SPECIFICATION

Introduction

Specification of work to be done and materials to be used at


Apartment 3A beach Buildings, Claxton Bay, the
construction of a new bathroom of Mrs. J Hobbs to the
satisfaction of:

Mr Joseph Smiles
Better Builders,
Jacaranda Avenue, Port of Spain

Wednesday, July 10th, 2011

GENERAL CONDITIONS AND PRELIMINARIES

The contractor shall be responsible for supplying all


materials, fixtures and fittings and shall leave the site tidy
and clean.

REMOVALS
Wall Remove wall between existing WC and small bedroom.
WC Remove existing WC.

CONSTRUCTION
Walls and doorways Construct new wall using plasterboard and wooden battens in
space left by old WC doorway.

FITTINGS
Bathroom suite Fit standard bathroom suite to new room to customer’s
specifications and choice with all necessary pipes and
plumbing.

Tile bath surrounding and above wash basin.