Location: SAN NARCISO, ZAMBALES Subject: BOM FOR ASPHALT ROAD UNIT COST TOTAL DIRECT COST TOTAL INDIRECT COST TOTAL AMOUNT ITEM / DESCRIPTION QUANTITY MATERIALS LABOR EQUIPMENT MATERIALS LABOR EQUIPMENT CONT. 5% PROFIT 10% VAT 12% (TAX INCLUDED) I. General Requirement 1.1 Mobilization / Demobilization 1.00 lot 300,000.00 - - 300,000.00 15,000.00 37,800.00 352,800.00 1.2 Temporary Facilities 1.00 lot 52,800.00 45,000.00 52,800.00 45,000.00 - 4,890.00 12,322.80 115,012.80 1.3 Temporary Utilities (Electrical/Water Consumption) 1.00 lot GEN. CON. SUPPLIED 1.4 Site Safety Protection / Warning Devices 1.00 lot 25,000.00 83,700.00 45,000.00 25,000.00 83,700.00 45,000.00 7,685.00 19,366.20 180,751.20 1.5 As-built, Shop drawings, Reports, Submittals 1.00 lot 5,000.00 100,000.00 5,000.00 100,000.00 - 5,250.00 13,230.00 123,480.00 1.6 Project Overhead, Supervision and Administrative Cost 1.00 lot 322,000.00 - 322,000.00 - 16,100.00 40,572.00 378,672.00 1.7 Worker's Permits & Clearances 1.00 lot 28,750.00 - 28,750.00 - 1,437.50 3,622.50 33,810.00 1.8 Testing and Commissioning 1.00 lot 187,000.00 - 187,000.00 - 9,350.00 23,562.00 219,912.00 1.9 Others (Please Specify) Workers Barracks / Apartment 1.00 lot 114,000.00 - 114,000.00 - 5,700.00 14,364.00 134,064.00 Workers Service 1.00 lot 60,000.00 - 60,000.00 - 3,000.00 7,560.00 70,560.00 Subtotal for General Requirements: 1,609,062.00 3. ROADWORKS Road Base Preparation ● Aggregate Base Course, 250mm thk. WMM - - Supply, Laying, Spreading and Compaction of well graded crushed rock aggregate base course to Wet Mix Macadam at Optimum Moisture Content in 3 uniform 3,018.75 cu.m 1,600.00 15.00 141.00 4,830,000.00 45,281.25 425,643.75 265,046.25 530,092.50 731,527.65 6,827,591.40 layers and compaction using Road Roller to achieve desired compaction density with 15% Compaction Shrinkage Asphalt Concrete Road / Bitumen Road Application of Tack Coat by hot straight run bitumen ● grade VG-30, including cleaning of road base surface, 10,500.00 sq.m 195.00 5.00 85.00 2,047,500.00 52,500.00 892,500.00 149,625.00 299,250.00 412,965.00 3,854,340.00 on WMM @ 0.75kg / Sq.m.
Providing and laying Dense Graded Bituminous
Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, hot mix transported using trippers, laying using asphalt ● 735.00 cu.m 24,825.00 25.00 162.50 18,246,375.00 18,375.00 119,437.50 919,209.38 1,838,418.75 2,537,017.88 23,678,833.50 paver of required grade, level and alignment, compacted with smooth wheeled vibra and tandem rollers upto desired compaction and density. Average compacted thickness 70mm of bitumen grade VG-30.
REMARKS/ NOTES/TERMS: 1.0 KERB STONE, SIDEWALK PAVING AND STONE PITCHING ON ROAD SHOULDER ARE NOT INCLUDED 2.0 SUBGRADE / CONSOLIDATED EARTH FILL IS ASSUMED TO BE FULLY COMPACTED AND ON GRADE OR FINISH GRADE LINE 2.0 WE REQUEST 30% DOWNPAYMENT ON THE WORKS COVERED FOR THE PROJECT 3.0 70% BALANCE WILL BE THRU PROGRESS BILLING 4.0 MOBILIZATION AND WORK COMMENCEMENT WILL BE AFTER DOWNPAYMENT Submitted By: B.P. ASUNCION TRADING AND CONSTRUCTION