REV: 01 SUMMARY DAILY WELDING REPORT


REPORT NO: 001 PROJECT TITTLE: Fabrication and installation of Agbada 1 W13S spool header.
DOC NO: SINL/002 DATE: 03/01/2024
CONTRACTOR: Step II International Nigeria Limited CLIENT: Heirs Energies Limited TOTAL PIPE LENGTH: 1.4m
AREA/LOCATION: Agbada I flow station EVALUATED MATERIAL GRADE: ASTM A106 Gr. B TOTAL WELD NO: 8jts

S/N WELD WELDING WALL PIPE WELDER’s VISUAL


NO RUNS/PASSES PROCESS THICKNESS SIZE NO INSPECTION REMARK
(mm) (Inch)
RP HP FP CP Acc Rej
1 FW001 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Flange-to-Elbow
2 FW002 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Elbow-to-Pipe
3 FW003 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Pipe-to-Equal tee
4 FW004 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Equal tee-to-Flange
5 FW005 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Equal tee-to-Pipe
6 FW006 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Pipe-to-Equal tee
7 FW007 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Equal tee-to-Flange
8 FW008 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Equal tee-to-Pipe
PREVIOUS WELD:
CUMMULATIVES WELD: 8jts
CONTRACTOR’S QC. ENGINEER HEL QA/QC REP
NAMES: NAMES:

SIGNATURE: SIGNATURE:

DATE: 03-01-2024 DATE: