Weekly Progres Report

Villa 5 Ref: RAB Small Villa Rev9

No JOB DESCRIPTION Technical QTY


specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
STRUKTUR
A PREPARATION
1 Bowplank 61.200 m1 0.180 61.20 100% 0.180 - - 61.20 100% 0.18
3 Temporary Holder Soil During Excavation 13.000 unit 0.084 13.00 100% 0.084 - - 13.00 100% 0.08
4 Terpal Sheet m2 - - 0% - - - - 0% -
- - 0% - - - - 0% -
0.263 - 0% - - - - 0% -
I Ground Floor - - 0% - - - - 0% -
A SOIL - - 0% - - - - 0% -
1 Soil Exavation 214.578 m3 0.424 214.58 100% 0.424 - - 214.58 100% 0.42
For River Stone Foundation - - 0% - - - - 0% -
For Footplate - - 0% - - - - 0% -
For Swimming Pool - - 0% - - - - 0% -
Digging Footplate 28.064 m3 0.166 28.06 100% 0.166 - - 28.06 100% 0.17
Dinging River stone 22.000 m3 0.087 22.00 100% 0.087 - - 22.00 100% 0.09
2 Sand Fill In - - 0% - - - - 0% -
Sandfill under Footplate t= 2.5cm 0.877 m3 0.009 0.88 100% 0.009 - - 0.88 100% 0.01
Sandfill under Riverstone t= 10cm 3.197 m3 0.034 3.20 100% 0.034 - - 3.20 100% 0.03
Sandfill under Slab t=2.5cm 1.855 m3 0.020 1.85 100% 0.020 - - 1.85 100% 0.02
Sandfill under Tie Beam t=2.5cm 0.762 m3 0.008 0.76 100% 0.008 - - 0.76 100% 0.01
3 Lean Concrete - - 0% - - - - 0% -
Lean Concrete Under Footplate t= 2.5 cm 35.080 m2 0.044 35.08 100% 0.044 - - 35.08 100% 0.04
Lean Concrete under Slab t=2.5 cm 74.191 m2 0.093 74.19 100% 0.093 - - 74.19 100% 0.09
Lean Concrete under Tie Beam t=2.5 cm 30.466 m2 0.038 30.47 100% 0.038 - - 30.47 100% 0.04
4 Plastick Sheet - - 0% - - - - 0% -
Plastick Sheet Under LC Footplate 35.080 m2 0.027 35.08 100% 0.027 - - 35.08 100% 0.03
Plastick Sheet Under LC Slab 74.191 m2 0.056 74.19 100% 0.056 - - 74.19 100% 0.06
Plastick Sheet Tie Beam 49.435 m2 0.038 49.44 100% 0.038 - - 49.44 100% 0.04
12 Backfill - - 0% - - - - 0% -
Backfill Digging Hole Limestone 71.526 m3 0.386 71.53 100% 0.386 - - 71.53 100% 0.39
Backfill For Floor Elevation Under Slab Limestone 18.548 m3 0.100 18.55 100% 0.100 - - 18.55 100% 0.10
13 Compaction Compaction with Stamper
496.305
Every
m220cm-30cm layer
0.327 369.79 75% 0.244 124.08 25% 0.082 493.87 100% 0.33
Under Riverstone - - 0% - - - - 0% -
Under TieBeam - - 0% - - - - 0% -
Under Ground Slab - - 0% - - - - 0% -
- - 0% - - - - 0% -
B RIVER STONE FOUNDATION - - 0% - - - - 0% -
1 River Stone Crush Foundation 1 PC : 4 Sand Type 1 17.813 m3 0.491 17.81 100% 0.491 - - 17.81 100% 0.49
- - 0% - - - - 0% -
C REINFORCED CONCRETE GROUND STRUCTURE - - 0% - - - - 0% -
1 Foot Plate 120x120x30 RC - K350 - - 0% - - - - 0% -
- Concrete K350 2.160 m3 0.106 2.16 100% 0.106 - - 2.16 100% 0.11
- Reinforcement - - 0% - - - - 0% -
Rebar D16 199.426 kg 0.108 199.43 100% 0.108 - - 199.43 100% 0.11
Rebar D13 125.651 kg 0.067 125.65 100% 0.067 - - 125.65 100% 0.07
Bendrat Wire 4.876 kg 0.003 4.88 100% 0.003 - - 4.88 100% 0.00
- Formwork ( Using Batako, Spesi 1 PC : 3 Sand ) 7.200 m2 0.034 7.20 100% 0.034 - - 7.20 100% 0.03
2 Foot Plate 150x150x30 RC - K350 - - 0% - - - - 0% -
- Concrete K350 3.375 m3 0.166 3.38 100% 0.166 - - 3.38 100% 0.17
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
- Reinforcement - - 0% - - - - 0% -
Rebar D16 295.825 kg 0.161 295.83 100% 0.161 - - 295.83 100% 0.16
Rebar D13 187.956 kg 0.099 187.96 100% 0.099 - - 187.96 100% 0.10
Bendrat Wire 7.257 kg 0.004 7.26 100% 0.004 - - 7.26 100% 0.00
- Formwork ( Using Batako, Spesi 1 PC : 3 Sand ) 9.000 m2 0.042 9.00 100% 0.042 - - 9.00 100% 0.04
3 Foot Plate 170x170x30 - - 0% - - - - 0% -
- Concrete K350 2.601 m3 0.128 2.60 100% 0.128 - - 2.60 100% 0.13
- Reinforcement - - 0% - - - - 0% -
Rebar D16 222.039 kg 0.121 216.60 98% 0.118 - - 216.60 98% 0.12
Rebar D13 141.780 kg 0.075 134.78 95% 0.071 - - 134.78 95% 0.07
Bendrat Wire 5.457 kg 0.003 5.27 97% 0.003 - - 5.27 97% 0.00
- Formwork ( Using Batako, Spesi 1 PC : 3 Sand ) 6.120 m2 0.029 6.12 100% 0.029 - - 6.12 100% 0.03
4 Column Pedestal 30/40 RC - K350 (-2000) - - 0% - - - - 0% -
- Concrete K350 2.736 m3 0.137 2.74 100% 0.137 - - 2.74 100% 0.14
- Reinforcement - - 0% - - - - 0% -
Rebar D16 812.606 kg 0.441 812.61 100% 0.441 - - 812.61 100% 0.44
Rebar D10 263.255 kg 0.134 263.26 100% 0.134 - - 263.26 100% 0.13
Bendrat Wire 16.138 kg 0.009 16.14 100% 0.009 - - 16.14 100% 0.01
- Formwork Plywood 12mm, Rangka
31.920
Timberm2
4/6 0.229 31.92 100% 0.229 - - 31.92 100% 0.23
5 Tie Beam 27.5/40 RC - K350 m' - - 0% - - - - 0% -
- Concrete K350 2.625 m3 0.129 2.63 100% 0.129 - - 2.63 100% 0.13
Integral 6.563 ltr 0.008 6.56 100% 0.008 - - 6.56 100% 0.01
- Reinforcement - - 0% - - - - 0% -
Rebar D16 454.502 kg 0.247 416.02 92% 0.226 - - 416.02 92% 0.23
Rebar D10 198.685 kg 0.102 179.03 90% 0.091 - - 179.03 90% 0.09
Bendrat Wire 9.798 kg 0.005 9.80 100% 0.005 - - 9.80 100% 0.01
- Formwork Plywood 12mm, Rangka
15.504
Timberm2
4/6 0.082 15.50 100% 0.082 - - 15.50 100% 0.08
- Formwork ( Using Batako, Spesi 1 PC : 3 Sand ) 9.031 m2 0.042 9.03 100% 0.042 - - 9.03 100% 0.04
6 Tie Beam 25/40 RC - K350 m' - - 0% - - - - 0% -
- Concrete K350 3.113 m3 0.153 3.11 100% 0.153 - - 3.11 100% 0.15
Integral 7.781 ltr 0.009 7.78 100% 0.009 - - 7.78 100% 0.01
- Reinforcement - - 0% - - - - 0% -
Rebar D16 555.565 kg 0.302 533.05 96% 0.289 - - 533.05 96% 0.29
Rebar D10 248.082 kg 0.127 241.17 97% 0.123 - - 241.17 97% 0.12
Bendrat Wire 12.055 kg 0.007 12.05 100% 0.007 - - 12.05 100% 0.01
- Formwork ( Using Batako, Spesi 1 PC : 3 Sand ) 24.900 m2 0.037 24.90 100% 0.037 - - 24.90 100% 0.04
7 Tie Beam 15/30 RC - K350 (Man Hole Tie Beam) m' - - 0% - - - - 0% -
- Concrete K350 0.134 m3 0.007 0.13 100% 0.007 - - 0.13 100% 0.01
Integral 0.334 ltr 0.000 0.33 100% 0.000 - - 0.33 100% 0.00
- Reinforcement - - 0% - - - - 0% -
Rebar D13 34.761 kg 0.018 26.05 75% 0.014 - - 26.05 75% 0.01
Rebar D10 21.160 kg 0.011 20.22 96% 0.010 - - 20.22 96% 0.01
Bendrat Wire 0.839 kg 0.000 0.69 83% 0.000 - - 0.69 83% 0.00
- Formwork Plywood 12mm, Rangka
2.675
Timberm2
4/6 0.023 2.66 99% 0.023 - - 2.66 99% 0.02
8 RC Slab 150 mm m2 - - 0% - - - - 0% -
- Concrete K350 16.544 m3 0.812 12.33 75% 0.605 4.14 25% 0.203 16.46 100% 0.81
Integral 33.087 Ltr 0.038 24.65 75% 0.029 8.27 25% 0.010 32.92 100% 0.04
- Reinforcement - - 0% - - - - 0% -
Wiremesh M10 220.580 m2 1.085 220.58 100% 1.085 - - 220.58 100% 1.08
Rebar D10 881.225 kg 0.450 881.23 100% 0.450 - - 881.23 100% 0.45
Bendrat Wire 13.218 kg 0.007 13.22 100% 0.007 - - 13.22 100% 0.01
- Formwork Plywood 12mm, Rangka
8.978
Timberm2
4/6 0.070 8.98 100% 0.070 - - 8.98 100% 0.07
9 Column 30/40 RC - K350 13.000 unit - - 0% - - - - 0% -
- Concrete K350 5.502 m3 0.275 2.75 50% 0.137 2.75 50% 0.137 5.50 100% 0.27
- Reinforcement - - 0% - - - - 0% -
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
Rebar D16 1,403.804 kg 0.762 1,403.80 100% 0.762 - - 1,403.80 100% 0.76
Rebar D10 421.527 kg 0.215 421.53 100% 0.215 - - 421.53 100% 0.22
Bendrat Wire 27.380 kg 0.015 27.38 100% 0.015 - - 27.38 100% 0.01
- Formwork Backfilm 18mm, Rangka
64.190
Timberm2
4/6 0.514 64.19 100% 0.514 - - 64.19 100% 0.51
10 Column 20/275 RC K350 1.000 unit - - 0% - - - - 0% -
- Concrete K350 0.212 m3 0.011 0.21 100% 0.011 - - 0.21 100% 0.01
- Reinforcement - - 0% - - - - 0% -
Rebar D16 47.625 kg 0.026 47.62 100% 0.026 - - 47.62 100% 0.03
Rebar D10 24.859 kg 0.013 24.86 100% 0.013 - - 24.86 100% 0.01
Bendrat Wire 1.087 kg 0.001 1.09 100% 0.001 - - 1.09 100% 0.00
- Formwork Plywood 12mm, Rangka
3.661
Timberm2
4/6 0.029 3.66 100% 0.029 - - 3.66 100% 0.03
D REMOVE FORMWORK N STAGGER - - 0% - - - - 0% -
1 Formwork Column 27.000 unit 0.044 12.96 48% 0.021 14.04 52% 0.023 27.00 100% 0.04
2 Fromwork Tie Beam 18.180 m2 0.009 - 0% - - - - 0% -
3 Formwork Slab 8.978 m2 0.004 - 0% - - - - 0% -
- - 0% - - - - 0% -
- - 0% - - - - 0% -
II FIRST FLOOR - - 0% - - - - 0% -
A REINFORCED CONCRETE FIRST FLOOR STRUCTURE - - 0% - - - - 0% -
1 Column 30/40 RC - K350 - - 0% - - - - 0% -
- Concrete K350 5.335 m3 0.271 - 0% - 5.34 100% 0.271 5.34 100% 0.27
- Reinforcement - - 0% - - - - 0% -
Rebar D16 1,080.625 kg 0.587 - 0% - 1,080.63 100% 0.587 1,080.63 100% 0.59
Rebar D10 410.854 kg 0.210 - 0% - 410.85 100% 0.210 410.85 100% 0.21
Bendrat Wire 22.372 kg 0.012 - 0% - 22.37 100% 0.012 22.37 100% 0.01
- Formwork Backfilm 18mm, Rangka
62.244
Timberm2
4/6 0.498 - 0% - 62.24 100% 0.498 62.24 100% 0.50
2 Column 25/20 RC - K350 1.000 unit - - 0% - - - - 0% -
- Concrete K350 0.153 m3 0.008 - 0% - 0.15 100% 0.008 0.15 100% 0.01
- Reinforcement - - 0% - - - - 0% -
Rebar D16 40.011 kg 0.022 - 0% - 40.01 100% 0.022 40.01 100% 0.02
Rebar D10 19.483 kg 0.010 - 0% - 19.48 100% 0.010 19.48 100% 0.01
Bendrat Wire 0.892 kg 0.000 - 0% - 0.89 100% 0.000 0.89 100% 0.00
- Formwork Backfilm 18mm, Rangka
2.745
Timberm2
4/6 0.022 - 0% - 2.75 100% 0.022 2.75 100% 0.02
3 Column 12.5/30 RC - K350 5.000 unit - - 0% - - - - 0% -
- Concrete K350 0.572 m3 0.029 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar D13 86.482 kg 0.046 - 0% - - - - 0% -
Rebar Ø8 56.978 kg 0.029 - 0% - - - - 0% -
Bendrat Wire 2.152 kg 0.001 - 0% - - - - 0% -
- Formwork 12.963 m2 0.093 - 0% - - - - 0% -
4 Column 30/20 RC - K350 1.000 unit - - 0% - - - - 0% -
- Concrete K350 0.183 m3 0.009 - 0% - 0.18 100% 0.009 0.18 100% 0.01
- Reinforcement - - 0% - - 100% - - 0% -
Rebar D16 26.674 kg 0.014 - 0% - 26.67 100% 0.014 26.67 100% 0.01
Rebar D10 21.949 kg 0.011 - 0% - 21.95 100% 0.011 21.95 100% 0.01
Bendrat Wire 0.729 kg 0.000 - 0% - 0.73 100% 0.000 0.73 100% 0.00
- Formwork 3.050 m2 0.022 - 0% - 3.05 100% 0.022 3.05 100% 0.02
5 B 27.5/40 RC -k350 m' - - 0% - - - - 0% -
- Concrete K350 6.540 m3 0.326 - 0% - 6.54 100% 0.326 6.54 100% 0.33
- Reinforcement - - 0% - - - - 0% -
Rebar D16 1,110.391 kg 0.603 277.60 25% 0.151 832.79 75% 0.452 1,110.39 100% 0.60
Rebar D13 176.581 kg 0.093 44.15 25% 0.023 132.44 75% 0.070 176.58 100% 0.09
Rebar D10 460.313 kg 0.235 115.08 25% 0.059 345.23 75% 0.176 460.31 100% 0.24
Bendrat Wire 26.209 kg 0.014 6.55 25% 0.004 19.66 75% 0.011 26.21 100% 0.01
- Formwork 63.909 m2 0.896 15.98 25% 0.224 47.93 75% 0.672 63.91 100% 0.90
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
6 B 25/40 RC -k350 m' - - 0% - - - - 0% -
- Concrete K350 1.705 m3 0.085 - 0% - 1.28 75% 0.064 1.28 75% 0.06
- Reinforcement - - 0% - - - - 0% -
Rebar D16 313.473 kg 0.170 78.37 25% 0.043 235.11 75% 0.128 313.47 100% 0.17
Rebar D13 66.128 kg 0.035 16.53 25% 0.009 49.60 75% 0.026 66.13 100% 0.04
Rebar D10 126.587 kg 0.065 31.65 25% 0.016 94.94 75% 0.049 126.59 100% 0.06
Bendrat Wire 7.593 kg 0.004 1.90 25% 0.001 5.69 75% 0.003 7.59 100% 0.00
- Formwork 17.903 m2 0.251 4.48 25% 0.063 13.43 75% 0.188 17.90 100% 0.25
7 B 20/30 RC K350 m' - - 0% - - - - 0% -
- Concrete K350 2.008 m3 0.100 - 0% - 1.51 75% 0.075 1.51 75% 0.08
- Reinforcement - - 0% - - - - 0% -
Rebar D13 467.343 kg 0.247 - 0% - 467.34 100% 0.247 467.34 100% 0.25
Rebar D10 185.011 kg 0.095 - 0% - 185.01 100% 0.095 185.01 100% 0.09
Bendrat Wire 9.785 kg 0.005 - 0% - 9.79 100% 0.005 9.79 100% 0.01
- Formwork 26.774 m2 0.375 6.69 25% 0.094 20.08 75% 0.282 26.77 100% 0.38
8 B 25/30 RC K350 m' - - 0% - - - - 0% -
- Concrete K350 0.090 m3 0.004 - 0% - 0.09 100% 0.004 0.09 100% 0.00
- Reinforcement - - 0% - - - - 0% -
Rebar D16 26.383 kg 0.014 - 0% - 26.38 100% 0.014 26.38 100% 0.01
Rebar D13 4.154 kg 0.002 - 0% - 4.15 100% 0.002 4.15 100% 0.00
Rebar D10 7.250 kg 0.004 - 0% - 7.25 100% 0.004 7.25 100% 0.00
Bendrat Wire 0.567 kg 0.000 - 0% - 0.57 100% 0.000 0.57 100% 0.00
- Formwork 1.016 m2 0.014 0.25 25% 0.004 0.76 75% 0.011 1.02 100% 0.01
9 B1 40/15 RC K350 m' - - 0% - - - - 0% -
- Concrete K350 1.814 m3 0.091 - 0% - 1.81 100% 0.091 1.81 100% 0.09
- Reinforcement - - 0% - - - - 0% -
Rebar D13 370.121 kg 0.196 - 0% - 370.12 100% 0.196 370.12 100% 0.20
Rebar D10 186.096 kg 0.095 - 0% - 186.10 100% 0.095 186.10 100% 0.10
Bendrat Wire 8.343 kg 0.005 - 0% - 8.34 100% 0.005 8.34 100% 0.00
- Formwork 28.719 m2 0.403 - 0% - 28.72 100% 0.403 28.72 100% 0.40
10 B2 15/30 RC K350 m' - - 0% - - - - 0% -
- Concrete K350 0.209 m3 0.010 - 0% - 0.21 100% 0.010 0.21 100% 0.01
- Reinforcement - - 0% - - - - 0% -
Rebar D13 44.937 kg 0.024 - 0% - 44.94 100% 0.024 44.94 100% 0.02
Rebar D10 22.602 kg 0.012 - 0% - 22.60 100% 0.012 22.60 100% 0.01
Bendrat Wire 1.013 kg 0.001 - 0% - 1.01 100% 0.001 1.01 100% 0.00
- Formwork 3.476 m2 0.049 - 0% - 3.48 100% 0.049 3.48 100% 0.05
11 B 40/40 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.592 m3 0.030 - 0% - 0.59 100% 0.030 0.59 100% 0.03
- Reinforcement - - 0% - - % - - 0% -
Rebar D16 164.257 kg 0.089 - 0% - 164.26 100% 0.089 164.26 100% 0.09
Rebar D10 40.149 kg 0.021 - 0% - 40.15 100% 0.021 40.15 100% 0.02
Bendrat Wire 3.066 kg 0.002 - 0% - 3.07 100% 0.002 3.07 100% 0.00
- Formwork 4.440 m2 0.062 - 0% - 4.44 100% 0.062 4.44 100% 0.06
12 BP 20/15 RC K350 m' - - 0% - - - - 0% -
- Concrete K350 + Macro Fibre - - 0% - - - - 0% -
Ready Mix K350 0.868 m3 0.044 - 0% - 0.87 100% 0.044 0.87 100% 0.04
Glenium 2.169 L 0.004 - 0% - 2.17 100% 0.004 2.17 100% 0.00
Macro Fibre 2.386 kg 0.017 - 0% - 2.39 100% 0.017 2.39 100% 0.02
- Reinforcement - - 0% - - - - 0% -
Rebar Ø10 87.257 kg 0.044 - 0% - 87.26 100% 0.044 87.26 100% 0.04
Rebar Ø8 35.874 kg 0.018 - 0% - 35.87 100% 0.018 35.87 100% 0.02
Bendrat Wire 1.847 kg 0.001 - 0% - 1.85 100% 0.001 1.85 100% 0.00
- Formwork 4.339 m2 0.061 - 0% - 4.34 100% 0.061 4.34 100% 0.06
13 BP 10/15 RC K350 m' - - 0% - - - - 0% -
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
- Concrete K350 + Macro Fibre - - 0% - - - - 0% -
Ready Mix K350 0.516 m3 0.026 - 0% - 0.52 100% 0.026 0.52 100% 0.03
Glenium 1.291 L 0.002 - 0% - 1.29 100% 0.002 1.29 100% 0.00
Macro Fibre 1.420 kg 0.010 - 0% - 1.42 100% 0.010 1.42 100% 0.01
- Reinforcement - - 0% - - - - 0% -
Rebar Ø8 94.738 kg 0.047 - 0% - 94.74 100% 0.047 94.74 100% 0.05
Bendrat Wire 1.421 kg 0.001 - 0% - 1.42 100% 0.001 1.42 100% 0.00
- Formwork 5.162 m2 0.072 - 0% - 5.16 100% 0.072 5.16 100% 0.07
14 BP 125/15 RC K350 m' - - 0% - - - - 0% -
- Concrete K350 + Macro Fibre - - 0% - - - - 0% -
Ready Mix K350 0.161 m3 0.008 - 0% - 0.16 100% 0.008 0.16 100% 0.01
Glenium 0.403 L 0.001 - 0% - 0.40 100% 0.001 0.40 100% 0.00
Macro Fibre 0.443 kg 0.003 - 0% - 0.44 100% 0.003 0.44 100% 0.00
- Reinforcement - - 0% - - - - 0% -
Rebar Ø10 10.813 kg 0.005 - 0% - 10.81 100% 0.005 10.81 100% 0.01
Rebar Ø8 15.481 kg 0.008 - 0% - 15.48 100% 0.008 15.48 100% 0.01
Bendrat Wire 0.394 kg 0.000 - 0% - 0.39 100% 0.000 0.39 100% 0.00
- Formwork 1.290 m2 0.018 - 0% - 1.29 100% 0.018 1.29 100% 0.02
15 BP 15/15 RC K350 m' - - 0% - - - - 0% -
- Concrete K350 + Macro Fibre - - 0% - - - - 0% -
Ready Mix K350 0.115 m3 0.006 - 0% - 0.11 100% 0.006 0.11 100% 0.01
Glenium 0.286 L 0.000 - 0% - 0.29 100% 0.000 0.29 100% 0.00
Macro Fibre 0.315 kg 0.002 - 0% - 0.31 100% 0.002 0.31 100% 0.00
- Reinforcement - - 0% - - - - 0% -
Rebar Ø10 6.486 kg 0.003 - 0% - 6.49 100% 0.003 6.49 100% 0.00
Rebar Ø8 9.529 kg 0.005 - 0% - 9.53 100% 0.005 9.53 100% 0.00
Bendrat Wire 0.240 kg 0.000 - 0% - 0.24 100% 0.000 0.24 100% 0.00
- Formwork 0.382 m2 0.005 - 0% - 0.38 100% 0.005 0.38 100% 0.01
16 BP 30/15 RC K350 m' - - 0% - - - - 0% -
- Concrete K350 + Macro Fibre - - 0% - - - - 0% -
Ready Mix K350 0.117 m3 0.006 - 0% - 0.12 100% 0.006 0.12 100% 0.01
Glenium 0.293 L 0.001 - 0% - 0.29 100% 0.001 0.29 100% 0.00
Macro Fibre 0.322 kg 0.002 - 0% - 0.32 100% 0.002 0.32 100% 0.00
- Reinforcement - - 0% - - - - 0% -
Rebar Ø10 3.625 kg 0.002 - 0% - 3.63 100% 0.002 3.63 100% 0.00
Rebar Ø8 8.949 kg 0.004 - 0% - 8.95 100% 0.004 8.95 100% 0.00
Bendrat Wire 0.189 kg 0.000 - 0% - 0.19 100% 0.000 0.19 100% 0.00
- Formwork 0.195 m2 0.003 - 0% - 0.20 100% 0.003 0.20 100% 0.00
17 Planter 120 mm m' - - 0% - - - - 0% -
- Concrete K350 + Macro Fibre - - 0% - - - - 0% -
Ready Mix K350 0.260 m3 0.013 - 0% - 0.26 100% 0.013 0.26 100% 0.01
- Reinforcement - - 0% - - - - 0% -
Rebar Ø8 40.987 kg 0.020 - 0% - 40.99 100% 0.020 40.99 100% 0.02
Bendrat Wire 0.615 kg 0.000 - 0% - 0.61 100% 0.000 0.61 100% 0.00
- Formwork 3.219 m2 0.046 - 0% - 3.22 100% 0.046 3.22 100% 0.05
18 Slab 150 K350+ Macro Fibre - - 0% - - - - 0% -
- Concrete K350 + Macro Fibre - - 0% - - - - 0% -
Ready Mix K350 15.086 m3 0.765 - 0% - 15.09 100% 0.765 15.09 100% 0.77
Glenium 37.716 L 0.065 - 0% - 37.72 100% 0.065 37.72 100% 0.06
Macro Fibre 41.488 kg 0.292 - 0% - 41.49 100% 0.292 41.49 100% 0.29
- - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Wiremesh M6 119.000 m2 0.224 - 0% - 119.00 100% 0.224 119.00 100% 0.22
Rebar Ø8 571.014 kg 0.285 - 0% - 571.01 100% 0.285 571.01 100% 0.29
Bendrat Wire 8.565 kg 0.005 - 0% - 8.57 100% 0.005 8.57 100% 0.00
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
- Formwork (Steel Deck) Metal Deck 0.75mm119.000 m2 0.889 - 0% - 119.00 100% 0.889 119.00 100% 0.89
- Scafolding 119.000 m2 0.492 59.50 50% 0.246 59.50 50% 0.246 119.00 100% 0.49
- Stud Bondek 179.000 point 0.096 - 0% - 179.00 100% 0.096 179.00 100% 0.10
- - 0% - - - - 0% -
B REINFORCED CONCRETE STAIRS - - 0% - - - - 0% -
1 Stair 1 (GF to 1st floor) - - 0% - - - - 0% -
- Concrete K350 - - 0% - - - - 0% -
Main Part 1.473 m3 0.072 - 0% - 1.47 100% 0.072 1.47 100% 0.07
Additional Part 0.401 m3 0.020 - 0% - 0.40 100% 0.020 0.40 100% 0.02
- Reinforcement - - 0% - - - - 0% -
Main Part - - 0% - - - - 0% -
Rebar D13 135.445 kg 0.072 - 0% - 135.45 100% 0.072 135.45 100% 0.07
Rebar D10 72.131 kg 0.037 - 0% - 72.13 100% 0.037 72.13 100% 0.04
Rebar Ø8 47.229 kg 0.024 - 0% - 47.23 100% 0.024 47.23 100% 0.02
Rebar Ø6 38.905 kg 0.020 - 0% - 38.90 100% 0.020 38.90 100% 0.02
Bendrat Wire 4.406 kg 0.002 - 0% - 4.41 100% 0.002 4.41 100% 0.00
Additional Part - - 0% - - - - 0% -
Rebar Ø6 21.928 kg 0.011 - 0% - 21.93 100% 0.011 21.93 100% 0.01
Bendrat Wire 0.329 kg 0.000 - 0% - 0.33 100% 0.000 0.33 100% 0.00
- Formwork - - 0% - - - - 0% -
Main Part 14.055 m2 0.177 - 0% - 14.06 100% 0.177 14.06 100% 0.18
Additional Part 1.853 m2 0.023 - 0% - 1.85 100% 0.023 1.85 100% 0.02
2 Stair 2 (Elv 3650 to Elv 4300) - - 0% - - - - 0% -
- Concrete K350 - - 0% - - - - 0% -
Main Part 0.339 m3 0.017 - 0% - 0.34 100% 0.017 0.34 100% 0.02
Additional Part 0.059 m3 0.003 - 0% - 0.06 100% 0.003 0.06 100% 0.00
- Reinforcement - - 0% - - - - 0% -
Main Part - - 0% - - - - 0% -
Rebar D10 28.112 kg 0.014 - 0% - 28.11 100% 0.014 28.11 100% 0.01
Rebar Ø8 14.476 kg 0.007 - 0% - 14.48 100% 0.007 14.48 100% 0.01
Rebar Ø6 1.870 kg 0.001 - 0% - 1.87 100% 0.001 1.87 100% 0.00
Bendrat Wire 0.667 kg 0.000 - 0% - 0.67 100% 0.000 0.67 100% 0.00
Additional Part - - 0% - - - - 0% -
- - 0% - - - - 0% -
- - 0% - - - - 0% -
- Formwork - - 0% - - - - 0% -
Main Part 3.959 m2 0.050 - 0% - 3.96 100% 0.050 3.96 100% 0.05
Additional Part 0.278 m2 0.004 - 0% - 0.28 100% 0.004 0.28 100% 0.00
- - 0% - - - - 0% -
C REMOVE FORMWORK N STAGGER - - 0% - - - - 0% -
1 Formwork Coloumn 20.000 Point 0.033 - 0% - 20.00 100% 0.033 20.00 100% 0.03
2 Formwork Beam 279.822 m2 0.138 - 0% - 279.82 100% 0.138 279.82 100% 0.14
3 Formwork Stair 20.144 m2 0.010 - 0% - 20.14 100% 0.010 20.14 100% 0.01
- - 0% - - - - 0% -
- - 0% - - - - 0% -
III ROOF FLOOR - - 0% - - - - 0% -
A REINFORCED CONCRETE ROOF FLOOR STRUCTURE - - 0% - - - - 0% -
1 B 40/20 RC K350 - - 0% - - - - 0% -
- Concrete K350 1.220 m3 0.061 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar D13 205.331 kg 0.109 - 0% - - - - 0% -
Rebar Ø8 64.655 kg 0.032 - 0% - - - - 0% -
Bendrat Wire 4.050 kg 0.002 - 0% - - - - 0% -
- Formwork 6.100 m2 0.052 - 0% - - - - 0% -
2 B 30/20 RC K350 - - 0% - - - - 0% -
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
- Concrete K350 1.299 m3 0.065 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar D13 268.161 kg 0.142 - 0% - - - - 0% -
Rebar Ø8 75.684 kg 0.038 - 0% - - - - 0% -
Bendrat Wire 5.158 kg 0.003 - 0% - - - - 0% -
- Formwork 10.385 m2 0.088 - 0% - - - - 0% -
3 B 25/20 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.283 m3 0.014 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar D13 40.580 kg 0.021 - 0% - - - - 0% -
Rebar Ø8 17.485 kg 0.009 - 0% - - - - 0% -
Bendrat Wire 0.871 kg 0.000 - 0% - - - - 0% -
- Formwork 2.260 m2 0.019 - 0% - - - - 0% -
4 B1 25/20 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.830 m3 0.041 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar D13 212.443 kg 0.112 - 0% - - - - 0% -
Rebar Ø8 50.646 kg 0.025 - 0% - - - - 0% -
Bendrat Wire 3.946 kg 0.002 - 0% - - - - 0% -
- Formwork 8.115 m2 0.069 - 0% - - - - 0% -
5 B 25/25 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.125 m3 0.006 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar D13 31.373 kg 0.017 - 0% - - - - 0% -
Rebar Ø8 6.818 kg 0.003 - 0% - - - - 0% -
Bendrat Wire 0.573 kg 0.000 - 0% - - - - 0% -
- Formwork 1.500 m2 0.013 - 0% - - - - 0% -
6 B 12.5/20 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.055 m3 0.003 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar Ø10 9.100 kg 0.005 - 0% - - - - 0% -
Rebar Ø8 4.868 kg 0.003 - 0% - - - - 0% -
Bendrat Wire 0.210 kg 0.000 - 0% - - - - 0% -
- Formwork 0.880 m2 0.007 - 0% - - - - 0% -
7 B 12.5/30 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.303 m3 0.015 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar Ø10 21.227 kg 0.002 - 0% - - - - 0% -
Rebar Ø6 12.704 kg 0.101 - 0% - - - - 0% -
Bendrat Wire 0.509 kg 0.000 - 0% - - - - 0% -
- Formwork 4.845 m2 0.041 - 0% - - - - 0% -
8 B 10/60 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.519 m3 0.026 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar Ø10 59.779 kg 0.030 - 0% - - - - 0% -
Rebar Ø8 45.885 kg 0.023 - 0% - - - - 0% -
Bendrat Wire 1.585 kg 0.001 - 0% - - - - 0% -
- Formwork 10.380 m2 0.088 - 0% - - - - 0% -
9 B 10/20 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.425 m3 0.021 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar Ø10 63.849 kg 0.006 - 0% - - - - 0% -
Rebar Ø8 39.181 kg 0.020 - 0% - - - - 0% -
Bendrat Wire 1.545 kg 0.001 - 0% - - - - 0% -
- Formwork 8.840 m2 0.075 - 0% - - - - 0% -
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
10 BP 10/45 RC K350 - - 0% - - - - 0% -
- Concrete K350 1.964 m3 0.098 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar Ø8 372.970 kg 0.186 - 0% - - - - 0% -
Bendrat Wire 5.595 kg 0.003 - 0% - - - - 0% -
- Formwork 39.285 m2 0.333 - 0% - - - - 0% -
11 BP 10/35 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.205 m3 0.010 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar Ø8 47.491 kg 0.024 - 0% - - - - 0% -
Bendrat Wire 0.712 kg 0.000 - 0% - - - - 0% -
- Formwork 4.091 m2 0.035 - 0% - - - - 0% -
12 BP 10/20 RC K350 - - 0% - - - - 0% -
- Concrete K350 0.548 m3 0.027 - 0% - - - - 0% -
- Reinforcement - - 0% - - - - 0% -
Rebar Ø8 105.966 kg 0.053 - 0% - - - - 0% -
Bendrat Wire 1.589 kg 0.001 - 0% - - - - 0% -
- Formwork 0.548 m2 0.005 - 0% - - - - 0% -
- - 0% - - - - 0% -
- - 0% - - - - 0% -
B STEEL ROOF FLOOR STRUCTURE - - 0% - - - - 0% -
1 Instal Base Plate - - 0% - - - - 0% -
- Base Plate 8 mm 279.260 kg 0.357 - 0% - - - - 0% -
- Anchor M16 216.000 point - - 0% - - - - 0% -
- Primer Cat 6.164 m2 - - 0% - - - - 0% -
3 Instal Hollow HSS 50x50x2.3 170.000 kg 0.217 - 0% - - - - 0% -
4 Instal Hollow HSS 50x100x2.8 766.100 kg 0.979 - 0% - - - - 0% -
5 Instal Hollow HSS 100x100x3.2 871.100 kg 1.113 - 0% - - - - 0% -
6 Primer Cat Hollow 88.400 m2 0.129 - 0% - - - - 0% -
- - 0% - - - - 0% -
C STEEL ROOF FLOOR STRUCTURE - - 0% - - - - 0% -
- - 0% - - - - 0% -
1 Pir Panel 110.000 m2 4.512 - 0% - - - - 0% -
2 Insulation Sealant 1.000 ls 0.494 - 0% - - - - 0% -
- - 0% - - - - 0% -
- - 0% - - - - 0% -
D Remove Formwork - - 0% - - - - 0% -
1 Formwork Beam 97.229 m2 0.048 - 0% - - - - 0% -
- - 0% - - - - 0% -
- - 0% - - - - 0% -
A PREPARATION - - 0% - - - - 0% -
1 Bowplank 26.000 m1 0.076 26.00 100% 0.076 - - 26.00 100% 0.08
2 Wall Protecttion (Bedeg) 5.000 point 0.032 5.00 100% 0.032 - - 5.00 100% 0.03
3 Terpal Sheet 0.108 - 0% - - - - 0% -
B SOIL - - 0% - - - - 0% -
1 Digging Soil 33.600 m3 0.199 33.60 100% 0.199 - - 33.60 100% 0.20
2 Plastic Sheet Under Lean Concrete - - 0% - - - - 0% -
Plastic Sheet Under Tie Beam 15.360 m2 0.012 15.36 100% 0.012 - - 15.36 100% 0.01
Plastick Sheet Under Slab 30.020 m2 0.023 30.02 100% 0.023 - - 30.02 100% 0.02
3 Sand Fill - - 0% - - - - 0% -
Sand Fill Under Tie Beam 0.384 m3 0.004 0.38 100% 0.004 - - 0.38 100% 0.00
Sand Fill Under Slab 0.751 m3 0.008 0.75 100% 0.008 - - 0.75 100% 0.01
Sand Fill Under River Stone 1.506 m3 0.016 1.51 100% 0.016 - - 1.51 100% 0.02
4 Lean Concrete - - 0% - - - - 0% -
Lean Concrete Under Tie Beam 15.360 m2 0.019 15.36 100% 0.019 - - 15.36 100% 0.02
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
Lean Concrete Under Slab 30.020 m2 0.038 30.02 100% 0.038 - - 30.02 100% 0.04
5 Backfill With Limestone 12.705 m3 0.069 12.71 100% 0.069 - - 12.71 100% 0.07
6 Compaction - - 0% - - - - 0% -
Compaction Under Tie Beam 15.360 m2 0.010 15.36 100% 0.010 - - 15.36 100% 0.01
Compaction Under Slab 30.020 m2 0.020 30.02 100% 0.020 - - 30.02 100% 0.02
0.417 - 0% - - - - 0% -
C FOUNDATION - - 0% - - - - 0% -
1 River Stone Crush Foundation 1 PC : 4 Sand Type 2 7.944 m3 0.219 7.94 100% 0.219 - - 7.94 100% 0.22
2 Light Brick Fill - - 0% - - - - 0% -
Bench 13.086 m3 0.492 13.09 100% 0.492 - - 13.09 100% 0.49
Stairs 2.669 m3 0.100 2.67 100% 0.100 - - 2.67 100% 0.10
0.812 - 0% - - - - 0% -
D PUMP ROOM BALANCING TANK STRUCTURE - - 0% - - - - 0% -
1 Tie Beam 30/30 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 0.222 m3 0.011 0.22 100% 0.011 - - 0.22 100% 0.01
Integral 0.555 Ltr 0.001 0.56 100% 0.001 - - 0.56 100% 0.00
Reinforcemen Bar - - 0% - - - - 0% -
Rebar D16 66.075 kg 0.036 66.08 100% 0.036 - - 66.08 100% 0.04
Rebar Ø8 33.959 kg 0.017 33.96 100% 0.017 - - 33.96 100% 0.02
Bendrat Wire 1.501 kg 0.001 1.50 100% 0.001 - - 1.50 100% 0.00
Formwork - - 0% - - - - 0% -
Batako Formwork 2.960 m2 0.014 2.96 100% 0.014 - - 2.96 100% 0.01
2 Tie Beam 30/65 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 0.392 m3 0.019 0.39 100% 0.019 - - 0.39 100% 0.02
Integral 0.979 Ltr 0.001 0.98 100% 0.001 - - 0.98 100% 0.00
Reinforcemen Bar - - 0% - - - - 0% -
Rebar D16 49.522 kg 0.027 49.52 100% 0.027 - - 49.52 100% 0.03
Rebar Ø8 21.949 kg 0.011 21.95 100% 0.011 - - 21.95 100% 0.01
Bendrat Wire 1.072 kg 0.001 1.07 100% 0.001 - - 1.07 100% 0.00
Formwork - - 0% - - - - 0% -
Batako Formwork 1.305 m2 0.006 1.31 100% 0.006 - - 1.31 100% 0.01
Plywood Formwork 1.305 m2 0.009 1.31 100% 0.009 - - 1.31 100% 0.01
3 Wall 150 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 4.085 m3 0.204 4.08 100% 0.204 - - 4.08 100% 0.20
Achor - - 0% - - - - 0% -
Integral 10.211 Ltr 0.012 10.21 100% 0.012 - - 10.21 100% 0.01
Reinforcemen Bar - - 0% - - - - 0% -
Wiremesh M10 65.490 m2 0.322 65.49 100% 0.322 - - 65.49 100% 0.32
Rebar D10 240.090 kg 0.123 240.09 100% 0.123 - - 240.09 100% 0.12
Formwork - - 0% - - - - 0% -
Batako Formwork 17.355 m2 0.081 17.36 100% 0.081 - - 17.36 100% 0.08
Plywood Formwork 34.610 m2 0.248 34.61 100% 0.248 - - 34.61 100% 0.25
4 Wall 120 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 0.304 m3 0.015 0.30 100% 0.015 - - 0.30 100% 0.02
Integral 0.761 Ltr 0.001 0.76 100% 0.001 - - 0.76 100% 0.00
Reinforcemen Bar - - 0% - - - - 0% -
Wiremesh M10 5.590 m2 0.027 5.59 100% 0.027 - - 5.59 100% 0.03
Rebar D10 33.106 kg 0.017 33.11 100% 0.017 - - 33.11 100% 0.02
Bendrat Wire 0.497 kg 0.000 0.50 100% 0.000 - - 0.50 100% 0.00
Formwork - - 0% - - - - 0% -
Plywood Formwork 4.134 m2 0.030 4.13 100% 0.030 - - 4.13 100% 0.03
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
5 Slab 200 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 1.920 m3 0.094 1.92 100% 0.094 - - 1.92 100% 0.09
Integral 4.800 Ltr 0.006 4.80 100% 0.006 - - 4.80 100% 0.01
Reinforcemen Bar - - 0% - - - - 0% -
Wiremesh M10 17.280 m2 0.085 17.28 100% 0.085 - - 17.28 100% 0.08
Rebar D10 58.913 kg 0.030 58.91 100% 0.030 - - 58.91 100% 0.03
Bendrat Wire 0.884 kg 0.000 0.88 100% 0.000 - - 0.88 100% 0.00
6 Sumpit - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 0.178 m3 0.009 0.18 100% 0.009 - - 0.18 100% 0.01
Integral 0.444 Ltr 0.001 0.44 100% 0.001 - - 0.44 100% 0.00
Reinforcemen Bar - - 0% - - - - 0% -
Rebar D10 36.127 kg 0.018 36.13 100% 0.018 - - 36.13 100% 0.02
Bendrat Wire 0.542 kg 0.000 0.54 100% 0.000 - - 0.54 100% 0.00
Formwork - - 0% - - - - 0% -
Batako Formwork 0.300 m2 0.001 0.30 100% 0.001 - - 0.30 100% 0.00
Plywood Formwork 0.360 m2 0.003 0.36 100% 0.003 - - 0.36 100% 0.00
7 Remove Formwork - - 0% - - - - 0% -
Wall 38.744 m2 0.019 38.74 100% 0.019 - - 38.74 100% 0.02
- - 0% - - - - 0% -
E SWIMMING POOL STRUCTURE - - 0% - - - - 0% -
1 Tie Beam 30/30 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 0.789 m3 0.039 0.79 100% 0.039 - - 0.79 100% 0.04
Integral 1.973 Ltr 0.002 1.97 100% 0.002 - - 1.97 100% 0.00
Reinforcemen Bar - - 0% - - - - 0% -
Rebar D16 198.302 kg 0.108 198.30 100% 0.108 - - 198.30 100% 0.11
Rebar Ø8 118.523 kg 0.059 118.52 100% 0.059 - - 118.52 100% 0.06
Bendrat Wire 4.752 kg 0.003 4.75 100% 0.003 - - 4.75 100% 0.00
Formwork - - 0% - - - - 0% -
Batako Formwork 9.360 m2 0.044 9.36 100% 0.044 - - 9.36 100% 0.04
2 Wall 150 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 5.282 m3 0.264 5.28 100% 0.264 - - 5.28 100% 0.26
Integral 13.204 Ltr 0.015 13.20 100% 0.015 - - 13.20 100% 0.02
Reinforcemen Bar - - 0% - - - - 0% -
Wiremesh M10 83.800 m2 0.412 83.80 100% 0.412 - - 83.80 100% 0.41
Rebar D10 223.716 kg 0.114 223.72 100% 0.114 - - 223.72 100% 0.11
Formwork - - 0% - - - - 0% -
Batako Formwork 31.732 m2 0.149 31.73 100% 0.149 - - 31.73 100% 0.15
Plywood Formwork 33.785 m2 0.243 33.79 100% 0.243 - - 33.79 100% 0.24
3 Wall 100 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 1.363 m3 0.068 1.36 100% 0.068 - - 1.36 100% 0.07
Integral 3.408 Ltr 0.004 3.41 100% 0.004 - - 3.41 100% 0.00
Reinforcemen Bar - - 0% - - - - 0% -
Wiremesh M6 31.020 m2 0.059 31.02 100% 0.059 - - 31.02 100% 0.06
Rebar Ø8 42.565 kg 0.021 42.57 100% 0.021 - - 42.57 100% 0.02
Bendrat Wire 0.638 kg 0.000 0.64 100% 0.000 - - 0.64 100% 0.00
Formwork - - 0% - - - - 0% -
Plywood Formwork 26.680 m2 0.192 26.68 100% 0.192 - - 26.68 100% 0.19
4 Gutter - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 0.586 m3 0.029 0.59 100% 0.029 - - 0.59 100% 0.03
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
Integral 1.466 Ltr 0.002 1.47 100% 0.002 - - 1.47 100% 0.00
Reinforcemen Bar - - 0% - - - - 0% -
Rebar Ø8 127.007 kg 0.063 127.01 100% 0.063 - - 127.01 100% 0.06
Bendrat Wire 1.905 kg 0.001 1.91 100% 0.001 - - 1.91 100% 0.00
Formwork - - 0% - - - - 0% -
Plywood Formwork 9.765 m2 0.070 9.76 100% 0.070 - - 9.76 100% 0.07
5 Slab 200 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 6.580 m3 0.323 6.58 100% 0.323 - - 6.58 100% 0.32
Integral 16.450 Ltr 0.019 16.45 100% 0.019 - - 16.45 100% 0.02
Reinforcemen Bar - - 0% - - - - 0% -
Wiremesh M10 65.800 m2 0.324 65.80 100% 0.324 - - 65.80 100% 0.32
Rebar D10 125.581 kg 0.064 125.58 100% 0.064 - - 125.58 100% 0.06
Bendrat Wire 1.884 kg 0.001 1.88 100% 0.001 - - 1.88 100% 0.00
6 Slab 80 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 0.764 m3 0.038 0.76 100% 0.038 - - 0.76 100% 0.04
Integral 1.911 Ltr 0.002 1.91 100% 0.002 - - 1.91 100% 0.00
Reinforcemen Bar - - 0% - - - - 0% -
Wiremesh M6 31.020 m2 0.059 31.02 100% 0.059 - - 31.02 100% 0.06
Rebar Ø6 70.438 kg 0.037 70.44 100% 0.037 - - 70.44 100% 0.04
Bendrat Wire 1.057 kg 0.001 1.06 100% 0.001 - - 1.06 100% 0.00
7 Stair 80 - - 0% - - - - 0% -
Concrete - - 0% - - - - 0% -
Ready Mix K350 0.612 m3 0.030 0.61 100% 0.030 - - 0.61 100% 0.03
Integral 1.530 Ltr 0.002 1.53 100% 0.002 - - 1.53 100% 0.00
Reinforcemen Bar - - 0% - - - - 0% -
Rebar Ø6 60.272 kg 0.006 60.27 100% 0.006 - - 60.27 100% 0.01
Bendrat Wire 0.904 kg 0.000 0.90 100% 0.000 - - 0.90 100% 0.00
Formwork - - 0% - - - - 0% -
Plywood Formwork 4.715 m2 0.034 4.72 100% 0.034 - - 4.72 100% 0.03
8 Remove Formwork - - 0% - - - - 0% -
Remove Wall Formwork 70.230 m2 0.035 70.23 100% 0.035 - - 70.23 100% 0.03
Remove Gutter Formwork 9.765 m2 0.005 9.76 100% 0.005 - - 9.76 100% 0.00
2.938 - 0% - - - - 0% -
F WATERPROOFING - - 0% - - - - 0% -
POOL - - 0% - - - - 0% -
1 Wall 79.995 m2 0.105 79.99 100% 0.105 - - 79.99 100% 0.11
2 Slab 28.947 m2 0.038 28.95 100% 0.038 - - 28.95 100% 0.04
PUMP ROOM AND BALANCING TANK - - 0% - - - - 0% -
1 Wall 38.744 m2 0.051 38.74 100% 0.051 - - 38.74 100% 0.05
2 Slab 7.395 m2 0.010 7.40 100% 0.010 - - 7.40 100% 0.01
- - 0% - - - - 0% -
FINISHING - - 0% - - - - 0% -
I GROUND FLOOR - - 0% - - - - 0% -
A LIGHT BRICK WALL - - 0% - - - - 0% -
0 0 - - 0% - - - - 0% -
2 Light Brick 10 mm 277.000 m2 1.472 - 0% - 207.75 75% 1.104 207.75 75% 1.10
B WALL FINISHING - 0 - - 0% - - - - 0% -
0 Render - 0 - - 0% - - - - 0% -
1 Plester Render 178.000 m2 0.787 - 0% - - - - 0% -
2 Smooth Render 178.000 m2 0.278 - 0% - - - - 0% -
3 Edge Render 145.000 m1 0.168 - 0% - - - - 0% -
4 Skoningan Render 24.250 m1 0.062 - 0% - - - - 0% -
0 Exterior Wall Finishing - 0 - - 0% - - - - 0% -
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
1 Painted Finish Wall (W0) 8.000 m2 0.035 - 0% - - - - 0% -
2 Stone Façade 20mm (W1) 119.000 m2 1.422 - 0% - - - - 0% -
4 Wood Grile Panel (W2) 15.000 m2 0.297 - 0% - - - - 0% -
5 Painted Finish Wall (W4) 58.000 m2 0.251 - 0% - - - - 0% -
0 Interior Wall Finishing - 0 - - 0% - - - - 0% -
1 Painted Finish Wall (W5) 112.000 m2 0.485 - 0% - - - - 0% -
3 Shadow Line Stainles 84.500 m1 0.249 - 0% - - - - 0% -
C FLOOR FINISHING - 0 - - 0% - - - - 0% -
1 Screed - 0 - - 0% - - - - 0% -
2 Granit Tile 60x60 Garage Area 64.000 m2 1.245 - 0% - - - - 0% -
3 Granit Tile 60x60 Interior Area 42.000 m2 0.827 - 0% - - - - 0% -
D CEILLING FINISHING - 0 - - 0% - - - - 0% -
1 Ceiling Gypsum 9mm + Framework 54.000 m2 0.582 - 0% - - - - 0% -
2 Ceilling Knauf Aquapanel 8mm + Framework 47.000 m2 0.641 - 0% - - - - 0% -
3 Ceilling Moisture Shield 9mm + Framework 4.000 m2 0.050 - 0% - - - - 0% -
4 Cove Ceilling 10.000 m2 0.108 - 0% - - - - 0% -
5 Painted Ceilling + Compound 64.000 m2 0.176 - 0% - - - - 0% -
6 Painted Ceilling + Compound (Weathershield) 51.000 m2 0.140 - 0% - - - - 0% -
7 Ceilling Shadow Line 134.000 m1 0.407 - 0% - - - - 0% -
E DOORS AND WINDOWS - 0 - - 0% - - - - 0% -
1 D1 Single Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 250x50mm 7.000 m1 0.010 - 0% - - - - 0% -
Door Wood griile panel 92x296cm 2.686 m2 0.385 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 4.000 pcs 0.038 - 0% - - - - 0% -
Smart Handle ex Dekson ELC 9318 MF PASS BT 1.000 set 0.133 - 0% - - - - 0% -
Door Stoper ex. Dks DS 008 SSS 1.000 pcs 0.002 - 0% - - - - 0% -
- 0 - - 0% - - - - 0% -
2 D2 Single Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 100x50mm 6.700 m1 0.010 - 0% - - - - 0% -
Door finised white laminated 62x296cm 1.835 m2 0.257 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 4.000 pcs 0.038 - 0% - - - - 0% -
Lever Handle ex. Dks LHTR 0017 SSS, 1.000 set 0.016 - 0% - - - - 0% -
Mortise lockcase ex. MTS IL DL 8585 SSS + cylinder CYL DC DL60MM SN 1.000 set 0.016 - 0% - - - - 0% -
Door Stoper ex. Dks DS 008 SSS 1.000 pcs 0.002 - 0% - - - - 0% -
3 D9 Single Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 100x50mm 5.100 m1 0.008 - 0% - - - - 0% -
Door Wood griile panel 72x210cm 1.512 m2 0.212 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 3.000 pcs 0.028 - 0% - - - - 0% -
Lever Handle ex. Dks LHTR 0017 SSS, 1.000 set 0.016 - 0% - - - - 0% -
Mortise lockcase ex. MTS IL DL 8585 SSS + cylinder CYL DC DL60MM SN 1.000 set 0.016 - 0% - - - - 0% -
Door Stoper ex. Dks DS 008 SSS 1.000 pcs 0.002 - 0% - - - - 0% -
4 D10 Folding Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 150x50mm 5.800 m1 0.009 - 0% - - - - 0% -
Door finised white laminated 241x40cm 2 unit 1.928 m2 0.270 - 0% - - - - 0% -
Door Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 6.000 pcs 0.056 - 0% - - - - 0% -
PP 105 115MM SSS 2.000 pcs 0.005 - 0% - - - - 0% -
cylinder CYL DC DL60MM SN 1.000 pcs 0.006 - 0% - - - - 0% -
ESCN D07 SSS 1.000 set 0.002 - 0% - - - - 0% -
Espanolet FB 040 12'' & 24" SSS 1.000 set 0.012 - 0% - - - - 0% -
5 D8 Single Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 330x50mm 5.100 m1 0.008 - 0% - - - - 0% -
Door finised white laminated 210x72cm 1.512 m2 0.212 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 3.000 pcs 0.028 - 0% - - - - 0% -
Lever Handle ex. Dks LHTR 0017 SSS, 1.000 set 0.016 - 0% - - - - 0% -
Mortise lockcase ex. MTS IL DL 8585 SSS + cylinder CYL DC DL60MM SN 1.000 set 0.016 - 0% - - - - 0% -
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
Door Stoper ex. Dks DS 008 SSS 1.000 set 0.002 - 0% - - - - 0% -
6 FG1 1.000 unit - - 0% - - - - 0% -
Aluminium frame black mate finish 40x50mm 21.160 m1 0.539 - 0% - - - - 0% -
10 mm tempered glass 25.456 m2 2.206 - 0% - - - - 0% -
7 FG2 1.000 unit - - 0% - - - - 0% -
Aluminium frame black mate finish 40x50mm 17.560 m1 0.447 - 0% - - - - 0% -
10 mm tempered glass 18.796 m2 1.629 - 0% - - - - 0% -
8 SD1 1.000 unit - - 0% - - - - 0% -
Aluminium frame black mate finish 75x50mm 19.560 m1 1.877 - 0% - - - - 0% -
10 mm tempered glass double 10.856 m2 0.780 - 0% - - - - 0% -
- 0 - - 0% - - - - 0% -
II FIRST FLOOR - 0 - - 0% - - - - 0% -
A LIGHT BRICK WALL - 0 - - 0% - - - - 0% -
1 Light brick 10 mm 240.000 m2 1.106 - 0% - 84.00 35% 0.387 84.00 35% 0.39
2 Light Brick 12 mm 16.000 m2 0.090 - 0% - - - - 0% -
B WALL FINISHING - 0 - - 0% - - - - 0% -
Render - 0 - - 0% - - - - 0% -
1 Plester Render 359.000 m2 1.646 - 0% - - - - 0% -
2 Smooth Render 359.000 m2 0.620 - 0% - - - - 0% -
3 Texture Render 131.000 m2 1.229 - 0% - - - - 0% -
4 Edge Render 375.573 m1 0.435 - 0% - - - - 0% -
5 Skoningan Render 24.250 m1 0.062 - 0% - - - - 0% -
0 Exterior Wall Finishing - 0 - - 0% - - - - 0% -
1 Painted Finish Wall (W3) Texture 131.000 m2 0.627 - 0% - - - - 0% -
2 Painted Finish Wall (W4) 62.000 m2 0.301 - 0% - - - - 0% -
3 Shadow Line Façade Stainless 120.573 m1 0.428 - 0% - - - - 0% -
Interior Wall Finishing - m' - - 0% - - - - 0% -
1 Painted Finish Wall (W5) 297.000 m2 1.443 - 0% - - - - 0% -
2 Granit Tile 60x120 Wall (W7) 28.000 m2 0.921 - 0% - - - - 0% -
3 Shadow Line Stainles 84.500 m1 0.249 - 0% - - - - 0% -
C FLOOR FINISHING - 0 - - 0% - - - - 0% -
1 Granit Tile 60x60 Interior Area 105.000 m2 2.145 - 0% - - - - 0% -
2 White Pebbles Stone 7.000 m2 0.010 - 0% - - - - 0% -
D CEILLING FINISHING - 0 - - 0% - - - - 0% -
1 Ceiling Gypsum 9mm + Framework 66.000 m2 0.712 - 0% - - - - 0% -
2 Ceilling Moisture Shield 9mm + Framework 17.000 m2 0.232 - 0% - - - - 0% -
3 Cove Ceilling 9.000 m2 0.112 - 0% - - - - 0% -
4 Painted Ceilling + Compound 75.000 m2 0.511 - 0% - - - - 0% -
5 Painted Ceilling + Compound (Weathershield) 17.000 m2 0.047 - 0% - - - - 0% -
6 Ceilling Shadow Line 134.000 m1 0.407 - 0% - - - - 0% -
7 ralling 10mm Temperd glass 5.047 m1 0.437 - 0% - - - - 0% -
8 Skylight tempered glass10mm 16.781 m2 1.454 - 0% - - - - 0% -
Bolt Support @1m 25.650 bh 0.042 - 0% - - - - 0% -
40mm anglebar with steel plate and anchor 12.825 m1 0.048 - 0% - - - - 0% -
8 Finshing Planter "Texture Render" 11.600 m2 0.109 - 0% - - - - 0% -
E DOORS AND WINDOWS - 0 - - 0% - - - - 0% -
1 D3a Single Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 40x100mm 6.300 m1 0.009 - 0% - - - - 0% -
Door finised white laminated 267x84cm 2.243 m2 0.314 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 4.000 pcs 0.038 - 0% - - - - 0% -
Lever Handle ex. Dks LHTR 0017 SSS, 1.000 set 0.016 - 0% - - - - 0% -
Mortise lockcase ex. MTS IL DL 8585 SSS + cylinder CYL DC DL60MM SN 1.000 set 0.016 - 0% - - - - 0% -
Door Stoper ex. Dks DS 008 SSS 1.000 pcs 0.002 - 0% - - - - 0% -
2 D3b Single Swing Door 2.000 set - - 0% - - - - 0% -
Frame 40x100mm 6.300 m1 0.009 - 0% - - - - 0% -
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
Door finised white laminated 267x84cm 2.243 m2 0.314 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 4.000 pcs 0.038 - 0% - - - - 0% -
Lever Handle ex. Dks LHTR 0017 SSS, 1.000 set 0.016 - 0% - - - - 0% -
Mortise lockcase ex. MTS IL DL 8585 SSS + cylinder CYL DC DL60MM SN 2.000 set 0.032 - 0% - - - - 0% -
Door Stoper ex. Dks DS 008 SSS 1.000 pcs 0.002 - 0% - - - - 0% -
3 D4a Single Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 40x250mm 5.700 m1 0.008 - 0% - - - - 0% -
Door finised white laminated 237x84cm 1.991 m2 0.279 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 3.000 pcs 0.028 - 0% - - - - 0% -
Lever Handle ex. Dks LHTR 0017 SSS, 1.000 set 0.016 - 0% - - - - 0% -
Mortise lockcase ex. MTS IL DL 8585 SSS + cylinder CYL DC DL60MM SN 1.000 set 0.016 - 0% - - - - 0% -
Door Stoper ex. Dks DS 008 SSS 1.000 pcs 0.002 - 0% - - - - 0% -
4 D4b Single Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 40x250mm 5.700 m1 0.008 - 0% - - - - 0% -
Door finised white laminated 237x84cm 1.991 m2 0.279 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 3.000 pcs 0.028 - 0% - - - - 0% -
Lever Handle ex. Dks LHTR 0017 SSS, 1.000 set 0.016 - 0% - - - - 0% -
Mortise lockcase ex. MTS IL DL 8585 SSS + cylinder CYL DC DL60MM SN 1.000 set 0.016 - 0% - - - - 0% -
Door Stoper ex. Dks DS 008 SSS 1.000 pcs 0.002 - 0% - - - - 0% -
5 D5a Single Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 40x100mm 6.200 m1 0.009 - 0% - - - - 0% -
Door finised white laminated 267x74cm 1.976 m2 0.277 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 4.000 pcs 0.038 - 0% - - - - 0% -
Lever Handle ex. Dks LHTR 0017 SSS, 1.000 set 0.016 - 0% - - - - 0% -
Mortise lockcase ex. MTS IL DL 8585 SSS + cylinder CYL DC DL60MM SN 1.000 set 0.016 - 0% - - - - 0% -
Door Stoper ex. Dks DS 008 SSS 1.000 pcs 0.002 - 0% - - - - 0% -
6 D5b Single Swing Door 1.000 unit - - 0% - - - - 0% -
Frame 40x100mm 6.200 m1 0.009 - 0% - - - - 0% -
Door finised white laminated 267x74cm 1.976 m2 0.277 - 0% - - - - 0% -
Hinge ex.Dekson NRP ESS 316 4"x3"4mm 4BB 4.000 pcs 0.038 - 0% - - - - 0% -
Lever Handle ex. Dks LHTR 0017 SSS, 1.000 set 0.016 - 0% - - - - 0% -
Mortise lockcase ex. MTS IL DL 8585 SSS + cylinder CYL DC DL60MM SN 1.000 set 0.016 - 0% - - - - 0% -
Door Stoper ex. Dks DS 008 SSS 1.000 pcs 0.002 - 0% - - - - 0% -
7 D6a 1.000 unit - - 0% - - - - 0% -
10 mm tempered glass fix 2.077 m2 0.180 - 0% - - - - 0% -
10 mm tempered glass door 600x220cm 1.320 m2 0.114 - 0% - - - - 0% -
Hinge door glass SH 5301 (GW) PSS 3.000 pcs 0.058 - 0% - - - - 0% -
8 D6b 1.000 unit - - 0% - - - - 0% -
10 mm tempered glass fix 2.077 m2 0.180 - 0% - - - - 0% -
10 mm tempered glass door 600x220cm 1.320 m2 0.114 - 0% - - - - 0% -
Hinge door glass SH 5301 (GW) PSS 3.000 pcs 0.058 - 0% - - - - 0% -
9 D7 fix glaas and door glass 1.000 unit - - 0% - - - - 0% -
10 mm tempered glass fix 2.077 m2 0.180 - 0% - - - - 0% -
10 mm tempered glass door 600x220cm 1.320 m2 0.114 - 0% - - - - 0% -
Hinge door glass SH 5301 (GW) PSS 3.000 pcs 0.058 - 0% - - - - 0% -
- 0 - - 0% - - - - 0% -
11 SD2 1.000 unit - - 0% - - - - 0% -
Aluminium frame black mate finish 75x50mm 18.960 m1 1.820 - 0% - - - - 0% -
10 mm tempered glass double 9.971 m2 0.716 - 0% - - - - 0% -
- 0 - - 0% - - - - 0% -
12 SD3 1.000 unit - - 0% - - - - 0% -
6mm glass with 3.024 m2 0.087 - 0% - - - - 0% -
6mm glass 3.024 m2 0.087 - 0% - - - - 0% -
Aluminium frame 30x30mm 26.100 m1 0.665 - 0% - - - - 0% -
- 0 - - 0% - - - - 0% -
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
13 SD4 1.000 unit - - 0% - - - - 0% -
Frame door 200x25mm 6.400 m1 0.009 - 0% - - - - 0% -
white laminate finish sliding door 2.565 m2 3.402 - 0% - - - - 0% -
14 W1 1.000 unit - - 0% - - - - 0% -
Aluminium frame black mate finish 100x50mm 16.610 m1 1.550 - 0% - - - - 0% -
fix glass 10mm double tempered glass 9.069 m2 0.786 - 0% - - - - 0% -
swing glass window only 1.682 m2 0.146 - 0% - - - - 0% -
swing glass frame 50x50mm 6.880 m1 0.642 - 0% - - - - 0% -
15 W2a 1.000 unit - - 0% - - - - 0% -
Aluminium frame black mate finish 100x50mm 15.410 m1 1.438 - 0% - - - - 0% -
fix glass 10mm double tempered glass 7.347 m2 0.637 - 0% - - - - 0% -
swing glass window only 1.682 m2 0.146 - 0% - - - - 0% -
swing glass frame 50x50mm 6.880 m1 0.642 - 0% - - - - 0% -
16 W2b 1.000 unit - - 0% - - - - 0% -
Aluminium frame black mate finish 100x50mm 15.410 m1 1.438 - 0% - - - - 0% -
fix glass 10mm double tempered glass 7.347 m2 0.637 - 0% - - - - 0% -
swing glass window only 1.682 m2 0.146 - 0% - - - - 0% -
swing glass frame 50x50mm 6.880 m1 0.642 - 0% - - - - 0% -
17 W3 1.000 unit - - 0% - - - - 0% -
Aluminium frame black mate finish 100x50mm 7.600 m1 0.709 - 0% - - - - 0% -
swing glass 10mm window only 1.800 m2 0.156 - 0% - - - - 0% -
swing glass frame 50x50mm 7.200 m1 0.672 - 0% - - - - 0% -
18 screan area pump room 1.000 unit - - 0% - - - - 0% -
Bengkirai timber screen with 2/12 cm + finishing lazur 7.830 m2 0.194 - 0% - - - - 0% -
timber jamb 10/10 cm + finishing lazur 6.000 m1 0.062 - 0% - - - - 0% -
II POOL - 0 - - 0% - - - - 0% -
1 Granit Tile 60x60 Floor 36.000 m2 0.709 - 0% - - - - 0% -
2 Granit Tile 60x60 Wall 33.000 m2 0.668 - 0% - - - - 0% -
3 Stone Over Gutter 19.500 m' 0.289 - 0% - - - - 0% -
Border toping pool 3.550 m' 0.053 - 0% - - - - 0% -
4 Man Hole Pump Room 1200x60mm 2 buah 1.000 unit - - 0% - - - - 0% -
Pek. 40x3mm strip bar dan 40x40x5mm angle bar 1200x600mm 2.000 unit 0.077 - 0% - - - - 0% -
Concrate t=35mm 1.440 m2 0.011 - 0% - - - - 0% -
Serat Fiber mesh 2 layer 2.880 m2 0.001 - 0% - - - - 0% -
Granit Tile 60x60 Floor 1.440 m2 0.004 - 0% - - - - 0% -
- 0 - - 0% - - - - 0% -
6 Plate beton 1,8*1,5m diatas over flow pool 0.324 M3 - - 0% - - - - 0% -
Concrete K350 0.324 m3 0.016 - 0% - - - - 0% -
Rebar D10 1 layer 25.755 kg 0.013 - 0% - - - - 0% -
Bendrat Wire 0.386 kg 0.000 - 0% - - - - 0% -
Formwork 0.792 m2 0.011 - 0% - - - - 0% -
Finsshing deking 2/11 bengkirai 3.360 m2 0.089 - 0% - - - - 0% -
7 Plate beton outdor sower 850x1000x50mm 0.043 M3 - - 0% - - - - 0% -
Concrete K350 0.043 m3 0.002 - 0% - - - - 0% -
Rebar D10 1 layer 9.485 kg 0.005 - 0% - - - - 0% -
Bendrat Wire 0.142 kg 0.000 - 0% - - - - 0% -
Formwork 0.185 m2 0.003 - 0% - - - - 0% -
Finsshing deking 2/11 bengkirai 1.220 m2 0.032 - 0% - - - - 0% -
III WATERPROFING - - - 0% - - - - 0% -
1 Screed Rooftop 4.280 m3 0.103 - 0% - - - - 0% -
2 Screed Toilet Floor 21.000 m2 0.503 - 0% - - - - 0% -
3 Water proofing Toilet Floor 21.000 m2 0.028 - 0% - - - - 0% -
4 Waterproofing Toilet Wall 140.000 m2 0.185 - 0% - - - - 0% -
5 Waterproofing Roof Top 107.000 m2 0.141 - 0% - - - - 0% -
- 0% - - - - 0% -
No JOB DESCRIPTION Technical QTY
specification / WorkUnit
Method PREOGRESS OF WORK
WEIGHT
LAST WEEK (%) THIS WEEK (%) UNTIL THIS WEEK (%) Cost
1 2 3 4.000 5 QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT QTY PROGRESS WIEGHT
- 0% - - - - 0% -

TOTAL -
TOTAL LABOR PRICE + MATERIAL PRICE -
TOTAL MAIN BUILDING AND SWIMMING POOL STRUCTURE 100 16.776 11.748 28.524 -