20,597,221.86 dia. 100 mm[6];TiPe
Rp411,690.04 Rp823,380.08 dia. 50 mm[2];TiPe
Rp141,158.87 Rp141,158.87 dia. 25 mm[1];TiPe
Rp0.00 Rp0.00 -Strainer[0];TiPe
Rp2,843,149.94 Rp5,686,299.88 dia. 100 mm[2];TiPe
Rp1,056,568.89 Rp1,056,568.89 dia. 50 mm[1];TiPe
Rp0.00 Rp0.00 -Check Valve[0];TiPe
Rp2,389,700.16 Rp2,389,700.16 dia. 100 mm[1];TiPe
Rp1,674,416.89 Rp1,674,416.89 dia. 50 mm[1];TiPe
Rp0.00 Rp0.00 -Flexible Joint[0];TiPe
Rp798,073.06 Rp2,394,219.18 dia. 100 mm[3];TiPe
Rp1,106,769.04 Rp2,213,538.08 dia. 50 mm[2];TiPe
Rp0.00 Rp0.00 -Foot Valve[0];TiPe
Rp2,957,451.82 Rp2,957,451.82 dia. 100 mm[1];TiPe
Rp1,106,769.04 Rp1,106,769.04 dia. 50 mm[1];TiPe
Rp3,754,475.74 Rp3,754,475.74 -Safety valve dia 100[1];TiPe
Rp5,299,095.74 Rp10,598,191.48 -Flow Meter (FM) dia 100[2];TiPe
Rp1,231,864.54 Rp1,231,864.54 -Automatic Air Vent dia 25[1];TiPe
Rp279,402.36 Rp558,804.72 -Pressure Gauge[2];TiPe
Rp511,095.36 Rp511,095.36 -Pressure Switch[1];TiPe
Rp5,171,021.49 Rp10,342,042.98 -Pipa BSP Sch.40 dia. 200 ( pipa header )[2];TiPe
Rp475,307.74 Rp19,012,309.60
Pipa BSP Sch.40 dia. 100 ( dari header ke riser gedung)[40];TiPe
Rp0.00 Rp0.00 -Pemipaan area pompa[0];TiPe
Rp0.00 Rp0.00 Pipa Sch.40 ASTM A-120 (warna Putih )[0];TiPe
Rp424,957.14 Rp2,549,742.84 Dari Pompa ke Ground Tank (dia 100)[6];TiPe
Rp142,912.46 Rp857,474.76 Dari Pompa ke Ground Tank (dia 50)[6];TiPe
Rp0.00 Rp0.00 PENYAMBUNGAN DAYA PLN[0];TiPe
Rp136,895,000.00 Rp136,895,000.00
Pekerjaan Pasang Baru Daya Listrik PLN 131 KVA (131.000 VA)[1];TiPe
Rp0.00 Rp0.00 -BP ( Biaya penyambungan )[0];TiPe
Rp0.00 Rp0.00 -UJL ( Uang Jaminan Langanan )[0];TiPe
Rp0.00 Rp0.00 -Biaya Instalatir[0];TiPe
Rp0.00 Rp0.00 -Concuil[0];TiPe
Rp0.00 Rp0.00
-Pemasangan dan material yang dibutuhkan, seperti,[0];TiPe
Rp0.00 Rp0.00
( kabel, tiang, pondasi, galian & urugan kembali, dll )[0];TiPe
Rp0.00 Rp0.00 PEKERJAAN INSTALASI KABEL FEEDER[0];TiPe
Rp0.00 Rp0.00
Kabel Distribusi Daya dari Panel Pompa - Air Bersih[0];TiPe
Rp52,672.77 Rp526,727.70 -NYY 4 x 4 mm2 ke LP-1[10];TiPe
Rp52,672.77 Rp526,727.70 -NYY 4 x 4 mm2 ke LP-2[10];TiPe
Rp52,672.77 Rp526,727.70 NYY 4 x 4 mm2 ke FP-1[10];TiPe
Rp52,672.77 Rp526,727.70 NYY 4 x 4 mm2 ke FP-2[10];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari Panel Hydrant[0];TiPe
Rp52,672.77 Rp526,727.70 -NYY 4 x 4 mm2 ke Jockey Pump[10];TiPe
Rp50,472.89 Rp504,728.90 -NYY 2(3 x 2,5) mm2 ke Diesel Fire Pump[10];TiPe
Rp0.00 Rp0.00 Kabel Distribusi Daya dari P. Pompa Booster[0];TiPe
Rp27,239.19 Rp54,478.38 -NYY 4 x 2,5 mm2 ke Pompa Booster 1[2];TiPe
Rp27,239.19 Rp54,478.38 -NYY 4 x 2,5 mm2 ke Pompa Booster 2[2];TiPe
Rp222,180.00 Rp4,443,600.00 -Proteksi Kabel dengan Pipa Gip Dia 100[20];TiPe
Rp0.00 Rp0.00
Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya[0];T
Rp7,535,146.75 Rp7,535,146.75 -Testing & Commissioning[1];TiPe
Mushola[24];TiPe

Kerja[0];TiPe

rja baru [190];TiPe

lamatan (Safety Talk dan/atau Tool Box Meeting), setiap hari[190];TiPe

mia (MSDS)[0];TiPe
e cap)[190];TiPe

DASARKAN KEPMENAKER NOMOR : KEP-196/MEN/1999, untuk Tenaga harian Proyek) [0];TiPe

an Dan Kesehatan Kerja (P2K3),[0];TiPe

(Flagman ),[0];TiPe

n, Obat Luka, Perban, dll)[1];TiPe

angan Berat Badan, Tensi Meter, dll),[1];TiPe


ngunan) + pemadatan CBR 5%[106,16];TiPe
ngunan)[92,48];TiPe
[46,24];TiPe

m bangunan)[0];TiPe

ngunan/teras)[0];TiPe
engikat[0];TiPe
boring stempat*[0];TiPe
asuk Dinding Railling Tangga[1416,41];TiPe

erluar dan Interior/Dind. Bag. Dalam[2236,21];TiPe

Tangga, Bordes, Canopi Jendela & Entrance[1021,7];TiPe


Latei)[940,33];TiPe

pis Rockwool[242,64];TiPe

ce Gypsum + Rangka Hollow Galvanis[3,41];TiPe

Medium dia 3" & dia 1", di Atas Dinding dan Nempel pada Didinding[41,48];TiPe

Dinding Dapur[287,66];TiPe

r/Selasar, R. Serbaguna, & R. Pengelola dan Unit Hunian[650,96];TiPe

S & RAILING[0];TiPe

me Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca Clear 5 mm (len

me Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca Clear 5 mm (len

me Alum. Powder Coating, Kaca Clear 5 mm & Daun Jendela Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca Clear 5 mm (len

neycomb Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) type P-1[10];TiPe

neycomb Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) type P-1'[2];TiPe

neycomb Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) type P-2[24];TiPe

ear 8 mm + BV Kaca Clear 5 mm (lengkap terpasang ) type P-3[1];TiPe


p terpasang ) P-4[3];TiPe

VC (lengkap terpasang ) type PT[13];TiPe

VC (lengkap terpasang ) type PTD[2];TiPe

Besi (lengkap terpasang ) type PB[2];TiPe

m. Powder Coating (lengkap terpasang) type PS[13];TiPe

rame Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) type J1[14];TiPe

rame Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) type J2[12];TiPe

rame Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) type J4[3];TiPe

Alum. Powder Coating, Kaca Clear 5 mm (lengkap terpasang) type J5[3];TiPe

type RB-1[6];TiPe

type RB-2[4];TiPe

type RB-4[2];TiPe

type RB-5[2];TiPe

m (lengkap terpasang) type BV-1[12];TiPe

m (lengkap terpasang) type BV-2[12];TiPe

ngkap terpasang) type JL-1[12];TiPe

Hollow Galvanis Uk. Rangka 60x60 cm[693,77];TiPe

ow Galvanis Uk. Rangka 60x60[76,83];TiPe

unian, R. Serbaguna, Koridor, Tangga Utama dan Tangga Servis Uk. 60x60 cm[757,89];TiPe

