GENERAL COMMENTS:

1. Refer to the comments given in Rev. A of P11643-11-28-76-1672-1, and


calculation for this shelter. Ensure to incorporate any changes in next revision.
2. CONTRACTOR to follow proper drawing format. It is noticed that the line
weight, texts, logos, etc... are not in line with the approved format.
A B 3. Notes shall be checked particularly FGL and net soil bearing capacity. If the
area doesn't have ground improvement, ensure to revise the note accordingly.
4. CONTRACTOR to ensure that the reference coordinates indicated here
matched the 3D model.
5. Other comments as marked in the drawing.