Professional Documents
Culture Documents
Drainage West Employees
Drainage West Employees
SUMMARY:
This project aims to address the existing problem of flooding ( portion of west employees
village) brought about by heavy volume of rainwater that comes from the four sides of the
subdivision and drops at the lowest point of the property. This proposal aims to construct a
new drainage line as identified on the inspection conducted and as shown on the drawing
presented.
Project: Repair of Drainage System ( Portion)
PROJECT BACKGROUND:
This proposal came up after a recurring problem of flooding as shown on the drawing.
Highlighted by the recent typhoon, flooding have been a major problem in that area that affects
PROJECT VISION:
This proposal aims to solve the flooding problem on that area of the subdivision in line with the
vision of D.J. Perez & Co. Inc. to give a better subdivision experience to buyers and homeowners.
Project: Repair of Drainage System ( Portion)
EXPECTED BENEFITS:
Upon completion of this project, the recurring problem as identified upon inspection,
PROJECT TIMELINE:
This project will have a duration of 90 days from start of construction to project
completion.
PREPARED FOR :
PREPARED BY: