MASDAR PROJECT

PROJECT 361

Date Conducted:
TOOL BOX TALK MEETING Location: STEELYARD AREA
Manpower:
Site Activity Hazard Identified Hazard Effect Preventive Measures

Steel Fixing (rebar, Manual Handling Serious injury 1. Experienced and trained steel fixers will be
Bending and Slips involved in cutting and bending and ensure
installation at the Trips adequate supervision.
First Level Fall from height 2. Steel fixers will wear suitable gloves,
Pinch point footwear and eye protection.
3. Unwanted/scrap materials will be removed
in order to eliminate slips, trips and falls.
4. Exposed vertical bars e.g. pile caps that are
sighted that expose personnel risk will be
bent, covered or protected by some other
means.
5. Proper platform should be provided,
6. Full Body Harness should be worn every
time and to be hooked always.
7. Complete scaffolding should be provided.
8. Close supervision.
9. Scaff – tag should be strictly followed.
10. Fire Extinguishers should be made available
on site always.

Prepared by: HSE Department Conducted by: Foreman/Charge Hand

_________________________
Safety Officer Foreman / Chargehand