Tactile Uk. 40x40 cm[9,9];TiPe

ing bangunan Uk. 60x60 cm[140,67];TiPe

a Tengah + Tangga Entrance + Tangga Servis Uk. 10 x 60 cm[87,1];TiPe

t=210 cm Toilet, R Cuci[316,55];TiPe


ah Canopy Jendela + Canopy Entrance[75,53];TiPe

nit Hunian (lengkap terpasang)[12];TiPe

m (lengkap terpasang)[3];TiPe

pasang)[1];TiPe

s - Toilet Umum (lengkap terpasang)[2];TiPe

oris - Unit Hunian (lengkap terpasang)[12];TiPe

gkap terpasang)[12];TiPe

, dan Janitor (lengkap terpasang)[24];TiPe

(lengkap terpasang)[12];TiPe

di Toilet Umum, di Ruang Cuci, di Janitor, dan di Tempat Sampah[37];TiPe

unian (lengkap terpasang)[12];TiPe

rior)[548,28];TiPe
erior)[1613,33];TiPe

S DI FACADE DAN SELASAR KELILING BANGUNAN[0];TiPe

/4"inc by specialist[9,55];TiPe
MP)[5,01];TiPe

asuk Dinding Railling Tangga[1539,37];TiPe

erluar dan Interior/Dind. Bag. Dalam[2404,86];TiPe

Tangga, Bordes, Canopi Jendela[1009,2];TiPe

en dan Pertemunan Dinding[1024,08];TiPe


ckwool[341,52];TiPe

Gypsum + Rangka Hollow Galvanis[3,19];TiPe


Medium dia 3" & dia 1", di Atas Dinding dan Nempel pada Didinding[41,48];TiPe

nding Dapur[336,72];TiPe

Unit Kamar[685,76];TiPe

S & RAILING[0];TiPe

me Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca Clear 5 mm (len

neycomb Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) type P-1[16];TiPe

neycomb Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) type P-2[32];TiPe

p terpasang ) P-4[3];TiPe

VC (lengkap terpasang ) type PT[16];TiPe

m. Powder Coating (lengkap terpasang) type PS[17];TiPe

rame Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) type J1[16];TiPe

rame Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) type J2[16];TiPe

rame Alum. Powder Coating, Kaca Clear 5 mm & Jendela Krepyak Alum. Powder Coating (lengkap terpasang) type J3[2];TiPe

type RB-1[6];TiPe

type RB-4[4];TiPe

type RB-5[2];TiPe

m (lengkap terpasang) type BV-1[16];TiPe

m (lengkap terpasang) type BV-2[16];TiPe

ngkap terpasang) type JL-1[16];TiPe

type R-1[1];TiPe

type R-2[2];TiPe

Hollow Galvanis Uk. Rangka 60x60 cm[691,64];TiPe


ow Galvanis Uk. Rangka 60x60[61,12];TiPe

unian, Koridor, Tangga Utama, dan Tangga Servis Uk. 60x60 cm[754,29];TiPe

let Uk. 20x20 cm[54,4];TiPe

a Tengah + Tangga Servis Uk. 10 x 60 cm[87,1];TiPe

Dinding t=210 cm Toilet, R Cuci[202,44];TiPe

ah Canopy Jendela[76,35];TiPe

nit Hunian (lengkap terpasang)[16];TiPe

oris - Unit Hunian (lengkap terpasang)[16];TiPe

gkap terpasang)[16];TiPe

engkap terpasang)[19];TiPe

(lengkap terpasang)[16];TiPe

di Ruang Cuci, di Janitor, dan di Tempat Sampah[36];TiPe

unian (lengkap terpasang)[16];TiPe

rior)[517,82];TiPe
erior)[1725,35];TiPe

asuk Dinding Railling Tangga[1539,37];TiPe

erluar dan Interior/Dind. Bag. Dalam[2404,86];TiPe

Tangga, Bordes, Canopi Jendela[1009,2];TiPe

en dan Pertemunan Dinding[1024,08];TiPe


ckwool[341,52];TiPe

Gypsum + Rangka Hollow Galvanis[3,19];TiPe

Medium dia 3" & dia 1", di Atas Dinding dan Nempel pada Didinding[43,79];TiPe
nding Dapur[336,72];TiPe

Unit Kamar[685,76];TiPe

S & RAILING[0];TiPe

me Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca Clear 5 mm (len

neycomb Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) type P-1[16];TiPe

neycomb Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) type P-2[32];TiPe

p terpasang ) P-4[3];TiPe

VC (lengkap terpasang ) type PT[16];TiPe

m. Powder Coating (lengkap terpasang) type PS[17];TiPe

rame Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) type J1[16];TiPe

rame Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) type J2[16];TiPe

rame Alum. Powder Coating, Kaca Clear 5 mm & Jendela Krepyak Alum. Powder Coating (lengkap terpasang) type J3[2];TiPe

type RB-1[6];TiPe

type RB-4[4];TiPe

type RB-5[2];TiPe

m (lengkap terpasang) type BV-1[16];TiPe

m (lengkap terpasang) type BV-2[16];TiPe

ngkap terpasang) type JL-1[16];TiPe

type R-1[1];TiPe

type R-2[2];TiPe

Hollow Galvanis Uk. Rangka 60x60 cm[691,64];TiPe

ow Galvanis Uk. Rangka 60x60[61,12];TiPe


unian, Koridor, Tangga Utama, dan Tangga Servis Uk. 60x60 cm[754,29];TiPe

let Uk. 20x20 cm[54,4];TiPe

a Tengah + Tangga Servis Uk. 10 x 60 cm[87,1];TiPe

Dinding t=210 cm Toilet, R Cuci[202,44];TiPe

ah Canopy Jendela[76,35];TiPe

nit Hunian (lengkap terpasang)[16];TiPe

oris - Unit Hunian (lengkap terpasang)[16];TiPe

gkap terpasang)[16];TiPe

engkap terpasang)[19];TiPe

(lengkap terpasang)[16];TiPe

di Ruang Cuci, di Janitor, dan di Tempat Sampah[36];TiPe

unian (lengkap terpasang)[16];TiPe

rior)[517,82];TiPe
erior)[1725,35];TiPe

asuk Dinding Railling Tangga[1539,37];TiPe

erluar dan Interior/Dind. Bag. Dalam[2404,86];TiPe

Tangga, Bordes, Canopi Jendela[1009,2];TiPe

en dan Pertemunan Dinding[1024,08];TiPe


ckwool[341,52];TiPe

Gypsum + Rangka Hollow Galvanis[3,19];TiPe

Medium dia 3" & dia 1", di Atas Dinding dan Nempel pada Didinding[43,79];TiPe

nding Dapur[336,72];TiPe
Unit Kamar[685,76];TiPe

S & RAILING[0];TiPe

me Alum. Powder Coating, Kaca Clear 8 mm & Daun Jendela Frame Alum. Powder Coating, Kaca Clear 5 mm + BV Kaca Clear 5 mm (len

neycomb Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) type P-1[16];TiPe

neycomb Engineering Door + BV Kaca Clear 5 mm (lengkap terpasang) type P-2[32];TiPe

p terpasang ) P-4[3];TiPe

VC (lengkap terpasang ) type PT[16];TiPe

m. Powder Coating (lengkap terpasang) type PS[17];TiPe

rame Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) type J1[16];TiPe

rame Alum. Powder Coating Kaca Clear 5 mm (lengkap terpasang) type J2[16];TiPe

rame Alum. Powder Coating, Kaca Clear 5 mm & Jendela Krepyak Alum. Powder Coating (lengkap terpasang) type J3[2];TiPe

type RB-1[6];TiPe

type RB-4[4];TiPe

type RB-5[2];TiPe

m (lengkap terpasang) type BV-1[16];TiPe

m (lengkap terpasang) type BV-2[16];TiPe

ngkap terpasang) type JL-1[16];TiPe

type R-1[1];TiPe

type R-2[2];TiPe

Hollow Galvanis Uk. Rangka 60x60 cm[691,64];TiPe

ow Galvanis Uk. Rangka 60x60[61,12];TiPe


unian, Koridor, Tangga Utama, dan Tangga Servis Uk. 60x60 cm[754,29];TiPe

let Uk. 20x20 cm[54,4];TiPe

a Tengah + Tangga Servis Uk. 10 x 60 cm[87,1];TiPe

Dinding t=210 cm Toilet, R Cuci[202,44];TiPe

ah Canopy Jendela[76,35];TiPe

nit Hunian (lengkap terpasang)[16];TiPe

oris - Unit Hunian (lengkap terpasang)[16];TiPe

gkap terpasang)[16];TiPe

engkap terpasang)[19];TiPe

(lengkap terpasang)[16];TiPe

di Ruang Cuci, di Janitor, dan di Tempat Sampah[36];TiPe

unian (lengkap terpasang)[16];TiPe

rior)[517,82];TiPe
erior)[1725,35];TiPe

nd. Terluar[549,89];TiPe
en[243,76];TiPe

S & RAILING[0];TiPe

Besi & Louvre Plat Besi TB 2 mm (lengkap terpasang ) type PD[2];TiPe

,Finish Duo Doff (terpasang pada tempatnya)[1];TiPe

ow Galvanis Uk. Rangka 60x60[41,71];TiPe


Torn (elv. +13,8) + 15 cm Pada Tanggulan[48,41];TiPe

kap terpasang)[4];TiPe

rior)[274,95];TiPe
erior)[73,69];TiPe

006,56];TiPe

Exterior[165,5];TiPe

-1,5 m[22];TiPe

1,5 m[22];TiPe

an[438];TiPe

NG.[0];TiPe

luran Kliling[167,79];TiPe

strip[167,79];TiPe
AR BANGUNAN[0];TiPe

d + serat fiber) Lantai dan Dinding[314,51];TiPe

erah Dak[112,92];TiPe
[57,96];TiPe

g lengkap terpasang)[3];TiPe

engkap terpasang)[3];TiPe

uk Opening Kusen Aluminium[9,32];TiPe

d + serat fiber) Lantai dan Dinding[68,26];TiPe

erah Dak[24,9];TiPe
[26,59];TiPe

rasang)[16];TiPe

m -acrylic (lengkap terpasang)[1];TiPe


mponen panel sbb :[14];TiPe
ng, dll )[1];TiPe

NTAK[0];TiPe

rger[1];TiPe

mpu[155];TiPe

op Kontak[81];TiPe
mponen panel sbb :[16];TiPe
ng, dll )[1];TiPe

NTAK[0];TiPe

rger[3];TiPe

mpu[146];TiPe

op Kontak[99];TiPe
mponen panel sbb :[16];TiPe
ng, dll )[1];TiPe

NTAK[0];TiPe

rger[3];TiPe

mpu[146];TiPe

op Kontak[99];TiPe
mponen panel sbb :[16];TiPe

ng, dll )[1];TiPe

NTAK[0];TiPe

rger[3];TiPe
mpu[146];TiPe

op Kontak[99];TiPe

onen panel,[1];TiPe
H, dengan kompo-[1];TiPe

, dengan kompo-[1];TiPe

MDP[50];TiPe
LA-LT.1[57];TiPe

ster[94];TiPe

l Pump[40];TiPe

rbaguna[26,5];TiPe

NTAK[0];TiPe

26 watt[12];TiPe

otdip Galvanis,(t = 7 m)[4];TiPe

mpu[2];TiPe

op Kontak[1];TiPe

P.PJU[4];TiPe

han Body[0];TiPe

ohm )[1];TiPe

Box[0];TiPe

ohm )[1];TiPe

Box[0];TiPe
ART[0];TiPe

Skedul :[0];TiPe
Skedul :[0];TiPe

Skedul :[0];TiPe

Skedul :[0];TiPe

+ Conduit pipa dia. 20)[4];TiPe


tem TV di-[0];TiPe

p termasuk[0];TiPe

am Gam-[0];TiPe

at / material[0];TiPe

esifikasi Teknis.[0];TiPe

abel coaxial[0];TiPe

masangan[0];TiPe

er-Lt.1[10];TiPe

er-Lt.2[15];TiPe

er-Lt.3[20];TiPe

er-Lt.3[25];TiPe

t / material[0];TiPe

esifikasi[0];TiPe
xial 5C/2V[0];TiPe

n bobokan[0];TiPe

soris sesuai[0];TiPe

e Alarm[0];TiPe

masuk peng-[0];TiPe

raikan dlm[0];TiPe

s pada item[0];TiPe

Ohm )[1];TiPe

MCFA ke MDF[28];TiPe

MDF ke TB-FA-LT.1[2];TiPe

MDF ke TB-FA-LT.2[6];TiPe

MDF ke TB-FA-LT.3[12];TiPe

RAN[0];TiPe
a dan penan-[0];TiPe

a sesuai Gam-[0];TiPe

RAN[0];TiPe

YA 2 x 1,5 mm2[0];TiPe

esoris dan[0];TiPe

suai detail[0];TiPe
PNAKER[1];TiPe

1 Ohm )[1];TiPe
Ohm )[1];TiPe

GAN (LUAR BANGUNAN)[0];TiPe


Tank, Panel Kontrol, Pressure switch,[0];TiPe

& base Plat )[0];TiPe

Assesories dan dudukan/ pondasi[0];TiPe

dan pemasangan pipa konstruksi : 1 unit[0];TiPe

p bordes tebal 2 mm : 1 unit[0];TiPe


c Fire Pump )[0];TiPe

c Fire Pump )[0];TiPe


dung)[40];TiPe

131.000 VA)[1];TiPe

material bantu lainya[0];TiPe


+ BV Kaca Clear 5 mm (lengkap terpasang ) type PJ-1[2];TiPe

+ BV Kaca Clear 5 mm (lengkap terpasang ) type PJ-2[1];TiPe

+ BV Kaca Clear 5 mm (lengkap terpasang ) type PJ-3[1];TiPe


+ BV Kaca Clear 5 mm (lengkap terpasang ) type PJ-1[1];TiPe

type J3[2];TiPe
+ BV Kaca Clear 5 mm (lengkap terpasang ) type PJ-1[1];TiPe

type J3[2];TiPe